ML18227B074
| ML18227B074 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie, Turkey Point |
| Issue date: | 07/07/1977 |
| From: | Schmidt A Florida Power & Light Co |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| Download: ML18227B074 (18) | |
Text
, {2a76)
U.S. NUCLEAR REGULATORY MISSION Do ET ER~
g'o Ro Co FROM:
Florida Power
& Light Co Miami, Fla.
A, D. Schmidt NRC DISTRIBUTION FoR PART 50 DOCKET MATERIAL FIL~
MONTHLY BR 7/14/77 DATE OF DOCUMENT 7/7/77 DATE RECEIVED
'ATE R ORIGINAL CJ COPY 0 NOTO R I2E D
+UNC LASS IF I E D PROP INPUT FORM NUMBER OF COPIES RECEIVED I 5/&rtlEW DESCRIPTION L'etter trans the following:
@g~gT g@IIIQV5
@g6)SS (1-P)
ENCLOSURE Month1y Report for JUNE 1977 Plant & Component Operability & Availability.
This Report to be used in preparing Gray Book by Planh 8o Operations.
(11-P)
PLANT +AM@.Turkey Point Units 3 & 4 St Lucie Unit Noi 1
RJL 7/15/77 MXPC
& CYS FOR CT N
FOR ACTION/INFORMATION C
D eS INTERNALD ISTRl BUTION rane e
C SS EXTERNAL DISTRIBUTION CONTROL NUMBER 77i960214
~r~$
A
P.O. BOX 013100, MIAMI, FL 33101 yglllg hr..4 FLORIDAPOWER & LIGHTCOMPANY July 7, 1977 Office of Management Information and Program Controls U.
S. Nuclear Regulatory Commission Washington, D. C.
20555 Gentlemen:
Attached are the June, 1977, Operating Status Reports for Turkey Point Unit Nos.
3 and 4 and St. Lucie Unit No. l.
The May, 1977, Operating Data Report for Turkey Point Unit No.
3 incorrectly reported values for Gross Thermal Energy, Gross Electrical Energy, and Net Electrical Energy Generated during May, 1977.
We are attaching a revised May, 1977, Operating Data Report for Turkey Point Unit No. 3.
We regret any inconvenience caused by these errors'.
1 Very truly yours, Vice President Power Resources VTC/DDC cc:
Mr. Norman C. Moseley Robert Lowenstein, Esquire 7719602i4 j
PEOPLE... SERVING PEOPLE
APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50 250 Turkey Point.
UNIT Unit No.
3 DATE July 7, l977 COMPLETED BY V. T. Chilson TELEPHONE MONTH
- JUNE, l977'AY AVERAGE DAILY POWER LEVEL
(Ãle-Net) 489 666 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 652 17 649 10 12 13 14 674 674 670 663 660 662 665 629 616 658 655 647 378 19 20 22 23 25 26 27 28 29 30 643
.643 646 647 650" 649 647 646 643 642 644 643 16 685 NOTE:
Average daily power greater than 666 NNe due to cooler condenser cooling water.
APP NDIZ C OPERATING DATA REPORT DOCZW NO.
50 - 250 utxey o nc UNIT Unic No.,
3 REPORT NONTH
- JUNE, 1977 OPERATING STATUS DATE Ju1)F 7, 1977 CONPLE~~
BY V. T. Chi1son TELEPHONE (305) 552-3769 1.
REPORTING PERIOD: 0001,77,06,01 CROSS HOURS XN REPORTING PMIODc THROUGH 2.
CUaamTLY AUTHORZZm PO<vmr LEVEL (NWC) c 2200 MAX DZPHiD. CAPACITY (HNe-Nec):
666 DESIGN ELECTRICAL RATZNC i
e-Nec 693
)
3.
Po~
LCEVZL TO tSHICH RESTRZCTZD (IF ANY)
('Q<e-Nec):
NONE 4.
REMONS FOR RESTRICTION (XF ARV1') c 720.0 THIS NONTH YFKR To DATE CL44ATZVE S.
814MIRRS OF ROIIRS RRiCTOR 848 CRTTTCii.....718.5
~384 2232~
6.
REACTOR RESERVE SHUTDOWN HOURS..........., 67.4 7.
HOURS GENERATOR ON LINE.
713.0 3 692.4
~30 73 8.
UNIT RZSZcRVZ SHUTDOWN HOURS....,.......,.. 9.
GROSS ~RNAL ENERGY C VERA'W'H)......
1 543 264 7 925 803 10.
GROSS ELECTRICAL
~c.
