|
---|
Category:Letter
MONTHYEARL-2024-184, Radiological Emergency Plan Revision 772024-11-0505 November 2024 Radiological Emergency Plan Revision 77 L-2024-173, Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-31031 October 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles L-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2024-175, Cycle 34 Core Operating Report2024-10-24024 October 2024 Cycle 34 Core Operating Report ML24291A2882024-10-24024 October 2024 Westinghouse Topical Report - Request for Withholding Information from Public Disclosure L-2024-177, Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis2024-10-22022 October 2024 Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis ML24276A2302024-10-16016 October 2024 Westinghouse Topical Report – Request for Withholding Information from Public Disclosure L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes ML24289A2372024-10-15015 October 2024 Transmittal of Revision 1 Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) L-2024-157, Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-0303 October 2024 Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles IR 05000250/20243012024-10-0303 October 2024 NRC Operator License Examination Report 05000250/2024301 and 05000251/2024301 L-2024-147, Submission of Periodic Reports2024-10-0101 October 2024 Submission of Periodic Reports L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24269A1292024-09-24024 September 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis ML24260A2262024-09-18018 September 2024 NRC Examination Results Summary - Examination Reports: 05000250/2024301 and 05000251/2024301 ML24262A2272024-09-18018 September 2024 Transmittal of Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles ML24158A0052024-09-17017 September 2024 Completion of Subsequent License Renewal Site Specific Environmental Review and Modification to Subsequent Renewed Facility Operating Licenses L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24207A0342024-09-13013 September 2024 – Exemption from Certain Requirements of 10 CFR 50.46 for Use of Axiom Fuel Rod Cladding – Letter ML24256A1132024-09-13013 September 2024 Regulatory Audit Summary Related to the Review of Regarding the Updated Spent Fuel Pool Criticality Safety Analysis License Amendment Request IR 05000250/20240052024-08-23023 August 2024 Updated Inspection Plan for Turkey Point Units 3 & 4 - Report 05000250/2024005 and 05000251/2024005 ML24234A0062024-08-22022 August 2024 Project Manager Assignment L-2024-122, Core Operating Limits Report2024-08-12012 August 2024 Core Operating Limits Report L-2024-106, Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-022024-08-12012 August 2024 Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-02 ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-089, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-07-25025 July 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24184B2822024-07-16016 July 2024 – Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal 05000250/LER-2024-002-01, Condition Prohibited by Technical Specifications2024-07-10010 July 2024 Condition Prohibited by Technical Specifications ML24173A1902024-06-28028 June 2024 Withdrawal of an Amendment Request ML24159A2652024-06-26026 June 2024 Correction of Safety Evaluation for Issuance of Amendment Nos. 298 & 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-100, Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project2024-06-19019 June 2024 Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter IR 05000250/20244012024-06-0505 June 2024 – Security Baseline Inspection Report 05000250-2024401, 05000251-2024401 and 07200062-2024401 L-2024-076, Reply to Notice of Violation; NOV 05000250, 05000251/2024010-052024-05-29029 May 2024 Reply to Notice of Violation; NOV 05000250, 05000251/2024010-05 L-2024-082, 2023 Annual Radiological Environmental Operating Report2024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000250/20240012024-05-10010 May 2024 Integrated Inspection Report 05000250/2024001 and 05000251/2024001 ML24135A0942024-05-0909 May 2024 Periodic Update to the Updated Final Safety Analysis Report L-2024-060, 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report2024-05-0909 May 2024 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report