ML18227B070
| ML18227B070 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie, Turkey Point |
| Issue date: | 10/05/1977 |
| From: | Schmidt A Florida Power & Light Co |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| Download: ML18227B070 (14) | |
Text
U.S. NUCLEAR REGULATORY C ISSION NRC FORM ]56 I2 7S)
,NRC,OISTRIBUTION FoR PART 60 DOCKET MATERIAL DOCKET~8~
5o-( So FILE NUMBB MONTH& BE TO:
No Ro Co ETTE R ORIGINAL COPY 0 NOTOR IZ E D NC LASS IF I E D DESCRIPTION Letter trans the following; FROM:
Florida Power
& Light Co, M.ami, Florida Ao Do Schmidt PROP INPUT FORM DATE OF DOCUMENT 10/5/77 DATE RECEIVED 10/28/77 NUMBER OF COPIES RECEIVED ENCLOSURE I
c Months Report for September 1977 Plant 8c Component Operability Ec Availability.
This Report to be used, in preparing Gray Book by PlanO
& Operations.
PLANT NAME:
Turkey Point Units 3 & 4 St+ Lucie Unit No+
1 RJL 10/28/77 (1>>P)
(9-P)
FOR ACTION/IN ORMATION
&.CYS FOR CTX N e
e INTERNAL DISTRl BUTION rane e
c ss EXTERNALDISTRIBUTION CONTROL NUMBER 773000277 NRC FORM ISS (2 76)
~e P
I'.
13100, MIAMI, FL 33101
%@@~~I WI1', "
.:C.
PLOAIDAPOWER & LIGIITCOMPANY October 5,
1977 gg ~Q QQ Og EyP~~
Office of Management Information and Program Contro 1 s c'.
S ~ Nuclear Regulatory Commission Washington, D.
C.
20555 Ol Gent 1emen:
Attached are the September,
- 1977, Ope for Turkey Point Unit Nos.
3 and 4 an No. 1.
ting Status Repor St. Lucie Unit
~
(
Very truly y'ours, D. Schmidt Vice President Power Resources VTC/DDC C3 r
in I
1>1
~ W m
C7 R
z0n cc:
Mr. James P.
0'ei 1ly Robert Lowenstein, Esquire
~l 773000277
l v
D
APPENDIX B AVERAGE DAILY UNIT POWER LEVEL.
DOCKET NO. 50 250 Tur ey Point UNIT Unit No.
3 DATE Oct.
5, 1977 COMPLETED BY >. T. Chilson TELEPHONE (305) 552-3824'ONTH SEPTEMBER, 1977 DAY AVERAGE DAILY POWER LEVEL (Kfe-Net)
DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
~
~
3 10 13'40 634 641 637 634 632 599 568 626 625 626 627 626 627 630 17 18 19 20 21'2
'23 24 25 26 27 28 29 30 536 298 633 638 640 641 641 640 636 634 354 290 16 628
APPENDIX C OPERATING DATA REPORT REPORT MONTH DOCKET NO.
Tur ey Point UNIT Unit No.
3 DATE Oct 5,
1977 OPERATING STATUS COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3824 1.
REPORTING PERIOD: 0001,77,09,01 GROSS HOURS IN REPORTING PERIOD:
720.0 THROUGH 2400
??
0 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt):
2200 RAIAX.DEPEND.
CAPACITY (MWe-Net):
666 DESIGN ELECTRICAL RATING (MWe-Net):
693 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY)
(:Bate-Net):
NONE 4 ~
REASONS FOR RESTRICTION (IF ANY):
THIS MONTH YEAR TO DATE CU.'UJLATIVE S.
HlltlSHRS OS HOURS RHACTOR HAS CRTTTCAA. ~ ~ ~.
~HUA ~S
~2lL9 6
6.
REACTOR RESERVE SHUTDOWN HOURS........
~...
38 '
43.7 111.1 7.
HOURS GENERATOR ON LIiNE......
~..
662.2 5 751.2
'L222I~3 85.0 8.
UiNIT RESERVE SHUTDOWiN HOURS'
.............. 9.
GROSS THERiuAL ENERGY GENERATED (MlSUj) ~
~
~ ~ ~
~
1 391 626 12 331 641 64 061 229 10 'ROSS ELECTRICAL ENERGY GENERATED (MtvH)...
419 795 3 897 296 20 467 747 11.
NET ELECTRICAL ENERGY GENERATED (MtsTH).....
397 417 '
699 575 12.
REACTOR SERVICE FACTOR.
94 '
90.7 13.
REACTOR AVAILABILITYFACTOR.
~.............
99.9 91.3 14.
UHIT SERVICE FACTOR...........
92.0 87.8 19 375 510 80.4 ill
. 66 79.9 15 ~
UNIT AVAILABILITYFACTOR. ~...
~..
~
~
~. ~...
92.0 87.8 80.1 16.
UNIT CAPACITY FACTOR (Using (MDC)....s......