CY GENERATED (NNH)...
483 136 2 554 886 11.
NZT ELECTRICAL ~GY ~cEMTZD (NNH).....
459 271 2 426 717 85.0 59 655 391 19 125 337 18 102 702 12.
REACTOR SERVICE ":ACTOR.....
~
13.
REACTOR AVAILABILITYFACTOR..............
14.
UNZT SERV'XCZ FACTOR.
99 '
99.8 99.0 88.5 88.5 85.0 79.4 79.6 76.7 15.
UNIT AVAXLABZLZTYFACTOR..................
99.0 85.0 16.
EtIT CAPACITY FACTOR (Usi"g (4RB)C)..........
95.8 83.9 17.
UNZT CAPACITY FACTOR (Using Design 4%e)...
92.0 80.6 68.6 18'NIT FORCED OUTAGZ RATE.
1.0 1.4 19.
SHtPiDONNS SCHEDULED OVER '.PXT 6 HONTHS (TYPE, DATE, AND DURATION OF EACH):
Sceaia Cenezacor Inspeccion Augusc 17 -
Sepcenber 13, 1977 20.
XF SHUTDOMi AT wM) OF REPORT PERIOD>
ZSTLATED DATE OF STARTUP:
21.
UNITS ZN TZST STATUS (PRXOR To COMMERCIAL OP~MTION):
INZTXAL CRZTICALZ;Y INITIAL ELZCTRXCZTY COKKRCLQ. OPERATION FORECAST ACHL~c,D
APPED)IZ C OPTING DATA REPORT REVISED R~ORT MOAVHH Ma 1977 OPE4LTXNG STATUS DOC'CET NO.
Turkey Poinc UNIT REVZSEO DATZ Ju1 7-7 COMPLA~~
BY V.
ZPHONE 305 5 2-THROUGH 2400,77 05 31 Z.
CVRREEZLY *LYEORZZDZ FORFAR L V L (HVZ):~v MAX.DEPT@. CAPACITY
(!Olfe-Nec):
3.
POlv~c.
LEVEL TO MHICH RESTRICTS) (IF ANY)
(M(Ee-Nec):
4.
AASONS FOR RESTRICTION (IF ANY):
THIS MONTH YEAR TO DATE CUAAATIVE S.
IOMIERS OF EOIIIIS RZACZOR SAS CRZ ICAL..... ~VS.A 3~RE 6.
REACTOR RESERVE SuuDOllN HOURS............ 7.
HOURS GENERATOR ON LLfE..
732.8 2 979.3 8.
UNIT RESERVE SHUTDOlvN HOURS.........
~..... 9 ~
GROSS THERMAL BKRGY GENERATED (MWH)... ~..
1 599 394 6 382 539 10.
GROSS ZLECRXCAL MRGY G lERATH) (MlsH)...
517 170 2 071 750 11.
NET ELECTRICAL ENERGY GENERATED (MNH).....
492 741 1 967 446 30 018.5 85.0 58 112 127 18 642 201 17 643 431 12.
ACTOR SERVICE FACTS,OR 99.0 86.3 79.2 13 ~
REACTOR AVAILABILITYFACTOR. ~.............
86.3 79.4 14.
UiNIT SERVICZ FACTOR.
98.5 82.2 76.3 15.
UNIT AVAXLAILITYFLECTOR..................
98.5 82.2 76.5 16'NIT CAPA'CITY FACTOR (Using (MDC)... ~ ~ ~ ~...
99 '
81.5 68.1 17.
UNIT CAPACITY FAC10R (Using Design MNe)..
- 95. 6 78.4
- 64. 7 18.
UNLIT FORCED OUTAGE RATE..
1.5 1.5 2.8 19.
SHUTDOlvNS SCHZDUI"-D O~c...'EZT 6
iMONTHS (T--Z, DATE, AND DURATION OF EACH):
ScearE Generacor Inspeccion July 10 - Aug. 6, 1977 20.
IF SHUTDO'fPif AT END OF R~ORT PERIODS EST QLTM DATE OF STAR~u 21.
UNITS Ll TEST STATUS (PRIOR TO CO. LOYAL OPHlATION):
INITIALCRXTICALX
~ Y INITIAL ELECTRICITY CO~iRCLELL OPERATION FORECAST ACHX:"VED
I)
REASOtl A:
EQUIPHENT FAILURE (EXPLAIN)
Bt HAINT. OR TEST C:
REFUELING D:
REGULATORY RESTRICTION E:
OPFRATOR TRAINItlG htlD I.ICFNSE EXAIIINATION F:
ADHINISTRATIVE G:
OPERATIONAL ERROR (EXPLAIN)
N:
OTIIER (EXPLAIN)
APPENDIX D UNIT SIIUTDOWNS AND POWER REDUCTIONS REPORT HOtlTII
- JUNE, 1977 DOCKET NO.
