ML18227B082
| ML18227B082 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie, Turkey Point |
| Issue date: | 12/06/1976 |
| From: | Schmidt A Florida Power & Light Co |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| Download: ML18227B082 (33) | |
Text
NIIC Po<<M 1OI Iz IIII U.O. NUCLI:ArlBEOULATOBYCOMMI'JION OO UMOE I'I 0-2 0 1
NRC "NBC DISTBIDUTIONForl PRI>> 60 DOCI<ET MRTEBtAL FROM: Florida Power 8c Tight Co.
Miami, Floriaa 33101 A.D. Schmidt Mt)I:B MOIITIILY RI PORT OATE OF OOCUMENT 12 6 OATE flECEIVEO 12 6 LETTEN 0 OB IGINAI OPY 0 NO TO B17 E O NC LASS IF IE0 INPUT FOBM NUMOLB OF COPIEG BLCEIVFD
, 1 cop/'EECBIPTION LETTER TRANS TliE POLL(NING:
DO NOT RZMO~
. ACKNOWrZDGZD IIOjTIILYRF PORT FOR November 1976 PLANT & COMPONENT OPERABILXTY &
AVAILABILITY'11ISREPORT TO BE USED IN PREPARXNG GRAY BOOK BK PLANS & OPERATIONS.
PLANT NAIIE TQrkepi Pt ~ UQit9 3 ST.
LUCIE $1 MXPC M/
CKS >OR A P
ON FOR ACTION/INFORMATION INTERNALD R I I3UTION IST NRC PD DQ>ALP S
- CtB, BRANCII C11XEP L IC ~X~
P RRISH LPDR: Miami Pla.
MU'SXC CXTERNAL DISTIIIDUTION CONTIIOLNUMOER p//rp//
NIIC F OBM l95 {2-7III
~
j
~VGS~KT 'PQ;~ gg GZDGZJ~i7QNZOA" I
l g
9 'fj 8A
~~')a xJ pI l
P. O. BOX 013100, MIAMI, FL 33101 e
i
~
S Once~~
u<.
SQ-ASu/Z& S9<
FLORIDA POWER 8c LIGHT COMPANY December 6,
1976 Office of Management.
Information and Program Controls U.
S. Nuclear Regulatory Commission Washington, D.
C.
20555 Gentlemen:
Attached are the November, 1976 Operating Status Reports for Turkey Point Unit Nos.
3 and 4 and St. Lucie Unit No. 1.
Very truly yours, D. Schmidt Vice President Power Resources VTC/DDC Attachments some MCg
~/4'-rgb/
~
I40a leaua ateaggg CCNhll$$ 10I$
+~4~%,
Il p
cc:
Mr. Norman C. Moseley Jack R.
- Newman, Esctuire g~ cjQ~)
PECP E... SERVING +EOPL'E
~
~
I F89 gf:
gala trdDV8 g4,M ~
~HW<O'l
~r m'LMtt P5
/g~~Wi $g $
APPENDIX B AVERAGE DAILY UNIT 'POWER'EVEL DOCKET NO.
UNIT Turkey Point Unit No.
3 DATE Dec.
3, 1976 COMPLETED BY V-T. Chilson TELEPHONE (3P5) 552 3830 MONTH
- November, 1976 DAY AVERAGE DAlLY POWER LEVEL (MWe-Net) 650 652 657 659 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 17 18 19 661 659 653 652 21 22 23 1P 12 13 664 662 658 649 612 25 26 27 28 29 14 30 15
~
~
0
~ ~
~
~
APPENDS C
OPERATING DATA REPORT REPORT MONTH November 1976 DOCKET NO. 50 - 250 UNIT Turkey Point Unit No.
3 DATE Dec.
3 1976 COMPLETED BY V. T. Cbilson OPERATING STATUS 1.
REPORTING PERIOD:
0001 76 11 Ol GROSS HOURS IN REPORTING PERIOD:
THROUGH 24 2.
