ML18227B082

From kanterella
Jump to navigation Jump to search
Letter Operating Status Reports of November 1976
ML18227B082
Person / Time
Site: Saint Lucie, Turkey Point  
Issue date: 12/06/1976
From: Schmidt A
Florida Power & Light Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML18227B082 (33)


Text

NIIC Po<<M 1OI Iz IIII U.O. NUCLI:ArlBEOULATOBYCOMMI'JION OO UMOE I'I 0-2 0 1

NRC "NBC DISTBIDUTIONForl PRI>> 60 DOCI<ET MRTEBtAL FROM: Florida Power 8c Tight Co.

Miami, Floriaa 33101 A.D. Schmidt Mt)I:B MOIITIILY RI PORT OATE OF OOCUMENT 12 6 OATE flECEIVEO 12 6 LETTEN 0 OB IGINAI OPY 0 NO TO B17 E O NC LASS IF IE0 INPUT FOBM NUMOLB OF COPIEG BLCEIVFD

, 1 cop/'EECBIPTION LETTER TRANS TliE POLL(NING:

DO NOT RZMO~

. ACKNOWrZDGZD IIOjTIILYRF PORT FOR November 1976 PLANT & COMPONENT OPERABILXTY &

AVAILABILITY'11ISREPORT TO BE USED IN PREPARXNG GRAY BOOK BK PLANS & OPERATIONS.

PLANT NAIIE TQrkepi Pt ~ UQit9 3 ST.

LUCIE $1 MXPC M/

CKS >OR A P

ON FOR ACTION/INFORMATION INTERNALD R I I3UTION IST NRC PD DQ>ALP S

CtB, BRANCII C11XEP L IC ~X~

P RRISH LPDR: Miami Pla.

MU'SXC CXTERNAL DISTIIIDUTION CONTIIOLNUMOER p//rp//

NIIC F OBM l95 {2-7III

~

j

~VGS~KT 'PQ;~ gg GZDGZJ~i7QNZOA" I

l g

9 'fj 8A

~~')a xJ pI l

P. O. BOX 013100, MIAMI, FL 33101 e

i

~

S Once~~

u<.

SQ-ASu/Z& S9<

FLORIDA POWER 8c LIGHT COMPANY December 6,

1976 Office of Management.

Information and Program Controls U.

S. Nuclear Regulatory Commission Washington, D.

C.

20555 Gentlemen:

Attached are the November, 1976 Operating Status Reports for Turkey Point Unit Nos.

3 and 4 and St. Lucie Unit No. 1.

Very truly yours, D. Schmidt Vice President Power Resources VTC/DDC Attachments some MCg

~/4'-rgb/

~

I40a leaua ateaggg CCNhll$$ 10I$

+~4~%,

Il p

cc:

Mr. Norman C. Moseley Jack R.

Newman, Esctuire g~ cjQ~)

PECP E... SERVING +EOPL'E

~

~

I F89 gf:

gala trdDV8 g4,M ~

~HW<O'l

~r m'LMtt P5

/g~~Wi $g $

APPENDIX B AVERAGE DAILY UNIT 'POWER'EVEL DOCKET NO.

UNIT Turkey Point Unit No.

3 DATE Dec.

3, 1976 COMPLETED BY V-T. Chilson TELEPHONE (3P5) 552 3830 MONTH

November, 1976 DAY AVERAGE DAlLY POWER LEVEL (MWe-Net) 650 652 657 659 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 17 18 19 661 659 653 652 21 22 23 1P 12 13 664 662 658 649 612 25 26 27 28 29 14 30 15

~

~

0

~ ~

~

~

APPENDS C

OPERATING DATA REPORT REPORT MONTH November 1976 DOCKET NO. 50 - 250 UNIT Turkey Point Unit No.

3 DATE Dec.

3 1976 COMPLETED BY V. T. Cbilson OPERATING STATUS 1.

REPORTING PERIOD:

0001 76 11 Ol GROSS HOURS IN REPORTING PERIOD:

THROUGH 24 2.

