Category:Letter
MONTHYEARL-2024-184, Radiological Emergency Plan Revision 772024-11-0505 November 2024 Radiological Emergency Plan Revision 77 L-2024-173, Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-31031 October 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles L-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums ML24291A2882024-10-24024 October 2024 Westinghouse Topical Report - Request for Withholding Information from Public Disclosure L-2024-175, Cycle 34 Core Operating Report2024-10-24024 October 2024 Cycle 34 Core Operating Report L-2024-177, Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis2024-10-22022 October 2024 Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis IR 05000335/20250102024-10-21021 October 2024 Notification of St. Lucie Plant Units 1 & 2 Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000335/2025010 and 05000389/2025010 ML24227A9702024-10-18018 October 2024 Letter to Kenneth Mack Dir, License and Reg Compliance, NextEra Energy, Inc Response to Request Re Engagement Re Sub License Renewal Environmental Review - St Lucie Nuclear Plant 1 and 2 ML24276A2302024-10-16016 October 2024 Westinghouse Topical Report – Request for Withholding Information from Public Disclosure ML24289A2372024-10-15015 October 2024 Transmittal of Revision 1 Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles L-2024-085, Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results2024-10-15015 October 2024 Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes L-2024-165, Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made2024-10-14014 October 2024 Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) L-2024-157, Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-0303 October 2024 Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles IR 05000250/20243012024-10-0303 October 2024 NRC Operator License Examination Report 05000250/2024301 and 05000251/2024301 L-2024-147, Submission of Periodic Reports2024-10-0101 October 2024 Submission of Periodic Reports ML24255A3092024-09-30030 September 2024 SLRA - Revised SE Letter L-2024-155, Subsequent License Renewal Application, Third Annual Update2024-09-27027 September 2024 Subsequent License Renewal Application, Third Annual Update L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes 05000335/LER-2024-001, Unplanned Reactor Scram2024-09-25025 September 2024 Unplanned Reactor Scram ML24269A1292024-09-24024 September 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis ML24260A2262024-09-18018 September 2024 NRC Examination Results Summary - Examination Reports: 05000250/2024301 and 05000251/2024301 ML24262A2272024-09-18018 September 2024 Transmittal of Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles IR 05000335/20240112024-09-18018 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000335/2024011 and 05000389/2024011 ML24158A0052024-09-17017 September 2024 Completion of Subsequent License Renewal Site Specific Environmental Review and Modification to Subsequent Renewed Facility Operating Licenses L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24207A0342024-09-13013 September 2024 – Exemption from Certain Requirements of 10 CFR 50.46 for Use of Axiom Fuel Rod Cladding – Letter ML24256A1132024-09-13013 September 2024 Regulatory Audit Summary Related to the Review of Regarding the Updated Spent Fuel Pool Criticality Safety Analysis License Amendment Request L-2024-138, License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles2024-09-11011 September 2024 License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles L-2024-148, Submittal of Offsite Dose Calculation Manual (Odcm), Revision 552024-09-0909 September 2024 Submittal of Offsite Dose Calculation Manual (Odcm), Revision 55 IR 05000250/20240052024-08-23023 August 2024 Updated Inspection Plan for Turkey Point Units 3 & 4 - Report 05000250/2024005 and 05000251/2024005 ML24234A0062024-08-22022 August 2024 Project Manager Assignment IR 05000335/20240052024-08-22022 August 2024 Updated Inspection Plan for St. Lucie, Units 1 & 2 - Report 05000335/2024005 and 05000389/2024005 