CURREiVZLY AUTHORIZED POWER LEVEL (MWt):
2200 MAX.DEPEND. CAPACITY (MWe-Net):
666 DESIGN ELECTRICAL RATING (MWe-Net):
693 720.0 3.
POWER LEVEL TO WHICH RESTRICTED '(IF ANY)
(MWe-Net):
4.
REASONS FOR RESTRICTION (IF ANY):
NONE THIS MONTH YEAR TO DATE Cl~fULATIVE 5.
NUMBERS OF HOURS REACTOR WAS CRITICAL.....
313.9 6 760.0 28 040.1 6.
REACTOR RESERVE SHUTDOWN hOURS..
~ ~ ~ ~....
~
~ 64.2 67.4 7.
HOURS GENERATOR ON LINE..................
~
313 ~ 5 6 669.1 27 039.1 8 ~
UNIT RESERVE SHUTDOWN HOURS.
~ ~ ~..
~ ~ ~ ~...
~
~ 0-85.0 9.
GROSS THERIIAL ENERGY GENERATED (MWH) ~.....
684 046 14 417 328 51 729 588 i
10 'ROSS ELECTRICAL ENERGY GENERATED (MWH)...
214 570 4 555 215 16 570 451 ll.
NET ELECTRICAL ENERGY GENERATED (K%).....
202 528 4 321 879 15 677 641 12.
REACTOR SERVICE FACTOR.
43.6 84.1 80.1 13.
REACTOR AVAILABILITYFACTOR....
~.....,,...
43 '
14 'iNIT SERVICE FACTOR.
~.
43.5 15.
UNIT AVAILABILITYFACTOR.
~..
~.............
43 '
84.9 82.9 82.9 80.3 77.3 77.5 16.
- I%IT CA'?ACITY FACTOR (Using (MDC). ~....
~..
42 '
80.7 68.2 17.
UNIT CAPACITY FACTOR (Using Design MWe)..
~
40 6 18.
UNIT FORCED OUTAGE RATE...................
77.2 O.a
- 64. 7 2.9 19.
SHUTDOWNS SCHEDULED OVER HECT 6 MONTHS (TYPE,
- DATE, AND DURATZON OF EACH):
20.
IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
Dec.
27 1976 21.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED IiNITZAL CRITICALITY INITIALELECTRICITY CO~KERCIAL OPERATION
0
(I)
REASON A:
EQUIPMENT FAILURE (EXPLAIN)
B:
HAINT. OR TEST C:
REFUELING D:
REGULATORY RESTRICTION E:
OPERATOR TRAINING AND I.ICENSE EXAHINATION F:
ADMINISTRATIVE G:
OPERATIONAL ERROR (EXPLAIN) ll:
OTlKR (EXPLAIN)
APPENDIX D UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT HONTll November 1976 DOCKET NO.
50 - 250 UNIT NAME Turkey Point Unit No. 3 DATE Dec. 3, 1976 COMPI.ETED BY V. T. Chilson TELEPllONE (305) 552 - 3830 (2)
HETllOD 1:
HANUAL 2:
MANUAL SCRAM 3:
AUTOHATIC SCRAM 4:
OIHL'R (EXPLAIli)
NO.
DATE TYPE F:
FORCED S:
SCllEDULED DURATION (BOURS)
REASON(1)
METIIOD OF SllUTTING DOWN TllE REACTOR OR REDUCING POWER(2)
CORRECTI VE ACTIONS/COlIMENTS 21 76-11-14 406.5 Unit No. 3 removed from service for refueling, main-
- tenance, and inspections.
(Nuclear and Non-nuclear systems)
SlMlARY: Unit No. 3 operated ar. approximately 100X R.P. during month until Nov. 14, 1976, when the unit was removed from service for refueling, maintenance, and inspections.
APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
UNIT Turkey Point Unit No.