CURREiVZLY AUTHORIZED POWER LEVEL (MWt):

2200 MAX.DEPEND. CAPACITY (MWe-Net):

666 DESIGN ELECTRICAL RATING (MWe-Net):

693 720.0 3.

POWER LEVEL TO WHICH RESTRICTED '(IF ANY)

(MWe-Net):

4.

REASONS FOR RESTRICTION (IF ANY):

NONE THIS MONTH YEAR TO DATE Cl~fULATIVE 5.

NUMBERS OF HOURS REACTOR WAS CRITICAL.....

313.9 6 760.0 28 040.1 6.

REACTOR RESERVE SHUTDOWN hOURS..

~ ~ ~ ~....

~

~ 64.2 67.4 7.

HOURS GENERATOR ON LINE..................

~

313 ~ 5 6 669.1 27 039.1 8 ~

UNIT RESERVE SHUTDOWN HOURS.

~ ~ ~..

~ ~ ~ ~...

~

~ 0-85.0 9.

GROSS THERIIAL ENERGY GENERATED (MWH) ~.....

684 046 14 417 328 51 729 588 i

10 'ROSS ELECTRICAL ENERGY GENERATED (MWH)...

214 570 4 555 215 16 570 451 ll.

NET ELECTRICAL ENERGY GENERATED (K%).....

202 528 4 321 879 15 677 641 12.

REACTOR SERVICE FACTOR.

43.6 84.1 80.1 13.

REACTOR AVAILABILITYFACTOR....

~.....,,...

43 '

14 'iNIT SERVICE FACTOR.

~.

43.5 15.

UNIT AVAILABILITYFACTOR.

~..

~.............

43 '

84.9 82.9 82.9 80.3 77.3 77.5 16.

  • I%IT CA'?ACITY FACTOR (Using (MDC). ~....

~..

42 '

80.7 68.2 17.

UNIT CAPACITY FACTOR (Using Design MWe)..

~

40 6 18.

UNIT FORCED OUTAGE RATE...................

77.2 O.a

64. 7 2.9 19.

SHUTDOWNS SCHEDULED OVER HECT 6 MONTHS (TYPE,

DATE, AND DURATZON OF EACH):

20.

IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

Dec.

27 1976 21.

UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED IiNITZAL CRITICALITY INITIALELECTRICITY CO~KERCIAL OPERATION

0

(I)

REASON A:

EQUIPMENT FAILURE (EXPLAIN)

B:

HAINT. OR TEST C:

REFUELING D:

REGULATORY RESTRICTION E:

OPERATOR TRAINING AND I.ICENSE EXAHINATION F:

ADMINISTRATIVE G:

OPERATIONAL ERROR (EXPLAIN) ll:

OTlKR (EXPLAIN)

APPENDIX D UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT HONTll November 1976 DOCKET NO.

50 - 250 UNIT NAME Turkey Point Unit No. 3 DATE Dec. 3, 1976 COMPI.ETED BY V. T. Chilson TELEPllONE (305) 552 - 3830 (2)

HETllOD 1:

HANUAL 2:

MANUAL SCRAM 3:

AUTOHATIC SCRAM 4:

OIHL'R (EXPLAIli)

NO.

DATE TYPE F:

FORCED S:

SCllEDULED DURATION (BOURS)

REASON(1)

METIIOD OF SllUTTING DOWN TllE REACTOR OR REDUCING POWER(2)

CORRECTI VE ACTIONS/COlIMENTS 21 76-11-14 406.5 Unit No. 3 removed from service for refueling, main-

tenance, and inspections.

(Nuclear and Non-nuclear systems)

SlMlARY: Unit No. 3 operated ar. approximately 100X R.P. during month until Nov. 14, 1976, when the unit was removed from service for refueling, maintenance, and inspections.

APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

UNIT Turkey Point Unit No.

