Category:Letter
MONTHYEARML24023A0342024-02-0505 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0038 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000335/20230102024-01-26026 January 2024 NRC Quadrennial Focused Engineering Inspection (FEI) Commercial Grade Dedication Report 05000335/2023010 and 05000389/2023010 L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) IR 05000335/20230042024-01-24024 January 2024 Integrated Inspection Report 05000335/2023004 and 05000389/2023004 ML23320A3062024-01-22022 January 2024 Issuance of Amendment Nos. 298 and 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project ML23341A2102024-01-22022 January 2024 LTR-23-0216-1 - Closure Letter - 2.206 Petition for License Renewal Plant Reactor Pressure Vessel Embrittlement L-2024-007, Inservice Inspection Program Owner'S Activity Report (OAR-1)2024-01-18018 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2024-004, Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years2024-01-18018 January 2024 Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-002, Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2024-01-0808 January 2024 Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-179, Unusual or Important Environmental Event - Turtle Mortality2023-12-14014 December 2023 Unusual or Important Environmental Event - Turtle Mortality L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2023-166, Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report2023-12-0606 December 2023 Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report ML23340A0332023-12-0101 December 2023 FPL to Fws, Comments Submitted by Florida Power and Light on the Species Status Assessment Accompanying the September 20, 2023 Proposed Threatened Species Status with Section 4(d) Rule for the Miami Cave Crayfish L-2023-172, Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule ML23332A1772023-11-28028 November 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, ML23333A0102023-11-27027 November 2023 Attachment B - 11/07/2022 - Waterkeeper Scoping Comments-1 ML23333A0152023-11-27027 November 2023 Attachment G - Arcadis Memo Re FPL Year 4 Raasr Final (June 2, 2023, Appended to Derm letter)-1 L-2023-162, Response to 50.69 2nd Round of Rals2023-11-21021 November 2023 Response to 50.69 2nd Round of Rals L-2023-146, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles2023-11-15015 November 2023 License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles IR 05000250/20230032023-11-0909 November 2023 Integrated Inspection Report 05000250/2023003 and 05000251/2023003 IR 05000335/20230032023-11-0606 November 2023 Integrated Inspection Report 05000335/2023003 and 05000389/2023003 ML23310A1342023-11-0404 November 2023 10 CFR 2.206 Petition - LTR-23-0216-1 Petition Amendment; Turkey Point Subsequent Renewal with Petitioner 11/04/2023 ML24016A2622023-10-25025 October 2023 Subsequent License Renewal Updated List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected Project ML23270B8882023-10-23023 October 2023 Regulatory Audit Summary Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structure, Systems, and Components for Nuclear Power Reactors EPID L-2022-LLA-0182 L-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis2023-10-11011 October 2023 License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23275A1102023-10-0202 October 2023 License Amendment Request Revision 2 for the Technical Specifications Conversion to NUREG-1432, Revision 5 IR 05000250/20230102023-09-29029 September 2023 Biennial Problem Identification and Resolution Inspection Report 05000250/2023010 and 05000251/2023010 L-2023-131, Subsequent License Renewal Application - Second Annual Update2023-09-28028 September 2023 Subsequent License Renewal Application - Second Annual Update ML23234A1922023-09-27027 September 2023 Issuance of Amendment Nos. 297 and 290 Regarding Conversion to Improved Standard Technical Specifications L-2023-136, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-26026 September 2023 Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML23265A5492023-09-22022 September 2023 Transmittal of WCAP-18830-P/NP Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles to Support a License Amendment Request from FPL - License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis L-2023-122, Corrections to the 2022 Annual Radiological Environmental Operating Report2023-09-20020 September 2023 Corrections to the 2022 Annual Radiological Environmental Operating Report IR 05000335/20233012023-09-20020 September 2023 NRC Operator License Examination Report 05000335/2023301 and 05000389/2023301 L-2023-127, Correction to the 2022 Annual Radioactive Effluent Release Report2023-09-18018 September 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-113, Correction to the 2020 Annual Radiological Environmental Operating Report2023-09-14014 September 2023 Correction to the 2020 Annual Radiological Environmental Operating Report L-2023-108, Report of 10 CFR 50.59 Plant Changes2023-09-11011 September 2023 Report of 10 CFR 50.59 Plant Changes L-2023-118, Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-11011 September 2023 Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML23243A9552023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application - Tribe- Section 106 Letters ML23243A9522023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9532023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9542023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application L-2023-107, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42023-09-0606 September 2023 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 L-2023-112, Corrections to the 2021 Annual Radioactive Effluent Release Report2023-09-0606 September 2023 Corrections to the 2021 Annual Radioactive Effluent Release Report ML23199A2352023-09-0505 September 2023 Letter to EPA-Turkey Point Nuclear Generating Station, Units 3 and 4 - Notice of Availability of Draft Site-Specific Environmental Impact Statement for Subsequent License Renewal 2024-02-05
[Table view] Category:Operating Report
MONTHYEARL-2023-051, Report of 10 CFR 50.59 Plant Changes2023-04-0404 April 2023 Report of 10 CFR 50.59 Plant Changes L-2022-039, and Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2022-04-14014 April 2022 and Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2022-016, Report of 10 CFR 50.59 Plant Changes2022-02-28028 February 2022 Report of 10 CFR 50.59 Plant Changes L-2021-097, and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report2021-05-13013 May 2021 and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report L-2021-096, 10 CFR 50.59(d)(2) Summary Report2021-05-11011 May 2021 10 CFR 50.59(d)(2) Summary Report L-2021-018, 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report2021-02-16016 February 2021 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report L-2020-065, Submission of Periodic Reports2020-04-0909 April 2020 Submission of Periodic Reports ML18227A9832018-08-15015 August 2018 Submit First Year Operation Report. L-2017-165, Report of 10 CFR 50.59 Plant Changes2017-09-20020 September 2017 Report of 10 CFR 50.59 Plant Changes L-2012-367, Cycle 20 Core Operating Limits Report2012-10-0202 October 2012 Cycle 20 Core Operating Limits Report L-2012-169, Annual Radiological Environmental Operating Report for Calendar Year 20112012-04-24024 April 2012 Annual Radiological Environmental Operating Report for Calendar Year 2011 L-2009-284, Submittal of Report of Changes, Tests & Experiments for Period April 4, 2008 Through June 13, 20092009-12-10010 December 2009 Submittal of Report of Changes, Tests & Experiments for Period April 4, 2008 Through June 13, 2009 L-2008-245, Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/082008-11-10010 November 2008 Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/08 L-2007-053, Annual Radiological Environmental Operating Report2007-05-0404 May 2007 Annual Radiological Environmental Operating Report L-2005-101, Inservice Inspection Program Third Interval - First Period - First Outage (SL2-15) Owner'S Activity Report (OAR-1)2005-05-0202 May 2005 Inservice Inspection Program Third Interval - First Period - First Outage (SL2-15) Owner'S Activity Report (OAR-1) L-2004-097, Annual Radiological Environmental Operating Report2004-05-11011 May 2004 Annual Radiological Environmental Operating Report ML18227B0771978-03-17017 March 1978 03/17/1978 Letter Operating Summary Reports of February 1978 