ML18227A408
| ML18227A408 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 01/07/1977 |
| From: | Schmidt A Florida Power & Light Co |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| Download: ML18227A408 (15) | |
Text
TO:
USNRC FROM:
BLORDIA PWR 6 LIGHT CO.
MIAMI, FLORDIA A.D. SCHMIDT NRC fOBNI 195 U.S.,NVCLLAB I'ICGULATOBYCOMMISSION" (2-7G)
'I
~I NRC DISTR l8UTION Fon RT 60 DOC I(ET IE/IATERlAL OOCKETNU 50-25(
251 35 FILE NUMBER MONTHLY REPORT OATE OF OOCUMFNT 1/7/77 OATL RECFIVEO 1/.g/77 QLETTER DOR IGINAL OCOPV CINOTORIZEO BUNC LASS IF I E 0 PROP INPUT FORM NUMBER OF COPIES RECEIVED DESCRIPTION LETTER TRANS THE FOLLOWING:
MO)THLY REPORT EOR DECFIIBER 1976 PLANT & COMPONENT OPERABILITY &
AVAILABILITY, THIS REPORT TO BE USED IN PREPARING GRAY BOOK BY PLANS &
OPERATIONS'LANT NAME~
TURKEY PT ~
//
1 3
6 4
'ACKNOWLEDGED OKOT gggoy@
MIPC W
CYS I'OR ACT ON FOR ACTION/INFORMATION INTERNALDISTRI BUTION MC PDR
'CDOMID BRANCH CHIEF L ZIEMANN /LEAR PARRISH DIGGS EXTERNAL DISTRIBUTIOIV I IIAMI I'I..
CONTROL NUiVlBER NRC FORM 195 (2 7GI
P. O. IfOX 013100. MIAMI, FL 33101
/y
~lp
~ J
~
C
~
FLORIDAPOWEH St LIGHT COMPANY I
~
~
P IK
~I g
~
. January 7,
1977 Office of Management Information and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C.
20555
- ~ ~~i~N gg f
~ Qe4~~>>
hi Gentlemen:
Attached are the December, 1976 Operating Status Reports for Turkey Point Unit Nos..3 and 4 and St. Lucie Unit No. 1.
Very truly yours, A. D. Schmidt Vice President Power Resources VTC/DDC cc:
Mr. Norman C. Moseley Jack R.
Newman, Esquire PEOPLE.
~. SERVING PCOf'LC
r.,
a u
1k II Jj
~1 g ~,
I
~ '
APPENDS B
AVERAGE DAILY UNIT POWER LEVEL
'I
~
~
I DOCKET NO.
-UNIT DATE COMPLETED BY 50 250 Turkey Point Unit No.
Jan.
6 1977 V. T. Chi son TELEPHONE (305) 552-3830 MONTH
- December, 19 7'6 DAY AVERAGE DAILY POWER LEVEL (NHe-Net)
DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 17 3
18 19 20 21 22 23 25 10 26 27 12 28 13 29 14 30 15 31 16
APPENDIX C OPERATING DATA REPO~
REPORT MONTH December 1976 e
DOCKET NO, 50 250 UNIT Turkey Point Unit No.
3 DATE Jan.
6, 1977 C'OMPLETED BY V. T. Chilson OPERATING STATUS TELEPHONE 1,
REPORTING PERIOD:
0001 76 12 01 GROSS HOURS 'IN REPORTING PERIOD:
THROUGH 4
2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2200.
Mlcl.DNPNDD. DAPADPPP (MNe-Nee):
~66 DESIGN ELECTRICAL RATING (MWe-Net):
693 744.0 3.
POWER LEVEL TO WHICH RESTRICTED (IP ANY)
(MWe-iVet):
46 REASONS POR RESTRZCTIOAV (IF ANY):.
NONE THIS MONTH YEAR TO DATE CUMULATIVE 56 NiDiBERS OF HOURS REACTOR WAS CRITICAL.....
0 0 6 760.0 28 040.1 6.
REACTOR RESERVE SHUTDOWN HOURS ~ ~ ~ ~ ~ ~. ~. ~..
0 0 64.2 67.4 7 ~
HOURS GENERATOR OVA LINE. ~..............
~..
