Letter Operating Status Reports of May 1977
ML18227B075
Person / Time
Site: Saint Lucie, Turkey Point  NextEra Energy icon.png
Issue date: 06/06/1977
From: Schmidt A
Florida Power & Light Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML18227B075 (20)


Text

, NRQ FORM e195-

{2.18)

NRC'ISTRIBUTION U.S. NUCLEAR REGULATORY C ISSION FoR PART 50 DOCKET MATERIAL DOCK B

R Wd-,ZW'a@i SM

~LE OMBER OmIKY BE 8

TO:

No Ro Ca ETTER PfOR I'GINAL CICOP Y 0NOTOR IZED

~UNCLASSIFIED PROP INPUT FORM FROM:

Florida Pwr & Light -Company Miami, 'Fla.

Ai Di Schmidt DATE OF DOCUMENT 6/6/77

'DATE RECEIVED 6/8/77 NUMBER OF COPIES RECEIVED

/ S/'@~~~

DESCRIPTION I

Letter trans the following:...

ape?g gLI '4 A

i, gi' ENCLOSU RE'onth+Report for Plant' Component'perability

& Availgbility.-.-'.

This Report "to be used in preparing Gray Book-by Planh 8; Operations.

PLANT NAME:

Turkey Point Units 3 & 4 RJL S FOR CTI N (1-P)

FOR ACTION/I (9-P)

NFO RMATION DO NOT REMOVE XCKZOV/LEDGED

~e es INTERNALDISTRIBUTION,.

rane c

ss I Vi EXTERNALDISTRIBUTION l.4& r

~

4L CONT NUMBER 77i6000i4

I

~

~

E k

r j'>>

0 FLORIDAPOWER 84 LIGHTCOMPANY

" '" 'uI.

~ i iy9~

g gg A.&I'ugg<<>9>>

Office of Manaqement Information and Proqram Controls U. S. Nuclear Requlatorv Commission Washinqton, D. C.

20555

~gIItatory Docket File Gentlemen:

Attached are the Mav, 1977, OI3eratinq Status ReI3orts for Turkey Point Unit Nos.

3 and 4 and St. Lucie Unit No. l.

Very trulv yours, A. D. Schmidt Vice President Power Resources VTC/DDC cc:

Mr. Norman C. Moseley Robert Lowenstein, Esquire 77i60oO PEOPLE... SERVING PEOPLE

'\\

0

~

y.

RE.G5.~4F-O 0 c ug f gpggglT p-ggr~gQ$ lG 8

gp JQ8~g p>iQ,>>

p4,

t APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50 250 Turkey Point UNIT Unit No.

3 DATE June 3,

1977 COMPLETED BY V. T. Chilson TELEPHONE (305) 552 3769 MONTH DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 17 67 679 684 682 676 672 668 18 19 20 21 22 23 682 681 681 682 682 679 672 10 12 13 14 15 669 671 678 679 682 683.

683 311 25 26 27 28 29 30 NOTE:

671 665 669 671 678~

679 679 Average daily power greater than 666 MWe due to cooler condenser cooling water.

0

APPENDIX C OPERATZNG DATA REPORT REPORT MONTH Ma 1977 DOCKET NO.

Turkey Point UNIT DATE June 3

1 COMPLETED BY V. T OPERATING STATUS 1.

REPORTING PERIOD: 0001,77,05,01 GROSS HOURS ZN REPORTING PERIOD:

THROUGH 2400 77 05 31 2.

CUREEIULY AUZUQRZZED POIIER LEVEL (EUZ)

K\\X.DEPEND. CAPACITY (MWe-Net):

744.0 3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY)

(MWe-Net):

4.

REASONS FOR RESTRICTZON {IF ANY):

THIS MONTH YEAR TO DATE CUMULATIVE S.

RIIUSERS OP HOURS REACT'OR IIAS CRITICAL. ~

~ ~

~

VSS 4

'L12.'LE 6.

REACTOR RESERVE SHUTDOWN HOURS............ '0-7.

HOURS GENERATOR ON'LINE 732.8 2 979.3 8.

