MONTHYEARL-2024-184, Radiological Emergency Plan Revision 772024-11-0505 November 2024 Radiological Emergency Plan Revision 77 L-2024-173, Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-31031 October 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles L-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2024-175, Cycle 34 Core Operating Report2024-10-24024 October 2024 Cycle 34 Core Operating Report ML24291A2882024-10-24024 October 2024 Westinghouse Topical Report - Request for Withholding Information from Public Disclosure L-2024-177, Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis2024-10-22022 October 2024 Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis ML24276A2302024-10-16016 October 2024 Westinghouse Topical Report – Request for Withholding Information from Public Disclosure L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes ML24289A2372024-10-15015 October 2024 Transmittal of Revision 1 Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) L-2024-157, Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-0303 October 2024 Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles IR 05000250/20243012024-10-0303 October 2024 NRC Operator License Examination Report 05000250/2024301 and 05000251/2024301 L-2024-147, Submission of Periodic Reports2024-10-0101 October 2024 Submission of Periodic Reports L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24269A1292024-09-24024 September 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis ML24260A2262024-09-18018 September 2024 NRC Examination Results Summary - Examination Reports: 05000250/2024301 and 05000251/2024301 ML24262A2272024-09-18018 September 2024 Transmittal of Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles ML24158A0052024-09-17017 September 2024 Completion of Subsequent License Renewal Site Specific Environmental Review and Modification to Subsequent Renewed Facility Operating Licenses L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24207A0342024-09-13013 September 2024 – Exemption from Certain Requirements of 10 CFR 50.46 for Use of Axiom Fuel Rod Cladding – Letter ML24256A1132024-09-13013 September 2024 Regulatory Audit Summary Related to the Review of Regarding the Updated Spent Fuel Pool Criticality Safety Analysis License Amendment Request IR 05000250/20240052024-08-23023 August 2024 Updated Inspection Plan for Turkey Point Units 3 & 4 - Report 05000250/2024005 and 05000251/2024005 ML24234A0062024-08-22022 August 2024 Project Manager Assignment L-2024-122, Core Operating Limits Report2024-08-12012 August 2024 Core Operating Limits Report L-2024-106, Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-022024-08-12012 August 2024 Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-02 ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-089, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-07-25025 July 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24184B2822024-07-16016 July 2024 – Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal 05000250/LER-2024-002-01, Condition Prohibited by Technical Specifications2024-07-10010 July 2024 Condition Prohibited by Technical Specifications ML24173A1902024-06-28028 June 2024 Withdrawal of an Amendment Request ML24159A2652024-06-26026 June 2024 Correction of Safety Evaluation for Issuance of Amendment Nos. 298 & 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-100, Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project2024-06-19019 June 2024 Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter IR 05000250/20244012024-06-0505 June 2024 – Security Baseline Inspection Report 05000250-2024401, 05000251-2024401 and 07200062-2024401 L-2024-076, Reply to Notice of Violation; NOV 05000250, 05000251/2024010-052024-05-29029 May 2024 Reply to Notice of Violation; NOV 05000250, 05000251/2024010-05 L-2024-082, 2023 Annual Radiological Environmental Operating Report2024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000250/20240012024-05-10010 May 2024 Integrated Inspection Report 05000250/2024001 and 05000251/2024001 ML24135A0942024-05-0909 May 2024 Periodic Update to the Updated Final Safety Analysis Report L-2024-060, 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report2024-05-0909 May 2024 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report ML24127A1862024-05-0909 May 2024 Request for Withholding Information from Public Disclosure ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-073, Cycle 34 Core Operating Limits Report2024-05-0101 May 2024 Cycle 34 Core Operating Limits Report L-2024-072, Cycle 33 Core Operating Limits Report2024-05-0101 May 2024 Cycle 33 Core Operating Limits Report L-2024-048, Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision2024-04-30030 April 2024 Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision L-2024-069, Radiological Emergency Plan Revision 762024-04-22022 April 2024 Radiological Emergency Plan Revision 76 L-2024-066, Sixth 10-Year Inservice Testing Interval Relief Request No. PR-022024-04-17017 April 2024 Sixth 10-Year Inservice Testing Interval Relief Request No. PR-02 2024-09-25
[Table view] Category:Operating Report
MONTHYEARL-2022-039, and Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2022-04-14014 April 2022 and Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2021-097, and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report2021-05-13013 May 2021 and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report L-2021-096, 10 CFR 50.59(d)(2) Summary Report2021-05-11011 May 2021 10 CFR 50.59(d)(2) Summary Report L-2021-018, 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report2021-02-16016 February 2021 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report L-2020-065, Submission of Periodic Reports2020-04-0909 April 2020 Submission of Periodic Reports ML18227A9832018-08-15015 August 2018 Submit First Year Operation Report. L-2008-245, Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/082008-11-10010 November 2008 Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/08 L-2007-053, Annual Radiological Environmental Operating Report2007-05-0404 May 2007 Annual Radiological Environmental Operating Report L-2004-097, Annual Radiological Environmental Operating Report2004-05-11011 May 2004 Annual Radiological Environmental Operating Report ML18227B0771978-03-17017 March 1978 03/17/1978 Letter Operating Summary Reports of February 1978 ML18227A4231978-03-0404 March 1978 Attached February, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0631978-03-0404 March 1978 03/04/1978 Letter Operating Status Reports of February 1978 ML18227A4221978-02-14014 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0641978-02-14014 February 1978 02/14/1978 Letter Operating Status Reports of January 1978 ML18227A4211978-02-0404 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0651978-02-0404 February 1978 02/04/1978 Letter Operating Status Reports of January 1978 ML18227A4201978-01-0707 January 1978 Attached December, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0671978-01-0707 January 1978 01/07/1978 Letter Operating Status Reports of December 1977 ML18227A4191977-12-0303 December 1977 Attached November, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0681977-12-0303 December 1977 12/03/1977 Letter Operating Status Reports of November 1977 ML18227A4171977-11-0505 November 1977 Attached October, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0691977-11-0505 November 1977 11/05/1977 Letter Operating Status Reports of October 1977 ML18227B0701977-10-0505 October 1977 10/05/1977 Letter Operating Status Reports of September 1977 ML18227B0711977-09-0303 September 1977 09/03/1977 Letter Operating Status Reports of August 1977 ML18227A4151977-09-0303 September 1977 Attached August, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0731977-08-0505 August 1977 08/05/1977 Letter Operating Status Reports of July 1977 ML18227A4141977-08-0505 August 1977 Attached July, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0741977-07-0707 July 1977 07/07/1977 Letter Operating Status Reports of June 1977, and a Revised Operating Data Report for May 1997 for Turkey Point Unit 3 ML18227A4131977-07-0707 July 1977 Attached June, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. May, 1977 for Unit 3 Incorrectly Reported for Some Values. Attached Revised May, 1977 Operating Data Report for Unit 3 ML18227B0751977-06-0606 June 1977 06/06/1977 Letter Operating Status Reports of May 1977 ML18227A4121977-06-0606 June 1977 Attached May, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0761977-05-0505 May 1977 05/05/1977 Letter Operating Status Reports of April 1977 ML18227A4111977-05-0505 May 1977 Attached April, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227A4101977-04-0404 April 1977 Attached March, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. Maximum Dependable Capacity (MWe-Net) for St. Lucie No. 1 Was Revised from 802 MWe-Net to 777 MWe-Net (Estimated) ML18227B0781977-04-0404 April 1977 04/04/1977 Letter Operating Status Reports of March 1977 ML18227B0791977-03-0707 March 1977 03/07/1977 Letter Operating Status Reports of February 1977 ML18227A4091977-03-0707 March 1977 Attached February, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0801977-02-0707 February 1977 02/07/1977 Letter Operating Status Reports of January 1977 ML18227B0811977-01-0707 January 1977 01/07/1977 Letter Operating Status Reports of December 1976 ML18227A4081977-01-0707 January 1977 Attached December, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0821976-12-0606 December 1976 12/06/1976 Letter Operating Status Reports of November 1976 ML18227B0831976-11-15015 November 1976 11/15/1976 Letter Corrected Copies of Operating Data Reports for October 1976 ML18227B0841976-11-0808 November 1976 11/08/1976 Letter Operating Status Reports of October 1976 ML18227A4061976-11-0808 November 1976 Attached October, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227A4071976-11-0505 November 1976 Attached Corrected Copies of October, 1976 Operating Data Reports for Turkey Point Unit Nos. 3 and 4 ML18227A4051976-10-0808 October 1976 Attached September, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0861976-09-0707 September 1976 09/07/1976 Letter Operating Status Reports of August 1976 ML18227A4031976-09-0707 September 1976 Attached August, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0871976-08-0505 August 1976 08/05/1976 Letter Operating Status Reports of July 1976 ML18227A4021976-08-0505 August 1976 Attached July, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. St. Lucie Unit No. 1 Was Previously Reported to Be in Commercial Operation, in Error. Attached Corrected June 1976 for St. Lucie No. 1 2022-04-14
[Table view] |
Text
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
DISTRIBUTION FOR INCOMING MATERIAL 50-2 /251 335
<<EC ORG: SCMMIDT A D DQCDATE: 02/04/78 NRC FL PWR 5 LIGHT 'DATE RCVD: 02/13/78 l 3OCTYPE: OTHER NOTARIZED: NO COPIES RECEIVED
SUBJECT:
LTR 1 ENCL 1
=ORWARDING MONTHLY OPERATING REPT FOR SUBJECT FACILITY"S 3 8c 4 AND SUB JECT FACILITY UNIT 1.
-LANT NAME: TURKEY POINT UNIT 3 REVIEWER INITIAL: X JM TURKEY POINT UNIT 4 DISTRIBUTER INITIAL:
ST. LUC I E UNIT 1 DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS
-""MONTHLY:OPERATING 'REPORTFOR,. GRAY BOOK .PREPARATION.
( DISTRIBUTION CODE A003)
FOR ACTION: BRANCH 83@F LEAR44W/2 ENCL INTERNAL: EG FILE++W/ENCL NRC PDR44W/ENCL OR ++W/2 ENCL EXTERNAL: LPDR S MIAMI, FL~~W/ENCL TIC++W/ENCL NS I C~~W/ENCL BNL(NATLAB>++W/ENCL ACRS CAT 8++W/0 ENCL DISTRIBUTION: LTR 10 ENCL 10 CONTROL N 780440061 SIZE: 1 P+3P+8P THF FND %%4%4 4%%%%%4%%%%%%%%%%%4%
l
I, 5 ~ FLORIDA POWER 8 LIGHT COMPANY February 4, 1978 Ply PlQ5L) lcd.gcwy CCmIS;.'cw hQI ~:ic~
~
Office of Management Information and Program Controls U. S. Nuclear Regulatory Commission Washington,,D. C. 20555 Gentlemen:
Attached are the January, 1978, Operating Status Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit No. 1.
Very truly yours, D. Schmo.
Vice President t
Power Resources VTC/DDC CC: Mx. James P. O'Reilly Robert Lowenstein, Esquire 780440061 PEOPLE... SERVING PEOPLE
AVERAGE DAILY le IT POWER LEVEL DOCKET i'. 50 250 Turkey Poinh UNIT U DATE F . 4 78 COMPLETED SY V. T. C et)
MONTH JANUARY 1978 DAY AVERAGE DAILY POWER .LEVEL DAY AVEBAGE DAILY POWER LEVEL (Mt'-Net) (Kfe-if 18 3 1.9 20 22 23 24 25 10 26.
27 12 28 13 29 14 30 31
OPERATING DATA REPORT DOCKET iVO.,
DATE Feb.A 197B COMPLETED BY ~~iLLLeoe TELEPHONE C~~-3824 OPERATING STATUS Turke Point Unit No. 3 Notes - Unit No. 3'.scheduled I. Unit Name: refueling, maintenance, and
~. Reporting period: Januar 1978 2200 inspections continued.
- 3. Licensed Thermal Power (MWt):
- 4. Namephte Rating (Gross elf We): 760
- 5. Design Electricai Rating (Net LifWe):
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net iaaf We):
- 8. If Changes Occur in Capacity Ratings (Items iVumber 3 Through 7) Since Last Report, Give Reasons:
h
- 9. Power Level To which Restricted, IfAny (iVet MWe): NONE
- 10. Reasons For Restrictions, If Any:
This Month Yr:to-Date Cumuh tive Il. Hours In Reporting Period 744.0 744.0 45'225.6
- 12. Number Of Hours Reactor Was Critical 35 225.
