Letter Operating Status Reports of February 1977
ML18227B079
Person / Time
Site: Saint Lucie, Turkey Point  
Issue date: 03/07/1977
From: Schmidt A
Florida Power & Light Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML18227B079 (15)


Text

NRC FORM 195 I2 76I U.Sa NUCLEAR REGULATORV CO ION DOCKET ER 0-33 250 51 NRC DISTRIBUTION FoR PART 50 DOCKET IVIATERIAL FILE N MONTHLY REPORT NRC TO:

FROM:

PPL Miami, Pl.

33101 Norman C. Moseley DATE OF DOCUMENT 0 DATE RE CEI V E 0 03-lII-QLE$7KR~

~ ~

QNOTORIZED QORIGINAL,~"

OUNCLASSIFIEO CJCOPV PROP INPUT FORM NUMBER OF COPIES RECEIVED

l. St n~g DESCRIPTION LETTER TRANS THE FOLLCMING:

( lpage

)

MONTHLY-REPORT FOR FEBRUARY, 1977 PLANT & COMPONENT OPERABILITY &

AVAILABILITY, THIS REPORT TO BE USED IN PREPARING GRAY BOOK BY PLANS &

OPERATIONS'LANT NAME:

TURKEY POINT tBGTS 3 h II Jcm ST.

LUCIE UNIT TP 1 (9X WS)

BONOTRid ACE+OWLEgal I

MIPC CYS FOR AC ON FOR ACTION/INFORIiIIATION INTERNAL0 ISTRI BUTION DR BRANCH CHIEF L EXTERNAL 0ISTRIBUTION CONTROL NUMBER

'I O~QDI/Q ulcc c naacp dna in.~c i.

0 zvoxza TOMOG

<>gyp.ppoMZM

P. O. BOX 013100, MIAMI, FL 33101 FLORIDAPOWER & LIGHTCOMPANY March 7, 1977 Office of Management Information

--~g File and Program Controls Imt gulato5 D~

U.

S. Nuclear Regulatory Commission Washington, D. C.

20555 Gentlemen:

Attached'are the Pebruary 1977 Operating Status Reports for Turkey Point Unit Nos.

3 and 4 and St. Lucie Unit No. 1.

Very truly yours, p~

A. D. Schmidt Vice President Power Resources C

VTC/DDC Attachments cc:

Mr. Norman C. Moseley Robert Lowenstein, Esquire 0>o~soxW f

&Jog" PEOPLE... SERVING PEOPLE

>~>~ 18kog y)g)g(ggp

t APPRG)IZ B AVERAGE DAILY DNIT POWER LEV12, DOCKET NO.

UNIT St. Lucie Unit No. *1 DATE March 2, 1977 COMPLETED BY V-T. Chilson TELEPHONE (305) 552-3830 MONTE Februar 1977 DAY AVERAGE DAILY PO~ LEVEL (MWe-Net) 284 DAY AVERAGE DAILY'OWER L %EL (MWe-Net) 694 2

3 10 12 331 656 719 721 724 723 722 724 722 723 721 720.

682 18 19 20 21 22 24 27'8 722 800 323 224 363 795 796 790 776 792 791 716

O.

APPENDIX C OPERATING DATA REPORT RK'ORT HONXH Feb 1977 DO@ET AN0.50 - 335 UNITSt. Lucis Unit Vo DATEMircJR 2 1977 OPERATXNG STATUS CO;PLY) JJYV. T. ChiIsoa TELEPHONE(305) 552 3830 THROUGH 2

CURRENTLY AUTHORIZED POWER LEVEL (iAWt):

2560 MAX.DEPBl9. CAPACITY (We>>Net):

s.)

3.

POWETL LEVEL TO WHICH RESTRICTED (IP ANY)

C5Te-Net):

4.

REASONS FOR RESTRXCTZON (XP AA'JY):

'PCS NONTH YEAR TO DATE CUMULATIVE S.

RCMIERS 09 COORS REAC OR CAS CRZTZCAL.....

630.6 1 362.2

~62 6.

REACTOR RESERVE SHUTDOWN HOURS...

~ 4.

~. ~. ~.

0.0 7

HOURS GENERATOR ON LINE~ ~ ~

~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

~ ~.

600.0 0.0 1 299.2 0 II 1 563. 2 8..

UNIT RESERVE SatrXDOWN HOURS...............,

0.0

~.

0.0 9.

CROSS TSERAL LTTRGT 0

{ERASER 0{SR)......

~gag I,

0.0 10.

CROSS ELECTRZCAL ESERGZ 088884280 (MG{)... ~434 6 0

~)LS)Z{

1 001 080 11.