L-2024-133, Snubber Program Plan Submittal2024-08-14014 August 2024 Snubber Program Plan Submittal L-2024-140, Cycle 28 Core Operating Limits Report2024-08-14014 August 2024 Cycle 28 Core Operating Limits Report IR 05000335/20240022024-08-13013 August 2024 Integrated Inspection Report 05000335-2024002 and 05000389-2024002 L-2024-132, 2024 Population Update Analysis2024-08-13013 August 2024 2024 Population Update Analysis L-2024-122, Core Operating Limits Report2024-08-12012 August 2024 Core Operating Limits Report L-2024-106, Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-022024-08-12012 August 2024 Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-02 L-2024-129, Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval2024-08-0707 August 2024 Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval 05000389/LER-2024-003, Unplanned Reactor Scram2024-08-0505 August 2024 Unplanned Reactor Scram ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-121, Subsequent License Renewal Commitment 30 Revision2024-07-30030 July 2024 Subsequent License Renewal Commitment 30 Revision L-2024-123, Submittal of In-Service Inspection Program Owners Activity Report (OAR-1)2024-07-29029 July 2024 Submittal of In-Service Inspection Program Owners Activity Report (OAR-1) L-2024-089, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-07-25025 July 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24184B2822024-07-16016 July 2024 – Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan 05000389/LER-2024-002-01, Safety Injection Tank Vent Through Wall Leakage2024-07-11011 July 2024 Safety Injection Tank Vent Through Wall Leakage 2024-09-09
[Table view] Category:Operating Report
MONTHYEARL-2023-051, Report of 10 CFR 50.59 Plant Changes2023-04-0404 April 2023 Report of 10 CFR 50.59 Plant Changes L-2022-039, and Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2022-04-14014 April 2022 and Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2022-016, Report of 10 CFR 50.59 Plant Changes2022-02-28028 February 2022 Report of 10 CFR 50.59 Plant Changes L-2021-097, and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report2021-05-13013 May 2021 and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report L-2021-096, 10 CFR 50.59(d)(2) Summary Report2021-05-11011 May 2021 10 CFR 50.59(d)(2) Summary Report L-2021-018, 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report2021-02-16016 February 2021 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report L-2020-065, Submission of Periodic Reports2020-04-0909 April 2020 Submission of Periodic Reports ML18227A9832018-08-15015 August 2018 Submit First Year Operation Report. L-2017-165, Report of 10 CFR 50.59 Plant Changes2017-09-20020 September 2017 Report of 10 CFR 50.59 Plant Changes L-2012-367, Cycle 20 Core Operating Limits Report2012-10-0202 October 2012 Cycle 20 Core Operating Limits Report L-2012-169, Annual Radiological Environmental Operating Report for Calendar Year 20112012-04-24024 April 2012 Annual Radiological Environmental Operating Report for Calendar Year 2011 L-2009-284, Submittal of Report of Changes, Tests & Experiments for Period April 4, 2008 Through June 13, 20092009-12-10010 December 2009 Submittal of Report of Changes, Tests & Experiments for Period April 4, 2008 Through June 13, 2009 L-2008-245, Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/082008-11-10010 November 2008 Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/08 L-2007-053, Annual Radiological Environmental Operating Report2007-05-0404 May 2007 Annual Radiological Environmental Operating Report L-2005-101, Inservice Inspection Program Third Interval - First Period - First Outage (SL2-15) Owner'S Activity Report (OAR-1)2005-05-0202 May 2005 Inservice Inspection Program Third Interval - First Period - First Outage (SL2-15) Owner'S Activity Report (OAR-1) L-2004-097, Annual Radiological Environmental Operating Report2004-05-11011 May 2004 Annual Radiological Environmental Operating Report ML18227B0771978-03-17017 March 1978 03/17/1978 Letter Operating Summary Reports of February 1978 ML18227B0631978-03-0404 