Category:Letter
MONTHYEARML24023A0342024-02-0505 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0038 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000335/20230102024-01-26026 January 2024 NRC Quadrennial Focused Engineering Inspection (FEI) Commercial Grade Dedication Report 05000335/2023010 and 05000389/2023010 L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) IR 05000335/20230042024-01-24024 January 2024 Integrated Inspection Report 05000335/2023004 and 05000389/2023004 ML23320A3062024-01-22022 January 2024 Issuance of Amendment Nos. 298 and 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project ML23341A2102024-01-22022 January 2024 LTR-23-0216-1 - Closure Letter - 2.206 Petition for License Renewal Plant Reactor Pressure Vessel Embrittlement L-2024-007, Inservice Inspection Program Owner'S Activity Report (OAR-1)2024-01-18018 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2024-004, Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years2024-01-18018 January 2024 Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-002, Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2024-01-0808 January 2024 Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-179, Unusual or Important Environmental Event - Turtle Mortality2023-12-14014 December 2023 Unusual or Important Environmental Event - Turtle Mortality L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2023-166, Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report2023-12-0606 December 2023 Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report ML23340A0332023-12-0101 December 2023 FPL to Fws, Comments Submitted by Florida Power and Light on the Species Status Assessment Accompanying the September 20, 2023 Proposed Threatened Species Status with Section 4(d) Rule for the Miami Cave Crayfish L-2023-172, Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule ML23332A1772023-11-28028 November 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, ML23333A0102023-11-27027 November 2023 Attachment B - 11/07/2022 - Waterkeeper Scoping Comments-1 ML23333A0152023-11-27027 November 2023 Attachment G - Arcadis Memo Re FPL Year 4 Raasr Final (June 2, 2023, Appended to Derm letter)-1 L-2023-162, Response to 50.69 2nd Round of Rals2023-11-21021 November 2023 Response to 50.69 2nd Round of Rals L-2023-146, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles2023-11-15015 November 2023 License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles IR 05000250/20230032023-11-0909 November 2023 Integrated Inspection Report 05000250/2023003 and 05000251/2023003 IR 05000335/20230032023-11-0606 November 2023 Integrated Inspection Report 05000335/2023003 and 05000389/2023003 ML23310A1342023-11-0404 November 2023 10 CFR 2.206 Petition - LTR-23-0216-1 Petition Amendment; Turkey Point Subsequent Renewal with Petitioner 11/04/2023 ML24016A2622023-10-25025 October 2023 Subsequent License Renewal Updated List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected Project ML23270B8882023-10-23023 October 2023 Regulatory Audit Summary Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structure, Systems, and Components for Nuclear Power Reactors EPID L-2022-LLA-0182 L-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis2023-10-11011 October 2023 License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23275A1102023-10-0202 October 2023 License Amendment Request Revision 2 for the Technical Specifications Conversion to NUREG-1432, Revision 5 IR 05000250/20230102023-09-29029 September 2023 Biennial Problem Identification and Resolution Inspection Report 05000250/2023010 and 05000251/2023010 L-2023-131, Subsequent License Renewal Application - Second Annual Update2023-09-28028 September 2023 Subsequent License Renewal Application - Second Annual Update ML23234A1922023-09-27027 September 2023 Issuance of Amendment Nos. 297 and 290 Regarding Conversion to Improved Standard Technical Specifications L-2023-136, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-26026 September 2023 Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML23265A5492023-09-22022 September 2023 Transmittal of WCAP-18830-P/NP Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles to Support a License Amendment Request from FPL - License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis L-2023-122, Corrections to the 2022 Annual Radiological Environmental Operating Report2023-09-20020 September 2023 Corrections to the 2022 Annual Radiological Environmental Operating Report IR 05000335/20233012023-09-20020 September 2023 NRC Operator License Examination Report 05000335/2023301 and 05000389/2023301 L-2023-127, Correction to the 2022 Annual Radioactive Effluent Release Report2023-09-18018 September 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-113, Correction to the 2020 Annual Radiological Environmental Operating Report2023-09-14014 September 2023 Correction to the 2020 Annual Radiological Environmental Operating Report L-2023-108, Report of 10 CFR 50.59 Plant Changes2023-09-11011 September 2023 Report of 10 CFR 50.59 Plant Changes L-2023-118, Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-11011 September 2023 Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML23243A9552023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application - Tribe- Section 106 Letters ML23243A9522023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9532023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9542023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application L-2023-107, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42023-09-0606 September 2023 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 L-2023-112, Corrections to the 2021 Annual Radioactive Effluent Release Report2023-09-0606 September 2023 Corrections to the 2021 Annual Radioactive Effluent Release Report ML23199A2352023-09-0505 September 2023 Letter to EPA-Turkey Point Nuclear Generating Station, Units 3 and 4 - Notice of Availability of Draft Site-Specific Environmental Impact Statement for Subsequent License Renewal 2024-02-05