4 Dec.

3, 1976 COMPLETED BY V. T. C?lilson TELEPHONE MONTH November 197 6 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

DAY AVERAGE DAIL POWER LEVEL (MWe-Net) 17 18 19 20 21'2 23 24 25 10 26 27 12 28

, 13 29 30 16

4

~

~

APPENDIX C OPERATING DATA REPORT REPORT MOAHHH Novenber 1976 DOCRET NO.

50 - 251 UNIT Turkey Point Unit No.

4 DATE Dec. 3, 1976 OPERATING STATUS COMPLETED BY V. T. Chilson TELEPHONE (305) 552 - 3830 l.

REPORTING PERIOD:

0001 76 11 01 GROSS HOURS IN REPORTING PERIOD:

THROUGH 24 2.

CURRENTLY AUTHORIZED POWER LEVEL (MWt):

NAI.DEPEND. CAPACITY (NNH-Naa):

720.0 3.

POWER LEVEL TO WHICH RZSTRICTZD (IF ANY)

(MWe-Net):

4.

REASONS FOR RESTRICTION (IF ANY):

NONE THIS MD~i YEAR TO DATE CUMULATIVE 5.

AABERS OF HOURS REACTOR WAS CRITICAL....

0.0 5 357.6 21 003.6 6.

REACTOR RESERVE SHUTDOWN HOURS..H.

~ ~ ~ ~.

~.

0.0 0.0 117.1 7.

HOURS OPERATOR ON LINE....

8 ~

WaIT RESERVE SHUTDOWN HOURS...

~........

0.0

~ 0.0 5 158.3 19 872.0 0.0 0.0 9.

GROSS THERlQIL ENERGY GENERATED (MtYH) ~ ~ ~.

~ ~

10.

CROSS ELECTRICAL ENERGY GENERATED (iBad)... 10 957 697 41 606 333 3 499 506 13 478 583 11.

NET ELECTRICAL ENERGY GENERATED (aaH).....

.- 1 638 3 316 334 12 774 964 12.

REACTOR SERVICE FACTOR.

0.0 66.6

~7.2 13.

REACTOR AVAILABILITYFACTOR...............

66.6

~Y 14.

UNIT SERVICE FACTOR 0.0 64.2

~6.2 15.

UNIT AVAILABILITYFACTOR..................

0.0 64.2

~6.2 16 ~

WilT CAPACITY PACTOR (Using (MDC)

~

~

~

61. 9 67.5 17.

UNIT CAPACITY FACTOR (Using Design MWe)...

0.0 59.5 6I,2 18'NIT FORCED OUTAGE RATE..

0.0 4 ~ 1 3 ~ 7 6

19 'HUTDOWNS SCHEDULED OVER ANEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Refueling, maintenancea and inspeciions April 4, 1977 through May 22, 1977 20'F SHUTDOWaN AT END OF REPORT PERIOD, ESTLfATED DATE OF STARTUP:

21 'NITS IN TEST STATUS (PRIOR TO COiMMERCIAL OPERATION):

FORECAST ACHIEVED INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

0

P I I I

~

~

~

~

~

~

~

\\

~

~

APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO., 50 - 335 UNIT St. Lucie Unit No.

1 DATE Dec.

3 1976 COMPLETED BY U. T. Chilson TELEPHONE (305) 552 3830 MONTH November, 1976 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 2 3

DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 17 18 19 20 21 22 23 24 25 10 26 27 12 28 29 14 30 16

~

~

~

g

~

APPENDIX C OPERATING DATA REPORT REPORT MONTH November 1976 DOCKET NO.

50 - 335 UNIT St Lucia Unit No 1

DATE Dec. 3, 1976 COMPLETED BY V. T. Chilson OPERATING STATUS TELEPHONE (305) 552-3830 1.

REPORTIi60 PERIOD: 0001,76 ll 01 GROSS HOVRS IN REPORTING PERIOD:

THROUGH 240 2.

CURRENTLY AUTHORIZED POWER LEVEL (MWt):

2560 MAX.DEPEND. CAPACITY (MWe-Net):

802 Estimated)

DESIGN ELECTRICAL RATING (MWe-Net):

802 720.0 3.