0.0 6 669.1 27 039.1 80 UNIT RESERVE SHUTDOWN HOURS ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
0.0 0.0 85.0 9.
GROSS THERMAL ENERGY GLVERATED (MiiH)...... 14 417 328 51 729 588 10.
GROSS ELECTRICAL ENERGY GLVERATED (i%H)...
0 4 555 215 16 570 451 11.
NET ELECTRICAL ENERGY GENERATED (MiiH)..... - 1 706 4 320 173 15 675 935 12.
REACTOR SERVICE FACTOR.
0.0 77.0 78.5 13.
REACTOR AVAILABILITYFACTOR,,
~...,,.....,
0.0 77.7 78.7 14.
UiNIT SERVICE FACTOR 0.0 15.
UNIT AVAILABILITYFACTOR. ~ ~ ~ eee
~ ~ ~ ~ ~ ~ ~ ~ ~ 6 ~
75.9 75.9 16.
iLVIT CAPACITY PACZOR (Using (MDC).....:...
73.8 66.8 17.
UNIT CAPACITY FAC10R (Using Design MWe)...
0 0 71.0 63.3 18.
19.
UNIT FORCED OUTAGE RATEe. ~. ~..........
~...
0 0 0.1 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPED DATED AVA DDURATION OF EACH) 2.9 20.
ZP SHUTDOWN AT END OP REPORT PERIOD, ESTLM(ATED DATE OP STAR UP:
Jan 16 1977 21.
UNITS IiV TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIALCRITICALITY ZNITIAL ELECTRICITY COMMERCIAL OPERATION
(1)
REASON h:
EQUIPMENT FAILURE (EXPLAIN)
B:
MAINT. OR TEST C
REFUELING D:
RECULATORY RESTRICTION E:
OPERATOR TRAINING AND LICENSE EXAMINATION P:
ADMINISTRATIVE G:
OPERATIONAL ERROR (EXPLAIN)
H:
OTHER (EXPLAIN)
APPENDIX D UHIT SBUTD(MNS AND POHER REDUCTIONS REPORT MONTH December 1976 DOCKET NO.
50 - 250 UNIT NAME Turkey Point Unit No.
3 DATE Jan.
6, 1977 COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3B30 (2)
METHOD 1:
MANUAL 2:
MANUAL SCRAM 3:
OlliER (EX%LAIN)
NO.
DATE TYPE P:
FORCED S
SCHEDULED DURATION (BOURS)
REASON(1)
METHOD OP SllUTTIHG Dpi THE REACTOR OR REDUCING PONER(2)
CORRECTIVE ACTIONS/CO:IHENTS 21 76-11-14 744.0 Unit No.
3 removed from service for refueling, maintenance, and inspections.
(Continued from previous month)
. (Nuclear and Non-nuclear systems)
~,
SUMMARY
Unit No.
3 removed from service for refueling, maintenance, and inspections.
(Continued from previous month) 4
~
o
0 APPENDIX B AVERAGE DAILY UNIT POWER LEVEL g
~
I DOCKET NO.
.UNIT
~ DATE 50 251 Turkey. Point Unit No.
4 Jan.
6, 1977 COMPLETED BY >- T. Chilson TELEPHONE (305) 552-3830 MONTH
- December, 1 9 7 6 DAY AVERAGE DAILY POWER LEVEL (Mle-Net)
DAY AVERAGE DAILY POWER LEVEL (Mfe-Net) 690 17 3
6 10 12 14'5 16 17 521
'83 689 687 661 664 69.6 690 689 684 680.
687 687 18 19 20 21 22 25 26 27 28 29
-30 NOTE:
697 689 605 683 692 692 693 695
'92 691 693 689 688 690 Average daily power level greater than 666 Wih due to cooler condenser cooling water.
APPENDIX C OPERATING DATA REPORT~
~i REPORT MONTH
- December, 1976
~
~
DOCKET Np.
50 - 250 UNIT Turke Point Unit No.
DATE Jan.
6 1977
'OUPLE ED BY V. T. Chilson OPERATING STATUS 1 ~
REPORTING PERIOD'001
> 76> 12 ipl GROSS HOURS IN REPORTING PERIOD'HRpUGH 2400,76,12~31 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt):
MAX.DEPEHO ~ CAPACITY ON -N i):
DESIGN ELECTRICAL RATING (MWe"Net):
693 3.