50 - 250 Turkey Point UIIIT IIAHE unit No.
3 DATE Jul 7
1977 COHPI,ETED IIY V. T. Chilson TELEPIIONF.
(305) 552-3769
!)
HETIIOD I:
HANUAL 2:
HANUAI SCRAH 3:
AUTOHATIC SCRAH 4:
OTIIFR (EXPLAItl)
TYPE F:
FORCED S:
SCIIEDULED DURATIOtl (110URS)
REASON(1)
HETIIOD OF SIIUTTING DOWN TIIE REACTOR OR REDUCING POWER(2)
CORRECTIVE ACTIONS/COIIHEIITS 15 77-06-01 Load reduction to repair steam generator feedMater pump No.
3A discharge check valve seal ring leak.
(Non-nuclear system) 16 77-06-14 7.0 Unit No.
3 was tripped due to a transient prcssure condition on the turbine auto-stop oil system.
(Non-nuclear system)
SUKIARY:
Unit No. 3 operated at approximately 100X R.P. during month except for load reduction on June I and outage of June 14-15, 1977.
APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
Turkey Point UNIT Unit No.
4 DATE Jul 6i 1977 COMPLETED BY V. T. Chilson TELEPHONE (3O5) 552-3769 MONTH
- JUNE, 1977 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
17 18 19 20 21 22 23 24 25 ao 26 27 12 28 13 29 14 30 16
APPVDLX C OPERATING DATA ~ORT REPORT MOiVVH JUiiE. 1977 OPVATZNC STATUS DOCKET NO.
50 - 251 Turkey Point UNIT Unit No.
4 DATE Jul 7, 1977 COMPLZ'iiD BY V. T. Chilson TELEPHONE (305) 552-3769 1.
RZPORTLVG PERIOD: 0001,77,06.01 CROSS HOlPiS IN RKORTLVG PERIOD:
'aiROUGii 2400 77 06 30 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt):
2200
'P~
DEPEND ~ CAPACITY (MWe-Net):
666 DESIGN LECTRXCAL RATZNC (Mhe Net):
93 720.0 3.
POWE L"-VEL TO WHICH RESTRICT& (I: AVY)
(MWe-Net):
4.
REASONS FOR RESTRICTION (XF ANY):
NONE 5.
NUMBERS OF HOURS REACTOR WAS CRITICAL. ~
THXS iiONTH YEAR TO DATE CUiiATXVZ 0.0 2 521.9 24 243.7 6 ~
REACTOR RESERVE SHUTDOWN HOURS
~ ~ ~ ~
~
~ ~ ~
~ ~ ~
~ 138.8 7.
HOURS GENERATOR ON LINE.
8.
UNIT RESERVE SHUTDOWN HOURS.
~.....
~.......
9.
GROSS THERMAL ENERGY GENERATED (MWH) ~.....
10.
CROSS ZLECTRXCAL ENERGY C~ci Tie) (MWii) 0.0 2 496.7 23 038.8 5 424 235 48 483 605 1 768 385 15 726 068 ll.
NET ELECTRICAL EiVVRGY G~c.
TED (~i)... ~ ~ - 1 236 1 678 909 14 909 375 12.
REACTOR SZRVZCZ FACTOR.
0.0 58.1 71.7 13 'EACTOR AVAZLABILITYFACTOR...
~...........
0' 58.1 72.2 14.
UNIT SERVICE FACTOR 15.
UNIT AVAILABILITYFACTOR.
~....
~
~
~
16.
iDii~ CAPA'CZTY FACTOR (Usiag Mi C).......
~..
0.0 0 0 57.5 57.5 58.0 68.2 68.2 66.9 17
~
UiNIT CAPACITY FACTOR (Usiag Desiga We)...
0 ~ 0 I
18.
UNIT FORCED OUTACZ RATE 0 '
- 55. 8 0.0 63.7 3.2 19.
SHUTDOWNS SCHEDULE OV i NEXT 6 MONTHS (TY, DAT., AÃ) DURATION OF EACH):
20.
IF SHUTDOWN AT BID OF REPORT PERIOD, EST2fATH) DATE OF STARTUP Au ust 4
1977 21.