POWER LEVEL TO WHICH RESTRZCTED (ZP ANY)

(66gfe-Net):

722 4.

REASONS FOR RESTRICTION (IF ANY):

"Temporary 90X restriction pending Reactor Coolant FloM Analysis" THIS MONTH YEAR TO DATE CU.fULATZVE 5 ~

NU66BERS OF HOURS REACTOR 'WAS CRITICAL

~

~ ~

~

6.

REACTOR RESERVE SHUTDOWN HOURS............

N/A(1)

N/A(1) 1 366.6 7 ~

HOURS GENERATOR ON LINE.... ~.

~.

~. ~ ~.......

8.

VNIT RESERVE SHUTDOWN HOURS............... 1 121.9 N/A N/A(

1 121.9 N/A(1) 9.

GROSS THERMAL ENERGY GENERATED (E&)~...

~ ~ 1 495 088 10.

GROSS ELECTRICAL ENERGY GENERATED (MWH) ~

~

~ 418 670 ll NET ELECTRICAL ENERGY GEKRATED (MWH) 374 180 1 4 5 08 418 670 374 180 12.

REACTOR SERVICE FACTOR 13.

REACTOR AVAILABILITYFACTOR.

~ ~. ~ ~ ~ ~ ~..

~ ~ ~ ~

14'Ni IT SERVICE FACTOR.

15'NIT AVAILABILITYFACTOR.

~.

~........

~ ~.

~.

~

16 ~

'MZT CAPACITY PACTOR (Using (MDC).......

~.

0.0 0.0 0.0 0.0 27 '

27. 2 22.6
22. 6 9.4 27.2 27.2 22.6
22. 6 9.4 17.

UNIT CAPACITY PACTOR (Using Design MWe)...

0' 18.

UNIT FORCED OVTAGE RATE.............,...,.

100 '

9,4 76 '

9.4 76.5 19 'HVTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AÃ) DURATION OF EACH):

N/A(1) 20.

IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

De 21.

VNZTS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

INITIALCRITICALITY INITIALELECTRICZTY COMMERCIAL OPERATION FORECAST ACHIEVED A~rrl 22, 7976 r

7 1976 NOTE:

(1) Unit in test status

h'

1:

HANUAL 2:

.HANUAL SCRAM 3:

AUTOHATIC SCRAM 6:

OIllER (EXPLAIN)

NO ~

(1)

REASON A:

EQUIPMENT FAILURE (EXPLAIN)

B:

HAINT. OR TEST C:

REFUELING D:

REGULATORY RESTRICTION E:

OPERATOR TRAINING AND LICENSE EXAHINATION F:

ADMINISTRATIVE G:

OPERATIONAL ERROR (EXPLAIN)

II:

OT)IER (EXPLAIN)

(2)

METHOD DATE TYPE F:

FORCED S:

SCHEDULED REPORT HONTH November 1976 DURATION (IlOURS)

REASON(1)

HETNOD OF SllUTTING DOWN Tllg REACTOR OR REDUCING POWER(2)

APPENDIX D UNIT SHUTDOWNS AllD POWER REDUCTIONS DOCRET NO.

UNIT NAME St. Lucie Unit No. 1 DATE Dec. 3, 1976 COHPLETED BY V. T. Chilson TELEPllONE 305 552 - 3830 CORRECTIVE ACTIONS/COMMENTS 16 76-07-10 720.0 Unit was removed from service for reactor tests and inspections.

(Nuclear system)

SUMMARY

Unit No. 1 reactor inspection continued during month.

o I

1 u

J j

P. O. BOX 013100, MIAMI, FL 33101

>Q Ili FLORIDA POWER & LIGHT COMPANY December 6,

1976 Office of Management Information and Program Controls U.

S. Nuclear Regulatory Commission Washington, D.

C.

20555 Gentlemen:

lg PPpjp.