[Table view] Category:Operating Report
MONTHYEARL-2023-051, Report of 10 CFR 50.59 Plant Changes2023-04-0404 April 2023 Report of 10 CFR 50.59 Plant Changes L-2022-039, and Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2022-04-14014 April 2022 and Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2022-016, Report of 10 CFR 50.59 Plant Changes2022-02-28028 February 2022 Report of 10 CFR 50.59 Plant Changes L-2021-097, and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report2021-05-13013 May 2021 and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report L-2021-096, 10 CFR 50.59(d)(2) Summary Report2021-05-11011 May 2021 10 CFR 50.59(d)(2) Summary Report L-2021-018, 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report2021-02-16016 February 2021 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report L-2020-065, Submission of Periodic Reports2020-04-0909 April 2020 Submission of Periodic Reports ML18227A9832018-08-15015 August 2018 Submit First Year Operation Report. L-2017-165, Report of 10 CFR 50.59 Plant Changes2017-09-20020 September 2017 Report of 10 CFR 50.59 Plant Changes L-2012-367, Cycle 20 Core Operating Limits Report2012-10-0202 October 2012 Cycle 20 Core Operating Limits Report L-2012-169, Annual Radiological Environmental Operating Report for Calendar Year 20112012-04-24024 April 2012 Annual Radiological Environmental Operating Report for Calendar Year 2011 L-2009-284, Submittal of Report of Changes, Tests & Experiments for Period April 4, 2008 Through June 13, 20092009-12-10010 December 2009 Submittal of Report of Changes, Tests & Experiments for Period April 4, 2008 Through June 13, 2009 L-2008-245, Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/082008-11-10010 November 2008 Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/08 L-2007-053, Annual Radiological Environmental Operating Report2007-05-0404 May 2007 Annual Radiological Environmental Operating Report L-2005-101, Inservice Inspection Program Third Interval - First Period - First Outage (SL2-15) Owner'S Activity Report (OAR-1)2005-05-0202 May 2005 Inservice Inspection Program Third Interval - First Period - First Outage (SL2-15) Owner'S Activity Report (OAR-1) L-2004-097, Annual Radiological Environmental Operating Report2004-05-11011 May 2004 Annual Radiological Environmental Operating Report ML18227B0771978-03-17017 March 1978 03/17/1978 Letter Operating Summary Reports of February 1978 ML18227B0631978-03-0404 March 1978 03/04/1978 Letter Operating Status Reports of February 1978 ML18227A4231978-03-0404 March 1978 Attached February, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0641978-02-14014 February 1978 02/14/1978 Letter Operating Status Reports of January 1978 ML18227A4221978-02-14014 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0651978-02-0404 February 1978 02/04/1978 Letter Operating Status Reports of January 1978 ML18227A4211978-02-0404 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0671978-01-0707 January 1978 01/07/1978 Letter Operating Status Reports of December 1977 ML18227A4201978-01-0707 January 1978 Attached December, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0681977-12-0303 December 1977 12/03/1977 Letter Operating Status Reports of November 1977 ML18227A4191977-12-0303 December 1977 Attached November, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0691977-11-0505 November 1977 11/05/1977 Letter Operating Status Reports of October 1977 ML18227A4171977-11-0505 November 1977 Attached October, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0701977-10-0505 October 1977 10/05/1977 Letter Operating Status Reports of September 1977 ML18227A4151977-09-0303 September 1977 Attached August, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0711977-09-0303 September 1977 09/03/1977 Letter Operating Status Reports of August 1977 ML18227A4141977-08-0505 August 1977 Attached July, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0731977-08-0505 August 1977 08/05/1977 Letter Operating Status Reports of July 1977 ML18227A4131977-07-0707 July 1977 Attached June, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. May, 1977 for Unit 3 Incorrectly Reported for Some Values. Attached Revised May, 1977 Operating Data Report for Unit 3 ML18227B0741977-07-0707 July 1977 07/07/1977 Letter Operating Status Reports of June 1977, and a Revised Operating Data Report for May 1997 for Turkey Point Unit 3 ML18227A4121977-06-0606 June 1977 Attached May, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0751977-06-0606 June 1977 06/06/1977 Letter Operating Status Reports of May 1977 ML18227A4111977-05-0505 May 1977 Attached April, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0761977-05-0505 May 1977 05/05/1977 Letter Operating Status Reports of April 1977 ML18227A4101977-04-0404 April 1977 Attached March, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. Maximum Dependable Capacity (MWe-Net) for St. Lucie No. 1 Was Revised from 802 MWe-Net to 777 MWe-Net (Estimated) ML18227B0781977-04-0404 April 1977 04/04/1977 Letter Operating Status Reports of March 1977 ML18227B0791977-03-0707 March 1977 03/07/1977 Letter Operating Status Reports of February 1977 ML18227A4091977-03-0707 March 1977 Attached February, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0801977-02-0707 February 1977 02/07/1977 Letter Operating Status Reports of January 1977 ML18227B0811977-01-0707 January 1977 01/07/1977 Letter Operating Status Reports of December 1976 ML18227A4081977-01-0707 January 1977 Attached December, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0821976-12-0606 December 1976 12/06/1976 Letter Operating Status Reports of November 1976 ML18227B0831976-11-15015 November 1976 11/15/1976 Letter Corrected Copies of Operating Data Reports for October 1976 ML18227A4061976-11-0808 November 1976 Attached October, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 2023-04-04