ML18227B0631978-03-0404 March 1978 03/04/1978 Letter Operating Status Reports of February 1978 ML18227A4231978-03-0404 March 1978 Attached February, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0641978-02-14014 February 1978 02/14/1978 Letter Operating Status Reports of January 1978 ML18227A4221978-02-14014 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0651978-02-0404 February 1978 02/04/1978 Letter Operating Status Reports of January 1978 ML18227A4211978-02-0404 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0671978-01-0707 January 1978 01/07/1978 Letter Operating Status Reports of December 1977 ML18227A4201978-01-0707 January 1978 Attached December, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0681977-12-0303 December 1977 12/03/1977 Letter Operating Status Reports of November 1977 ML18227A4191977-12-0303 December 1977 Attached November, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0691977-11-0505 November 1977 11/05/1977 Letter Operating Status Reports of October 1977 ML18227A4171977-11-0505 November 1977 Attached October, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0701977-10-0505 October 1977 10/05/1977 Letter Operating Status Reports of September 1977 ML18227A4151977-09-0303 September 1977 Attached August, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0711977-09-0303 September 1977 09/03/1977 Letter Operating Status Reports of August 1977 ML18227A4141977-08-0505 August 1977 Attached July, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0731977-08-0505 August 1977 08/05/1977 Letter Operating Status Reports of July 1977 ML18227A4131977-07-0707 July 1977 Attached June, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. May, 1977 for Unit 3 Incorrectly Reported for Some Values. Attached Revised May, 1977 Operating Data Report for Unit 3 ML18227B0741977-07-0707 July 1977 07/07/1977 Letter Operating Status Reports of June 1977, and a Revised Operating Data Report for May 1997 for Turkey Point Unit 3 ML18227A4121977-06-0606 June 1977 Attached May, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0751977-06-0606 June 1977 06/06/1977 Letter Operating Status Reports of May 1977 ML18227A4111977-05-0505 May 1977 Attached April, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0761977-05-0505 May 1977 05/05/1977 Letter Operating Status Reports of April 1977 ML18227A4101977-04-0404 April 1977 Attached March, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. Maximum Dependable Capacity (MWe-Net) for St. Lucie No. 1 Was Revised from 802 MWe-Net to 777 MWe-Net (Estimated) ML18227B0781977-04-0404 April 1977 04/04/1977 Letter Operating Status Reports of March 1977 ML18227B0791977-03-0707 March 1977 03/07/1977 Letter Operating Status Reports of February 1977 ML18227A4091977-03-0707 March 1977 Attached February, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0801977-02-0707 February 1977 02/07/1977 Letter Operating Status Reports of January 1977 ML18227B0811977-01-0707 January 1977 01/07/1977 Letter Operating Status Reports of December 1976 ML18227A4081977-01-0707 January 1977 Attached December, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0821976-12-0606 December 1976 12/06/1976 Letter Operating Status Reports of November 1976 ML18227B0831976-11-15015 November 1976 11/15/1976 Letter Corrected Copies of Operating Data Reports for October 1976 ML18227A4061976-11-0808 November 1976 Attached October, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 2023-04-04
[Table view] Category:Monthly
MONTHYEARL-2020-065, Submission of Periodic Reports2020-04-0909 April 2020 Submission of Periodic Reports ML18227B0771978-03-17017 March 1978 03/17/1978 Letter Operating Summary Reports of February 1978 ML18227B0631978-03-0404 March 1978 03/04/1978 Letter Operating Status Reports of February 1978 ML18227B0641978-02-14014 February 1978 02/14/1978 Letter Operating Status Reports of January 1978 ML18227B0651978-02-0404 February 1978 02/04/1978 Letter Operating Status Reports of January 1978 ML18227B0671978-01-0707 January 1978 01/07/1978 Letter Operating Status Reports of December 1977 ML18227B0681977-12-0303 December 1977 12/03/1977 Letter Operating Status Reports of November 1977 ML18227B0691977-11-0505 November 1977 11/05/1977 Letter Operating Status