/4eepro~

yo Attached are the November, 1976 Operating Status Repbrts for Turkey Point Unit Nos.

3 and 4 and St. Lucie Unit No. l.

Very truly yours, D. Schmidt Vice President Power Resources VTC/DDC Attachments cc:

Mr. Norman C. Moseley Jack R.

Newman, Esquire PEOPLE... SERVING PEOPLE

APPEiiDLX B AVERAGE DAILY UilIT POWER LEVEL DOCZET No. 50 25o UNIT Turkey Point Unit No.

3 DATE Dec.

3, 1976 COMPLETED BY V. T. Chi1son TELEPHONE (305)

MONTH

November, 1976 DAY AVERAGE DAILY POWER LEVEL (M<e-Net) 650 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 17 10 12 14 15 657 659 661 659 653 652 664 662 658 649 612 18 19 20 21'2 23 24 25 26 27 28 29 30

APPENDIX C OPERATING DATA REPORT DOCKET NO. 50 - 250 UNIT Turkey Point Unit No.

3 REPORT ifONTH Novenber 1976 OPERATING STATUS DATE Dec.

3 1976 CONPLE~~M BY V. T. Chilson TELEPHONE 305 552 3830 1.

REPORTING PERIOD:

0001,76 11,01 GROSS HOURS ZN REPORTING PERIOD:

THROUGH 4

i 2.

CURRENTLY AUTHORIZED POWER LEVEL (YWt):

2200 NA!C.DEPEND. CAPACITY (NWe-Net):

666 DESZGN ELECTRICAL RATING (MWe-Net):

693 3.

POWER LEVEL TO f&ICH RESTRIC~c3 (IF AVZ)

( ffie-Net):

4.

REASONS FOR RESTRICTION (IF A'fY):

NONE THIS ifONTH YEAR TO DATE CL~fUIATZVE 5.

NUiiBERS OF HOURS REACTOR ffAS CRITICAL.....

313.9 6 760.0 28 040.1 6.

REACTOR RESERVE SHUTDOWNi HOURS'

~...

~... 64.2 67.4 7.

HOURS GENERATOR ON LINE. ~

~

313.5 6 669.1 27 039 F 1 8.

UNZT RESERVE SHUTDOWN HOURS...

~..

~ ~.. ~. ~.. 85.0 9.

GROSS THER'.~M. ENERGY GE.'DZRATED (MhH) ~ ~....

684 046 14 417 328 10.

GROSS ELECTRICAL ENERGY OPERATED (NWH) ~..

214 570 4 555 215 11 ~

NET ELECTRICAL ENERGY GENERATED ( ffv'8)~,...

202 528 4 321 879 51 729 588 16 570 451 15 677 641 12.

REACTOR SERVICE FACTOR.

43.6 84.1 80.1 13.

REACTOR AVAILABILITYFACTOR...............

43 6

84.9 80.3 14.

UNIT SERVICE FACTOR.

~ ~

~

15.

UNIT AVAILABZLZTYFACTOR.. <<......

~.....-.

43.5 82.9 77.3 77.5 16.

UNIT CAPA'CITY FACTOR (Using (HDC)..........

42 '

80.7 68.2 17.

fiNZT CAPACITY FACTOR (Using Design NWe)...

40 6

77.2 18.

UNIT FORCED OUTAGE RATE.

~.

0.0 0.1 19.

SHfi&)OWNS SCu~ULED OVER.'fECT 6 )fONTHS (TYPE, DATE, AND DURATION OF EACH):

64.7 2.9 20.

ZF SHUTDOWN AT END OF REPORT PERIOD, ESTL~ATED DATE OF STARTUP:

Dec.

27 1976 21 ~

UNITS EN TEST STATUS (PRIOR TO COKfERCZAL OPERATZON):

ZiNZTIAL CRITICALITY INITIALELECTRICITY CO~DfERCIAL OP ERATZON FORECAST ACHIEVED

IIETIIOD 1:

HAHIIAI.