EEZ EL CTRZCAL LSERGT GuERATEO (843{).....

426 236

~86 0

12.

REACTOR SERVICE FACTOR

93. 9 96.2 96.8 13 'EACTOR AVAZLABZLZT FACTOR..

~. ~........

~.

93.9 96.2 96.8 14.

UZNIT SERVZCE FACTOR..

89.3 ~ ~4 13.

IMT ASAZZARZLZTT TACTOR.................. ~8

93. 0 16.

JDIIT GAPA'CITY FA'CXOR (Using (MDC)... ~

~ - -

~ ~

81 ~ 6 75.8

71. 4 17.

UANIT CAPACXTY FACTOR (Using Design We)...

18.

UNIT FORCED OUTAGE RATE.

79.1 73.4 69.2 19.

SJHJTDOWNS SCHEDULE) OVER MEET 6 NONTHS (TYPES DATE, AND DURATION OF EACH):

20.

XP SHUTDOWN AT END OF REPORT PERIOD, ESTDQTZD DATE OF.STARTUP:

21.

UNITS ZN TEST STATUS (PRIOR TO CORKRCXAL OPK!ATIOiJ):

FORECAST ACHIEVE)

XNXTIAL CRITICALITY INITIAL ELECTRICITY'OAOEERCZAL OPERA'ZION

I)

REASON ht EQUIPMENT FAILURE (EXPLAIN)

B:

MAINT. OR TEST C:

REFUELINC D:

REGULATORY RESTRICTION E:

OPERATOR TRAININC AND LICENSE EXAHINATION F:

ADHINISTRATIVE C:

OPERATIONAL ERROR (EXPLAIN)

N:

OTHER (EXP!DIN)

APPENDIX D UNIT SUUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50 - 335 UNIT NAME St. Lucie Unit No.

1 DATE Harch 2

1977 COHPLETED BY V. T. Chilson TEI.EPNONE (305) 552-3&30

!)

METHOD 1 o HANUAL 2:

-HANUAL SCRAM 3:

AUTOMATIC SCRAH OTHER (EXPLAIN)

NO.

DATE 77-02-01 77-02-02 77-02-03 77-02-20 77-02-21 77-02-21 TYPE Fe FORCED St SCHEDULED DURATION (BOURS) 12.4 20.0 4.8 13.8 2.8 18.2 REASON(1)

B HETNOD OF SNUTTINC DOWN TUE REACTOR OR REDUCINC POWER(2)

CORRECTIVE ACTIONS/COMMENTS Partial loss of flow test (tripped one reactor coolant pump).

Power Ascension Teat Program.

Total loss of flow test (tripped all reactor coolant pumps).

Power Ascension Test Program.

Loss of off-site power supply.

Power Ascension Test Program.

Turbine tripped from approximately 100Z R.P.

Power Ascension Test Program.

Unit tripped on low steam generator level during trans-ient condition while increasing load after the unit was returned to service from the paper ascention turbine trip test.

Generator tripped from approximately IOOZ R.P.

Power Ascension Test Program.

SUMMARY

Power Ascension Test Program continued during month.

APPEiiDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50 250 UNIT Turke Point Unit No.

3 DATE March 2, 1977 COMPILED BY V. T. Chilson TELEPHONE (305) 552-3830 ZO~

February 1977 DAY AVERAGE DAILY POWER LEVEL (Mfe-Net)

DAY AVERAGE DAILY POWr"R LEVEL (tGfe-Net)

2' 10 12 13 685

'85 631 522 568 346 686 691 694 689 686 688 687 684 17 19 20 21 22 23 25 26 27 691 695 616 691 558 614 692 698 642 550 685 683 684 688 NOTE:

Average daily power greater than 666 N/e due to cooler condenser cooling water.

APPENDIX C OPERATING DATA REPORT REPORT MONTH Febr()s 1977 OP~TING STATUS DOCKET NO.

5 UANZT Tzzrke Poi t DATE March 2, 1977 COMPM~ BY V. T. Chilson TELEPHONE 30 0.

3 THROUGH 4

2.

CIMRHHZLY *IITHORZZEO POSER I V L (MMC):~

MAX.DEPEND. CAPACZTY (MWe Net):

6 3.

POWER LEVEL TO WHICH RESTRICTED (IF AAVl)

(AAWe-Net):

4.

REASONS FOR RESTRICTION (IP ANY):

THIS MOAAH YEAR TO DATE CUMULATIVE 5.

MOMEERS OP HOCltS

!IEACTOR VAS CRZTZCAL.....

662.0

~1 2LQ2%2 6.