82.9 84.8 17.
UNIT CAPACITY FACTOR (Using Design MWe)...
79 '
81.5 69.6 66.1 18.
UNIT FORCED OUTAGE RATE....................
9 2.9 19 SHUTDOWiNS SCHEDULED OVER NEXT 6 MONTHS (TYPE ~
DATE s AA%) DURATION OF EACH)
'efuelings maintenance and insPections - Dec. 1, 1977 - Jan.
25, 1978 20 IF SHUTDOWN AT END Of REPORT PERIODR ESTIMATED DATE OF STARTUP:
21.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
INITIALCRITICALITY ISNITIAL ELECTRICITY COMMERCIAL OPERATION FORECAST ACHIEVED
~
I
~
~
~
I
~
~ '
~ t j
~ '
~
~
~
~
~
~
~
~
APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
5 0 2 5 1 ur ey oint UNIT Unit No.
4 Oct ~
5 g 1977 COMPLETED BY V. T. Chilson TELEPHONE (305)
'552-3824 MONTH SEPTEMBER, 1977 DAY AVERAGE DAILY POWER LEVEL (Mfe-Net)
DAY AVERAGE DAILY POWER LEVEL (lÃe-Net) 3 586 678 670 660 656 17 19 20 21 659 661 660 661 662 553 10 12 13
'4 as 16 656 553 656 653 651 651 657 658 659 23 24 26 27 28 29 30 NOTE:
667 663 655 656 659 657 Average daily power greater than 666 NNe due to cooler condenser cooling water.
APPENDIX C OPERATING DATA REPORT REPORT HONTH SKPTEfSKR 1977 OPERATING STATUS DOCKET NO ~
50 251 ur cy o nt UNIT Unit No. 4 DATE Oct. 5, 1977 CO,'fPLETED BY V. T ~ Chilson TELEPHONE (305) 552-3824 1.
RKPORTLNG PERIOD: 0001,77,09.01 GROSS HOURS IN REPORTING PERIOD:
THROUGH 2400 77 09 30 2.
CURRENTLY AUTHORIZED POHER LEVEL (iIMt):
2200 MAX.DEPE'.lD. CAPACITY (Wc"Net):
666 DESIGN ELECTRICAL RATING (We-Net):
693 720.0 3.
POf'ER LEVEL TO WHICH RESTRICTED (IF ANY)
('fUe-Nct):
4.
REASONS FOR RESTRICTION (IF ANY):
NONE THIS ifONTH YEAR TO DATE CUNlLATIVK 5 ~
iVlJNBKRS OF HOURS REACTOR ffAS CRITICAL....
717.6 3 893.9 6.
REACTOR RESERVE SHUTDOHNi HOURS.
~.
~ ~ ~,...., 7 ~
HOURS GENERATOR ON LINE.o...'......
~..
~...,
690 7
3 746.2 8.
UiNIT RESERVE SHUTDOffN HOURS............... 9.
GROSS THERifAL ENERGY GENERATED (HfJH)......
1 477 538 8 029 380 10.
GROSS ELECTRICAL ENERGY GENERATED (ifflH).~.
475 115 2 592 212 ll NET ELECTRICAL EiNERGY GENERATED (HffH) 451 567 2 455 238 12, REACTOR SERVICE FACTOR 99.7 59.4 25 615.7 138 '
24 288.2 51 088 750 16 549 895 15 685 704 71.2 13.
REACTOR AVAILABILITYFACTOR..............,
99.7 59.4 14.
UNIT SERVICE FACTOR...
95 '
57.2 15.
UNIT AVAILABILITYFACTOR...
~.............,
95 9
57.2 4
16 ~
UNIT CAPACITY FACTOR (Using (HDC).........
94 ~ 2 56:3 17.
lPilIT CAPACITY FACÃR (Usia8 Design Wc)...
90.5 54.1 66.0 18.
UNIT FORCED OUTAGE RATE......
~............
0.6 2.8 19 ~
SHUTDOWiS SCHEDULED OVER ViKXT 6 NONTHS (TYPE,
- DATE, AND DURATIOil OF EACH):
20.
IF SHUTD01Pif AT END OF REPORT PERIOD, ESTIHATED DATE OF STARTUP:
21.
UNITS IN TEST STATUS (PRIOR TO CO!0fERCIAL OPERATION):
'ORECAST ACHIEVED INITIALCRITICALITY INITIALELECTRICITY CO!OfKRCIAL OPERATION
i APPENDIX B AVERAGE DAILY UNIT POWER LEVEL
~i DOCKET NO.
50 - 335 ucxe UNIT Unit No.
1 DATE Oct. 5, 1977 1
~
~
COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3824 MONTH SEPTEMBER, 1977 DAY AVERAGE DAINTY POWER LEVEL (MWe-Net) 1 748 779 17 757 778 DAY AVERAGE DAILY POWER LEVEL (kH<e-Ne't) 10 12 13 14 15 16 784 777 775 784 784 774 745 783 780 781 778 780 781 775 19 20 21 22 23 25 26 27 28 29 30 NOTE:
777 744 741 732 770 635 Average daily power greater than 777 NWe due to cooler condenser cooling water.
