U.S. NUCLEAR REGULATORY COMMISSIO DOCKET NUMBER 0-25 TO:
Hi Ri Co FROMI Florida Power 6 Light Company Miami, Florida Ai Di Schmidt QLETTER Q OR IGINAL QCOI V Q NOTOR IZEO QUNCLASSIFIE0
, PROP INPUT FORM NRC DISTRIBUTION FoR PART 50 DOCKET MATERIAL FILE NUMBER IeNTHL DATE OF OOCUMENT ll/S/77
/
OATE RECEIVED I
ll/ll/77 NUMBER OF COPIES RECEIVEO DESCRIPTION Letter trans the f'ollowing.'NCL.OSURE Month~ Report l;or October'977 Plant
& Component Operability
&, Availability.
Thi.s Report to be used in preparing Gray Rook by PlanS h Operations.
PLANT QME Turkey Point Units 3
8 4
Sti Lucie Unit 1 RJL 11/14/77 (1-P)
(9-P)
FOR ACTION/INFORMATION INTERNALD ISTR I BUTION nc e
~ Arear EXTERNALDISTRIBUTION CONTROL NUMBER lv0103
/
NRC FORM 19d I2 7d)
~m(ggIt ggP!(fY 11L @Pl I
FLORIOA POWER & LIGHT COMPANY November 5,
1977 Office of Management, Information and Program Controls U. S. Nuclear Regulatory Commission Nashington, D. C.
20555 Gentlemen:
Attached are the October, 1977, Operating Status Reports for Turkey Point Unit Nos.
3 and 4 and St. Lucie Unit No. 1.
Very truly yours, D. Schmidt Vice President Power Resources VTC/DDC cc:
Mr. James P. O'Reilly Robert Lowenstein, Esquire 77n1 ~rr01 Qe PEOPLE... SERVING PEOPLE
0 APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
Turkey Point UNIT Unit No.
3 DATE COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3824 MONTH OCTOBER 1977 DAY AVERAGE DAILY POWER.LEVEL I
(Nfe-Net)
DAY AVEBAGE DAILYPO~ LEVEL (MWe-Net) 3 5
10 12 13
'4 15 16 593 629 636 639 639 635 636 637 639 637 632 573 624 625 625 624 17 18 19 20 21'2 24 25 26 27 28 29 30 622 623 618 620 620 622 618 615 615 615 610 615 632 633
OPERATING STATUS OPFRATING DATAREPORT DOCKET NO.
DATE Kg~~77 COhiPLETED BY >-T. Chilson TELEPHONE ~305 552-3525 Notes
- 1. Unit Name:
- 2. Reportfng Period: October 1977
- 3. I.icensed Thermal Power (MWt):
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
7.
aximum De endable Ca acit et MWe:
M p
p y(N
)
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted, IfAny (Net MWe):
- 10. Reasons For Restrictions, IfAny:
NO.
This Month Yr:to-Date I
Cumulative 43'17..6 34 673.1 296.0 633.0 43.7 ill.2.
33" 534;1 495. 0 85.0 960 533 65 690 121 1 628 892 20 957 262 386 811 163 971'
" 19'39 906 89..0'7..
9 89.0 78.1 70.1 85.7
- 82. 4
'66.5 2.6 2.9' Jan.
- 16. 1978
- 11. Hours In Reporting Period 7
- 12. Number Of Hours Reactor Was Critical 13, Reactor Reserv~ Shutdown Hours '4. Hours Generator On-Line 743.8 6
- 16. Gross Thermal Energy Generated (MWH) 13
- 17. Gross Electrical Energy Generated (MWH) 489 515
- 18. Net Electrical Energy Generated (hIWH) 464 396 4
- 19. Unit Service Factor 99.8
- 20. Unit AvailabilityFactor' 99 ~ 8
- 21. Unit Capacity Factor (Using MDCNet)
- 23. Unit Forced Outage Rate 0.2,
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each)
Refuelin maintenance and ins ections - Hov. 19 1977
- 25. IfShut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COhlMERCIALOPERATION
.)