POWER LEVEL Tp WHICH RESTRICTED (IP ANY)
(MWe-Net):
NONE 4.
REASONS FOR RESTRICTION (IP AVl):
744.p THIS MONTH YEAR TO DATE CUMULATIVE 5.
NUMBERS OF HOURS REACTOR WAS CRITICAL.... ~
6 075.9 21 721.8 6.
REACTOR RESERVE SHUTDOWN HOURS............
21.7 21.7 138 ~ 8 le HOURS GENERATOR ON LINE.
~
~
~
670il 5 828.4 20 542.0 8.
UNIT RESERVE SHUTDOWN HOURS.....
~.........
0.0 0.0 0.0 9.
GROSS THERMAL ENERGY GENERATED (MWH).....,
1 453 037 ll 103 004 41 751 640 10.
GROSS ELECTRICAL ENERGY OK&RATED (MWH)...
479 100 3 978 606 13 957 688 11.
NET ELECTRICAL EJERGY GENERATED (AH).....
455 502 3 771 836 13 230 466 12.
REACTOR SERVICE FACTOR.
96.5 69.2 73 '
13.
REACTOR AVAILABILITYFACTOR...............
99 '
69.5 74.2 14.
UNIT SERVICE FACTOR.
~ ~ ~ ~ ~ ~ ~ to ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
- 66. 4 69.8 15.
UNIT AVAILABILITYFACTOR..................
90.1 66.4 69.8 16.
UNIT CAPACITY FACTOR (Using (MDC)... ~ ~ ~...
91' 17.
UNIT CAPACITY FACTOR (Using Design MWe)...
88 3 64.5 62.0 68.2 64.8 18.
UNIT FORCED OUTAGE RATE...........'........
- 0 5 3.7 3.6 19.
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Repair steam generator tube leak - Jan.
6, 1977 through Jan.
12, 1977.
Refueling, maintenance, and inspections - April 4, 1977 through May 22, 1977.
20.
IF SHUTDOWiN AT END OF REPORT PERIOD, ESTLQTED DATE OF STARTUP:
21.
UNITS IN TEST STATUS (PRIOR Tp COMMERCIAL OPERATION):
PORECAST ACHIEVED INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION
1 REASON A:
EQUIPMENT FAILURE (EXPIAIN)
B:
MAINT. OR TEST C:
REFUELING D:
REGULATORY RESTRICTION E
OPERATOR TRAINING AND LICENSE EXAHINATION F
ADlIINISTRATIVE G:
OPERATIONAL ERROR (EXPLAIN)
H:
OTHER (EXPLAIN)
APPENDIX D UNIT SIIUTDOWNS AND POWER REDUCTIONS REPORT MONTIIDecember 1976 DOCKET NO.
50 - 251 UNIT NAHE Turke Point Unit No. 4 DATE Jan.
6 1977 COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3830 (2)
METHOD 1:
MAIiVAL 2:
.MANUAL SCRAH 3:
AUTOHATIC SCRAM OTIIER (EXPLAIN)
NO.
TYPE F:
FORCF3)
S SCHEDULED DURATION (BOURS)
REASON(1)
METHOD OF SHUTTLNG DOWN THE REACTOR OR REDUCING POWER(2)
CORRECTIVE ACTIONS/CRDIENTS 28 76-10-28 69.4 Unit No.
4 was removed from service for steam gener-ator tube inspection program.
(Continued from previous month)
(Nuclear system) 29 76-12-04 3.2 Unit No.
4 tripped on steam generator No.
4 A high level during a transient condition caused by the loss of a vital instrument bus Fewer supply.
(Nuclear system) 30 76-12-20 1.3 Unit No.
4 tripped during a transient condition cause by the failure of a component in nuclear instrumen-tation system channel N-41.
(Nuclear system)
SUMMARY
- Unit No.
4 was returned to service on December 3, 1976 following completion of steam generator tube inspection program.
Unit operated at 100X R.P. during month except for outages on Dec. 4, 1976 and Dec. 20, 1976.
APPENDIX B AVERAGE DAILY UNIT POWER LEVEL I
5
~
I r
C DOCKET NO. 50 335
'.UNIT St.
Luce.e Unzt No.
1 I
DATE Jan.