~
~
~
~
~
~
~
~
~
~
~
~
~
H
~
~
I '
I
~
~
~
~
~
I
~
~
~
~
~
~
APPENDIX C OPERATING DATA REPORT DOCNET VO.
St. l,ucie UAVIA Unit No 1
REPORT HONTH SEPTEHBER 1977 OPERATIiVG STATUS DATE Oct. 5, 1977 COHPLETED BY V
T. Chilson>
TELEPHONE (305) 552-3824 1.
REPORTING PERIOD.
0001 '7509 F 01 GROSS HOURS IN REPORTING PERIOD:
THROUGH 2400 2.
CURRENTLY AUTHORIZED PPWER LEVEl (HWt):
2560 NAY.ONP-NO. cAPAcYYY (7070-Nee):
~77 DESIGiV ELECTRICAL RATIiiG (."lWe-Net):
802 720.0 3.
P01iER LEVEL TO WlICH RES'IRICTED (IF ANY)
(!llie-AVet):
4.
REASONS FOR RESTRICTION (IF ANY):
NONE THIS.10NTH YEAR TO DATE Cb~fULATIVE 5.
VA AA HERS'F HOURS REACTOR WAS CRITICAL.....
'~l 5 659.2 E
6.
REACTOR RESERVE>SHUTDO1Pf HOURS......
~..... 101. 5 101,5 7.
HOURS GENERATOR ON LINE......,.
572.8 451.1 5 715.1 8.
UNIT RESERVE SHUTDOiiN HOURS.
~ ~ ~........... 0-90 GROSS THERMO ENERGY GEAVERATED (HliH)......
1 450 241 12 655 049 13 002 752 10.
GROSS ELECTRICAL ENERGY. GENERATED (HWH)...
465 670 4 087 670 4 195 940 ll.
iVET ELECTRICAL EiVERGY GENERATED (MPH).....
439 618 3 833 361 3 932 536 12.
REACTOR SERVICE FACTOR.
79.6 86.4 86.9 13.
REACTOR AVAILABILITYFACTOR.. ~..... ~...
~..
14.
UNIT SERVICE FACTOR
- 79. 6 87.9 88.4 83.2 83.9 15.
UNIT AVAILABILITYFACTOR........
~.
~.
~....
~
79 6
16.
RiIT CAPACITY FACTOR (Using (K)C).... ~. ~..
78 '
83.2 75.3 83.9 74.3 17.
UNIT CAPACITY FACTOR (Using Design HWe).
~.
76 '
73.0 72.0 18.
UNIT FORCED OUTAGE RATE 13.4 12.8 19.
SHUTDOliNS SCHEDULED OVER NEXT 6 HONTHS (TYPE, DATE, AND DURATION OF EACH):
Refueling, tYaintcnanco, and inspections - Hatch 15 - Suae 6, 1977 20.
IF SHU'IDOWN AT END OF REPORT PERIOD, ESTI.@TED DATE OF STARTUP:
Oct, 10, 1977 21.
UNITS IN TEST STATUS (PRIOR TO COAElHERCIAL OPERAKTIOVE):
INITIALCRITICALITY FORECAST ACHIEVED INITIALELECTRICITY COKlERCIAL OPERATION
SON EQUIPMENT FAILURE (EXPLAIH)
MAINT. OR TEST REFUELIHC e
REGULATORY RESTRICTION OPERATOR TRAIHIHG AND LICENSE EXAMIHATIOH ADMINISTRATIVE OPERATIONAL ERROR (EXPLAIN)
OTHER (FXPLAIH)
APPENDIX D UNIT SllUTDMNS AND POHER REDUCTIONS REPORT MONTH SEPTEMEER, 1977 DOCKET NO.
UNIT HAME 50 - 335 t.
uc e Unir No. 1 Oct. 5, 1977 TELEPHONE 4
{305) 552-3S24 COMPLETED EY V. T. Chilson
's f
lOD MANUAL MANUAL SCPAM AUTOMATIC SCRAM OlllER (EXPLAIN)
NO.
DATE TYPE F:
PORCH)
S:
SCHEDULED DURATION (HOURS)
REASON(1)
. METHOD OF SHUTTING DOWN THE REACTOR OR REDUCING POWER{2)
CORRECTIVE ACTIONS/CRDlEHTS 33 77-09-24 125.2 Unit vas removed from service to perform preliminary Marranty inspection.
(Nuclear and Non-nuclear systems)
SlDDiARY; Unit No. 1 operated at approximately 100X R.P. until Septem5er 24, 1977, Mhen the unit was removed from service for preliminary Marranty inspection.
RECEIYEO 00CUHEHT PROCESSING UNIT 19'i'/ OC'i 26 N 9 38