[Table view] Category:Monthly
MONTHYEARL-2020-065, Submission of Periodic Reports2020-04-0909 April 2020 Submission of Periodic Reports ML18227B0771978-03-17017 March 1978 03/17/1978 Letter Operating Summary Reports of February 1978 ML18227B0631978-03-0404 March 1978 03/04/1978 Letter Operating Status Reports of February 1978 ML18227B0641978-02-14014 February 1978 02/14/1978 Letter Operating Status Reports of January 1978 ML18227B0651978-02-0404 February 1978 02/04/1978 Letter Operating Status Reports of January 1978 ML18227B0671978-01-0707 January 1978 01/07/1978 Letter Operating Status Reports of December 1977 ML18227B0681977-12-0303 December 1977 12/03/1977 Letter Operating Status Reports of November 1977 ML18227B0691977-11-0505 November 1977 11/05/1977 Letter Operating Status Reports of October 1977 ML18227B0701977-10-0505 October 1977 10/05/1977 Letter Operating Status Reports of September 1977 ML18227B0711977-09-0303 September 1977 09/03/1977 Letter Operating Status Reports of August 1977 ML18227B0731977-08-0505 August 1977 08/05/1977 Letter Operating Status Reports of July 1977 ML18227B0741977-07-0707 July 1977 07/07/1977 Letter Operating Status Reports of June 1977, and a Revised Operating Data Report for May 1997 for Turkey Point Unit 3 ML18227B0751977-06-0606 June 1977 06/06/1977 Letter Operating Status Reports of May 1977 ML18227B0761977-05-0505 May 1977 05/05/1977 Letter Operating Status Reports of April 1977 ML18227B0781977-04-0404 April 1977 04/04/1977 Letter Operating Status Reports of March 1977 ML18227B0791977-03-0707 March 1977 03/07/1977 Letter Operating Status Reports of February 1977 ML18227B0801977-02-0707 February 1977 02/07/1977 Letter Operating Status Reports of January 1977 ML18227B0811977-01-0707 January 1977 01/07/1977 Letter Operating Status Reports of December 1976 ML18227B0821976-12-0606 December 1976 12/06/1976 Letter Operating Status Reports of November 1976 ML18227B0831976-11-15015 November 1976 11/15/1976 Letter Corrected Copies of Operating Data Reports for October 1976 ML18227B0841976-11-0808 November 1976 11/08/1976 Letter Operating Status Reports of October 1976 ML18227B0861976-09-0707 September 1976 09/07/1976 Letter Operating Status Reports of August 1976 ML18227B0871976-08-0505 August 1976 08/05/1976 Letter Operating Status Reports of July 1976 ML18227B0881976-07-0202 July 1976 07/02/1976 Letter Operating Status Reports of June 1976 ML18227B0951975-10-0909 October 1975 10/09/1975 Letter Operating Summary Reports of September 1975 ML18227B0961975-09-0909 September 1975 09/09/1975 Letter Operating Summary Reports of August 1975 ML18227B0971975-08-0101 August 1975 08/01/1975 Letter Operating Status Reports of July 1975 ML18227B0981975-07-0303 July 1975 07/03/1975 Letter Operating Status Reports of June 1975 ML18227B0991975-06-0505 June 1975 06/05/1975 Letter Operating Status Reports of May 1975 ML18227B1001975-05-0505 May 1975 05/05/1975 Letter Operating Status Reports of April 1975 ML18227B1011975-04-0404 April 1975 04/04/1975 Letter Operating Status Reports of March 1975 ML18227B1021975-03-0606 March 1975 03/06/1975 Letter Operating Status Reports of February 1975 ML18227B1041975-02-0707 February 1975 02/07/1975 Letter Operating Status Reports of January 1975 ML18227B1031975-02-0707 February 1975 02/07/1975 Letter Operating Status Reports of January 1975 2020-04-09
[Table view] |
Text
NIIC Po<<M 1OI U.O. NUCLI:Arl BEOULATOBY COMMI'JION OO UMOE I'I Iz IIII 0-2 0 1 Mt)I:B "NBC DISTBIDUTION Forl PRI>> 60 DOCI<ET MRTEB tAL MOIITIILY RI PORT FROM: Florida Power 8c Tight Co. OATE OF OOCUMENT NRC Miami, Floriaa 33101 12 6 A.D. Schmidt OATE flECEIVEO 12 6 LETTEN 0 NO TO B17 E O INPUT FOBM NUMOLB OF COPIEG BLCEIVFD 0 OB IG IN AI NC LASS IF IE 0 , 1 OPY cop/'EECBIPTION LETTER TRANS TliE POLL(NING: IIOjTIILY RF PORT FOR November 1976 PLANT & COMPONENT OPERABILXTY &
AVAILABILITY'11ISREPORT TO BE USED IN DO NOT RZMO~ PREPARXNG GRAY BOOK BK PLANS & OPERATIONS.
. ACKNOWrZDGZD .
PLANT NAIIE TQrkepi Pt ~ UQit9 3 ST. LUCIE $ 1 FOR ACTION/INFORMATION MXPC M/ CKS >OR A P ON INTERNAL D IST R I I3UTION NRC PD DQ>ALP S CtB, BRANCII C11XEP L IC ~X~ P RRISH LPDR: Miami Pla. CXTERNAL DISTIIIDUTION CONTIIOL NUMOE R p//rp//
MU'SXC NIIC F OBM l95 {2-7III
~
j
~VGS~KT 'PQ;~ gg GZDGZJ~i7QNZOA" I
l g
9 'fj 8A
~ ~')a xJ pI l
P. O. BOX 013100, MIAMI, FL 33101 e i ~ S FLORIDA POWER 8c LIGHT COMPANY Once~~ u<.
SQ- ASu/Z& S9< December 6, 1976 Office of Management. Information and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:
Attached are the November, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit No. 1.
Very truly yours, some MCg D. Schmidt ~/4'-rgb/
Vice President ~ I40a leaua ateaggg CCNhll$$ 10I$
Power Resources
+~4~%,
VTC/DDC Il p Attachments cc: Mr. Norman C. Moseley Jack R. Newman, Esctuire g~ jQ~)
c PECP E... SERVING +EOPL'E
~ ~
I F89 gf:
gala trdDV8
~HW<O'l g4,M ~
~r m'LM tt P5
/g~~Wi $g $
APPENDIX B AVERAGE DAILY UNIT 'POWER'EVEL DOCKET NO.