ML24127A1862024-05-0909 May 2024 Request for Withholding Information from Public Disclosure ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-073, Cycle 34 Core Operating Limits Report2024-05-0101 May 2024 Cycle 34 Core Operating Limits Report L-2024-072, Cycle 33 Core Operating Limits Report2024-05-0101 May 2024 Cycle 33 Core Operating Limits Report L-2024-048, Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision2024-04-30030 April 2024 Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision L-2024-069, Radiological Emergency Plan Revision 762024-04-22022 April 2024 Radiological Emergency Plan Revision 76 L-2024-066, Sixth 10-Year Inservice Testing Interval Relief Request No. PR-022024-04-17017 April 2024 Sixth 10-Year Inservice Testing Interval Relief Request No. PR-02 2024-09-25
[Table view] Category:Operating Report
MONTHYEARL-2022-039, and Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2022-04-14014 April 2022 and Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2021-097, and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report2021-05-13013 May 2021 and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report L-2021-096, 10 CFR 50.59(d)(2) Summary Report2021-05-11011 May 2021 10 CFR 50.59(d)(2) Summary Report L-2021-018, 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report2021-02-16016 February 2021 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report L-2020-065, Submission of Periodic Reports2020-04-0909 April 2020 Submission of Periodic Reports ML18227A9832018-08-15015 August 2018 Submit First Year Operation Report. L-2008-245, Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/082008-11-10010 November 2008 Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/08 L-2007-053, Annual Radiological Environmental Operating Report2007-05-0404 May 2007 Annual Radiological Environmental Operating Report L-2004-097, Annual Radiological Environmental Operating Report2004-05-11011 May 2004 Annual Radiological Environmental Operating Report ML18227B0771978-03-17017 March 1978 03/17/1978 Letter Operating Summary Reports of February 1978 ML18227A4231978-03-0404 March 1978 Attached February, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0631978-03-0404 March 1978 03/04/1978 Letter Operating Status Reports of February 1978 ML18227A4221978-02-14014 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0641978-02-14014 February 1978 02/14/1978 Letter Operating Status Reports of January 1978 ML18227A4211978-02-0404 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0651978-02-0404 February 1978 02/04/1978 Letter Operating Status Reports of January 1978 ML18227A4201978-01-0707 January 1978 Attached December, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0671978-01-0707 January 1978 01/07/1978 Letter Operating Status Reports of December 1977 ML18227A4191977-12-0303 December 1977 Attached November, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0681977-12-0303 December 1977 12/03/1977 Letter Operating Status Reports of November 1977 ML18227A4171977-11-0505 November 1977 Attached October, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0691977-11-0505 November 1977 11/05/1977 Letter Operating Status Reports of October 1977 ML18227B0701977-10-0505 October 1977 10/05/1977 Letter Operating Status Reports of September 1977 ML18227B0711977-09-0303 September 1977 09/03/1977 Letter Operating Status Reports of August 1977 ML18227A4151977-09-0303 September 1977 Attached August, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0731977-08-0505 August 1977 08/05/1977 Letter Operating Status Reports of July 1977 ML18227A4141977-08-0505 August 1977 Attached July, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0741977-07-0707 July 1977 07/07/1977 Letter Operating Status Reports of June 1977, and a Revised Operating Data Report for May 1997 for Turkey Point Unit 3 ML18227A4131977-07-0707 July 1977 Attached June, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. May, 1977 for Unit 3 Incorrectly Reported for Some Values. Attached Revised May, 1977 Operating Data Report for Unit 3 ML18227B0751977-06-0606 June 1977 06/06/1977 Letter Operating Status Reports of May 1977 ML18227A4121977-06-0606 June 1977 Attached May, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0761977-05-0505 May 