6, 1977 COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3830 MONTH December DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
DAY AVERAGE DAILY POWrR LEVEL (MWe-Net) 3 18 19 10 12 13 14 15 20 21 22 23 24 25 26 27 28'9 30 31 370 377 376 374 380 374 371 378 376 373 374 16
APPENDIX C OPERATING DATA REPORT DOCXET NO. 50 - 335 REPORT MONTH December, 1976 OPERATING STATUS UNIT St ~ Lucio Unit No. 1 J'ATE Jan.
6, 1977 COMPLETED BY V. T. Chilson
\\ ~
TELEPHONE (305) 552-3830 1.
REPORTING PERIOD:
0001.76912,21 GROSS HOURS IN REPORTING PERIOD:
THROUGH 24 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt):
2560 MAl(.DEPEND. CAPACITY (MWe"Net):
~ 802 Estimated)
DESIGN ELECTRZCAL RATING (MWe-Net):
802 264.0 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY)
(MWe-Net):
722 4.
REASONS FOR RESTRICTION (IF AWa ):
"Temporary 90X restriction pending reactor coolant flow analysis" THIS MONTH YEAR TO DATE CUMULATIVE 5 ~
NUAABERS OF HOURS REACTOR WAS CRITICAL
~ ~ ~ ~
264.0 264.0 6.
REAUTOR RESERVE SRUTDODE EOIIIIS............
0.0 7.
IIOURS OESEIIATOR OE LTSE.......,....
264.0 13.
REACTOR AVAILABILITYFACTOR.............:.
100.0 100.0 14.
UNZT SERVICE FACTOR............,....,...,.
100.0 15.
'UNIT AVAILABILITYFACTOR..............,...
100.0 100.0 100.0 16 UNIT CAPACITY FACTOR (Using (MDC). ~ ~ ~. ~.,
46.7 46.7 17.
UNIT CAPACITY FACTOR (Using Design MWe)...
46 7
46.7
\\
18.
UNIT FORCED OUTAGE RATE...................
0.0 0.0 8.
UNIT RESERVE SHUTDOWN HOURS...............
0 0.0 9.
GROSS THEPRlAL BARGY GE'.STERATED (MWH) ~ ~.. ~.
~
347 603 347 603 10.
GROSS ELECTRZCAL FNERGY GERKRATED (MWH)...
108 270 108 270 11.
NET ELECTRICAL ENERGY GE:IERATED (Ã%) ~ ~ ~ ~ ~
98 975 98 975 12.
REACTOR SERVICE FACTOR 100.0 100.0 0.0 347 603 108 270 98 975 100.0 100.0 100.0 100.0 46.7 46.7 0.0 19.
SHUTDOWANS SCHEDULED OVER NEXT 6 MO~iS (TYPE, DATE> AND DURATION OF EACH):
20.
IF SHUTDOWLN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
21.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIALCRITICALITY INITIALELECTRICITY CORAAERCIAL OPERATION 4
49221 22, 1976
~EA 7
1976 D
21 1976
(1)
REASON A:
EQUIPMENT FAILURE (EXPLAIN)
B:
MAINT. OR TEST C:
REFUELING D:
REGULATORY RESTRICTION E:
OPERATOR TRAINING AIID LICENSE EXAMINATION F:
ADttIHISTRATIVE G:
OPERATIOtlAL ERROR (EXPLAIN)
H:
OTHER (FJ(PLAIN)
APPEtlDIX D UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH December 1976 DOCKET NO.
I UNIT NAME St. Lucie Unit o.
1 DATE Jan.
6, 1977 CO'IPI ETED BY V
T Chilson TELEPHONE (305) 552-3830.
(2) tIETHOD 1:
MANUAL 2:
.MANUAI SCRAM 3:
AUTOMATIC SCRAM OTHER (EXPLAIN)
NO.
DATE TYPE F! FORCED S:
SCHEDULED DURATION (HOURS)
REASON (1)
METHOD OF SHUTTING DOWN THE REACTOR OR REDUCING POWER(2)
CORRECTIVE ACTIONS/COtDIENTS NONE
SUMMARY
- Unit No. 1 vas placed in commercial operation on December 21, 1976, at 12:01 a.m.
Unit operated at approximately 50X R.P. through end of month.
4=