10/05/1977 Letter Operating Status Reports of September 1977
ML18227B070
Person / Time
Site: Saint Lucie, Turkey Point  NextEra Energy icon.png
Issue date: 10/05/1977
From: Schmidt A
Florida Power & Light Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML18227B070 (14)


Text

U.S. NUCLEAR REGULATORY C ISSION DOC KET~8~

NRC FORM ]56 I2 7S) 5o-( So FILE NUMBB

,NRC,OISTRIBUTION FoR PART 60 DOCKET MATERIAL MONTH& BE TO: FROM: DATE OF DOCUMENT Florida Power & Light Co, 10/5/77 No Ro Co M.ami, Florida DATE RECEIVED Ao Do Schmidt 10/28/77 ETTE R 0 NOTOR IZE D PROP INPUT FORM NUMBER OF COPIES RECEIVED ORIGINAL COPY N C LASS IF I E D ENCLOSURE I c DESCRIPTION Letter trans the following; Months Report for September 1977 Plant 8c Component Operability Ec Availability.

This Report to be used, in preparing Gray Book by PlanO & Operations.

PLANT NAME: Turkey Point Units 3 & 4 St+ Lucie Unit No+ 1 RJL 10/28/77 (1>>P) (9-P)

FOR ACTION/IN ORMATION

&.CYS FOR CTX N INTERNAL D IST Rl BUTION e e rane e c ss EXTERNAL DISTRIBUTION CONTROL NUMBER 773000277 NRC FORM ISS (2 76)

~e P

I'. 13100, MIAMI, FL 33101

%@@~~I WI1', " -

.:C.

PLOAIDA POWER & LIGIITCOMPANY October 5, 1977 gg ~Q QQ Og EyP~~

Of fice of Management Information and Program Contro 1 s Nuclear Regulatory Commission c'.

S ~

Washington, D. C. -

20555 Ol Gent 1 emen:

Attached are the September, 1977, Ope ting Status Repor for Turkey Point Unit Nos . 3 and 4 an St. Lucie Unit No. 1. ~

(

Very truly y'ours, C3 r

I in D. Schmidt W 1>1 Vice President ~

m C7 Power Resources z R

VTC/DDC n0 cc: Mr. James P. 0 'ei 1 ly Robert Lowenstein, Esquire

~l 773000277

l v

D

APPENDIX B AVERAGE DAILY UNIT POWER LEVEL .

DOCKET NO. 50 250 Tur ey Point UNIT Unit No. 3 DATE Oct. 5, 1977 COMPLETED BY >. T. Chilson TELEPHONE (305) .

552-3824'ONTH

~

1977

~

SEPTEMBER, DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (Kfe-Net) (MWe-Net) 17 536 634 18 3 641 19 298 637 20 633 634 638 21'2 632 640 599 '23 641 13'40 568 626 24 641 640 25 10 625 26 636 626 27 634 627 28 354 626 29 290 627 30 630 16 628

APPENDIX C OPERATING DATA REPORT DOCKET NO.

Tur ey Point UNIT Unit No. 3 REPORT MONTH DATE Oct 5, 1977 COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3824 OPERATING STATUS

1. REPORTING PERIOD: 0001,77,09,01 GROSS HOURS IN REPORTING PERIOD: 720.0 THROUGH 2400 ?? 0
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2200 RAIAX. DEPEND. CAPACITY (MWe-Net): 666 DESIGN ELECTRICAL RATING (MWe-Net): 693
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (:Bate-Net): NONE 4 ~ REASONS FOR RESTRICTION (IF ANY):

THIS MONTH YEAR TO DATE CU.'UJLATIVE S.

6.

6 HlltlSHRS OS HOURS RHACTOR HAS CRTTTCAA. ~ ~ ~ .

REACTOR RESERVE SHUTDOWN HOURS' HOURS........ ~ ...

~HUA 38 '

~S 43.7

~2lL9 111.1

7. HOURS GENERATOR ON LIiNE. ... .. ..

~ 662.2 5 751.2 ill

'L222I~3

8. UiNIT RESERVE SHUTDOWiN .............. 85.0
9. GROSS THERiuAL ENERGY GENERATED (MlSUj) ~ ~ ~ ~ ~ ~ 1 391 626 12 331 641 64 061 229 10 'ROSS ELECTRICAL ENERGY GENERATED (MtvH)... 419 795 3 897 296 20 467 747 397 417
11. NET ELECTRICAL ENERGY GENERATED (MtsTH)..... 699 575 19 375 510
12. REACTOR SERVICE FACTOR. . .. . . 94 ' 90.7 80.4
13. REACTOR AVAILABILITYFACTOR. ~ ............. 99.9 91.3 . 66
14. UHIT SERVICE FACTOR...... ..... . .., ... 92.0 87.8 79.9 15 ~ UNIT AVAILABILITYFACTOR. ~... ..