UNITS Lf TEST STATUS (PRIOR TO COK1~%CZAL OP~VATZON)
INITIALCRITICALITY LVITLQ. ELECTRICITY
"."ORECAST ACHZc~cD COKKRCZAL OPZRATZOiV
.)
REASON h:
EQUIPllEHT FAILURE (EXPLAIN)
D:
NAIHT. OR TEST C:
RFFUEl.ING D:
REGULATORY RFSTRICTION E:
OPERATOR TithlHING AND l ICENSE EXANINATION F:
ADllIHISTRATIVE G:
OPFRATIOHAL ERROR (EXPLAIN)
H:
OTIIER (EXPLAIN)
APPENDIX D UNIT SIIUTDOWHS AHD POWER REDUCTIONS REPORT HONTll JUtiE 1977 DOCRET HO.
50 - 251 Turkey Point UHLT HAHE Unit No.
4 DATE July 7, 1977 COllPI,ETED DY V. T. Chilson TELEPIIONE (305) 552-37G9
)
HETilOD 1:
NANUAL 2:
NANUAL SCRAN 3:
AUTONATIC SCRAH 4-'OTllER (EXPLAIN)
HO.
DATE TYPE F:
FORCED S:
SCllEDULED DURATION (I10URS)
REASON(1)
NETHOD OF SHUTTING DOWH Tllg REACTOR OR REDUCING POWER(2)
CORRECTIVE ACTIONS/COllHEHTS 5
77-05-09 720.0 Unit No.
4 was removed from service for refueling, maintenance, and inspections.
(Continued from previous month)
(Nuclear and non-nuclear systems)
SUNllhRY:. Unit Ho.
4 was out of service for entire month for refueling, maintenance, and inspections.
II
APPENDIX B AVERAGE DAlLY UNIT POWER LEVEL DOCKET NO.
50 335 St. Lucie UNIT Unit No.
1 DATE July 7, 1977 COMPLETED BY V - T. Chilson TELEPHONE
( 05) 552-3769 MONTH
- JUNE, 1977 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
DAY AVERAGE DAlLY POWER LEVEL (MWe-Net) 10 12 13 14 661 573 758 724 785 777 782 569 716 691 17'8 19 20 21 22 23 24 25 26 27 28 29 30 746 775 776 782 781 768 787 782 708 160 770 219 773 773 746 NOTE:
Average daily power level greater than 777 MNe due to cooler condenser cooling water.
APPHG)IZ C OP lATZNG DATA REPORT DOCZm LWO.
50 - 335 c.
ucie T Unit No.
1 REPORT HONTH JUNE >
1977 OP~TING STATUS DATE July 7> 1977 COARlP~ SY VS T. Chilson TZZ'HONE (305) 552-3769 l.
REPORTING PERIOD: 0001>77,06,01 GROSS ROUE Ll REPORTING PERIOD:
THROUGH 2.
CURRERiTLY AUTdORZZ~T) POWcR LEVEL (Ydt):
2560
-DEPBG).
CAPACITY (MWe-Nec):
777 (Est.)
DESZGil LECAAZCAL RATING (%le-LNec):
802 3.
POiSMc LEVEL TO WHICH RESTRICTS (IF AliY)
(Ntle-Nec):
4.
REASONS FOR RES'iiICTION (I ANY):
THIS HONTH YEAR TO DATE CUAAATZVE 5.
ROM!ERE 09 ROIIRS REACTOR IIAS CRZTZCAL.....
6330.
~RJ=
~R3 L 6.
REACTOR RESERVE SHUTDOWN HOURS............
84 ~ 7 92.8 92.8 7.
HOURS GENERATOR ON LINE..
576.1 3 448 '
3 712.5 S.
UNIT RESERVE SHUTDOWN HOURS.............
~. 9.
GROSS TRERSAL RTERGZ CCIE!LATCI {RIIR)...... 1 377 938 7 603 896 I 951 499 10.
GROSS Et CTRZCAL BIERCE CCIERATEO {RLR)...
443 980 2 467 380
~4120 6 0 11.
RE'2 ELZCZRZCAL SERGE 0"'lE!IATCI {RRE).....
415 192 2 304 588
~2403 56 12.
~~ CTOR SERVICE :ACTOR.
13.
REACTOR AVAILABILITYFACTOR...
14.
UiNIT SERVZC FACTOR.
87.5 99.3 83.1 85.2 80.0 79.4 84.1 86.1 15.
UNIT AVAZLA3ILZTYFACTOR..................
80.0 79.4
~80.
16.
UNIT C.ELPACITY FACTOR (Using (4>DC)..........
74.2 68.3 67.1 17.