March 1978 03/04/1978 Letter Operating Status Reports of February 1978 ML18227A4231978-03-0404 March 1978 Attached February, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0641978-02-14014 February 1978 02/14/1978 Letter Operating Status Reports of January 1978 ML18227A4221978-02-14014 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0651978-02-0404 February 1978 02/04/1978 Letter Operating Status Reports of January 1978 ML18227A4211978-02-0404 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0671978-01-0707 January 1978 01/07/1978 Letter Operating Status Reports of December 1977 ML18227A4201978-01-0707 January 1978 Attached December, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0681977-12-0303 December 1977 12/03/1977 Letter Operating Status Reports of November 1977 ML18227A4191977-12-0303 December 1977 Attached November, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0691977-11-0505 November 1977 11/05/1977 Letter Operating Status Reports of October 1977 ML18227A4171977-11-0505 November 1977 Attached October, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0701977-10-0505 October 1977 10/05/1977 Letter Operating Status Reports of September 1977 ML18227A4151977-09-0303 September 1977 Attached August, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0711977-09-0303 September 1977 09/03/1977 Letter Operating Status Reports of August 1977 ML18227A4141977-08-0505 August 1977 Attached July, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0731977-08-0505 August 1977 08/05/1977 Letter Operating Status Reports of July 1977 ML18227A4131977-07-0707 July 1977 Attached June, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. May, 1977 for Unit 3 Incorrectly Reported for Some Values. Attached Revised May, 1977 Operating Data Report for Unit 3 ML18227B0741977-07-0707 July 1977 07/07/1977 Letter Operating Status Reports of June 1977, and a Revised Operating Data Report for May 1997 for Turkey Point Unit 3 ML18227A4121977-06-0606 June 1977 Attached May, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0751977-06-0606 June 1977 06/06/1977 Letter Operating Status Reports of May 1977 ML18227A4111977-05-0505 May 1977 Attached April, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0761977-05-0505 May 1977 05/05/1977 Letter Operating Status Reports of April 1977 ML18227A4101977-04-0404 April 1977 Attached March, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. Maximum Dependable Capacity (MWe-Net) for St. Lucie No. 1 Was Revised from 802 MWe-Net to 777 MWe-Net (Estimated) ML18227B0781977-04-0404 April 1977 04/04/1977 Letter Operating Status Reports of March 1977 ML18227B0791977-03-0707 March 1977 03/07/1977 Letter Operating Status Reports of February 1977 ML18227A4091977-03-0707 March 1977 Attached February, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0801977-02-0707 February 1977 02/07/1977 Letter Operating Status Reports of January 1977 ML18227B0811977-01-0707 January 1977 01/07/1977 Letter Operating Status Reports of December 1976 ML18227A4081977-01-0707 January 1977 Attached December, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0821976-12-0606 December 1976 12/06/1976 Letter Operating Status Reports of November 1976 ML18227B0831976-11-15015 November 1976 11/15/1976 Letter Corrected Copies of Operating Data Reports for October 1976 ML18227A4061976-11-0808 November 1976 Attached October, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 2023-04-04
[Table view] Category:Monthly
MONTHYEARL-2020-065, Submission of Periodic Reports2020-04-0909 April 2020 Submission of Periodic Reports ML18227B0771978-03-17017 March 1978 03/17/1978 Letter Operating Summary Reports of February 1978 ML18227B0631978-03-0404 March 1978 03/04/1978 Letter Operating Status Reports of February 1978 ML18227B0641978-02-14014 February 1978 02/14/1978 Letter Operating Status Reports of January 1978 ML18227B0651978-02-0404 February 1978 02/04/1978 Letter Operating Status Reports of January 1978 ML18227B0671978-01-0707 January 1978 01/07/1978 Letter Operating Status Reports of December 1977 ML18227B0681977-12-0303 December 