Reports of October 1977 ML18227B0701977-10-0505 October 1977 10/05/1977 Letter Operating Status Reports of September 1977 ML18227B0711977-09-0303 September 1977 09/03/1977 Letter Operating Status Reports of August 1977 ML18227B0731977-08-0505 August 1977 08/05/1977 Letter Operating Status Reports of July 1977 ML18227B0741977-07-0707 July 1977 07/07/1977 Letter Operating Status Reports of June 1977, and a Revised Operating Data Report for May 1997 for Turkey Point Unit 3 ML18227B0751977-06-0606 June 1977 06/06/1977 Letter Operating Status Reports of May 1977 ML18227B0761977-05-0505 May 1977 05/05/1977 Letter Operating Status Reports of April 1977 ML18227B0781977-04-0404 April 1977 04/04/1977 Letter Operating Status Reports of March 1977 ML18227B0791977-03-0707 March 1977 03/07/1977 Letter Operating Status Reports of February 1977 ML18227B0801977-02-0707 February 1977 02/07/1977 Letter Operating Status Reports of January 1977 ML18227B0811977-01-0707 January 1977 01/07/1977 Letter Operating Status Reports of December 1976 ML18227B0821976-12-0606 December 1976 12/06/1976 Letter Operating Status Reports of November 1976 ML18227B0831976-11-15015 November 1976 11/15/1976 Letter Corrected Copies of Operating Data Reports for October 1976 ML18227B0841976-11-0808 November 1976 11/08/1976 Letter Operating Status Reports of October 1976 ML18227B0861976-09-0707 September 1976 09/07/1976 Letter Operating Status Reports of August 1976 ML18227B0871976-08-0505 August 1976 08/05/1976 Letter Operating Status Reports of July 1976 ML18227B0881976-07-0202 July 1976 07/02/1976 Letter Operating Status Reports of June 1976 ML18227B0951975-10-0909 October 1975 10/09/1975 Letter Operating Summary Reports of September 1975 ML18227B0961975-09-0909 September 1975 09/09/1975 Letter Operating Summary Reports of August 1975 ML18227B0971975-08-0101 August 1975 08/01/1975 Letter Operating Status Reports of July 1975 ML18227B0981975-07-0303 July 1975 07/03/1975 Letter Operating Status Reports of June 1975 ML18227B0991975-06-0505 June 1975 06/05/1975 Letter Operating Status Reports of May 1975 ML18227B1001975-05-0505 May 1975 05/05/1975 Letter Operating Status Reports of April 1975 ML18227B1011975-04-0404 April 1975 04/04/1975 Letter Operating Status Reports of March 1975 ML18227B1021975-03-0606 March 1975 03/06/1975 Letter Operating Status Reports of February 1975 ML18227B1041975-02-0707 February 1975 02/07/1975 Letter Operating Status Reports of January 1975 ML18227B1031975-02-0707 February 1975 02/07/1975 Letter Operating Status Reports of January 1975 2020-04-09
[Table view] |
Text
NRC FoAM 195 V S NUCLEAR AEGVLATORYCo> SION Do M SEA (2 70) 0-250 51/335 FI u EA NRC DISTRIBUTION FQR PART 60 DOCKET MATERIAL MONTHLY REPORT TO: FROM: DATE OF DOCUMENT Florida Power & Light Co. 9 7 76 N,R C+ Miami, Florida DATE RECEIVED A. D. Schmidt 9 2076 BETTE R ONOTOAIZED PROP INPUT FORM NUMBER OF COPIES RECEIVED OORIGINAL UNCLASSIFIED One signed copy
//COP Y DE S C A I P T I 0 N ENCLOSU RE LETTER TRANS THE FOLLOWING: MONTHLY REPORT FOR Au ust 1976 PLANT & COMPONENT OPERABILITY &
AVAILABILITY'HISREPORT TO BE USED IN PREPARING GRAY BOOK BY PLANS 6c OPERATIONS'LANT NAME: (1-P)
ACKNOWLEDGED Turkey Point 3-& St. Lucie f11 QO NOT REMOV'E FOR ACTION/INFORMATION 9 21 76 RJL W CYS FO AC ON INTERNAL D IST RI BUTION KRJUJ E D
BRANCH CIIIEF L Lear/Ziemann Parrish Di s EXTERNAL DISTRIBUTION CO TOOL NUMBER
~pD~ Ft Bierce Fl ~
~C NSI PSSo Nflc FOAM 10ti IQ 70I
~ P ~
~
C ~ ~
~
h I1 ~ ~
h
~ ~
SIf ~
e '
0~
.~
~ ~
FLORIDA POWER 5 LIGHT COMPANY September 7, 1976 Office of Management Xnformation and .Program Controls U. S. Nuclear Regulatory Commission Washington, D. C. 20555, Gentlemen,.
Attached are the August, 1976 Operating Status Reports for Turkey'Point Unit Nos. 3 and 4 and St. Lucie Unit No. 1.
Very truly yours, A. D. Schmidt Vice President Power Resources VTC/PM Attachments
'cc: Mr. Norman C. Moseley Jack R. Newman, Esquire gg~
g
~Iia~~
g~g%
u'~'DIiIi go)I
APPENDIX D AVERAGE DAILY UtPIT POWER IEVEL DocKET No ~ 50 - 250 ~
vNIT Turke Point Unit No. 3 DIIDD S~ 7 1676 "
COM'LETED DY 1
~~~s RDRTR August 1976 DAY AVERAGE DAILY P(NER LEVEL DAY AVERAGE DAILY POWER LEVEL ta)'7tc-wct) (Nfc Nct) 17 411 2 645 18 19 4 635 20 675 Gno 613 22 7 576 ?3 656 24 619 25.