1977 05/05/1977 Letter Operating Status Reports of April 1977 ML18227A4111977-05-0505 May 1977 Attached April, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227A4101977-04-0404 April 1977 Attached March, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. Maximum Dependable Capacity (MWe-Net) for St. Lucie No. 1 Was Revised from 802 MWe-Net to 777 MWe-Net (Estimated) ML18227B0781977-04-0404 April 1977 04/04/1977 Letter Operating Status Reports of March 1977 ML18227B0791977-03-0707 March 1977 03/07/1977 Letter Operating Status Reports of February 1977 ML18227A4091977-03-0707 March 1977 Attached February, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0801977-02-0707 February 1977 02/07/1977 Letter Operating Status Reports of January 1977 ML18227B0811977-01-0707 January 1977 01/07/1977 Letter Operating Status Reports of December 1976 ML18227A4081977-01-0707 January 1977 Attached December, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0821976-12-0606 December 1976 12/06/1976 Letter Operating Status Reports of November 1976 ML18227B0831976-11-15015 November 1976 11/15/1976 Letter Corrected Copies of Operating Data Reports for October 1976 ML18227B0841976-11-0808 November 1976 11/08/1976 Letter Operating Status Reports of October 1976 ML18227A4061976-11-0808 November 1976 Attached October, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227A4071976-11-0505 November 1976 Attached Corrected Copies of October, 1976 Operating Data Reports for Turkey Point Unit Nos. 3 and 4 ML18227A4051976-10-0808 October 1976 Attached September, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0861976-09-0707 September 1976 09/07/1976 Letter Operating Status Reports of August 1976 ML18227A4031976-09-0707 September 1976 Attached August, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0871976-08-0505 August 1976 08/05/1976 Letter Operating Status Reports of July 1976 ML18227A4021976-08-0505 August 1976 Attached July, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. St. Lucie Unit No. 1 Was Previously Reported to Be in Commercial Operation, in Error. Attached Corrected June 1976 for St. Lucie No. 1 2022-04-14
[Table view] |
Text
I l!!t' Dl>M'..>a
>V !lit i v.s. NVCL>>.n>>>>LVVLATvf>v coMJ.>>J'sioN DC
>'l r
~~
Doc Kf T NU>A >JL H N>>>M>>C>>
btRC Dl "TRIDVTION~.o>> RT GO DOCKET MATERIAl MONTIILY REPORT I" I!OM: OATr: oF DocvMLt4T ro:'o Florida Power & Light 4/4/77 Ro CD Fla. Co'iami, DATE f>>CCC>>Vf.o A, D, Schmidt 4/13/77
.~g C J Tef> ONOTOO>Zr. n Pflof'Nf'VT ro>>h> NVM>>sfl OF COP>ES F>>> CEIVEO Ro>>lfo>t4AL f)copY
>>f.':.c f J>i'T foN RUN C L Ass>F>e 0 tt>CLOCV f>>E
/ Se I
I L)'TT)j)J, TI(/>)IS T'rIE FOLLO'hG: I 10'<'.")!LY REPO!",T FOR MARCH, 1977 PLA!IT & CO:"JPONEhT OPERABILllY. &
AVAXLAB1'LX'LZ, ')'IIXS PZPORT TO BE USED X.'i P):EPARXhG C", 'sY BrOK BY PLANS OPERATIC:.S.*
I
!ACKNOWXZDGZD (1-P) (9-P)
'PLA'vT NA~>Z:
Turkey Point Units 3 & 4 RJL SONOT RKMOVF.
~ .) J > J.' ~ T~ I-Of'. /',CT IOP,'/IJX I'0>i .>4'l I Jf~:
MIPC lj/6 CYS FPR, r,,-(~',>
I If'JTI!If>>iAL iS>> I a I l J Lf f I >> J J'i
.1 .": 3.ULi'
~
J J ~
p f'J.
Bil!,NC!I (:) I'I!.""gi) a.ZC SSZ. (L, + I5
?xglC td>JC I >J>>>>>> >!>! IP ~ /lj)
FLORIDA POWER & LIGHT COMPANY
@mNF Wp'~g April 4, 1977 g)) gs (
Office of Management Information and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:
Attached are the March, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit No. 1.
Maximum Dependable Capacity (MWe-Net) for St. Lucie Unit No. 1 was revised from 802 MWe-Net to 777 MWe-Net (Estimated).
The revised capacity was calculated using anticipated summer conditions and data obtained when the unit 'was operating at 100% R.P.
Very truly yours, chmi t Vice President Power Resources VTC/DDC cc: Mr. Norman C. Moseley Robert Lowenstein, Esquire g7/yfoVI PEOPLE... SERVING PEOPLE
t APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 250 Turkey Point UNIT Unit No. 3 DATE A ril 4 1977 COMPLETED BY V. T. Chilson TEL'EPHONE (305) 552-3769 MONTH March, 1977 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) P57e-Net) 684 17 672 686 670 690 19 671 685 20 669 683 21 667 679 22 669 67-7 23 673 681 24 676 690 686 10 688 26 692 685 27 690 12 681 28 686 13 679 29 685 674 30 678'78 668 16 671 iCOTE: Average daily power level greater than 666 Kfe due to cooler condenser cooling water.