1977 12/03/1977 Letter Operating Status Reports of November 1977 ML18227B0691977-11-0505 November 1977 11/05/1977 Letter Operating Status Reports of October 1977 ML18227B0701977-10-0505 October 1977 10/05/1977 Letter Operating Status Reports of September 1977 ML18227B0711977-09-0303 September 1977 09/03/1977 Letter Operating Status Reports of August 1977 ML18227B0731977-08-0505 August 1977 08/05/1977 Letter Operating Status Reports of July 1977 ML18227B0741977-07-0707 July 1977 07/07/1977 Letter Operating Status Reports of June 1977, and a Revised Operating Data Report for May 1997 for Turkey Point Unit 3 ML18227B0751977-06-0606 June 1977 06/06/1977 Letter Operating Status Reports of May 1977 ML18227B0761977-05-0505 May 1977 05/05/1977 Letter Operating Status Reports of April 1977 ML18227B0781977-04-0404 April 1977 04/04/1977 Letter Operating Status Reports of March 1977 ML18227B0791977-03-0707 March 1977 03/07/1977 Letter Operating Status Reports of February 1977 ML18227B0801977-02-0707 February 1977 02/07/1977 Letter Operating Status Reports of January 1977 ML18227B0811977-01-0707 January 1977 01/07/1977 Letter Operating Status Reports of December 1976 ML18227B0821976-12-0606 December 1976 12/06/1976 Letter Operating Status Reports of November 1976 ML18227B0831976-11-15015 November 1976 11/15/1976 Letter Corrected Copies of Operating Data Reports for October 1976 ML18227B0841976-11-0808 November 1976 11/08/1976 Letter Operating Status Reports of October 1976 ML18227B0861976-09-0707 September 1976 09/07/1976 Letter Operating Status Reports of August 1976 ML18227B0871976-08-0505 August 1976 08/05/1976 Letter Operating Status Reports of July 1976 ML18227B0881976-07-0202 July 1976 07/02/1976 Letter Operating Status Reports of June 1976 ML18227B0951975-10-0909 October 1975 10/09/1975 Letter Operating Summary Reports of September 1975 ML18227B0961975-09-0909 September 1975 09/09/1975 Letter Operating Summary Reports of August 1975 ML18227B0971975-08-0101 August 1975 08/01/1975 Letter Operating Status Reports of July 1975 ML18227B0981975-07-0303 July 1975 07/03/1975 Letter Operating Status Reports of June 1975 ML18227B0991975-06-0505 June 1975 06/05/1975 Letter Operating Status Reports of May 1975 ML18227B1001975-05-0505 May 1975 05/05/1975 Letter Operating Status Reports of April 1975 ML18227B1011975-04-0404 April 1975 04/04/1975 Letter Operating Status Reports of March 1975 ML18227B1021975-03-0606 March 1975 03/06/1975 Letter Operating Status Reports of February 1975 ML18227B1041975-02-0707 February 1975 02/07/1975 Letter Operating Status Reports of January 1975 ML18227B1031975-02-0707 February 1975 02/07/1975 Letter Operating Status Reports of January 1975 2020-04-09
[Table view] |
Text
U.S. NUCLEAR REGULATORY C ISSION DOC KET~8~
NRC FORM ]56 I2 7S) 5o-( So FILE NUMBB
,NRC,OISTRIBUTION FoR PART 60 DOCKET MATERIAL MONTH& BE TO: FROM: DATE OF DOCUMENT Florida Power & Light Co, 10/5/77 No Ro Co M.ami, Florida DATE RECEIVED Ao Do Schmidt 10/28/77 ETTE R 0 NOTOR IZE D PROP INPUT FORM NUMBER OF COPIES RECEIVED ORIGINAL COPY N C LASS IF I E D ENCLOSURE I c DESCRIPTION Letter trans the following; Months Report for September 1977 Plant 8c Component Operability Ec Availability.
This Report to be used, in preparing Gray Book by PlanO & Operations.
PLANT NAME: Turkey Point Units 3 & 4 St+ Lucie Unit No+ 1 RJL 10/28/77 (1>>P) (9-P)
FOR ACTION/IN ORMATION
&.CYS FOR CTX N INTERNAL D IST Rl BUTION e e rane e c ss EXTERNAL DISTRIBUTION CONTROL NUMBER 773000277 NRC FORM ISS (2 76)
~e P
I'. 13100, MIAMI, FL 33101
%@@~~I WI1', " -
.:C.
PLOAIDA POWER & LIGIITCOMPANY October 5, 1977 gg ~Q QQ Og EyP~~
Of fice of Management Information and Program Contro 1 s Nuclear Regulatory Commission c'.
S ~
Washington, D. C. -
20555 Ol Gent 1 emen:
Attached are the September, 1977, Ope ting Status Repor for Turkey Point Unit Nos . 3 and 4 an St. Lucie Unit No. 1. ~
(
Very truly y'ours, C3 r
I in D. Schmidt W 1>1 Vice President ~
m C7 Power Resources z R
VTC/DDC n0 cc: Mr. James P. 0 'ei 1 ly Robert Lowenstein, Esquire
~l 773000277
l v
D
APPENDIX B AVERAGE DAILY UNIT POWER LEVEL .