UNIT Turkey Point Unit No. 3 DATE Dec. 3, 1976 COMPLETED BY V- T. Chilson TELEPHONE (3P5) 552 3830 MONTH November, 1976 DAY AVERAGE DAlLY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 650 17 652 18 657 19 659 661 21 659 22 653 23 652 664 25 1P 662 26 658 27 12 649 28 13 612 29 14 30 15
~ ~
0
~ ~
~ ~ APPENDS C OPERATING DATA REPORT DOCKET NO. 50 - 250 UNIT Turkey Point Unit No. 3 REPORT MONTH November 1976 DATE Dec. 3 1976 COMPLETED BY V. T. Cbilson OPERATING STATUS
- 1. REPORTING PERIOD: 0001 76 11 Ol GROSS HOURS IN REPORTING PERIOD: 720.0 THROUGH 24
- 2. CURREiVZLY AUTHORIZED POWER LEVEL (MWt): 2200 MAX.DEPEND. CAPACITY (MWe-Net): 666 DESIGN ELECTRICAL RATING (MWe-Net): 693
- 3. POWER LEVEL TO WHICH RESTRICTED '(IF ANY) (MWe-Net): NONE
- 4. REASONS FOR RESTRICTION (IF ANY):
THIS MONTH YEAR TO DATE Cl~fULATIVE
- 5. NUMBERS OF HOURS REACTOR WAS CRITICAL..... 313.9 6 760.0 28 040.1
- 6. REACTOR RESERVE SHUTDOWN hOURS.. ~ ~ ~ ~.... ~ ~
64.2 67.4
- 7. HOURS GENERATOR ON LINE.................. ~
313 ~ 5 6 669.1 27 039.1 8~ UNIT RESERVE SHUTDOWN HOURS. ~ ~ ~ .. ~ ~ ~ ~ ... ~ ~
0- 85.0
- 9. GROSS THERIIAL ENERGY GENERATED (MWH) ~
i
..... 684 046 14 417 328 51 729 588 10 'ROSS ELECTRICAL ENERGY GENERATED (MWH)... 214 570 4 555 215 16 570 451 ll. NET ELECTRICAL ENERGY GENERATED (K%)..... 202 528 4 321 879 15 677 641
- 12. REACTOR SERVICE FACTOR. 43.6 84.1 80.1
- 13. REACTOR AVAILABILITYFACTOR.... ~ .....,,... 43 ' 84.9 80.3 14 'iNIT SERVICE FACTOR. . . ~ . .. , 43.5 82.9 77.3
- 15. UNIT AVAILABILITYFACTOR. ~ .. ~ ............. 43 ' 82.9 77.5
- 16. *I%IT CA'?ACITY FACTOR (Using (MDC). ~ .... ..
~ 42 ' 80.7 68.2
- 17. UNIT CAPACITY FACTOR (Using Design MWe).. ~
40 6 77.2 64. 7
- 18. UNIT FORCED OUTAGE RATE................... O.a 2.9
- 19. SHUTDOWNS SCHEDULED OVER HECT 6 MONTHS (TYPE, DATE, AND DURATZON OF EACH):
- 20. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: Dec. 27 1976
- 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED IiNITZAL CRITICALITY INITIAL ELECTRICITY CO~KERCIAL OPERATION
0 (I) REASON APPENDIX D DOCKET NO. 50 - 250 A: EQUIPMENT FAILURE (EXPLAIN)
B: HAINT. OR TEST UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Turkey Point Unit No. 3 C: REFUELING D: REGULATORY RESTRICTION DATE Dec. 3, 1976 E: OPERATOR TRAINING AND I.ICENSE EXAHINATION COMPI.ETED BY V. T. Chilson F: ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN) REPORT HONTll November 1976 TELEPllONE (305) 552 - 3830 ll: OTlKR (EXPLAIN)
(2) HETllOD 1: HANUAL METIIOD OF 2: MANUAL SCRAM TYPE SllUTTING DOWN 3: AUTOHATIC SCRAM F: FORCED DURATION TllE REACTOR OR 4: OIHL'R (EXPLAIli) NO. DATE S: SCllEDULED (BOURS) REASON(1) REDUCING POWER(2) CORRECTI VE ACTIONS/COl IMENTS 21 76-11-14 406.5 Unit No. 3 removed from service for refueling, main-tenance, and inspections. (Nuclear and Non-nuclear systems)
SlMlARY: Unit No. 3 operated ar. approximately 100X R.P. during month until Nov. 14, 1976, when the unit was removed from service for refueling, maintenance, and inspections.
APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
UNIT Turkey Point Unit No. 4 Dec. 3, 1976 COMPLETED BY V. T. C?lilson TELEPHONE MONTH November 197 6 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAIL POWER LEVEL (MWe-Net) (MWe-Net) 17 18 19 20 21'2 23 24 25 10 26 27 12 28
, 13 29 30 16
4 APPENDIX C
~ ~
OPERATING DATA REPORT DOCRET NO. 50 - 251 UNIT Turkey Point Unit No. 4 REPORT MOAHHH Novenber 1976 DATE Dec. 3, 1976 COMPLETED BY V. T. Chilson OPERATING STATUS TELEPHONE (305) 552 - 3830
- l. REPORTING PERIOD: 0001 76 11 01 GROSS HOURS IN REPORTING PERIOD: 720.0 THROUGH 24
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt):
NAI.DEPEND. CAPACITY (NNH-Naa):
- 3. POWER LEVEL TO WHICH RZSTRICTZD (IF ANY) (MWe-Net): NONE
- 4. REASONS FOR RESTRICTION (IF ANY):
THIS MD~i YEAR TO DATE CUMULATIVE
- 5. AABERS OF HOURS REACTOR WAS CRITICAL.... 0.0 5 357.6 21 003.6
- 6. REACTOR RESERVE SHUTDOWN HOURS..H. ~ ~ ~ ~ . ~ . 0.0 0.0 117.1
- 7. HOURS OPERATOR ON LINE.... 0.0 5 158.3 19 872.0 8~ WaIT RESERVE SHUTDOWN HOURS... ~ ........ ~ 0.0 0.0 0.0
- 9. GROSS THERlQIL ENERGY GENERATED (MtYH) ~ ~ ~ . ~ ~
10 957 697 41 606 333
- 10. CROSS ELECTRICAL ENERGY GENERATED (iBad)... 3 499 506 13 478 583
- 11. NET ELECTRICAL ENERGY GENERATED (aaH)..... .- 1 638 3 316 334 12 774 964
- 12. REACTOR SERVICE FACTOR. 0.0 66.6 ~7.2
- 13. REACTOR AVAILABILITYFACTOR............... 66.6 ~Y
- 14. UNIT SERVICE FACTOR 0.0 64.2 ~6.2
- 15. UNIT AVAILABILITYFACTOR.................. 0.0 64.2 ~6.2 16 ~ WilT CAPACITY PACTOR (Using (MDC) . ~
~ ~ 61. 9 67.5
- 17. UNIT CAPACITY FACTOR (Using Design MWe)... 0.0 59.5 6I,2 18 'NIT FORCED OUTAGE RATE.. 0.0 4~1 3~7 6 19 'HUTDOWNS SCHEDULED OVER ANEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
20 'F Refueling, maintenancea SHUTDOWaN and inspeciions April 4, 1977 through May 22, 1977 AT END OF REPORT PERIOD, ESTLfATED DATE OF STARTUP:
21 'NITS IN TEST STATUS (PRIOR TO COiMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
0 P
II I
~ ~
~ ~ ~
~ ~
\ ~ ~
APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO., 50 - 335 UNIT St. Lucie Unit No. 1 DATE Dec. 3 1976 COMPLETED BY U. T. Chilson TELEPHONE (305) 552 3830 MONTH November, 1976 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 17 2 18 3 19 20 21 22 23 24 25 10 26 27 12 28 29 14 30 16
~ ~
APPENDIX C
~ g ~
OPERATING DATA REPORT DOCKET NO. 50 - 335 UNIT St Lucia Unit No 1 REPORT MONTH November 1976 DATE Dec. 3, 1976 COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3830 OPERATING STATUS
- 1. REPORTIi60 PERIOD: 0001,76 ll 01 GROSS HOVRS IN REPORTING PERIOD: 720.0 THROUGH 240
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2560 MAX.DEPEND. CAPACITY (MWe-Net): 802 Estimated)
DESIGN ELECTRICAL RATING (MWe-Net): 802 (66gfe-Net): 722
- 3. POWER LEVEL TO WHICH RESTRZCTED (ZP ANY)
- 4. REASONS FOR RESTRICTION (IF ANY):
"Temporary 90X restriction pending Reactor Coolant FloM Analysis" THIS MONTH YEAR TO DATE CU.fULATZVE 5~ NU66BERS OF HOURS REACTOR 'WAS CRITICAL ~ ~ ~ ~
1 366.6
- 6. REACTOR RESERVE SHUTDOWN HOURS............ N/A(1) N/A(1) 7 ~ HOURS GENERATOR ON LINE.... ~ .~. ~ . ~ ~....... 1 121.9 1 121.9 HOURS............... N/A N/A( N/A(1)
- 8. VNIT RESERVE SHUTDOWN
- 9. GROSS THERMAL ENERGY GENERATED (E&) ~... ~ ~ 1 495 088 1 4 5 08
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) ~ ~ ~
418 670 418 670 ll NET ELECTRICAL ENERGY GEKRATED (MWH) 374 180 374 180
- 12. REACTOR SERVICE FACTOR 0.0 27 ' 27.2
- 13. REACTOR AVAILABILITYFACTOR. ~ ~ . ~ ~ ~ ~ ~ .. ~ ~ ~ ~
- 27. 2 27.2 14 'Ni IT SERVICE FACTOR. 0.0 22.6 22.6 15 'NIT AVAILABILITYFACTOR. . ........~ ~ ~ ~ . ~ . ~
0.0 22. 6 22. 6 16 ~ 'MZT CAPACITY PACTOR (Using (MDC)....... ~ . 0.0 9.4 9.4
- 17. UNIT CAPACITY PACTOR (Using Design MWe)... 0' 9,4 9.4
- 18. UNIT FORCED OVTAGE RATE.............,...,. 100 ' 76 ' 76.5 19 'HVTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AÃ) DURATION OF EACH):
N/A(1)
- 20. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: De
- 21. VNZTS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY A~rrl 22, 7976 INITIAL ELECTRICZTY r 7 1976 COMMERCIAL OPERATION NOTE: (1) Unit in test status
h' (1) REASON APPENDIX D DOCRET NO.