2:

HANUAI, SCRAH 3:

AUTOHATIC SCIIAII OI tKR (EXPITIN)

NO.

(I)

REASOII A:

EJUIPHEIIT FAILURF. (EXPITIN)

U:

IIAIHT. OR TFST C:

REFUEI.I tlC 0:

RECUIATOIIY RESTRICTION E:

OPERATOR THAINLIIC AIID LICENSE EXAHINATIOH F:

ADtllNISTRATIVE C:

OPERATIOIIAI. ERROR (EXPMIII)

II:

OTIIER

{EXPIAIII)

(2)

DATE TYPE F:

FORCED S:

SCIIEDUIZD REPORT HOHTII November 1976 DURATION (IIOURS)

REASOII (1) tlETHOD OF SIIUTTIIIC DOWN TIIL'EACTOR OR REDUCIHC POWER(2)

Al'PENDIX D UNIT SIIUTDOQHS AND POWER REDUCTIONS DOCKET HO.

50 - 250 UHIT HAHE Turkey Point Unit No. 3 DATE Dec. 3, 1976 COHPLETED DY V. T. Chilson TELEPHONE (305) 552 3S30 CORRECTIVE ACTIOIIS/COtIHENTS 21 76-11-14 406.5 Unit No.

3 removed from service for refueling, main-

tenance, and inspections.

{Nuclear and Hon-nuclear systems)

SUIRIARYt Unit No.

3 operated at approximately lOOX R.P. during month until Hov. 14, 1976, when the unit was removed from service for refueling, maintenance, and inspections.

~

~

APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50 251 UNIT Turkey Point Unit No.

4 DATE Dec.

3, 1976 COMPLETED BY V. T. Chilson TELEPHONE (305) 552 - 3830 MONTH November 197 6 DAY AVERAGE DAiLY POWER LEVEL (caffe-Net)

DAY AVERAGE DAIL POWER LEVEL (K<e-Net)

17 18 19 20 21'2-23 10 26 27 13 14 28 29 30

OPERATZifG DATA REPORT REPORT HOAEHH Novenber 1976 OPKRATLfG STATUS DOCKET NO.

50 - 251 UNIT TurkeY Point Unit No.

4 DATE Dec. 3, 1976 CO'fPLE ED BY V

T Chilson TELvV'HONE (305) 552>> 3830 1.

REPORTING PERIOD:

0001 76 Il 01 GROSS HOURS IPhf REPORTING PERIOD:

THROUGH 2.

CURRENTLY AUTHORIZED PO'ifKR LaWEL (Nfft)f EAE hDEPEED.

CAPACIPP (EPe-Ehh):

266 720.0 3.

POffKR LEVEL TO MiZCH RESTRICTED (ZF ANY)

(Nffe-Net):

4 REIGNS FOR RESTRXCTZO'f (ZF AA'fY)f NOifE THIS NONTH Yv~ TO DATE Cl fULAXXVE 5.

NUWBERS OF HOURS REACTOR HAS CRITICAL.....

0 0 5 357 ~ 6 21 003.6 6.

REACTOR RESERVE SHUTDOWN HOURS..

~ ~..

~..

~..

7.

HOURS GEKRATOR ON LINE........,,.........

0.0 0.0 0.0 5 158.3 117.1 19 872.0 8.

UNIT RESERVE SHUTDOffhhf HOURS...

~.

~ ~.. ~.....

0 ~ 0 0.0 0.0 9

GROSS THERAGQ E'.fERGY GENERATED (MPEf)~,, ~,

0 10 957 697 41 606 333 10, GROSS ELECTRICAL LlKRGY GENERATED (2fÃ6f)...

0-3 499 506 13 478 583 11.

i~c, ELECTRICAL EifERGY GE'.fE'.%TED (NNH).....

- I 638 3 316 334 12 774 964 12.

REACTOR SERVICE FACTOR........,

0 ~ 0

66. 6

~t 13.

REACTOR AVAZLABILZTYFACTOR.............

~.

0.0 66.6 14 ~

U:fIT SERVICE FACTOR...... ~.....,.