REASON A:
+UIPHEHT FAILURE (EXPIAIH)
B:
Eihiiff. OR TEST C:
REFUEI.IHC D:
REGULATORY RESTRICTIOH E:
OPCRATOR TRAIHINC AND I.ICEHSE EXAMIHATIOH F:
ADIIINISTRATIVE C:
OPERATIONAL ERROR (EXPIAIN)
H:
OTHER (EXPIAIN)
APPENDIX D UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT HONTN OCTOBER, 1977 DOCKET NO.
UNIT NAEIE DATE 50 - 250 Turkey Point Unit Ho.
3 Nov. 5 1977 TELEPHONE (305) 552 - 3824 COHPI.ETED BY V. T. Chilson
)
EIETNOD 1:
- HANUAI, 2:
EIANUAI. SCRAH 3:
AUTOHATIC SCRAH 4:
01 IIER (EXPIAIN)
NO.
DATE TYPE F:
FORCED S:
SCHEDULED DURATION (IIOURS)
REASON(1)
. HETHOD OF S)EUTTINC DOWN THE REACTOR OR REDUCIHC POWER(2)
CORRECTIVE ACTIONS/COEIMENTS 25 77-10-12 1.2 Unit trip caused by malfunction of the generator voltage regulator.
Corrective actions included repairing a faulty component in the voltage regulator control system.
(Hon-nuclear system)
SUMMARY
Unit No. 3 operated at approximately 100X R.P., except for outage on Scptembcr 12, 1977.
0 I
APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 251 Turkey Point UNIT Unit No.
4 DATE Nov.
5 1977 COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3824 MONTH
- OCTOBER, 1977 DAY AVERAGE DAILY POWER. LEVEL (MWe-Net)
DAY AVERAGE DAILYPO~ LEVEL (MWe-Net) 3
~
4 5
10 12 14 16 658 657 652 655 672 675 673 674 670 664 658 658 657 670 674 670 17 18 19 20 21 22 24 25 26 27 28 29 30 31 VaOTE:
668 671 665 665 665 666 672 62 647 648 647 269 Average daily power greater than 666 MÃe due to cooler condenser cooling water.
OP~cTING DATAREPORT DOCKET NO.
D4TE Hov.
5 1977 C051PLETED BY ~V. Chllson TELEFHOHE ~30 552-3524 OPERATING STATUS
]
Unit Name Turke Po U 1 o
- 2. Reporting period:
October 1977
- 3. Licensed Thermal Power (MWt):
- 4. Namephte Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net hWe) t Notes s
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, IfAny (Net MWe):
- 10. Reasons For Restrictions, IfAny:
NONE This Month s
Yr:to.Date Cumulative..
7 296.0 36'45.0 26 275.0 659.3 4 553.3 438.8:-
457 595 3 049 807 17 007 490 435 282 890 520
'620 &86 67.. 9 60..4'7.9 60.4 66.5 59.5 3.4 2.4
- 11. Hours In Reporting Period 45.
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 15. Unit Reserve Shutdown Favours 16.'ross Thermal Energy Generated (MWH) 1 443 071
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor
- 20. Unit AvailabilityFactor
,21. Unit Capacity Factor (Using MDC Net)
- 23. Unit Forced Outage Rate 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
s
- 25. IfShut Down At End Of Report Period, Estimated Date nf Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Nov. 11, 1977 Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION (9/77)
.)
REASotl h:
EQUIPHEHT FAII.URE (EXPLAIN)
B:
HhltlT. OR TEST C:
REFUEI.IHG D:
REGUIATOIIY RESTRICTION E:
t)l'ERATOR TRAIHIHG AHD LICFNSE EXAHINATIOH F:
AIIHINISTRATIVE G:
OPERATIOHAI. ERROR (EXPLAIN)
II:
OTHER (FBPLAItl)
APPEtiDIX D UNIT SIIUTIMMHS AND POIIER REDUCTIONS REPORT HOHTII OCTOBER. 1977 DOCKET tlo.
Turkey Point UNIT NAHE Unit Ho.
4 DATE Nov. 5 1977 COHPIZTED BY V. T. Chilson TELEPHONE (305) 552-3824
)
tlETIIOD I:
HAtlUAL 2:
HAHUAL SCRAII 3-AUIYIIIATICSCRAII 4:
OTIIER (EXPLAIN)
HO.