'3. Reactor Reserve Shutdown Hours 1
- 14. Hours Generator On-Line 4 .4
- 15. Unit Reserve Shutdown Hours 85.0
- 16. Gross Thermal Energy Generated (MWH) <<0- 66 774
- 17. Gross Electrical Energy Generated'(MWH) . 21 284 345
- 18. Net Electrical Energy Generated (MWH) 2 240
- 19. Unit Service Factor 7 .4
- 20. Unit Availability Factor.
75.6 ZI. Unit Capacity Factor (Using MDC i et) ' 66.9
- 22. Unit Capacity Fahctor (Using DER i let)
- 23. Unit Forced Outage Rate 2. 8'
- 24. Shutdowns Scheduled Over Next 6 Months ( Type, Date, and Duration of Eachl:
Feb. 1'2 1978
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status {Prior to Commercial Operation): Forecast Achieved INITlAL CRITICA'L'ITY INITIALELECTRICITY COMMERCIAL OPERATlON (u/77 )
DOCKET NO.
UNIT SIIUTDOWNS AND POiUER REDUCTIONS REPORT MONTII JANUARY 1978
) I a Licensee
)) Vl Cause & Corrective o 0
)
t) Action to NI). Date m ~Cd Event CJ Eo 0 Prevent Rccurrcnce
~ C/) Rcport rF 28 77-11-23 S 744.0 N/A N/A N/A Unit No. 3 was removed from service for scheduled refueling, maintenance, and inspections. (Continued from previous month) (Nuclear and non-nuclear systems)
I 3 F: I'ofccil Reason: ' Metliod: Exhibit G - Instructions S: Scheduled A-Equipmcnt Failure (Explain) -Manual for Preparation of Data II Maintenance or Test 2.Manual Scrain. Entry Shccts for Licensee C-Rcfucling 3-Automatic Scraiii. Event Report (LER) File (NUREG-D-Regulatory Restriction 4.Other (Explain) OI6)
E-Opcralor Training & Liccnsc Fxamination F-Administrative 5 G.Operational Eiror (Explain) Exhibit I - S~in). Sour<<
I I.Olhcr (Explain)
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 251 Turkey Point UNIT Unit No. 4 DATE Feb. 4 1978 CO>PLETED BY V. T. Chilson TELEPHONE 305 552-3824 HOhTH JANUARY 1978 DAY AVERAGE DAILY POWER, LEVEL DAY AVERAGE DAILY POWER L VEL
.(Kfe-Net) (Mle-Net) 671 675 666 18 664 667 19 659 673 20 65'9 5 672 21. 667 662 22 674 670 23 668 8 668 24 660
'6'49 '28 9 25 10 678- 646 683 27 669 12 682 28 674 13 675 29 677 14 675 30 678 15 676 31 675 677 NOTE: Average daily aower greater than 666 MWe due to cooler condenser cooling water.
OPERATING DATA REPORT DOCKET NO. ~0-2 DATE Feb.4 1978 COAIPLETED BY ~~II',eon ZK~~2-3824 TELEPHOiVE OPERATliVG STATUS Turke Point Unit No. 4 Notes Unit No. 4 operated
- l. Unit 4Vame:
at approximately 100/ R p
~. Reporti'ng period: January, 1978 except for outage of Jan. 25,
- 3. Licensed Thermal Power (iiIWt):
1978.
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net 4%IWe):
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. 4Maximum Dependable Capacity (Net iBIWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To 1Vhich Restricted, IfAny (Net MWe):
- 10. Reasons For Restrictions, If Any:
This Month Yr.-to-Date Cumulative 744.
- 12. Number Of Hours Reactor Was Critical 734.4 734. 4 ~2
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line 732.9
- 15. Unit Reserve Shutdown Hours 16.
A Gross Thermal Energy Generated (i%I WH) 1 601 257
~ ~ '" e"") 489 98.5
- 19. Unit Service Factor
- 20. Unit Avaihbility Factor 98.5 98.5
- 21. Unit Capacity Factor (Using MDC Net) 98.7
~". Unit Capacity Factor (Using DER Net) 94.9
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 I~Ionths (Type, Date, and Duration of Each):
Steam Generator Ins ectio Feb.