4 Dec.
3, 1976 COMPLETED BY V. T. C?lilson TELEPHONE MONTH November 197 6 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
DAY AVERAGE DAIL POWER LEVEL (MWe-Net) 17 18 19 20 21'2 23 24 25 10 26 27 12 28
, 13 29 30 16
4
~
~
APPENDIX C OPERATING DATA REPORT REPORT MOAHHH Novenber 1976 DOCRET NO.
50 - 251 UNIT Turkey Point Unit No.
4 DATE Dec. 3, 1976 OPERATING STATUS COMPLETED BY V. T. Chilson TELEPHONE (305) 552 - 3830 l.
REPORTING PERIOD:
0001 76 11 01 GROSS HOURS IN REPORTING PERIOD:
THROUGH 24 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt):
NAI.DEPEND. CAPACITY (NNH-Naa):
720.0 3.
POWER LEVEL TO WHICH RZSTRICTZD (IF ANY)
(MWe-Net):
4.
REASONS FOR RESTRICTION (IF ANY):
NONE THIS MD~i YEAR TO DATE CUMULATIVE 5.
AABERS OF HOURS REACTOR WAS CRITICAL....
0.0 5 357.6 21 003.6 6.
REACTOR RESERVE SHUTDOWN HOURS..H.
~ ~ ~ ~.
~.
0.0 0.0 117.1 7.
HOURS OPERATOR ON LINE....
8 ~
WaIT RESERVE SHUTDOWN HOURS...
~........
0.0
~ 0.0 5 158.3 19 872.0 0.0 0.0 9.
GROSS THERlQIL ENERGY GENERATED (MtYH) ~ ~ ~.
~ ~
10.
CROSS ELECTRICAL ENERGY GENERATED (iBad)... 10 957 697 41 606 333 3 499 506 13 478 583 11.
NET ELECTRICAL ENERGY GENERATED (aaH).....
.- 1 638 3 316 334 12 774 964 12.
REACTOR SERVICE FACTOR.
0.0 66.6
~7.2 13.
REACTOR AVAILABILITYFACTOR...............
66.6
~Y 14.
UNIT SERVICE FACTOR 0.0 64.2
~6.2 15.
UNIT AVAILABILITYFACTOR..................
0.0 64.2
~6.2 16 ~
WilT CAPACITY PACTOR (Using (MDC)
~
~
~
- 61. 9 67.5 17.
UNIT CAPACITY FACTOR (Using Design MWe)...
0.0 59.5 6I,2 18'NIT FORCED OUTAGE RATE..
0.0 4 ~ 1 3 ~ 7 6
19 'HUTDOWNS SCHEDULED OVER ANEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Refueling, maintenancea and inspeciions April 4, 1977 through May 22, 1977 20'F SHUTDOWaN AT END OF REPORT PERIOD, ESTLfATED DATE OF STARTUP:
21 'NITS IN TEST STATUS (PRIOR TO COiMMERCIAL OPERATION):
FORECAST ACHIEVED INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION
0
P I I I
~
~
~
~
~
~
~
\\
~
~
APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO., 50 - 335 UNIT St. Lucie Unit No.
1 DATE Dec.
3 1976 COMPLETED BY U. T. Chilson TELEPHONE (305) 552 3830 MONTH November, 1976 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 2 3
DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 17 18 19 20 21 22 23 24 25 10 26 27 12 28 29 14 30 16
~
~
~
g
~
APPENDIX C OPERATING DATA REPORT REPORT MONTH November 1976 DOCKET NO.
50 - 335 UNIT St Lucia Unit No 1
DATE Dec. 3, 1976 COMPLETED BY V. T. Chilson OPERATING STATUS TELEPHONE (305) 552-3830 1.
REPORTIi60 PERIOD: 0001,76 ll 01 GROSS HOVRS IN REPORTING PERIOD:
THROUGH 240 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt):
2560 MAX.DEPEND. CAPACITY (MWe-Net):
802 Estimated)
DESIGN ELECTRICAL RATING (MWe-Net):
802 720.0 3.