10 G38 26 G38 27 12 616 28 13 29 14 30 15 31 16 3 NOTE: Daily, average power level greater than GGG )4Ne due to cooler condenser cooling, water.
1 2
DOC:."== iO. 50 - 250 e UhiT S.gt DD,h".AS dt'.h~ Oys-2 . --t~ UN Nhhp- Turkev point Unit No. 3
~ 1
~ sn ~ 'p Sept. 3, 1976
\ ~ Crt yfyo I V. T. Chilson (305) 552 - 3830
~-PC. kDN 8 Afl e: '3975
~
3 S 6 6'h e/ yv UWT:CN 8=: 2'AC.Ceh QoR 7'1 S: SCURDU77;.D (3 fnoogS) 3ZASON(1) EDUCING pO '-"R(2) cM."c. u t"-.-"yg/cox"".y.g
- 16. 76-08-05 .S Load redaction to perform periodic test of turbine main steam stop, reheat stop, and reheat intcrccpt valves. (Non-nuclear system) 17 76-08-0 N/A Load reduction to locate and repair condenser tube leak.
(Non-nuclear system) 76-08-lq Unit No. 3 vas removed from service to repair leaking drain 18 S"'01.8 v~lve located inside containment (Nuclear System) 3 19 76-08-2 167.7 Unit No. 3 Mas removed from service to locate and repair tube leak in steam gene ator No. 3A. There vere no significan 6;uantitics of radioact've material released as ra result ' of this smal), leak. Corrective action was to plug the le g tube. (Nuclear System)
~ t gntt yo. 3 operated *- pp:oxl=aeely lapg R p. dur.tng=a rhexteptfor load rod attune on A g st 6 and 6, outage of August 13 - 17, aad o =ega of Aaguss 23 to grpte.-.her 1, 1376.
APPENDIX D AVERAGE DAILY UNIT PONEB LEVEL DocKET No. 50 251 utirT Turkey point Unit No. 4 DATE4Se t. 3 1976.
coNPLETED Dx V. T. Chilson TELEPIIONE ~~~2,- 3830 FIGNTII August 1976 DAY AVI',BAGE D44ILY PONF'B IrEVEL DAY AVHBAGE DAILY PONEB LEVEL (Nwc-Nct) (FMe-Net) 1 654 17 657 2 656 18 658 3 655 19 667 20 5 653 21 657 6 651 22 654 23 642 24 25 10 653 26'7 11 652 650 12 . G5 9 28 13 G61 29 658 14 30 UU 655'aily 31'OTE 16 655 average power level .
greater than 666 )4(4e due, to cooler condenser. cooling water.
APPEEDXX D DOCNET NO. 50 251 UNYT SHETDO'(FANS AND PO'n=R REDDCT ONS DN . NPXE Turkev Point 'Unit No. 4" DATE Sent. 3, 1976 a'L a a< w v CORP ETED BY V. T. Chilson TELEPHON. 305 552 3830 P PG:l .".Q::.8 A~aust 1976 Pea XETHOD Oi
'V ~ ~ ~ \ 'P TYPE $ !VJT TNG DOXN F: FORCED DDRAT ON TEE PICTOR OR-NO. S: SCE DJLED (ECCRS) REi iSON(1) RCDDCTNG PO 'ER(2} CORRECT VE ACTXONS/CO)RENTS 4: O ")" 4" IEEPLATN)
NONE Unit No. 4 operated at approximately 100% R.p. during month.
0 0 APPFtlf>IX C OPERATIiNG DATA REPORT
'NO ~ 50 2 197G'OCKET tAUT Turke
'DATE Se t. 3 Point Unit No.
1976 4
REPORT I!OilTII hu ust CONI'IRETED BY V. T~ Chilson TETLEPHONE 305 552 3830 e
OPL'RATIleG SThTUS .