DATE TYPE Fi FORCED 8:
SCIIEDULED DURATION gIOURS)
REASON(1)
. HETNOD OF SNUTTIHG DOMN THE REACTOR OR REDUCING POMER(2)
CORRECTIVE ACTIONS/COHHEHTS 16 77-10-28 86.0 Unit was removed from service to locate and repair tube leak in steam generator No. 4B.
Corrective actions included plugging one leaking tube.
(Huclear system)
SUHHARY:
Unit No. 4 operated at approximately 10OX R.P. until October 28, 1977, when the unit was removed from service to repair steam generator No. 4B tube leak.
APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50 335 St. Lucie UNIT Unit No.'
DATE Nov. 5, 1977 COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3824 MONTH OCTOBER 1977 DAY AVERAGE DAILY POWER.LEVEL (Nfe-Net)
DAY AVERAGE DAILY POtPuR L VEL (MRe-Net) 17 789 3
18 19 791 791 20 779 21 763 22 792 793 10 12 13 14 16 232 740 773 785 787 789 789 24 25 26 27" 28 29 30 31 NOTE:
770 790 790 776 652 666 754 686 Average daily power greater than 777 MWe due to cooler condenser cooling water.
OPERATING DATAREPORT DOCKET NO.
DATE 3hz
'~977 COMPLETED BY 3LZ ~son TELEPHONE ~305 552-3824 OPERATING STATUS Notes I
Umt Name:
St. Lucie Unit No. 1
- 2. Reportmg Period:
Oct:ober 1977
- 3. Licensed Thermal Power (44IWt)t
- 4. Namephte Rating (Gross hIWe):
- 5. Design Electrical Rating (Net MWe):
7.
i m De ndable Ca acit et MWe:
22 777 Max mu pe p
y(N
)
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, IfAny (Net MWe):
- 10. Reasons For Restrictions, IfAny:
NONE This Month Yr.-to-Date 1
~
I
~ ~
Cumulative 7 560.0 6 182.5 6 446.5 101;5.
.'101.5 4 502 280 4 610 550
'4 223 721 4" 322'96 390 160 81;8 82.4 73.6 67.4 12.3 11.
9'97&
- 11. Hours In Reporting Period
'45. 0
- 12. Number Of Hours Reactor Was Critical '
523 ~ 3
- 13. Reactor Reserve Shutdown Hours JlilL~
- 15. Unit Reserve Shutdown E3ouzs
-0'-
- 17. Gross Electrical Energy Generated (MWH) 414
- 18. Net electrical Energy Generated (hIWH)
- 20. Unit AvailabilityFactor 69.4
- 21. Unit Capacity Factor (Using MDC Net)
I>>'3.
Unit Forced Outage Rate 24. Shutdowns Scheduled Over Next 6 hlonths (Type. Date, and Duration of Each):
~
Refuelin maintenance and ins ections March 15 June 6
- 25. IfShut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COhlhIERCIALOPERATION (oI77)
)
REASON A:
EqUIPNL'NT FAILURE (EXPLAIN)
B:
HAINT. OR TIST C
RL'FUbl IN(
D:
REGULATORY RESTRICTIOH E:
OPERATOR TRAINING AND LICENSE EXAHINATION F:
ADNIHISTRATIVE C:
OPERATIONAL ERROR (EXPLAIN)
H:
OTHER (FAPLAIN)
APPENDIX D UHIT SllUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT HAHE DATE 50 - 335 St. Lucis Unit No. 1 Nov.
5 1977 TELEPHONE (305) 552"3824 COHl LETED BY V. T. Cbilson
)
HETIIOD I:
HAHUAL 2:
HANUAL SCRAH 3:
AUTOHATIC SCRAH 4:
OTHER (EXPLAIN)
HO.
DATE TYPE F:
FORCED S:
SCHEDUr.ED DURATION (HOURS)
REASON(1)
. HETHOD OF SllUTTINC DOWN THE REACTOR OR REDUCINC POWER(2)
CORRECTIVE ACTIONS/COtlHEHTS 33 77-09-24 228.0 Unit was removed from service to perform preliminary warranty inspection.
(Continued from previous montb)
(Nuclear and non-nuclear systems)
SUHHARY:
Unit was returned to service on October 10, 1977, following completion of scheduled outago to perform preliminary warranty inspection.