POWER LEVEL TO WHICH RESTRZCTED (ZP ANY)
(66gfe-Net):
722 4.
REASONS FOR RESTRICTION (IF ANY):
"Temporary 90X restriction pending Reactor Coolant FloM Analysis" THIS MONTH YEAR TO DATE CU.fULATZVE 5 ~
NU66BERS OF HOURS REACTOR 'WAS CRITICAL
~
~ ~
~
6.
REACTOR RESERVE SHUTDOWN HOURS............
N/A(1)
N/A(1) 1 366.6 7 ~
HOURS GENERATOR ON LINE.... ~.
~.
~. ~ ~.......
8.
VNIT RESERVE SHUTDOWN HOURS............... 1 121.9 N/A N/A(
1 121.9 N/A(1) 9.
GROSS THERMAL ENERGY GENERATED (E&)~...
~ ~ 1 495 088 10.
GROSS ELECTRICAL ENERGY GENERATED (MWH) ~
~
~ 418 670 ll NET ELECTRICAL ENERGY GEKRATED (MWH) 374 180 1 4 5 08 418 670 374 180 12.
REACTOR SERVICE FACTOR 13.
REACTOR AVAILABILITYFACTOR.
~ ~. ~ ~ ~ ~ ~..
~ ~ ~ ~
14'Ni IT SERVICE FACTOR.
15'NIT AVAILABILITYFACTOR.
~.
~........
~ ~.
~.
~
16 ~
'MZT CAPACITY PACTOR (Using (MDC).......
~.
0.0 0.0 0.0 0.0 27 '
- 27. 2 22.6
- 22. 6 9.4 27.2 27.2 22.6
- 22. 6 9.4 17.
UNIT CAPACITY PACTOR (Using Design MWe)...
0' 18.
UNIT FORCED OVTAGE RATE.............,...,.
100 '
9,4 76 '
9.4 76.5 19 'HVTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AÃ) DURATION OF EACH):
N/A(1) 20.
IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
De 21.
VNZTS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
INITIALCRITICALITY INITIALELECTRICZTY COMMERCIAL OPERATION FORECAST ACHIEVED A~rrl 22, 7976 r
7 1976 NOTE:
(1) Unit in test status
h'
1:
HANUAL 2:
.HANUAL SCRAM 3:
AUTOHATIC SCRAM 6:
OIllER (EXPLAIN)
NO ~
(1)
REASON A:
EQUIPMENT FAILURE (EXPLAIN)
B:
HAINT. OR TEST C:
REFUELING D:
REGULATORY RESTRICTION E:
OPERATOR TRAINING AND LICENSE EXAHINATION F:
ADMINISTRATIVE G:
OPERATIONAL ERROR (EXPLAIN)
II:
(2)
METHOD DATE TYPE F:
FORCED S:
SCHEDULED REPORT HONTH November 1976 DURATION (IlOURS)
REASON(1)
HETNOD OF SllUTTING DOWN Tllg REACTOR OR REDUCING POWER(2)
APPENDIX D UNIT SHUTDOWNS AllD POWER REDUCTIONS DOCRET NO.
UNIT NAME St. Lucie Unit No. 1 DATE Dec. 3, 1976 COHPLETED BY V. T. Chilson TELEPllONE 305 552 - 3830 CORRECTIVE ACTIONS/COMMENTS 16 76-07-10 720.0 Unit was removed from service for reactor tests and inspections.
(Nuclear system)
SUMMARY
Unit No. 1 reactor inspection continued during month.
o I
1 u
J j
P. O. BOX 013100, MIAMI, FL 33101
>Q Ili FLORIDA POWER & LIGHT COMPANY December 6,
1976 Office of Management Information and Program Controls U.
S. Nuclear Regulatory Commission Washington, D.
C.
20555 Gentlemen:
lg PPpjp.
/4eepro~
yo Attached are the November, 1976 Operating Status Repbrts for Turkey Point Unit Nos.