UNIT RESERVE SHUTDOWN HOURS.........,.

~... <<0-9 ~

GROSS THECAL ENERGY GENERATED (MWH).....,

1 599 328 6 382 473 30 018.5

~

85.0 58 112 061 10.

GROSS ELECTRICAL ENERGY GENERATED (MWH) ~

~.

11.

NET ELECTRICAL ENERGY GENERATED (MWH) ~ ~ ~ ~.

519 030 2 073 610 494 541 1 969 246 18 644 061 17 645 181 12 'EACTOR SERVZCE PACTOR....

99 '

13.

REACTOR AVAILABILITYFACTOR...............

99 '

14'NIT SERVICE FACTOR.

~.

86.3 86.3 82.2 79.2 79.4 76.3 15'NIT AVAILABILITYFACTOR...........,.....,

98.5 82.2 76.5 16.

KGT CAPA'CITY FACTOR (Using (MDC)..........

99 ~ 8

81. 6 68.1 17.

UNIT CAPACITY FACTOR (Using Design MWe)...

95' 18.

UNIT FORCED OUTAGE RATE...........,....,.

1.5 78.4 1.5 64.7 2.8 19.

SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Stean Generator Inspection -

July 10 - Aug. 6, 1977 20.

IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF 'STARTUP:

21.

UNITS IN TEST STATUS (PRIOR TO CORDKRCZAL OPERATION):

FORECAST ACHIEVED INITIALCRITICALITY INITIALELECTRZCITY COMMERCIAL OPERATION

1

.)

METHOD 1:

MANUAL 2::~UAL SCRAM 3:

AUTOMATIC SCRAM 4:

OTHER (EXPLAIN)

NO.

1)

REASON A:

EQUIPMENT FAILURE (EXPLAIH)

B:

MAINT. OR TEST C:

REFUELINC D:

RECULATORY RESTRICTION E:

OPERATOR TRAIHING AND LICENSE EXAMINATION F:

ADMINISTRATIVE C:

OPERATIONAL ERROR (EXPLAIN)

H:

OTllER (EXPLAIN) 7 DATE TYPB F:

FORCED S:

SCHEDULED DURATION (BOURS)

REASOH(1)

METHOD OF SIIUTTINC DOWN THE REACTOR OR REDUCINC POWER(2)

APPENDIX D UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET HO.

50 250 UNIT NAME DATE P

Unit No.

3 COMPLETED BY TELEPHONE CORRECTIVE ACTIONS/CRkfENTS 14 77-05-16 11.2 Unit No. 3 vas tripped by spurious operation of a relay in the reactor protection system.

(Nuclear System)

Unit operated at approximately 100X R.P.. except for outage on May 16, 1977.

t A

I

t APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50 Turkey Point UNIT Unit No.

4 DATE t'une 3

1977 COMPLETED BY V. T. Chilson TELEPHONE (305) 552 3769 MONTH May 19?7 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

DAY AVERAGE DAILY POWER LEVEL (MWe-Neo) 17 18 563 675 673 669 661 "49 19 20 21 22 23 24 10 26 12 13 27 28 29 30 16 NOTE:

Average daily power greater than 666 MWe due to cooler condenser cooling water.

APPEAADIX C OPERATING DATA REPORT DOCKET NO.

50 - 251 r ey o nt UNIT Unit NoP 4

REPORT MONTH OPERATING STATUS DATE June 3

1977 COMPLETED BY V. T. Chilson TELEPHONE (305) 552 - 3769 THROUGH 2400 77 05 31 2.

CEltREliELP AllZRORZZED PARER LRP L (REE):~

MAX DEPEND.

CAPACITY (MWe-Net):

666 3 ~

POWER LEVEL TO WHICH RESTRICTED (IF ANY)

~44e-Net):

4.

REASONS FOR RESTRICTION (IF ANY):

THIS MONTH YEAR TO DATE CUMULATIVE 5.

NUMBERS OF HOURS REACTOR WAS CRITICAL...,,

127.0 2 521.9 6.

RECTOR RESERVE SHUTDOWN HOURS.