~ ~ ~ ~ . ~... 92.0 87.8 80.1

16. UNIT CAPACITY FACTOR (Using (MDC)....s...... 82.9 84.8 69.6
17. UNIT CAPACITY FACTOR (Using Design MWe)... 79 ' 81.5 66.1
18. UNIT FORCED OUTAGE RATE.................... ' 9 2.9 19 SHUTDOWiNS SCHEDULED OVER NEXT 6 MONTHS (TYPE ~ DATE s AA%) DURATION OF EACH) maintenance and insPections - Dec. 1, 1977 - Jan. 25, 1978 'efuelings 20 IF SHUTDOWN AT END Of REPORT PERIODR ESTIMATED DATE OF STARTUP:
21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY ISNITIAL ELECTRICITY COMMERCIAL OPERATION

~ ' I ~ ~

~ I ~

~ '

~ t j ~ '

~ ~ ~ ~ ~ ~ ~ ~

APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 251 ur ey oint UNIT Unit No. 4 Oct ~ 5 g 1977 COMPLETED BY V. T. Chilson TELEPHONE (305) '552-3824 MONTH SEPTEMBER, 1977 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (Mfe-Net) (lÃe-Net) 17 659 586 661 3 678 19 660 670 20 661 660 21 662 656 553 23 656 24 667 553 663 10 656 26 655 653 27 656 12 651 28 13 651 29 659

'4 657 30 657 as 658 16 659 NOTE: Average daily power greater than 666 NNe due to cooler condenser cooling water.

APPENDIX C OPERATING DATA REPORT DOCKET NO ~ 50 251 ur cy o nt UNIT Unit No. 4 REPORT HONTH SKPTEfSKR 1977 DATE Oct. 5, 1977 CO,'fPLETED BY V. T ~ Chilson TELEPHONE (305) 552-3824 OPERATING STATUS

1. RKPORTLNG PERIOD: 0001,77,09.01 GROSS HOURS IN REPORTING PERIOD: 720.0 THROUGH 2400 77 09 30
2. CURRENTLY AUTHORIZED POHER LEVEL (iIMt): 2200 MAX.DEPE'.lD. CAPACITY (Wc"Net): 666 DESIGN ELECTRICAL RATING (We-Net): 693
3. POf'ER LEVEL TO WHICH RESTRICTED (IF ANY) ('fUe-Nct): NONE
4. REASONS FOR RESTRICTION (IF ANY):

THIS ifONTH YEAR TO DATE CUNlLATIVK 5~ iVlJNBKRS OF HOURS REACTOR ffAS CRITICAL.... 717.6 3 893.9 25 615.7

6. REACTOR RESERVE SHUTDOHNi HOURS. ~ . ~ ~ ~ ,...., 138 '

7 ~ HOURS GENERATOR ON LINE.o...'...... ~ .. ...,

~

690 7 3 746.2 24 288.2

8. UiNIT RESERVE SHUTDOffN HOURS............... 9. GROSS THERifAL ENERGY GENERATED (HfJH)...... 1 477 538 8 029 380 51 088 750
10. GROSS ELECTRICAL ENERGY GENERATED (ifflH). ~ . 475 115 2 592 212 16 549 895 ll NET ELECTRICAL EiNERGY GENERATED (HffH) 451 567 2 455 238 15 685 704 12, REACTOR SERVICE FACTOR 99.7 59.4 71.2
13. REACTOR AVAILABILITYFACTOR.............., 99.7 59.4
14. UNIT SERVICE FACTOR... . . . . . 95 ' 57.2
15. UNIT AVAILABILITYFACTOR...

4

~ ............., 95 9 57.2 16 ~ UNIT CAPACITY FACTOR (Using (HDC)......... 94 ~ 2 56:3 66.0

17. lPilIT CAPACITY FACÃR (Usia8 Design Wc)... 90.5 54.1
18. UNIT FORCED OUTAGE RATE...... ~ ............ 0.6 2.8 19 ~ SHUTDOWiS SCHEDULED OVER ViKXT 6 NONTHS (TYPE, DATE, AND DURATIOil OF EACH):
20. IF SHUTD01Pif AT END OF REPORT PERIOD, ESTIHATED DATE OF STARTUP:
21. UNITS IN TEST STATUS (PRIOR TO CO!0fERCIAL OPERATION): 'ORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY CO!OfKRCIAL OPERATION

APPENDIX B AVERAGE DAILY UNIT POWER LEVEL i ~

i DOCKET NO. 50 - 335 1 ucxe ~ ~

UNIT Unit No. 1 DATE Oct. 5, 1977 COMPLETED BY V. T. Chil son TELEPHONE (305) 552-3824 MONTH SEPTEMBER, 1977 DAY AVERAGE DAINTY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (kH<e-Ne't) 1 748 17 757 779 778 784 19 777 777 20 744 775 21 741 784 22 732 784 23 770 774 635 745 25 10 783 26 780 27 12 781 28 13 778 29 14 780 30 15 781 16 775 NOTE: Average daily power greater than 777 NWe due to cooler condenser cooling water.