'2
- 1. REPORTING PERIOD: 0001.76,08,01 Gl!OSS HOURS It( REPORTING PERIOD: 744.0 Tilfi101ff'll 7400 7(i Oft 31 2~ cvftf Ete'I'LY PLOTFoc lzs D~c<ER LEYEL (>Aft) '220(f 4 NAX. DEPEND. CAPAC TY (>IN -tfct) 2
- 3. POhVR LEVEI TO 'i(RICH R STRICTED (IF AtlY) . (IQjc-ttct) t NONE 4~ REhSO!IS FOR RESTRICTION (IF ANY): ~
5.
6.
7~
NU>!I!ER OF HOURS Pefls!C.OR IVAS I!EACTOR RESERVE SliUT Ol0t HOVRS GEttERATOR 0,'I LIatE ~
CRITICAL..
hOURS..........
~ ~
~ ..
~
'- '8 THIS I!ONTII 'YEAR TO DATE 74444.0 744.0 4
4 371.5 200.6 CUNUL'iT"VE 20 017.4 914. 2
- 8. UNIT PeESERVE Sf!UTEO:w.: HOURS.............. CIIOS"I IIER 1'L ll'RCY '".CEIISR%TER ifeill7..... I 027 4'l9 '~2479,
- 10. GROSS ELEC"'RICAL F. ERQ'I QF SPRAT 0 (>~(if) .,
- 51) 287 2 856 508 12 '835 585 I ET EL>> CTRICAL FNFRGY QE EPehTED (R itl) -
486 418 2 709 8G4 12, 168 4949 12 'eEACTOR Sf'.RVICE FACTOR.... ... ..... .. 100.0 74 ' '
75.5
- 13. REhCTOR AVAIL'BII.IY FACTOR.. 100.0 74.7 75.9
- 14. UitIT SERVICE FACTOP ~ ~ ~ ~ ~ ~ ')00 0 71.7- 71,$
- 15. EIIIT nenzl.nell.i Y PRC,OR.......... ~ ~ ~
.. I......
~ ~ ~ ~ ~00.0 ~77 7~
16 VtfIT CAPhCITY FAC OR (Using l'!DC) 9ft 2 ~6.S
- 17. UtlIT CAPhCITY FACTOR (Using Design >We) .. ~ 94 ~ 3 66.8 66.2 184 lAIIT FORCED OVTAGc RATE ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 0 4.G 3.8
- 19. SHVTDO!G!S SCHEDUI,ED OVER NEXT 6 )40'.fTHS (TYPE, DhTE, AND,DUPehTION OF El>>C;I)
NONE
- 20. IF SllVTDO!(N AT END 0: F 'PORT PERIOD, ESTINATED DAT 0 STRRTOP:
n 214, UNITS IN TES'T STATUS (PPIOR TO CO>LR!ERCIAL OPEftATIO:I) FORECAST ACHIEVED IleITIAL CRI. I CAIPITY IaNITIAle Ele>>E'CTFICITY COv.fERCI AI, OPE f!ATION ~
APPENDIX B AVERAGE DAILY UNIT PONER LEVEL DOCKET'o. 50 - 335 UNIT St. Lucie Unit No. 1 DATE Se t. 3, 1976 .
CONPLETED BY V. T. Chil.:on TELEPIIONE < 552 '- 3830 NONTII hocOusl: 1976 DAY AVERAGE DAILY POKER LEVEI DAY AVERAGE DA'ILY POMER LEVEL
(!."Ae-Not) (Vitae Net) 17 18 19 20 21 22 23 25 10 26 27 12 28 13 29 30 31
/ h
1
, APPE: DTX D DOCEET NO. 50 -
St. Lucie Unit 335'Y UN SECTDO;5S AND P~n=R 3"-DU aZCNS UNXTNi~gE No. 1 cn
'R 2Z.T'NG
~ l CPE: ATO? AND TELEP RON .
qnz . 552 3830, R"PCRT ycNTE August 1976 ivETUOD OF 1 Ehg vL\~ '1 ~ly TYPE S!O'b DCrN 08 Ul )
~
2 ~
~ ~
FORCED DDPXTXCN g!!E REA TCR CR NO. S: SCEEDU~ (HCCRS) REASCN{1! RFDUCTNG PC:KR(2) CORM~CTT'vr. AC TONS/CCyvENTS vcr e vn q q) 16 75-07-10 F 744.0 Unit was renoved from service for reactor tests and inspection. (Nuclear System)
Unit Ão. 1 reactor inspection continued dur(ng month.