4 ~ ~

~ - ~ ~ ~ ~ ~ ~

-'0- 7.

HOURS GENERATOR ON LINE........,........

~,

121.5 2 496.7 8.

UNIT RESERVE SHUTDOWN HOURS....,.......... 9.

GROSS THER4%!L ENERGY GENERATED (MtK)......

259 799 5 424 235 10.

GROSS ELECTRICAL ENERGY GWERATED (MWH)...

83 320 1 768 385 11.

NET ELECTRICAL ENERGY GENERATED (MWH)~....

77 271 1 680 145 12.

REACTOR SERVICE FACTOR........,...

~.......

69.6 13.

REACTOR AVAILABILITYFACTOR...............

17' 69.6

~24 243, 138. 8 23 038.8 48 483 605 15 726 068 14 910 611 73 '

73.7 14.

UNIT SERVICE FACTOR..

15.

UNIT AVAILABILITYFACTOR.. ~,

~. ~......

~....

16.3 68.9 69.7

69. 7 16.

'ElIT GAPA'CITY 'FACTOR (Using (MDC).........

17.

UNIT CAPACITY PACTOR (Using Design AAWe). ~.

18.

UNIT FORCED OUTAGE RATE......>>............

15.6 15.0 69.6 66.9 68.3 65.1 3.2 19.

SHUTDOWiNS SCHEDULED OVER NEKT 6 MOAAHS (TYPE, DATE, AND DURATION OF EACH):

20.

IF SHUTDOWN AT BARD OF REPORT PERIOD, ESTIMATED DATE OF.STARTUP:

21.

UNITS IN TEST STATUS (PRIOR TO COMMERCIAL.OPERATION):

INITIALCRITICALITY

~ 4 INITIALELECTRICITY COKKRCIAL OPERATION PORECAST ACHIEVED

0

~

~

I

I)

REASON A:

EQUIPMENT FAILURE (EXPLAIN)

B:

MAINT. OR TEST C:

REFUELING D:

REGULATORY RESTRICTION E:

OPERATOR TRAIHING AND LICENSE EXAMINATION F:

ADMINISTRATIVE G:

OPERATIONAL ERROR (EXPLAIN)

H:

OTHER (EXPLAIN)

APPENDIX D UNIT SHUTDOWNS AND POWER REDUCTIONS DATE COMPLETED BY Ju s TELEPHONE DOCKET NO.

50 - 251 UNIT NAME Turke Point U

No.

?)

METHOD 1:

MANUAL 2:.39QAJAL SCRAM 3:

AUTOMATIC SCRAM 4:

OTHER (EXPLAIN)

NO.

DATE TYPE F:

FORCED S:

SCHEDULED DURATION (BOURS)

REASON (1)

METHOD OF SHUTTIHG DOWN THE REACTOR OR REDUCING POWER(2)

CORRECTIVE ACTIONS/COMMENTS 77-04-26 74.3 Unit No.

4 was removed from service to repair steam generator No.

4C tube leak.

(Continued from previous month)

(Nuclear System) 77-05-09 548.2 Unit was removed from service for refueling, maint-

enance, and inspections.

(Nuclear and Non-nuclear Systems)

Unit No. 4 was removed from service for schedueled refueling, maintenance, and inspections on May 9, 1977.

/

0

~

g

~

APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

St. Lucre UNIT Un>t N< ' 1 DATE June 3.

1977 COMPLETED BY >- T. Chilson TELEPHONE (305) 552 3769 MONTH DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 670 DAY AVERAGE DAILY POWER LEVEL (K<e-Net) 585 17 10 12 13 14 15 678 692 702 687 684 678 665 657 584 197 712 672 336 18 19 20 21 22 23 25 26 27 28 29 30 31 748 742 526 748 716 743 745 683 697 492 740 739 731 480

t i

~

V

APPENDIX C OPERATING DATA REPORT REPORT MONTH DOCKET NO.

t ~

uc e UNIT Unit No. 1 DATE June 3, 1977 OPERATING STATUS COMPLETED BY V. T. Chilson TELEPHONE (305) 552 - 3769 l.