DOCKET NO. 50 250 Tur ey Point UNIT Unit No. 3 DATE Oct. 5, 1977 COMPLETED BY >. T. Chilson TELEPHONE (305) .
552-3824'ONTH
~
1977
~
SEPTEMBER, DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (Kfe-Net) (MWe-Net) 17 536 634 18 3 641 19 298 637 20 633 634 638 21'2 632 640 599 '23 641 13'40 568 626 24 641 640 25 10 625 26 636 626 27 634 627 28 354 626 29 290 627 30 630 16 628
APPENDIX C OPERATING DATA REPORT DOCKET NO.
Tur ey Point UNIT Unit No. 3 REPORT MONTH DATE Oct 5, 1977 COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3824 OPERATING STATUS
- 1. REPORTING PERIOD: 0001,77,09,01 GROSS HOURS IN REPORTING PERIOD: 720.0 THROUGH 2400 ?? 0
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2200 RAIAX. DEPEND. CAPACITY (MWe-Net): 666 DESIGN ELECTRICAL RATING (MWe-Net): 693
- 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (:Bate-Net): NONE 4 ~ REASONS FOR RESTRICTION (IF ANY):
THIS MONTH YEAR TO DATE CU.'UJLATIVE S.
6.
6 HlltlSHRS OS HOURS RHACTOR HAS CRTTTCAA. ~ ~ ~ .
REACTOR RESERVE SHUTDOWN HOURS' HOURS........ ~ ...
~HUA 38 '
~S 43.7
~2lL9 111.1
- 7. HOURS GENERATOR ON LIiNE. ... .. ..
~ 662.2 5 751.2 ill
'L222I~3
- 8. UiNIT RESERVE SHUTDOWiN .............. 85.0
- 9. GROSS THERiuAL ENERGY GENERATED (MlSUj) ~ ~ ~ ~ ~ ~ 1 391 626 12 331 641 64 061 229 10 'ROSS ELECTRICAL ENERGY GENERATED (MtvH)... 419 795 3 897 296 20 467 747 397 417
- 11. NET ELECTRICAL ENERGY GENERATED (MtsTH)..... 699 575 19 375 510
- 12. REACTOR SERVICE FACTOR. . .. . . 94 ' 90.7 80.4
- 13. REACTOR AVAILABILITYFACTOR. ~ ............. 99.9 91.3 . 66
- 14. UHIT SERVICE FACTOR...... ..... . .., ... 92.0 87.8 79.9 15 ~ UNIT AVAILABILITYFACTOR. ~... ..
~ ~ ~ ~ . ~... 92.0 87.8 80.1
- 16. UNIT CAPACITY FACTOR (Using (MDC)....s...... 82.9 84.8 69.6
- 17. UNIT CAPACITY FACTOR (Using Design MWe)... 79 ' 81.5 66.1
- 18. UNIT FORCED OUTAGE RATE.................... ' 9 2.9 19 SHUTDOWiNS SCHEDULED OVER NEXT 6 MONTHS (TYPE ~ DATE s AA%) DURATION OF EACH) maintenance and insPections - Dec. 1, 1977 - Jan. 25, 1978 'efuelings 20 IF SHUTDOWN AT END Of REPORT PERIODR ESTIMATED DATE OF STARTUP:
- 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY ISNITIAL ELECTRICITY COMMERCIAL OPERATION
~ ' I ~ ~
~ I ~
~ '
~ t j ~ '
~ ~ ~ ~ ~ ~ ~ ~
APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 251 ur ey oint UNIT Unit No. 4 Oct ~ 5 g 1977 COMPLETED BY V. T. Chilson TELEPHONE (305) '552-3824 MONTH SEPTEMBER, 1977 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (Mfe-Net) (lÃe-Net) 17 659 586 661 3 678 19 660 670 20 661 660 21 662 656 553 23 656 24 667 553 663 10 656 26 655 653 27 656 12 651 28 13 651 29 659
'4 657 30 657 as 658 16 659 NOTE: Average daily power greater than 666 NNe due to cooler condenser cooling water.