UNIT CAPACITY FACTOR (Using Design LRIWe)...
71.9 66.2 65.1 18.
UNZT FORCED OUTAGE RATE.
25.0 19.3 18.2 19 'HUTDOWNS SCHEDULE) OVER LLT 6 NONTHS (TY E> DATE, AÃ) DURATION OF EACH):
Prelisdnary Warrancy Inspection Septet)ber 3 to Septet)ber 16, 1977 204 IP SHUTDOWN AT iD OF REPORT PERIOD, ESTLfAWD) DATE OF STARTlAP:
21.
UNITS LI TEST STATUS (?RIOR TO CO~A-OCTAL OP%ATION):
INITIAL CRITICALITY LlITIALELECTRICITY COKKRCLQ. OPERATION FORECAST ACHI=PcO
I)
REASON rqUIPNENT FAILURE (EXPLAIN)
D:
HAINT. OR TFST C:
REFUELIHC D:
REGULATORY RESTRICTION E:
OPERATOR TRAINING AND LICENSE EXANINATIOH F:
ADHIHISTRATIVE G:
OPERATIONAL ERROR (FNPLAIH)
N:
OTHER (EXPLAIN)
APPENDIX D UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT NONTN
- JUNE, 1977 PAGE 1 OF 2 DOCRET HO.
50 - 335 St. Lucie UNIT NAHF.
Unit No. 1 July 7, 1977 COHPLETFD BY V. T. Cbilson TELEPHONF.
(305) 552-3769
'.)
Nm>OD I:
HAHUAL 2:
HAHUAL SCRAN 3:
AUTOHATIC SCRAN DINER (EXPLAIN)
NO.
DATE TYPE F:
FORCED S:
SCHEDULED
.DURATION (HOURS)
REASON(1)
NETNOD OF SHUTTINC DOWN THE REACTOR OR REDUCIHC POWER(2)
CORRECTIVE ACTIONS/CRDIENTS 18 77-05-31 3.9 77-06-05 20 77-06-05 21 77-06-05 102.4 3.5 3.4 3.1 Unit was trlppcd by actuation of the loss of field relay.
Corrective action included replacement of generator exciter components.
(Continued from previous month)
Unit was removed from service to balance the turbine-gencrator-exciter.
(Hon-nuclear system)
Unit was removed from service to balance tbc turbinc-generator-exciter.
(Hon-nuclear system)
Unit was removed from service to balance the turbinc-generator-exciter.
(Hon-nuclear system) 22 23 77-06-07 77-06-13 3.8 Reactor trip caused by loss of second of two rod control system power supplies.
(Nuclear system)
Load reduction to repair leak on turbine plant cooling
~ster pump No.
18 seal water system.
(Non-nuclear system)
~
~
I)
REASON A:
EQUIPMEHT FAILURE (EXPLAIN) 8:
MAINT. OR TEST C:
RFFUFLIHG D:
REGULATORY RFBTRICTION E:
OPERATOR TRAINIHG AND I.ICEHSE EXAMINATION F:
ADMINISTRATIVE G:
OPERATIONAL ERROR (EXPLAIN)
Il:
OTUL'R (FD(PIDGIN)
APPENDIX D UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH JUNE, 1977 PACE 2 OF 2 DOCKET HO.
UNIT HAME DATE COMPLETED DY TELEPHONE 50 - 335 St. Lucio Unit No.
1 July 7, 1977 V. T. Cbilson (305) 552-3769
- )
METHOD 1:
IIAHUAL 2:
.MANUAL SCRAM 3:
0IIIER (EXPLAIN)
NO.
DATE TYPE F:
FORCED S:
SCHEDULED DURATION (HOURS)
RFASON(1)
METHOD OF SHUTTING DOWN TNE REACTOR OR REDUCING POWER(2)
CORRECTIVE ACTIONS/COMMENTS 24 77-06-25
- 14. 6 Unit tripped on low steam generator level as a result of tbe loss of steam generator feedwater pump Ho. IA which tripped due to failed expansion joint in tbe condensate system.
Corrective action includod re-placing the failed expansion )oint.
(Hon-nuclear system) 25 77-06-28 13.1 Unit was removed from service to rePair packing leak on valve located inside the containment building that could not be isolated.
(Nuclear system)
SUtlMhRY:
Unit operated nt approximately 99X R.P. during month except for load reduction on June 13 and outages of May 31-June 5, June 7, June 25-26, and June 28, 1977.
0
~
~
V
~
y y~
iAI','163 L~vn o;iiss3".aud IN3HAQGQ 03AI3338