REACTOR RESERVE SHUTDOWN HOURS.

~ ~ ~ ~ ~

~

~ ~ ~ ~ ~

0.0 0.0 7.

HOURS GENERATOR ON LIVE.~..... ~.........

656.0 923 0

~27 9 2.

8.

UNIT RESERVE SHUTDOWN HOURS...,..... ~.....

0.0 0.0

~8,0 9 ~

GROSS THER'LEAL RKRGY GUTTED (MWH).~....

1 395 687

3. 908 496 53 638 084 10.

GROSS EZZCTRZCAL LMlGT GEAYPAXEO (MAYI)..

~

457 227 622 992

~17 19 44 11.

MET EUICTRZCAL ENEIIGY GENERATZO (MIH),...,

435 126 588 601

~26 264 5

6 12.

REACTOR SERVICE FACTOR........

98.5 74.2 78.3 13.

REAC,OR AVAZIAEZLZTYPACTOR...............

98.5

~4 14.

IIHZT SMIVZCE PASTOR.........

~97 15 ~

CHZT AVAZZASZLZTT PACTOR.... ~............

~

97.6 16.

ElZT CAPACZ1T PACIOR (O*l 8 OIOC).......... ~7.

17.

UANIT CAPACITY FACTOR (Using Design MWe)...

93.4

60. 0
63. 2 18.

UNIT 'FORCED OUTAGE RATE.

2.4

2. 6 19 ~

SHUTDOWNS SCHEDULE) OVER AAT 6 MONTHS (~EP

DATE, AAV) DURATION OF EACH):

20.

ZF SHUTDOWN AT mWD OP REPORT PERZODP ESTDf~ DATE OF.STARTUP:

21.

UNITS Qf Rc,ST STATUS (PRIOR TO COEKRCIAL OPPOSITION):

FORECAST ACHIEVED QUETZAL CRITICALITY LVCTIAL Q ECTRICITY COKKRCZAL OPERATION

I)

REASON h:

EQUIPHEIIT FAILURE (EXPLAIN)

Dt HAINT. OR TEST C:

REFUELIHC D:

RECULATORY RESTRICTIOH OPERATOR TRAININC AND LICEtlSE EXAHINATION P:

ADHINISTRATIVE C:

OPERATIONAL ERROR (EXPIAIN)

N:

OTHER (FXPLAIN)

APPEtlDIX D WHIT SUlffDOWHS AHD POWER REDUCTIONS REPORT HONTN Februar 1977 DATE Harch 2, 1977 COHPLETED EY V. T. Chilson TEI,EPIIOHE (305) 552-3830 DOCKET NO.

50 250 UHIT NAHE Turkey Point Unit No.

3

!)

HETIIOD 1:

HANUAL 2:

.MANUAL SCRAH 3:

AU'I'OHATIC SCRAH 4:

0tllER (EXPLAIN)

HO.

DATE TYPE Pl PORCED St SCHEDULED DURATION (HOURS)

REASON(l)

HETIIOD OP SIIUTTINC DOWN TNE REACTOR OR REDUCINC POWER(2)

CORRECTIVE ACTIONS/COtDIEHTS 6

77-02-03 Load reduction to locate and repair condenser tube leak.

(Non-nuclear system) 77-02-05 12.3 Unit No. 3 was removed from service co repair oil leak on reactor coolanc pump Ho. 3A.

(Nuclear system) 77>>02-06 1.0 Reactor tripped by nuclear instrumentation syscem while increasing load afcer thc unic was returned to service.

(Nuclear system) 9 77-02-21 2.7 h

Reactor trip caused by loss of second of two rod-control system power supplies.

(Nuclear system) 10 77-02-25 Load reduction to locate and repair condenser cube leak.

(tlon-nuclear system)

SUIOIARYt Unit Ho. 3 operated ac approximately 100X R.P. except for load reductions on Pebruary 3 and 25, 1977, and outages on February 5, 6 and 21, 1977.

APPEHDIX B AVERAGE DAILY UHIT. POWER Li;VPJ DOCKET HO.

50 251 Turkey Point Unit No.

4 March 2, 1977 COMPLETED BY V. T. Chilson TEL'EPHOHE (305) 552-3830 MO~

February 1977 DAY AVERAGE DAILY POWER LEVEL (MWe-Het )

DAY AVERAGE DAILY PO~ LEVEL (iiWe-Hee) 10 12 13 aa as 16 680.

686 687 680 681 683 681 683 682 686 689 691 686 687 689 689 17 18 19 20 21 22 23 2S 26 27 28 NOTE:

693 693 688 685 687 691 688 684 682 686 680 676 Average daily power greater than 666 NWe due to cooler condenser cooling water.