APPENDIX C OPERATING DATA REPORT DOCKET NO ~ 50 251 ur cy o nt UNIT Unit No. 4 REPORT HONTH SKPTEfSKR 1977 DATE Oct. 5, 1977 CO,'fPLETED BY V. T ~ Chilson TELEPHONE (305) 552-3824 OPERATING STATUS
- 1. RKPORTLNG PERIOD: 0001,77,09.01 GROSS HOURS IN REPORTING PERIOD: 720.0 THROUGH 2400 77 09 30
- 2. CURRENTLY AUTHORIZED POHER LEVEL (iIMt): 2200 MAX.DEPE'.lD. CAPACITY (Wc"Net): 666 DESIGN ELECTRICAL RATING (We-Net): 693
- 3. POf'ER LEVEL TO WHICH RESTRICTED (IF ANY) ('fUe-Nct): NONE
- 4. REASONS FOR RESTRICTION (IF ANY):
THIS ifONTH YEAR TO DATE CUNlLATIVK 5~ iVlJNBKRS OF HOURS REACTOR ffAS CRITICAL.... 717.6 3 893.9 25 615.7
- 6. REACTOR RESERVE SHUTDOHNi HOURS. ~ . ~ ~ ~ ,...., 138 '
7 ~ HOURS GENERATOR ON LINE.o...'...... ~ .. ...,
~
690 7 3 746.2 24 288.2
- 8. UiNIT RESERVE SHUTDOffN HOURS............... 9. GROSS THERifAL ENERGY GENERATED (HfJH)...... 1 477 538 8 029 380 51 088 750
- 10. GROSS ELECTRICAL ENERGY GENERATED (ifflH). ~ . 475 115 2 592 212 16 549 895 ll NET ELECTRICAL EiNERGY GENERATED (HffH) 451 567 2 455 238 15 685 704 12, REACTOR SERVICE FACTOR 99.7 59.4 71.2
- 13. REACTOR AVAILABILITYFACTOR.............., 99.7 59.4
- 14. UNIT SERVICE FACTOR... . . . . . 95 ' 57.2
- 15. UNIT AVAILABILITYFACTOR...
4
~ ............., 95 9 57.2 16 ~ UNIT CAPACITY FACTOR (Using (HDC)......... 94 ~ 2 56:3 66.0
- 17. lPilIT CAPACITY FACÃR (Usia8 Design Wc)... 90.5 54.1
- 18. UNIT FORCED OUTAGE RATE...... ~ ............ 0.6 2.8 19 ~ SHUTDOWiS SCHEDULED OVER ViKXT 6 NONTHS (TYPE, DATE, AND DURATIOil OF EACH):
- 20. IF SHUTD01Pif AT END OF REPORT PERIOD, ESTIHATED DATE OF STARTUP:
- 21. UNITS IN TEST STATUS (PRIOR TO CO!0fERCIAL OPERATION): 'ORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY CO!OfKRCIAL OPERATION
APPENDIX B AVERAGE DAILY UNIT POWER LEVEL i ~
i DOCKET NO. 50 - 335 1 ucxe ~ ~
UNIT Unit No. 1 DATE Oct. 5, 1977 COMPLETED BY V. T. Chil son TELEPHONE (305) 552-3824 MONTH SEPTEMBER, 1977 DAY AVERAGE DAINTY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (kH<e-Ne't) 1 748 17 757 779 778 784 19 777 777 20 744 775 21 741 784 22 732 784 23 770 774 635 745 25 10 783 26 780 27 12 781 28 13 778 29 14 780 30 15 781 16 775 NOTE: Average daily power greater than 777 NWe due to cooler condenser cooling water.
~ '
~ ~
~ ~
~ ~ ~ ~ ~ ~
~ ~ H ~ ~
I ' I ~ ~
~ ~
~ I ~
~ ~ ~ ~ ~
APPENDIX C OPERATING DATA REPORT DOCNET VO.