3 and 4 and St. Lucie Unit No. l.
Very truly yours, D. Schmidt Vice President Power Resources VTC/DDC Attachments cc:
Mr. Norman C. Moseley Jack R.
Newman, Esquire PEOPLE... SERVING PEOPLE
APPEiiDLX B AVERAGE DAILY UilIT POWER LEVEL DOCZET No. 50 25o UNIT Turkey Point Unit No.
3 DATE Dec.
3, 1976 COMPLETED BY V. T. Chi1son TELEPHONE (305)
MONTH
- November, 1976 DAY AVERAGE DAILY POWER LEVEL (M<e-Net) 650 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 17 10 12 14 15 657 659 661 659 653 652 664 662 658 649 612 18 19 20 21'2 23 24 25 26 27 28 29 30
APPENDIX C OPERATING DATA REPORT DOCKET NO. 50 - 250 UNIT Turkey Point Unit No.
3 REPORT ifONTH Novenber 1976 OPERATING STATUS DATE Dec.
3 1976 CONPLE~~M BY V. T. Chilson TELEPHONE 305 552 3830 1.
REPORTING PERIOD:
0001,76 11,01 GROSS HOURS ZN REPORTING PERIOD:
THROUGH 4
i 2.
CURRENTLY AUTHORIZED POWER LEVEL (YWt):
2200 NA!C.DEPEND. CAPACITY (NWe-Net):
666 DESZGN ELECTRICAL RATING (MWe-Net):
693 3.
POWER LEVEL TO f&ICH RESTRIC~c3 (IF AVZ)
( ffie-Net):
4.
REASONS FOR RESTRICTION (IF A'fY):
NONE THIS ifONTH YEAR TO DATE CL~fUIATZVE 5.
NUiiBERS OF HOURS REACTOR ffAS CRITICAL.....
313.9 6 760.0 28 040.1 6.
REACTOR RESERVE SHUTDOWNi HOURS'
~...
~... 64.2 67.4 7.
HOURS GENERATOR ON LINE. ~
~
313.5 6 669.1 27 039 F 1 8.
UNZT RESERVE SHUTDOWN HOURS...
~..
~ ~.. ~. ~.. 85.0 9.
GROSS THER'.~M. ENERGY GE.'DZRATED (MhH) ~ ~....
684 046 14 417 328 10.
GROSS ELECTRICAL ENERGY OPERATED (NWH) ~..
214 570 4 555 215 11 ~
NET ELECTRICAL ENERGY GENERATED ( ffv'8)~,...
202 528 4 321 879 51 729 588 16 570 451 15 677 641 12.
REACTOR SERVICE FACTOR.
43.6 84.1 80.1 13.
REACTOR AVAILABILITYFACTOR...............
43 6
84.9 80.3 14.
UNIT SERVICE FACTOR.
~ ~
~
15.
UNIT AVAILABZLZTYFACTOR.. <<......
~.....-.
43.5 82.9 77.3 77.5 16.
UNIT CAPA'CITY FACTOR (Using (HDC)..........
42 '
80.7 68.2 17.
fiNZT CAPACITY FACTOR (Using Design NWe)...
40 6
77.2 18.
UNIT FORCED OUTAGE RATE.
~.
0.0 0.1 19.
SHfi&)OWNS SCu~ULED OVER.'fECT 6 )fONTHS (TYPE, DATE, AND DURATION OF EACH):
64.7 2.9 20.
ZF SHUTDOWN AT END OF REPORT PERIOD, ESTL~ATED DATE OF STARTUP:
Dec.
27 1976 21 ~
UNITS EN TEST STATUS (PRIOR TO COKfERCZAL OPERATZON):
ZiNZTIAL CRITICALITY INITIALELECTRICITY CO~DfERCIAL OP ERATZON FORECAST ACHIEVED
IIETIIOD 1:
HAHIIAI.
2:
HANUAI, SCRAH 3:
AUTOHATIC SCIIAII OI tKR (EXPITIN)
NO.