REPORTING PERIOD: 0 THROUGH 2.

CIIRIIEHTLT AUTHORIZES POIIER LEVEL (HWS):~26 MAX.DEPEND.

CAPACITY (MWe-Net):

777 Est.)

DESIGN ELECTRICAL RATING (MWe-Net):

802 3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY)

(MWe-Net)-

4.

REASONS FOR RESTRICTIOARt (ZF ANY):

NONE THIS MO'AAH YEAR TO DATE CUMULATIVE S.

!CMITES OP HOURS REACTOR WAS CRETTCAL.....

663.3 2 9199 6.

REACTOR RESERVE SHUTDOWN HOURS.

~ ~ ~

~ ~ ~ ~ ~ ~ ~ ~

8.2 8.2 7.

HOURS GENERATOR ON LIAME..................,

655.1 2 872.5 8.

UANIT RESERVE SHUTDOWN HOURS............... -0 9.

GROSS THERMAL EKRGY GEKRATED (MWH)......

1 519 476 6 225 958 10.

GROSS ELECTRICAL ENERGY GENERATED (MWH)...

478 400 2 023 400 11.

NET ELECTRICAL ENERGY G~ERATED (MWH).....

448 820 1 889 396

~32 6. 6 573 561 2 131 670 1 988 371 12.

REACTOR SERVICE FACTOR.

89.4 82 '

83. 4 13.

REACTOR AVAILABILITYFACTOR...............

82.4 83.6 14'iNIT SERVICE FACTOR.

88.0 79.3 80.7 15.

UNIT AVAILABILITYFACTOR........

~.........

88'0 79.3 16.

'WZT CAPACITY FACTOR (Using (MDC)....

77.6 67.1 17.

UNIT CAPACITY FAC10R (Using Design MWe). ~ ~

65.0 18.

UNIT FORCED OUTAGE RATE......

80.7 65.8 63.8 17.9 19.

SHUTDOWNS SCHEDULED OVER NEXT 6 MOTHS (TYPE, DATE, AND DURATION OF EACH):

20.

IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STAR'AAP:

21.

UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

INITIALCRITIC%.ITY INITIAL ELECTRZCITY COLDKRCIAL OPERATION FORECAST ACHIEVED

llETHOD 1:

MANUAL 2:

.MfdiUAL SCRAM 3:

AUTOMATIC SCRAM 4:

OTHER (EXPLAIN)

NO.

15 16 I)

REASON A:

EQUIPMENT FAILURE (EXPLAIN)

B:

MAItiT. OR TEST C:

REFUELING D:

RECULATORY RESTRICTION E:

OPERATOR TRAINING AND LICENSE EXAMINATION F:

ADMINISTRATIVE C:

OPERATIONAL ERROR (EXPLAIN)

H:

OTHER (EXPLAIN)

~)

DATE 77-05-10 77-05-16 TYPE F:

FORCED S:

SCHEDULED DURATION (BOURS)

REASON(1)

METHOD OF SHUTTING DOWN THE REACTOR OR REDUCINC POWER(2) 63.5 11.6 APPENDIX D UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50 - 335 UNIT NAME St. Lucie Unit No. 1 DATE June 3, 1977 COMPLETED BY V. T. Chilson TELEPHONE (305) 552 - 3769 CORRECTIVE ACTIONS/CRQKNTS Unit was removed from service to repair a leak located inside the containment building that could not be isolated.

(Nuclear System)

Unit was removed from service due to transient 4

condition on the transmission system.

(Non-nuclear System) 17 18 77-05-27 77-05-31 5.6 8.2 Unit was tripped during a transient condition by the steam generator. level protection system.

(Nuclear System@

Unit was tripped by actuation of the Loss of Field Relay.

Corrective actions included. replacement.:of generator exciter conponcnts.

(Non-nuclear System)

SUMMARY

Unit s operated at an avera'ge reactor power level of 95 X R.P. during month except for outages o

Ma 10 Ma 16 y

~

y

~

May 27, and May 31, 1977 '

~

~

~

~