0.0

64. 2

~6. 2 15

~

UNIT AVAILABILITYFACTOR...,...........,.,

0.0 64.2 69.2

'6.

fQXT CAPACITY FACTOR (Using (EAADC).........

0 '

61.9 67.5 17.

UNIT CAPACITY FACTOR (Using Design NNe)...

0 0 59.5 Q,.2 18.

UNXT FORCED OUTAGE RATE.

0.0 4.1 3.7 FORECAST ACHXKVED XNITIAL CRITICALITY INITIALKLECTRICI' CONNERCXAL OPERATION 19.

SHUTDOfP'NS SCfEZDULH) OVER NLYT 6 HONTHS (TYPE, DATE, AND DURATION OF EACH) f Refueling, naintenance, and inspections April 4, 1977 through Hay 22, 1977 20.

IP SHUTDOfPif AT END OF REPORT PERIOD, ESTO>TED DATE OF STAREJP~

h 21.

UNITS I.'f TEST STATUS (PR OR TO CONEfKRCZAL OPERATION):

(I)

RFASOH h:

E(jUll'Ml?HT FAII.URE (EXPLAIN)

U:

MAINT. OR Tl?ST C:

REFUELIHC D:

RECULA'fORY RESTRICTION E:

OPERATOR T <AIHINC AHD l.lCEHSE EXAMINATION F:

ADMINISTRATIVE C:

OPKf?ATIOHAI. ERROR (EXPLAIN)

H:

O'I'UL'R (KXPIJLIN)

APPENDIX D UNIT SHUTDOWNS hHD POWFR REDUCTIONS REPORT MOHTII November, 1976 DOCEET HO.

50 - 251 UNIT NAME DATE Turkey Point Unit No.

4 Dec.

3, 1976 TELEPIIONE (305) 552 - 3830 COMPI.ETED BY V. T. Cbilson (2)

METHOD 1:

MANUAL 2'ANUAL SCRAM 3:

AUTOMATIC SCRAM 4:

OTHER (EXPLAIN)

HO.

DATE TYPE F:

FORCED S:

SCHEDUI.ED DURATION (HOURS)

REASON(1)

METHOD OF SUUTTINC DOWN TUE REACTOR OR REDUCIHC POWER(2)

CORRECTIVE ACTIONS/CONlEHTS 28 76-10-28 720.0 Unit No.

4 was removed from service for steam generator tube inspection program.

(Nuclear system)

SUMMARY

Unit No.

4 rcmaincd out of service to perform stcam generator tube inspection.

i APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50 335 UNIT St. Lucie Unit No.

1 DATE Dec.

3 1976 COMPLETED BY V. T. Chi1son TELEPHONE (305) 552 - 3830 MONTH November, 197 6 DAY AVERAGE DAILY POWER LEVEL (caffe-Net

)

DAY AVERAGE DAILY POWER LEVEL (i~Me-Net

)

17 18 19 20 21 22 23.

25 26 12 13 14 27 28 29 30

~

~

APPENDIX C OPERATING DATA REPORT REPORT MONTH November 1976 OPERATIiNG STATUS DOCKET NO.

50 - 335 U.fXT St. Lucis Unit No. 1 DATE Deo9 3, 1976 COMPLK.ED BY V. T. Chilson TELEPHONE 1.

REPORTING PERIOD: 0001 76 11 01 GROSS HOURS XN REPORTING PERIOD:

TfZOUGH 2400 2.

CURRLfTLY AUTHORIZED POWER LEVEL (99Wc):

2560 MAY.DEPEND. CAPACZTY (Ntfe-Net):

802 Es imated)

DESIGN ELECTRICAL RATING (MWe-Net):

802 720 '

3.

POWER LEVEL TO WHICH RESTRICTED (XF ANY)

(:fWe-Nec):

722 4 ~

REASONS FOR RESTRICTION (XF AhY):

"Temporary 90K restriccion pending Reactor Coolanc Flow Analysis" THIS 'fONTH YEAR TO DAT CU.'fULATIVK 5.