~ '

~ ~

~ ~

~ ~ ~ ~ ~ ~

~ ~ H ~ ~

I ' I ~ ~

~ ~

~ I ~

~ ~ ~ ~ ~

APPENDIX C OPERATING DATA REPORT DOCNET VO.

St. l,ucie UAVIA Unit No 1 REPORT HONTH SEPTEHBER 1977 DATE Oct. 5, 1977 COHPLETED BY V T. Chilson>

OPERATIiVG STATUS TELEPHONE (305) 552-3824

1. REPORTING PERIOD. 0001 '7509 F 01 GROSS HOURS IN REPORTING PERIOD: 720.0 THROUGH 2400
2. 2560 CURRENTLY AUTHORIZED PPWER LEVEl NAY.ONP-NO. cAPAcYYY (7070-Nee):

DESIGiV ELECTRICAL RATIiiG (."lWe-Net):

(HWt):

~77 802

3. P01iER LEVEL TO WlICH RES'IRICTED (IF ANY) (!llie-AVet): NONE
4. REASONS FOR RESTRICTION (IF ANY):

THIS .10NTH YEAR TO DATE Cb~fULATIVE

5. VA AA HERS'F HOURS REACTOR WAS CRITICAL..... '~l 5 659.2 E
6. REACTOR RESERVE>SHUTDO1Pf HOURS...... ~

101. 5 101,5

7. HOURS GENERATOR ON LINE. .....,. . . ,... 572.8 '

451.1 5 715.1

8. UNIT RESERVE SHUTDOiiN HOURS. ~ ~ ~ ........... 0-90 GROSS THERMO ENERGY GEAVERATED (HliH)...... 1 450 241 12 655 049 13 002 752
10. GROSS ELECTRICAL ENERGY. GENERATED (HWH)... 465 670 4 087 670 4 195 940 ll. iVET ELECTRICAL EiVERGY GENERATED (MPH)..... 439 618 3 833 361 3 932 536
12. REACTOR SERVICE FACTOR. 79.6 86.4 86.9
13. REACTOR AVAILABILITYFACTOR.. ~..... ~... .. ~ 87.9 88.4
14. UNIT SERVICE FACTOR 79. 6 83.2 83.9
15. UNIT AVAILABILITYFACTOR........ ~ . ~ . ~ .... ~ 79 6 83.2 83.9
16. RiIT CAPACITY FACTOR (Using (K)C).... ~ . ~ .. 78 ' 75.3 74.3
17. UNIT CAPACITY FACTOR (Using Design HWe). ~ . 76 ' 73.0 72.0
18. UNIT FORCED OUTAGE RATE 13.4 12.8
19. SHUTDOliNS SCHEDULED OVER NEXT 6 HONTHS (TYPE, DATE, AND DURATION OF EACH):

Refueling, tYaintcnanco, and inspections - Hatch 15 - Suae 6, 1977

20. IF SHU'IDOWN AT END OF REPORT PERIOD, ESTI.@TED DATE OF STARTUP: Oct, 10, 1977
21. UNITS IN TEST STATUS (PRIOR TO COAElHERCIAL OPERAKTIOVE): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COKlERCIAL OPERATION

's f

APPENDIX D DOCKET NO. 50 - 335 SON EQUIPMENT FAILURE (EXPLAIH)

t. uc e MAINT. OR TEST UNIT SllUTDMNS AND POHER REDUCTIONS UNIT HAME Unir No. 1 REFUELIHC e Oct. 5, 1977 REGULATORY RESTRICTION OPERATOR TRAIHIHG AND LICENSE EXAMIHATIOH COMPLETED EY V. T. Chilson ADMINISTRATIVE TELEPHONE {305) 552-3S24 OPERATIONAL ERROR (EXPLAIN) REPORT MONTH SEPTEMEER, 1977 4

OTHER (FXPLAIH) lOD MANUAL . METHOD OF MANUAL SCPAM TYPE SHUTTING DOWN AUTOMATIC SCRAM F: PORCH) DURATION THE REACTOR OR OlllER (EXPLAIN) NO. DATE S: SCHEDULED (HOURS) REASON(1) REDUCING POWER{2) CORRECTIVE ACTIONS/CRDlEHTS 33 77-09-24 125.2 Unit vas removed from service to perform preliminary Marranty inspection. (Nuclear and Non-nuclear systems)

SlDDiARY; Unit No. 1 operated at approximately 100X R.P. until Septem5er 24, 1977, Mhen the unit was removed from service for preliminary Marranty inspection.

RECEIYEO 00CUHEHT PROCESSING UNIT 19'i'/ OC'i 26 N 9 38