APPE!!DIH C OPERATIt!G DPRLTA REPORT DOCKET NO. 50 335 UNIT St.. Lucic Unit I
'DATE Sc t. 3 1976 REPORT l(OHT(I~A. tt 119976 ~
~
CO.'IPI.ETED BY V. T: Chilson OPERATI!!G S tiTUS a
- l. REI'ORTIttG PERIOD: 000) 76 08 0) ~GROSS HOURS ZN REPORTINC PERIOD:
TIIIIOIIG)l YACC~76 D 744 0
- 2. CORRIE'I'LY ill)'italtlXED PCEER L YPL (tali) 2 2566 ffhXP Df'PH)JD ~ CAPACITY '(Ri'tc Nct) t ~gZ !(Et animate(f)
DHEXGII EL"CTRICAL II TXI:G ()illa lt ~t- 807.
- 3. PONER LEVEL TO WHICH RESTRICTED (IF ANY) (I".fc-!tet) t 722 4 ~ REASO!!S FOR RESTI!ICTION (IF ANY):
"Temporary 90/ rcdtriction pcndin8 reactor coolant flow analysis" TlfIS NO!I'I'H YEAR TO DATE CUliULATIVE 5, IIUf:DER OF HOURS REACTOR WAS CRITICAL. a ~ a ,~1 3 6.6 1 366.6
- 6. REACTOR RESERVE SHUTDOfftt HOURS ~ -, ~ ~ ~ ~ ~ ~ ~ ~ tl/h - Nlb 7~ HOVRS G i! RATOR OAN I>lt E ~ ~ ~ ~ ~ ~ ~ ~ .~ ~ *~ ~ ~ ~ ~ ~ 1 121.9 121!9 8 ~ Ua!IT RHSERVE SHUTDONai !IOURS ~ ~ . ~ ~ . ~ .. ~ ~ . ~ ~
o) 9~ CROSS THER J)L ENERGY GENHRATLD (Ntitf) . ~... 0- ~ 1 495 088 1 495 088 lO ~ GROSS ELEC lt C il I'NERCY CENEFVLT D (NNH) ~ ~
0- '418 670 '418 670
- 11. NET ELHCTf!ICAL ENERGY, CE!lERA"'HD (fS)lH).... 37!i 180 '374 180
- 12. PaHACTOR SERVICE FACTOP.. ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0' 48.4 ' '8.4 136 REACTOR AVAIIAABILZTYPACAOR. .. ~... ~..... ' 0~0 48. 4i 48.4 3:
~
1(f ~ 'NIT SHRVICH FACTO!i~ ~
". ~ ~ ~ ~ ~ ~ ~ ~ a ~ ~ ~ 0.0 4i0. 3 40. 3
- 15. UNIT AVhlI.ABILITY FACTOR......:.......... 0.0 40. 40.3
- 16. 'U!'IT CAPIiCITY I'ACTOR (0" ing NDC) ..!... .. ~ 0:0 )6.7 16.7
- 17. UNIT CAPACITY FiXCTOR (Using Dosign FIWc) .. ~ 0.0 16.7 =- ~ 16. 7 e
189 UNIT PORC 'D OUTPXC>> RATE ~ ~ ~ a ~ a a ~ ~ ~ ~ ~ ~
19 ~ SHVTDOHHS SCHEDU'D OVER tlHXT 6 NONTHS (TYPE, DATE, AND DURATION OF EACH }:
~
N/A 20 ~ ZF SIIU'fDONN AT END OF REPORT PERIOD, HSTINATED D!iTH OF STARTUP:
21 ~ UNITS I!I T 'ST STATUS (PRIOR'TO CO'.P36aERCZiiL OPERATIOal): FORECAST ACHIEVED INITIAL CRI Tl CALITY April 22, 1976 INITIAL HIPECTRZCITY )~fa 7~@ 76 COFRH:RCI iiL Of'ERATIO.'I 6
NOTE: ()). Unit in test status
0 iF ~
.r ~
' .