1
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup: N/A
- 26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved li llTIALCRITICALITY INITIAL ELECTRICITY
251 DOCKET NO. 50 UNIT Sl[UTDOWNS AND POWER REDUCTIONS it .No. 4 REPORT MON fn JANUARY 1978 552- 824 P> Q Cause &, Corrective 0
Licenscc tI(I4 p pC El p
N(>. Date ~ II Event ~ Aclion lo J
Report ((f u) o Eo p Prevent Rccurrcnce
~ (I>
Q o
Cl 78-01-25 11.1 B 1 N/A N/A N/A Unit No. 4 was removed from service
'to perform integrated safeguards surveillance test. (Nuclear system) 4 F: Forced Reason: Method: Exhibit G - Instruclions S: Scheduled A-E(luipment Failure (Explain) I-Manual for Preparation ol Data B.Maintenance or Test 2.Manual Scram. Fnlry Sheets for Licensee C-Retueling 3-Aulon>atic Scram. Evcnl Report (LER) File INUREG.
D-Regulatory Restriction 4.Other (Explain) 0 I6 I )
E.Operalor Training &, Liccnsc Examination F-Administrative G.Opcralional Error (Explain) Exhibit I - Sa>nc Source
((I/77) I I-Olhcr (Explain)
AVERAGE DAlLY UNIT POWER LEVEL DOCKET NO.
St. Lucie UNIT Unit No. 1 DATE Feb. 4, 1978 COa~PLETED BY V. T. Chilson TELEPHONE (305) 552-3824 MONTH JANUARY, 1978 DAY AVERAGE DAILY POWER,LEVEL DAY AVERAGE DAILY POWER LEVEL
(%Le-Net) (M!le-Net) 800 761 801 18 760 783 19 790 771 20 791 727 21 791 "6 661 22 707 752 23 799 24 798 25 84 10 799 26 756 793 27 762 12 801 28 667 13 618 29 172 788 30 494 698 31 471
,16 685 NOTE: Average daily power greater than 777 EÃe due to cooler condenser cooling water.
OPERATING DATA REPORT DOCKET NO.. 50-335 DATE Zeh.~~978 CD'liPLETED BY ~Y.. Chi son TELEPHONE ~0 ~2-3824 OPERATliVG STATUS St. Lucie Unit No. 1 Unit No. 1 operated January 1978 at approximately 100X R.P.
- g. Reporti'ng period: for 2560 except outages of Jan;13
- 3. Licensed Thermal Power (MWt):
850 23, 28, 29- and 31, 1978.
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
802
- 6. Maximum Dependable Capacity (Gross MWe): 822
- 7. Maximum Dependable Capacity (Net L~IWe): 777
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted, If Any.(Net MWe): NONE
- 10. Reasons For Restrictions, If Any:
This Month Yr:to-Date Cumulative
- 11. Hours In Reporting Period 744.0 667.
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line 653.4 8
- 15. Unit Reserve Shutdown pours
'6. Gross Thermal Energy Generated (MWH) 1 569 897
- 17. Gross Electrical Energy Generated (MWH) '513 ~70
- 18. Net Electrical Energy Generated (MWH) 483 157
- 19. Unit Service Factor 87.8
- 20. Unit Availability Factor Sss .
- 21. Unit Capacity Factor (Using MDC Net) 83 6
- 22. Unit Capacity Factor (Using-DER Net) 81.0.
- 23. Unit Forced Outage Rate 4.7
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date,and Duration of Each):
Refuelin maintenance and. ins I
- 25. IfShut Down At End Of Report Period. Estimated Date of Startup: N/A
- 26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COLilMERCIALOPERATION
DOCKET NO.
UNIT SIIUTDOWNS AND POWER REDUCTIONS DATF Feb. 4 1978 COMPLETED BY REPORT MONTII JANUARY 1978 Pa e 1 of 3 fP~
C er c '> Liccnsec
~w P Cause Er. Corrective
~I 5 Q p 0D Dale 0 j Event Q Action lo
)a I- Cl
¹ E~ Prevent Recurrence
~M Report 0 CJ
~
78-01-13 .3. 7 A 3 N/A RB CRDRVE Unit was tripped by reactor protectio system caused by rapid insertion of a CEA. Corrective actions included im-provements to CEA power supply system.