(I)
REASOII A:
EJUIPHEIIT FAILURF. (EXPITIN)
U:
IIAIHT. OR TFST C:
REFUEI.I tlC 0:
RECUIATOIIY RESTRICTION E:
OPERATOR THAINLIIC AIID LICENSE EXAHINATIOH F:
ADtllNISTRATIVE C:
OPERATIOIIAI. ERROR (EXPMIII)
II:
OTIIER
{EXPIAIII)
(2)
DATE TYPE F:
FORCED S:
SCIIEDUIZD REPORT HOHTII November 1976 DURATION (IIOURS)
REASOII (1) tlETHOD OF SIIUTTIIIC DOWN TIIL'EACTOR OR REDUCIHC POWER(2)
Al'PENDIX D UNIT SIIUTDOQHS AND POWER REDUCTIONS DOCKET HO.
50 - 250 UHIT HAHE Turkey Point Unit No. 3 DATE Dec. 3, 1976 COHPLETED DY V. T. Chilson TELEPHONE (305) 552 3S30 CORRECTIVE ACTIOIIS/COtIHENTS 21 76-11-14 406.5 Unit No.
3 removed from service for refueling, main-
- tenance, and inspections.
{Nuclear and Hon-nuclear systems)
SUIRIARYt Unit No.
3 operated at approximately lOOX R.P. during month until Hov. 14, 1976, when the unit was removed from service for refueling, maintenance, and inspections.
~
~
APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50 251 UNIT Turkey Point Unit No.
4 DATE Dec.
3, 1976 COMPLETED BY V. T. Chilson TELEPHONE (305) 552 - 3830 MONTH November 197 6 DAY AVERAGE DAiLY POWER LEVEL (caffe-Net)
DAY AVERAGE DAIL POWER LEVEL (K<e-Net)
17 18 19 20 21'2-23 10 26 27 13 14 28 29 30
OPERATZifG DATA REPORT REPORT HOAEHH Novenber 1976 OPKRATLfG STATUS DOCKET NO.
50 - 251 UNIT TurkeY Point Unit No.
4 DATE Dec. 3, 1976 CO'fPLE ED BY V
T Chilson TELvV'HONE (305) 552>> 3830 1.
REPORTING PERIOD:
0001 76 Il 01 GROSS HOURS IPhf REPORTING PERIOD:
THROUGH 2.
CURRENTLY AUTHORIZED PO'ifKR LaWEL (Nfft)f EAE hDEPEED.
CAPACIPP (EPe-Ehh):
266 720.0 3.
POffKR LEVEL TO MiZCH RESTRICTED (ZF ANY)
(Nffe-Net):
4 REIGNS FOR RESTRXCTZO'f (ZF AA'fY)f NOifE THIS NONTH Yv~ TO DATE Cl fULAXXVE 5.
NUWBERS OF HOURS REACTOR HAS CRITICAL.....
0 0 5 357 ~ 6 21 003.6 6.
REACTOR RESERVE SHUTDOWN HOURS..
~ ~..
~..
~..
7.
HOURS GEKRATOR ON LINE........,,.........
0.0 0.0 0.0 5 158.3 117.1 19 872.0 8.
UNIT RESERVE SHUTDOffhhf HOURS...
~.
~ ~.. ~.....
0 ~ 0 0.0 0.0 9
GROSS THERAGQ E'.fERGY GENERATED (MPEf)~,, ~,
0 10 957 697 41 606 333 10, GROSS ELECTRICAL LlKRGY GENERATED (2fÃ6f)...
0-3 499 506 13 478 583 11.
i~c, ELECTRICAL EifERGY GE'.fE'.%TED (NNH).....
- I 638 3 316 334 12 774 964 12.
REACTOR SERVICE FACTOR........,
0 ~ 0
- 66. 6
~t 13.
REACTOR AVAZLABILZTYFACTOR.............
~.
0.0 66.6 14 ~
U:fIT SERVICE FACTOR...... ~.....,.