Nfi~ifBERS OF HOURS RvvlCTOR WAS CRITICAL.~... 1 366.6 6 ~

RvVlCTOR RESERVE SHUTDOIPif HOURS ~ ~ ~ ~ ~ ~ ~

~ ~.

~ ~

(1)

N/A 7 ~

HOURS GENERATOR ON LiiNK.~...,..........

~.. 1 121.9 8

l ifIT RESERVE SHUTDOWiN HOURS ~ ~ ~ ~ ~, ~ ~ ~

~ ~, ~ ~,

iN/A(1)

N/A(1) 9.

GROSS THERMAL ENERGY GcCERATED (MffH)~ ~ ~.

~ ~ 1 495 088 10.

GROSS ELFCTRICAL KffERGY GR9rRATED (>fWH)... 418 670 ll.

NET ELECTRICAL ENERGY GENERATED (MfR) ~ ~..

~

374 180 12 ~

REACTOR SERVICE FACiOR

~

~

~

~

~

~ ~

7 ~ 2 13.

REACTOR AVAILABILITYFAC-OR..

~

~ ~.

~ ~

~.

~ ~. ~ ~

1 366.6 1 121.9 N/A(1) 1 495 0 418 670 374 180 27.2 27.2 14.

Ui9ZT SERVICE FACTOR.

15.

UNIT AVAILABXLZTYFACTOR.

~. ~..

~ ~.

~ ~ ~.. ~..

~

0 ~ 0 22.6 0.0 22.6 22.6 22.6 16.

fDfIT CAPACI Y FACTOR (Using (MDC)........,,

0.0 9.4 9,4 17.

UNIT CAPACITY FAClSR (Using Design MWe)...

0.0 9.4 9.4 18.

UNIT FORCFD OUTAGE RATE.

~.......

~

100.0 76.5 19.

SHffTDOWNS SCHEDULED OVER NK<T 6 MONTHS (TYPE,

DATE, Ai%) DURATIO'f OF N/A( )

20.

IF SHUTDOf99N AT RiD OF REPORT PERIOD, ESTLfATED DATE OF STARTUP:

De EACH):

76.5 21.

UNXTS XN TEST STATUS (PRIOR TO COl-fKRCXAL OPERATION):

INITIALCRITICALITY INITIALELECTRICITY CO999RCZAL OPERATZON FORECAST ACHIEVED Apri1 22, 1976 7

7979 NOTE:

(I) Unit in cess status

(1)

REASON A:

Et1UIPHENT FAII.URE (EXPIAltt)

B:

MAItlT. OR TFST C:

REFUFLIHG 0:

REGUI>VrORY RESTRICTION E:

OPERATOR TRAINIHC AtlD l.ICEHSE EXAktlNATION F:

ADkllNISTRATIVE G:

OPERATIONAL ERROR (EXPIAIN) ll:

OTIIER (FA'PIAIH)

APPENDIX D UNIT SHUTDOWNS AtlD POWER REDUCTIOtlS REPORT klOtlTH November 1976 DOCKET HO.

50 335 UNIT HAME St. Lucis Unit No. 1 DATE Dcc. 3, 1976 COtlPLETED BY V. T. Chilson TELEPHONE 305 552 3830

- (2) ktETttoD 1:

tlAHUAL 2:

t!AHUAL SCltAkl 3:

AUTOk!ATIC SCRAkt Oittk:<<(EXPLAZtt)

HO.

DATE TYPE F:

FORCEI)

S:

SCHEDUI.ED DURATIOti (tiOURS)

REASON(1)

METHOD OF SllUTTIHC DOWN TIIE REACTOR OR REDUCING POWER(2)

CORRECTIVE ACTIONS/COtIHENTS 16 76-07-10 720.0 Unit was removed from service for reactor tests and inspections.

(Nuclear system)

SUttktARY:

Unit tlo.

1 reactor inspection continued during month.

t