APPENDIX C OPERATING DATA REPORT DOCKET NQ. 50" 250 Turkey Point UNIT Unit No.
REPORT MONTH March, 1977 DATE A ril 4 1977 COMP~i BY V. T. Chilson OPERATING STATUS
- 1. REPORTING PERIOD:0001,77,03 01 GROSS HOURS ZN REPORTING PERIOD: 744. 0 THROUGH 2400 77 03 1
- 2. UJRRENTLY AUTHORIZED POWER LEVEL (MWt): 2200 MAX.DEPEND. CAPACITY (MWe-Net): 666 DESIGN ELECTRICAL RATING (MWe-Net): 693
- 3. POWER LEVEL TO WHICH RESTRICTED (ZF ANY) (MWe-Net): NONE
- 4. REASONS FOR RESTRICTION (IF ANY):
THIS MONTH YEAR TO DATE CUMULATIVE
- 5. NUMBERS OF HOURS REACTOR WAS CRITICAL..... 744 ~ 0 1 794.6 29 834.7
- 6. REACTOR RESERVE SHUTDOWN HOURS.. ~ ~ . ~ ...... 0 67.4
- 7. HOURS GENERATOR ON LliK. 744.0 1 666.9 28 706.1 8~ UNIT RESERVE SHUTDOWN HOURS ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
0 85.0 9 ~ GROSS THER%6. ENERGY GENERATED (MWH)...,.. 1 629 974 3 538 470 5~2 1Q GRQSS ELECTRICAL ENERGY GENERATED NWH) 530 368 1 153 360 17 723 811 ll. NET ELECTRICAL ENERGY GL3JERATED (MWH),..., 505 511 1 094 112 16 770 047
- 12. REACTOR SERVICE FACTOR. 100.0 83.1
- 13. REACTOR AVAILABILITYPACTOR. ~ . . ~ ~ ~ ~,....., 100. 0 83.1 ~78.
- 14. UNIT SERVICE FACTOR,. ~ ...,,.....,......... 100.0 77.2 75.7
- 15. UNIT AVAILABILITYFACTOR. , . ... ,......
~ ~ ~ ~ ~ 100.0 77 ' 76.0 16 'NIT CAPACITY FACTOR (Using (MDC) ~ ..>>.... 102.0 (1) 76.1 67.4
- 17. UNIT CAPACITY FACTOR (Using Design MWe)... 98 ' 73.1 63.9 18 'NIT FORCED OUTAGE RATE...,.,....,....... 0.0 1.5 2.8
- 19. SHUTDOWiNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OP EACH):
- 20. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
21 'NITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION NOTEJ (1) Unit Capacity Factor (using MDC) greater than 100K due to cooler condenser cooling water.
APPEHDIX D DOCKET NO. 50 - 250
'.) REASON h: EQUIPMEHT FAILURE (EXPLAIN) UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Turne Point Unit No. 3 B: MAIHT. OR TEST C:
D:
REPUELIHG REGULATORY RESTRICTIOH DATE A ril 4 1977 E: OPERATOR TRAINING AHD COMPLETED BY V. T. Chileon LICENSE EXAMINATION F: ADMINISTRATIVE TELEPHONE (305) 552-3769 G: OPERATIONAL ERROR (EXPLAIN) REPORT MONTH March 1977 H: OTHER (EXPLAIN)
- ) METHOD 1: HANUAL METHOD OF 2: .MANUAL SCRAM TYPE SHUTTING DOWN 3t AUTOMATIC SCRAM F: FORCED DURATION Tllg REACTOR OR 4: OTHER (EXPLAIN) NO. DATE S: SCHEDULED (HOURS) REASON(l) REDUCING POWER(2) CORRECTIVE ACTIONS/COMMENTS NONE
SUMMARY
- Unit No. 3 operated at approximately 100X R.P. during month.
t APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 251 Turkey Point UNIT DATE April 4, 1977 COMPLETED BY V. T. Chilson TEL'EPHONE (305) 552-3769 MONTH March, 1977 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 662 688 18 662 690 19 663 4 685 20 319 680 21 "6 677 22 673 23 675 24 675 10 677 26 27 644 12 671 28 677 13 671 29 683 14 665 30 679 15 661 31 672 16 609 NOTE: Average daily power level greater than 666 MWe due to cooler condenser cooling water.