0.0
- 64. 2
~6. 2 15
~
UNIT AVAILABILITYFACTOR...,...........,.,
0.0 64.2 69.2
'6.
fQXT CAPACITY FACTOR (Using (EAADC).........
0 '
61.9 67.5 17.
UNIT CAPACITY FACTOR (Using Design NNe)...
0 0 59.5 Q,.2 18.
UNXT FORCED OUTAGE RATE.
0.0 4.1 3.7 FORECAST ACHXKVED XNITIAL CRITICALITY INITIALKLECTRICI' CONNERCXAL OPERATION 19.
SHUTDOfP'NS SCfEZDULH) OVER NLYT 6 HONTHS (TYPE, DATE, AND DURATION OF EACH) f Refueling, naintenance, and inspections April 4, 1977 through Hay 22, 1977 20.
IP SHUTDOfPif AT END OF REPORT PERIOD, ESTO>TED DATE OF STAREJP~
h 21.
UNITS I.'f TEST STATUS (PR OR TO CONEfKRCZAL OPERATION):
(I)
RFASOH h:
E(jUll'Ml?HT FAII.URE (EXPLAIN)
U:
REFUELIHC D:
RECULA'fORY RESTRICTION E:
OPERATOR T <AIHINC AHD l.lCEHSE EXAMINATION F:
ADMINISTRATIVE C:
OPKf?ATIOHAI. ERROR (EXPLAIN)
H:
O'I'UL'R (KXPIJLIN)
APPENDIX D UNIT SHUTDOWNS hHD POWFR REDUCTIONS REPORT MOHTII November, 1976 DOCEET HO.
50 - 251 UNIT NAME DATE Turkey Point Unit No.
4 Dec.
3, 1976 TELEPIIONE (305) 552 - 3830 COMPI.ETED BY V. T. Cbilson (2)
METHOD 1:
MANUAL 2'ANUAL SCRAM 3:
OTHER (EXPLAIN)
HO.
DATE TYPE F:
FORCED S:
SCHEDUI.ED DURATION (HOURS)
REASON(1)
METHOD OF SUUTTINC DOWN TUE REACTOR OR REDUCIHC POWER(2)
CORRECTIVE ACTIONS/CONlEHTS 28 76-10-28 720.0 Unit No.
4 was removed from service for steam generator tube inspection program.
(Nuclear system)
SUMMARY
Unit No.
4 rcmaincd out of service to perform stcam generator tube inspection.
i APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50 335 UNIT St. Lucie Unit No.
1 DATE Dec.
3 1976 COMPLETED BY V. T. Chi1son TELEPHONE (305) 552 - 3830 MONTH November, 197 6 DAY AVERAGE DAILY POWER LEVEL (caffe-Net
)
DAY AVERAGE DAILY POWER LEVEL (i~Me-Net
)
17 18 19 20 21 22 23.
25 26 12 13 14 27 28 29 30
~
~
APPENDIX C OPERATING DATA REPORT REPORT MONTH November 1976 OPERATIiNG STATUS DOCKET NO.
50 - 335 U.fXT St. Lucis Unit No. 1 DATE Deo9 3, 1976 COMPLK.ED BY V. T. Chilson TELEPHONE 1.
REPORTING PERIOD: 0001 76 11 01 GROSS HOURS XN REPORTING PERIOD:
TfZOUGH 2400 2.
CURRLfTLY AUTHORIZED POWER LEVEL (99Wc):
2560 MAY.DEPEND. CAPACZTY (Ntfe-Net):
802 Es imated)
DESIGN ELECTRICAL RATING (MWe-Net):
802 720 '
3.
POWER LEVEL TO WHICH RESTRICTED (XF ANY)
(:fWe-Nec):
722 4 ~
REASONS FOR RESTRICTION (XF AhY):
"Temporary 90K restriccion pending Reactor Coolanc Flow Analysis" THIS 'fONTH YEAR TO DAT CU.'fULATIVK 5.