A: EQUIPMENT FAILURE (EXPLAIN)
B: HAINT. OR TEST UNIT SHUTDOWNS AllD POWER REDUCTIONS UNIT NAME St. Lucie Unit No. 1 C: REFUELING D: REGULATORY RESTRICTION DATE Dec. 3, 1976 E: OPERATOR TRAINING AND LICENSE EXAHINATION COHPLETED BY V. T. Chilson F: ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN) REPORT HONTH November 1976 TELEPllONE 305 552 - 3830 II: OT)IER (EXPLAIN)
(2) METHOD 1: HANUAL HETNOD OF 2: .HANUAL SCRAM TYPE SllUTTING DOWN 3: AUTOHATIC SCRAM F: FORCED DURATION Tllg REACTOR OR 6: OIllER (EXPLAIN) NO ~ DATE S: SCHEDULED (IlOURS) REASON(1) REDUCING POWER(2) CORRECTIVE ACTIONS/COMMENTS 16 76-07-10 720.0 Unit was removed from service for reactor tests and inspections. (Nuclear system)
SUMMARY
- Unit No. 1 reactor inspection continued during month.
o I 1 u
J j
P. O. BOX 013100, MIAMI, FL 33101
>Q Ili FLORIDA POWER & LIGHT COMPANY December 6, 1976 lg Office of Management Information PPpjp.
and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C. 20555
/4eepro~
yo Gentlemen:
Attached are the November, 1976 Operating Status Repbrts for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit No. l.
Very truly yours, D. Schmidt Vice President Power Resources VTC/DDC Attachments cc: Mr. Norman C. Moseley Jack R. Newman, Esquire PEOPLE... SERVING PEOPLE
APPEiiDLX B AVERAGE DAILY UilIT POWER LEVEL DOCZET No. 50 25o UNIT Turkey Point Unit No. 3 DATE Dec. 3, 1976 COMPLETED BY V. T. Chi1son TELEPHONE (305)
MONTH November, 1976 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (M<e-Net) (MWe-Net) 650 17 '
18 657 19 659 20 661 21'2 659 653 23 652 24 664 25 10 662 26 658 27 12 649 28 612 29 14 30 15
APPENDIX C OPERATING DATA REPORT DOCKET NO. 50 - 250 UNIT Turkey Point Unit No. 3 REPORT ifONTH Novenber 1976 DATE Dec. 3 1976 CONPLE~~M BY V. T. Chilson OPERATING STATUS TELEPHONE 305 552 3830
- 1. REPORTING PERIOD: 0001,76 11,01 GROSS HOURS ZN REPORTING PERIOD:
THROUGH 4 i
- 2. CURRENTLY AUTHORIZED POWER LEVEL (YWt): 2200 NA!C.DEPEND. CAPACITY (NWe-Net): 666 DESZGN ELECTRICAL RATING (MWe-Net): - 693
- 3. POWER LEVEL TO f&ICH RESTRIC~c3 (IF AVZ) ( ffie-Net): NONE
- 4. REASONS FOR RESTRICTION (IF A'fY):
HOURS' THIS ifONTH YEAR TO DATE CL~fUIATZVE
- 5. NUiiBERS OF HOURS REACTOR ffAS CRITICAL..... 313.9 6 760.0 28 040.1
- 6. REACTOR RESERVE SHUTDOWNi ... ... ...
~ ~
64.2 67.4
- 7. HOURS GENERATOR ON LINE. ~ ~ 313.5 6 669.1 27 039 F 1
- 8. UNZT RESERVE SHUTDOWN HOURS... ~ .. ..
~ ~ ~ . ~ .. 85.0
- 9. GROSS THER'.~M. ENERGY GE.'DZRATED (MhH) ~ ~ .... 684 046 14 417 328 51 729 588
- 10. GROSS ELECTRICAL ENERGY OPERATED (NWH) ~ .. 214 570 4 555 215 16 570 451 11 ~ NET ELECTRICAL ENERGY GENERATED ( ffv'8) ~,... 202 528 4 321 879 15 677 641
- 12. REACTOR SERVICE FACTOR. 43.6 84.1 80.1
- 13. REACTOR AVAILABILITYFACTOR............... 43 6 84.9 80.3
- 14. UNIT SERVICE FACTOR. . ~ ~ .. ~
43.5 82.9 77.3
- 15. UNIT AVAILABZLZTYFACTOR.. << ...... .....-.
~ 77.5
- 16. UNIT CAPA'CITY FACTOR (Using (HDC).......... 42 ' 80.7 68.2
- 17. fiNZT CAPACITY FACTOR (Using Design NWe)... 40 6 77.2 64.7
- 18. UNIT FORCED OUTAGE RATE. . . ~ ..,......,... 0.0 0.1 2.9
- 19. SHfi&)OWNS SCu~ULED OVER .'fECT 6 )fONTHS (TYPE, DATE, AND DURATION OF EACH):
- 20. ZF SHUTDOWN AT END OF REPORT PERIOD, ESTL~ATED DATE OF STARTUP: Dec. 27 1976 21 ~ UNITS EN TEST STATUS (PRIOR TO COKfERCZAL OPERATZON): FORECAST ACHIEVED ZiNZTIAL CRITICALITY INITIAL ELECTRICITY CO~DfERCIAL OP ERATZON
Al'PENDIX D DOCKET HO. 50 - 250 (I) REASOII A: EJUIPHEIIT FAILURF. (EXP ITIN)
U: IIAIHT. OR TFST UNIT SIIUTDOQHS AND POWER REDUCTIONS UHIT HAHE Turkey Point Unit No. 3 C: REFUEI.I tlC 0: RECUIATOIIY RESTRICTION DATE Dec. 3, 1976 E: OPERATOR THAINLIIC AIID LICENSE EXAHINATIOH COHPLETED DY V. T. Chilson F: ADtllNISTRATIVE C: OPERATIOIIAI. ERROR (EXPMIII) TELEPHONE (305) 552 3S30 REPORT HOHTII November 1976 II: OTIIER {EXPIAIII)
(2) IIETIIOD 1: HAHIIAI. tlETHOD OF 2: HANUAI, SCRAH TYPE SIIUTTIIIC DOWN 3: AUTOHATIC SCIIAII F: FORCED DURATION TIIL'EACTOR OR OI tKR (EXP ITIN) NO. DATE S: SCIIEDUIZD (IIOURS) REASOII (1) REDUCIHC POWER(2) CORRECTIVE ACTIOIIS/COtIHENTS 21 76-11-14 406.5 Unit No. 3 removed from service for refueling, main-tenance, and inspections. {Nuclear and Hon-nuclear systems)
SUIRIARYt Unit No. 3 operated at approximately lOOX R.P. during month until Hov. 14, 1976, when the unit was removed from service for refueling, maintenance, and inspections.