(Nuclear system) 78-01-23 S 57.3 N/A CB VESSEL Unit was removed from service to re-place failed gasket on pressurizer manway closure. (Nuclear system) 78-01-28 9.0 N/A INSTRU Unit 'was tripped by actuation 'of loss (c) of field relay caused by intermittent.
-loss of power supply to generator voltage regulator. (Non-nuclear
.system) 3 4 F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A.Equipmcnt Failure (Explain) '.Manual for Preparation ol'ata B.hlaintcnance or Test 2.hIaoual Scram. Entry Sheets for Ltceoscc C.Refueling 3-Autotoatic Sera>o. Event Report (LER) File (NURLG-D.Rcgul at ory Rest riel ion 4.Other (Explain) OI6l )
I'. Operator Training h License Exatoinalion F-Administrative G Operational Error (Explaitt) Exhibit I - Satnc Source
('t/77) I I-Other (Explain)
DOCKET NO.
UNIT SIIUTDOWNS AND POWER REDUCTIONS UNIT NAME St. I.ticie Unit No. 1 DATE Feb. 4 1978 COMPLETED IIY V. T. Chilson REPORT MON fII JANUARY, 1978 TELEPlIONE Page 2 of 3 ftj P i a Q Licenscc EI Cause &, Currcclivc o'-" u 0 Nii. Date Event Action to Rcport ¹ Eo 0 Prcvcnt Rccurrcnce
~ch g V 4 78-01-29 0.3 N/A zzz Unit was tripped by steam generator level protection system due to a tran ient condition while increasing load after the unit was returned to servic (Non-nuclear system) 78-01-29 7. 2 N/A HA INSTRU Unit was tripped by actuation of loss (c) of field relay caused by intermittent loss of power supply to generator voltage regulator. (Non-nuclear system) 78-01-29 7.7 A 3 N/A INSTRU Unit was tripped by actuation of loss (c) of field relay caused by intermittent loss of power supply to generator voltage regulator (Non-nuclear system)
I .3 F: Forced Reason: ' Method: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) -Manual for Preparation oi'Data II-Maintenance or Test 2-Manual Scram. Entry Sl>ccts for Licensee C-Refueling 3-Auloioatic Scratn. Event Rcport (LER) File (NUREG-D Regulatory Rcstrtclion 4.Other (Explain) Ol 6 I )
E.Operator Training &. Liccosc Exatoioatlon 'I F-Administrative 5 G.Operational Error (Explain) Exhibit I - Sante Source I')/77) II Otltcr (Explain)
~ ~
4 DOCKET NO.
UNIT SIIUTDOWNS AND POSER REDUCTIONS UNIT NAME St ~ Lucie Unit No, 1 COMI'LETED DY. V. T Chilson REPORT MONTII JANUARY 1978 Page 3 of 3 r4 A J Licensee
~J Cause 84 Corrcctivc O O 0 4J Q O Action to No. Date ~ A m os Event
¹ Eu
~Q ~
Q Prevent Rccurrcnce U) Rcport O Q
78-01-31 5.4 A N/A INSTRU Unit was tripped by actuation of loss (c) of field relay caused by intermittent loss of power supply to generator voltage regulator. Corrective actions included locating and repair-ing intermittent high resistence connections in voltage regula'tor power supply system. (Non-nuclear system) 3 F: Forced Reason: Method: Exhibit G - Instructions S: Schcllulcd A.E4luipmcnt Failure (Explain) I -hlanual for Prcparatton of Data II.Maintenance or Test 2.Manual Scram. Entry Shccts lor Liccnsec C Rci uclhlg 3-Autolnatic Scratn. Event Report (LER) File (NURI!G-D-Regulatory Restriction 4-Other (Explaul) 016I )
E-Operator Training h. Liecnsc Exatnination I'-Administrative 5 G.Operational Error (Explain) Exhibit I - Salne Source
('t/77) I I Other (Explahl)
h C