Nfi~ifBERS OF HOURS RvvlCTOR WAS CRITICAL.~... 1 366.6 6 ~
RvVlCTOR RESERVE SHUTDOIPif HOURS ~ ~ ~ ~ ~ ~ ~
~ ~.
~ ~
(1)
N/A 7 ~
HOURS GENERATOR ON LiiNK.~...,..........
~.. 1 121.9 8
l ifIT RESERVE SHUTDOWiN HOURS ~ ~ ~ ~ ~, ~ ~ ~
~ ~, ~ ~,
iN/A(1)
N/A(1) 9.
GROSS THERMAL ENERGY GcCERATED (MffH)~ ~ ~.
~ ~ 1 495 088 10.
GROSS ELFCTRICAL KffERGY GR9rRATED (>fWH)... 418 670 ll.
NET ELECTRICAL ENERGY GENERATED (MfR) ~ ~..
~
374 180 12 ~
REACTOR SERVICE FACiOR
~
~
~
~
~
~ ~
7 ~ 2 13.
REACTOR AVAILABILITYFAC-OR..
~
~ ~.
~ ~
~.
~ ~. ~ ~
1 366.6 1 121.9 N/A(1) 1 495 0 418 670 374 180 27.2 27.2 14.
Ui9ZT SERVICE FACTOR.
15.
UNIT AVAILABXLZTYFACTOR.
~. ~..
~ ~.
~ ~ ~.. ~..
~
0 ~ 0 22.6 0.0 22.6 22.6 22.6 16.
fDfIT CAPACI Y FACTOR (Using (MDC)........,,
0.0 9.4 9,4 17.
UNIT CAPACITY FAClSR (Using Design MWe)...
0.0 9.4 9.4 18.
UNIT FORCFD OUTAGE RATE.
~.......
~
100.0 76.5 19.
SHffTDOWNS SCHEDULED OVER NK<T 6 MONTHS (TYPE,
- DATE, Ai%) DURATIO'f OF N/A( )
20.
IF SHUTDOf99N AT RiD OF REPORT PERIOD, ESTLfATED DATE OF STARTUP:
De EACH):
76.5 21.
UNXTS XN TEST STATUS (PRIOR TO COl-fKRCXAL OPERATION):
INITIALCRITICALITY INITIALELECTRICITY CO999RCZAL OPERATZON FORECAST ACHIEVED Apri1 22, 1976 7
7979 NOTE:
(I) Unit in cess status
(1)
REASON A:
Et1UIPHENT FAII.URE (EXPIAltt)
B:
MAItlT. OR TFST C:
REFUFLIHG 0:
REGUI>VrORY RESTRICTION E:
OPERATOR TRAINIHC AtlD l.ICEHSE EXAktlNATION F:
ADkllNISTRATIVE G:
OPERATIONAL ERROR (EXPIAIN) ll:
OTIIER (FA'PIAIH)
APPENDIX D UNIT SHUTDOWNS AtlD POWER REDUCTIOtlS REPORT klOtlTH November 1976 DOCKET HO.
50 335 UNIT HAME St. Lucis Unit No. 1 DATE Dcc. 3, 1976 COtlPLETED BY V. T. Chilson TELEPHONE 305 552 3830
- (2) ktETttoD 1:
tlAHUAL 2:
t!AHUAL SCltAkl 3:
AUTOk!ATIC SCRAkt Oittk:<<(EXPLAZtt)
HO.
DATE TYPE F:
FORCEI)
S:
SCHEDUI.ED DURATIOti (tiOURS)
REASON(1)
METHOD OF SllUTTIHC DOWN TIIE REACTOR OR REDUCING POWER(2)
CORRECTIVE ACTIONS/COtIHENTS 16 76-07-10 720.0 Unit was removed from service for reactor tests and inspections.
(Nuclear system)
SUttktARY:
Unit tlo.
1 reactor inspection continued during month.
t