St. l,ucie UAVIA Unit No 1 REPORT HONTH SEPTEHBER 1977 DATE Oct. 5, 1977 COHPLETED BY V T. Chilson>
OPERATIiVG STATUS TELEPHONE (305) 552-3824
- 1. REPORTING PERIOD. 0001 '7509 F 01 GROSS HOURS IN REPORTING PERIOD: 720.0 THROUGH 2400
- 2. 2560 CURRENTLY AUTHORIZED PPWER LEVEl NAY.ONP-NO. cAPAcYYY (7070-Nee):
DESIGiV ELECTRICAL RATIiiG (."lWe-Net):
(HWt):
~77 802
- 3. P01iER LEVEL TO WlICH RES'IRICTED (IF ANY) (!llie-AVet): NONE
- 4. REASONS FOR RESTRICTION (IF ANY):
THIS .10NTH YEAR TO DATE Cb~fULATIVE
- 5. VA AA HERS'F HOURS REACTOR WAS CRITICAL..... '~l 5 659.2 E
- 6. REACTOR RESERVE>SHUTDO1Pf HOURS...... ~
101. 5 101,5
- 7. HOURS GENERATOR ON LINE. .....,. . . ,... 572.8 '
451.1 5 715.1
- 8. UNIT RESERVE SHUTDOiiN HOURS. ~ ~ ~ ........... 0-90 GROSS THERMO ENERGY GEAVERATED (HliH)...... 1 450 241 12 655 049 13 002 752
- 10. GROSS ELECTRICAL ENERGY. GENERATED (HWH)... 465 670 4 087 670 4 195 940 ll. iVET ELECTRICAL EiVERGY GENERATED (MPH)..... 439 618 3 833 361 3 932 536
- 12. REACTOR SERVICE FACTOR. 79.6 86.4 86.9
- 13. REACTOR AVAILABILITYFACTOR.. ~..... ~... .. ~ 87.9 88.4
- 14. UNIT SERVICE FACTOR 79. 6 83.2 83.9
- 15. UNIT AVAILABILITYFACTOR........ ~ . ~ . ~ .... ~ 79 6 83.2 83.9
- 16. RiIT CAPACITY FACTOR (Using (K)C).... ~ . ~ .. 78 ' 75.3 74.3
- 17. UNIT CAPACITY FACTOR (Using Design HWe). ~ . 76 ' 73.0 72.0
- 18. UNIT FORCED OUTAGE RATE 13.4 12.8
- 19. SHUTDOliNS SCHEDULED OVER NEXT 6 HONTHS (TYPE, DATE, AND DURATION OF EACH):
Refueling, tYaintcnanco, and inspections - Hatch 15 - Suae 6, 1977
- 20. IF SHU'IDOWN AT END OF REPORT PERIOD, ESTI.@TED DATE OF STARTUP: Oct, 10, 1977
- 21. UNITS IN TEST STATUS (PRIOR TO COAElHERCIAL OPERAKTIOVE): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COKlERCIAL OPERATION
's f
APPENDIX D DOCKET NO. 50 - 335 SON EQUIPMENT FAILURE (EXPLAIH)
- t. uc e MAINT. OR TEST UNIT SllUTDMNS AND POHER REDUCTIONS UNIT HAME Unir No. 1 REFUELIHC e Oct. 5, 1977 REGULATORY RESTRICTION OPERATOR TRAIHIHG AND LICENSE EXAMIHATIOH COMPLETED EY V. T. Chilson ADMINISTRATIVE TELEPHONE {305) 552-3S24 OPERATIONAL ERROR (EXPLAIN) REPORT MONTH SEPTEMEER, 1977 4
OTHER (FXPLAIH) lOD MANUAL . METHOD OF MANUAL SCPAM TYPE SHUTTING DOWN AUTOMATIC SCRAM F: PORCH) DURATION THE REACTOR OR OlllER (EXPLAIN) NO. DATE S: SCHEDULED (HOURS) REASON(1) REDUCING POWER{2) CORRECTIVE ACTIONS/CRDlEHTS 33 77-09-24 125.2 Unit vas removed from service to perform preliminary Marranty inspection. (Nuclear and Non-nuclear systems)
SlDDiARY; Unit No. 1 operated at approximately 100X R.P. until Septem5er 24, 1977, Mhen the unit was removed from service for preliminary Marranty inspection.
RECEIYEO 00CUHEHT PROCESSING UNIT 19'i'/ OC'i 26 N 9 38