APPENDS C

OPERATING DATA REPORT REPORT'MONTH Februa 1977 OPERATZNiG STATUS DOCKET HO. 50 - 251 USNITTurke Point Unit No.

4 DATEMarch 2, 1977 CORfPLETZD BY V T-Chilson TELEPHONE (305) 552-3S30 2.

REPORTLiG PERIOD:

THROUGH 42SCREE227 RVSEGRXRSG SCREE 123GR (RGR>:~

FEZ DE. ZRfD. CAPACITY (44We-Hat):

666 DZSEGN ELECTRICAL RATQfG (MWe-Het):

693 3.

POWER MVEL TO WHZCH RZSTRIC'RED (ZF ANY)

(Mffe-Het):

NONE 4.

REASONS FOR RESTRZCTXON (Z= A'fY)f THIS MOHTH YEAR TO DATE CUMULATEVE 5 ~

NUMBERS OF HOURS REACTOR WAS CRZTXCAL..'. ~

6 RECTOR RZSERVE SHUTDOWN HOURS ~ ~ ~ ~ ~ ~ ~ ~ - ~ ~ ~

0-0 1 1S6.1 2~2967.

0.0 138.8 1;

HOURS GERfZRATOR ON LQ1E............. ~.....

672.0 1 172.9 21 715.0 S.

UNIT RESERVE SHUTDOWN HOURS.

~.

~.

~ ~ ~,

~ ~...,

0.0 0.0 0.0 9 ~

GROSS THERMAL Wr ERGY GE'.fEffATED (MWH)......

1 470 916 2 549 724 45 609 094 IG GROSS.IECSRECRR BIERCE GEIRRSSEG (RRR)...

463 623

~837 4

~47 IE22; ll.

NET ELECTRICAL EKRGY Gc fZRATED (MWH).....

460 636 796 901 14 027 367 12.

REACTOR SERVICE FACTOR......

100. 0 83.7

74. 2 13.

REACTOR AVAILABILITYFAC OR...............

100.0

. 83.7 74.7 14.

UNIT SERVICE..ACTOR.

100.0 82.9 70.4 15.

UNIT AVAZLABZLZTYFACTOR....

~ ~ ~. ~. ~.....

~.

16.

fDfZT fJRPACZTY 'PACER (Uaing

~i C) 17.

UNIT CAPACITY FACTOR (Usiag Design '44fe)...

100.0 102.9 98.9 82.9 84.5

81. 2 70.4 69.0 65.6 18.

UHZT FORCED OUTAGZ RATE............,.......

0.0 0.0 3.5 19 SHUTDOVifg SCHEDULED O~ ifEZT 6 MONTHS (TYPE ~ DATE, AND DURATION OF EACH):

Retueliag, maintenance, aad iaspections - April 25 through June 11, 1977 20.

IF SHUTDOWNi AT ESD OF R~ORT PZREODR ZSTQfATEf DW~~ OF STARTUP:

21.

UNITS Lf TZST STATUS (PRIOR TO CO~OCTAL OPTATION) f FORECAST ACHZKVctf ZilITIALCRITICALITY LVITZALELECTRICITY COfOfERCL4L OPERATION (1)

NOTE:

Unit Capacity Factor (MDC) greater than 1002 due to cooler condenser cooling varsr.

,)

REASON h:

EQUIPHENT PAILURE (EXPLAIN)

B:

HAINT. OR TEST C:

REFUELIHC D:

RECULATORY RESTRICTION E:

OPERATOR TRAINING AHD LICEHSE EXAHINATIOH P:

ADIIIHISTRATIVE C:

OPERATIOHAI. ERROR (EXPLAIN)

H:

0TUER (EXPLAIN)

APPEHDIX D UNIT SIIUTDOWHS AND POWER REDUCTIONS DOCKET NO.

50 251 UNIT NAHE Turke Point Unit No.

4 DATE Harch 2, 1977 COHPLETED BY V. T. Chilson TELEPHONE (305) 552-3830

)

HETHOD 1:

HAHUAL 2:

HAHUAI. SCRAH 3:

AUTOHATIC SCRAH 4:

OTIIER (EXP1AIN)

NO DATE TYPE P:

FORCED S:

SCHEDULED DURATION (HOURS)

REASOH(1)

HETIIOD OP SIIUTTINC DOWN TIIE REACTOR OR REDUCIHC POWER(2)

CORRECTIVE ACTIONS/COtDIEHTS NONE SIDDIARY:

Unit No.

4 operated at approximately 100X R.P. during month.

I