~ APPENDIX B
~
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 251 UNIT Turkey Point Unit No. 4 DATE Dec. 3, 1976 COMPLETED BY V. T. Chilson TELEPHONE (305) 552 - 3830 MONTH November 197 6 (K<e-Net)
DAY AVERAGE DAiLY POWER LEVEL DAY AVERAGE DAIL POWER LEVEL (caffe-Net) 17 18 19 20 21'2-23 10 26 27 28 13 29 14 30
OPERATZifG DATA REPORT DOCKET NO. 50 - 251 UNIT TurkeY Point Unit No. 4 REPORT HOAEHH Novenber 1976 DATE Dec. 3, 1976 CO'fPLE ED BY V T Chilson OPKRATLfG STATUS TELvV'HONE (305) 552>> 3830
- 1. REPORTING PERIOD: 0001 76 Il 01 GROSS HOURS IPhf REPORTING PERIOD: 720.0 THROUGH
- 2. CURRENTLY AUTHORIZED PO'ifKR LaWEL (Nfft)f EAE hDEPEED. CAPACIPP (EPe-Ehh): 266
- 3. POffKR LEVEL TO MiZCH RESTRICTED (ZF ANY) (Nffe-Net): NOifE 4 REIGNS FOR RESTRXCTZO'f (ZF AA'fY) f THIS NONTH Yv~ TO DATE Cl fULAXXVE
- 5. NUWBERS OF HOURS REACTOR HAS CRITICAL..... 0 0 5 357 ~ 6 21 003.6
- 6. REACTOR RESERVE SHUTDOWN HOURS.. ~ ~ .. .. ..
~ ~ 0.0 0.0 117.1
- 7. HOURS GEKRATOR ON LINE........,,......... 0.0 5 158.3 19 872.0
- 8. UNIT RESERVE SHUTDOffhhf HOURS... ~ . ~ ~ .. ~..... 0~0 0.0 0.0 9 GROSS THERAGQ E'.fERGY GENERATED (MPEf) ~,, ~, 0 10 957 697 41 606 333 10, GROSS ELECTRICAL LlKRGY GENERATED (2fÃ6f)... 0- 3 499 506 13 478 583
- 11. i~c, ELECTRICAL EifERGY GE'.fE'.%TED (NNH)..... - I 638 3 316 334 12 774 964
- 12. REACTOR SERVICE FACTOR ........, . 0~0 66. 6 ~t
- 13. REACTOR AVAZLABILZTY FACTOR............. ~ . 0.0 66.6 14 ~ U:fIT SERVICE FACTOR...... ~.....,. 0.0 64. 2 ~6. 2 15 ~ UNIT AVAILABILITYFACTOR...,...........,., 0.0 64.2 69.2
'6. fQXT CAPACITY FACTOR (Using (EAADC)......... 0' 61.9 67.5
- 17. UNIT CAPACITY FACTOR (Using Design NNe)... 0 0 59.5 Q,.2
- 18. UNXT FORCED OUTAGE RATE. 0.0 4.1 3.7
- 19. SHUTDOfP'NS SCfEZDULH) OVER NLYT 6 HONTHS (TYPE, DATE, AND DURATION OF EACH) f Refueling, naintenance, and inspections April 4, 1977 through Hay 22, 1977
- 20. IP SHUTDOfPif AT END OF REPORT PERIOD, ESTO>TED DATE OF STARE JP~
h
- 21. UNITS I.'f TEST STATUS (PR OR TO CONEfKRCZAL OPERATION): FORECAST ACHXKVED XNITIAL CRITICALITY INITIAL KLECTRICI' CONNERCXAL OPERATION
(I) RFASOH APPENDIX D DOCEET HO. 50 - 251 h: E(jUll'Ml?HT FAII.URE (EXPLAIN)
U: MAINT. OR Tl?ST UNIT SHUTDOWNS hHD POWFR REDUCTIONS UNIT NAME Turkey Point Unit No. 4 C: REFUELIHC D: RECULA'fORY RESTRICTION DATE Dec. 3, 1976 E: OPERATOR T <AIHINC AHD COMPI.ETED BY V. T. Cbilson l.lCEHSE EXAMINATION F: ADMINISTRATIVE -
C: OPKf?ATIOHAI. ERROR (EXPLAIN) REPORT MOHTII November, 1976 TELEPIIONE (305) 552 3830 H: O'I'UL'R (KXPIJLI N)
(2) METHOD 1: MANUAL METHOD OF 2'ANUAL SCRAM TYPE SUUTTINC DOWN 3: AUTOMATIC SCRAM F: FORCED DURATION TUE REACTOR OR 4: OTHER (EXPLAIN) HO. DATE S: SCHEDUI.ED (HOURS) REASON(1) REDUCIHC POWER(2) CORRECTIVE ACTIONS/CONlEHTS 28 76-10-28 720.0 Unit No. 4 was removed from service for steam generator tube inspection program. (Nuclear system)
SUMMARY
- Unit No. 4 rcmaincd out of service to perform stcam generator tube inspection.
i APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 335 UNIT St. Lucie Unit No. 1 DATE Dec. 3 1976 COMPLETED BY V. T. Chi1son TELEPHONE (305) 552 - 3830 MONTH November, (caffe-Net 197 6 (i~Me-Net DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL
) )
17 18 19 20 21 22 23.
25 26 27 12 28 13 29 14 30
~ ~
APPENDIX C OPERATING DATA REPORT DOCKET NO. 50 - 335 U.fXT St. Lucis Unit No. 1 REPORT MONTH November 1976 DATE Deo9 3, 1976 COMPLK.ED BY V. T. Chilson TELEPHONE OPERATIiNG STATUS
- 1. REPORTING PERIOD: 0001 76 11 01 GROSS HOURS XN REPORTING PERIOD: 720 '
TfZOUGH 2400
- 2. CURRLfTLY AUTHORIZED POWER LEVEL (99Wc): 2560 MAY.DEPEND. CAPACZTY (Ntfe-Net): 802 Es imated)
DESIGN ELECTRICAL RATING (MWe-Net): 802
- 3. POWER LEVEL TO WHICH RESTRICTED (XF ANY) (:fWe-Nec): 722 4 ~ REASONS FOR RESTRICTION (XF AhY):
"Temporary 90K restriccion pending Reactor Coolanc Flow Analysis" THIS 'fONTH YEAR TO DAT CU.'fULATIVK
- 5. Nfi~ifBERS OF HOURS RvvlCTOR WAS CRITICAL. ~... 1 366.6 1 366.6 (1) N/A 6~ RvVlCTOR RESERVE SHUTDOIPif HOURS ~ ~ ~ ~ ~ ~ ~ ~ ~ . ~ ~
7 ~ HOURS GENERATOR ON LiiNK. ~...,.......... .. ~
1 121.9 1 121.9 8 l ifIT RESERVE SHUTDOWiN HOURS ~ ~ ~ ~ ~, ~ ~ ~ ~ ~, ~ ~, iN/A(1) N/A(1) N/A(1)
- 9. GROSS THERMAL ENERGY GcCERATED (MffH) ~ ~ ~ . ~ ~ 1 495 088 1 495 0
- 10. GROSS ELFCTRICAL KffERGY GR9rRATED (>fWH)... 418 670 418 670 ll. NET ELECTRICAL ENERGY GENERATED (MfR) ~ ~ .. ~ 374 180 374 180 12 ~ REACTOR SERVICE FACiOR ~ ~ ~ ~ ~ ~ ~ 7~2 27.2
- 13. REACTOR AVAILABILITYFAC-OR.. ~ ~ ~ . ~ ~ ~ . ~ ~ . ~ ~ 27.2
- 14. Ui9ZT SERVICE FACTOR. 0~0 22.6 22.6
- 15. UNIT AVAILABXLZTYFACTOR. ~ . ~ .. ~ ~ . ~ ~ ~ .. ..
~ ~
0.0 22.6 22.6
- 16. fDfIT CAPACI Y FACTOR (Using (MDC)........,, 0.0 9.4 9,4
- 17. UNIT CAPACITY FAClSR (Using Design MWe)... 0.0 9.4 9.4
- 18. UNIT FORCFD OUTAGE RATE. . ~ .... ... ~ ... 100.0 76.5 76.5
- 19. SHffTDOWNS SCHEDULED OVER NK<T 6 MONTHS (TYPE, DATE, Ai%) DURATIO'f OF EACH):
N/A( )
- 20. IF SHUTDOf99N AT RiD OF REPORT PERIOD, ESTLfATED DATE OF STARTUP: De
- 21. UNXTS XN TEST STATUS (PRIOR TO COl-fKRCXAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY Apri1 22, 1976 INITIAL ELECTRICITY 7 7979 CO999RCZAL OPERATZON NOTE: (I) Unit in cess status
APPENDIX D DOCKET HO. 50 335 (1) REASON A: Et1UIPHENT FAII.URE (EXPIAltt)
B: MAItlT. OR TFST UNIT SHUTDOWNS AtlD POWER REDUCTIOtlS UNIT HAME St. Lucis Unit No. 1 C: REFUFLIHG 0: REGUI>VrORY RESTRICTION DATE Dcc. 3, 1976 E: OPERATOR TRAINIHC AtlD l.ICEHSE EXAktlNATION COtlPLETED BY V. T. Chilson F: ADkllNISTRATIVE G: OPERATIONAL ERROR (EXPIAIN) REPORT klOtlTH November 1976 TELEPHONE 305 552 3830 ll: OTIIER (FA'PIAIH)
- (2) ktETttoD 1: tlAHUAL METHOD OF 2: t!AHUAL SCltAkl TYPE SllUTTIHC DOWN 3: AUTOk!ATIC SCRAkt F: FORCEI) DURATIOti TIIE REACTOR OR Oittk:<<(EXPLAZtt) HO. DATE S: SCHEDUI.ED (tiOURS) REASON(1) REDUCING POWER(2) CORRECTIVE ACTIONS/COtIHENTS 16 76-07-10 720.0 Unit was removed from service for reactor tests and inspections. (Nuclear system)
SUttktARY: Unit tlo. 1 reactor inspection continued during month.
t