APPEHDZX C OPERATING DATA REPORT DOCKET NO. 50-251 Turkey Point UNIT Unit Ho. 4 REPORT MONTH March, 1977 DATE A ril 4 1977 COMPLE ED BY V. T. Chilson TELEPHONE OPERATING STATUS
- 1. REPORTINC PERIOD: 0001,77,03.01 CROSS HOURS IN REPORTING PE.'GOD: 744.0 THROUGH
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2200 MAX.DEFOG). CAPACITY (MWe-Het): 666 DESlGN ELECTRICAL RATING (MWe-Net): 93
- 3. POWER LEVEL TO WHZCH RESTRICTED (IF AHY) (MWe-Net): HONE
- 4. REASONS FOR RESTRICTION {IF ANY):
THIS MONTH YEAR TO DATE,CUAAATIVE S. IIIIUSERS OF HOURS REACTOR WAS CRETICA1..... 397.3 ~S 23 'M 2
- 6. REACTOR RESERVE SHUTDOWN HOURS ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
138.8
- 7. HOURS GENERATOR ON LINE................... 591.3 1 764.2 22 306.2
- 8. UiHZT RESERVE SHUTDOWH HOURS............... 9. GROSS THERMAL EKRGY GENERATED (MWH) ~ . ~ . ~ ~ 1 280 629 3 830 353 46 889 723
- 10. GROSS ELECTRICAL ENERGY GBKRATED (KiH)... 414 125 1 251 665 15 209 348 ll. NET ELECTRICAL ENERGY GENERATED (ARHH)..... 393 600 1 190 501 ~>~7
- 12. REACTOR SERVICE FACTOR.. ~..... ~ - ~ ~ -- ~ ~ -~~. 82.6 74.4
- 13. REACTOR AVAILABILITYFACTOR.. ~ ............ 80.3 82.6 74.8
- 14. UNIT SERVZCE FACTOR. 79.5 81.7 70.6
- 15. UNIT AVAILABILITYFACTOR...............,.. 79.5 81.7 70.6
- 16. KNIT GAPA'CITY FACTOR (Using (MDC)......... 79 ' 82.8 69.2
- 17. UNIT CAPACITY FACTOR (Using Design MWe)... 76 ' 79 ' 65.8
- 18. UNIT FORCED OUTAGE RATE. 0.0 39 3
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Refueling, maintenance, end inspections - April 25 through June 11, 1977 IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: '0.
- 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED ZNITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
APPENDIX D DOCKET NO. 50 - 251 I) REASON h: EQUIPHEHT FAILURE (EXPLAIN)
UNIT SHUTDOWNS AHD POWER REDUCTIONS UNIT NAME Turke Point Unit No. 4 B: HAINT. OR TEST C: REFUELINC, April 4, 1977 D: RECULATORY RESTRICTIOH E: OPERATOR TRAININC AND V. T. Chilson COMPLETED BY LICENSE EXAHINATIOH P: ADHINISTRATIVE TELEPHONE (305) 552-3769 C: OPERATIONAL ERROR (EXPLAIN) REPORT MONTH March, 1977 H: OTIIER (PJ(PLAIN)
!) HETllOD 1: MANUAL HETNOD OP 2: .MANUAL SCRAH TYPE SHUTTINC DOWH 3: AUTOHATIC SCRAM P: FORCED DURATION THE REACTOR OR 4: OTHER (EXPLAIN) NO. S: SCHEDULED (BOURS) REASON(1) REDUCIHC POWER(2) CORRECTIVE ACTIONS/CQDlEHTS 77-03-20 152. 7 Unit No. 4 uas removed from service to repair steam generator No. 4C tube leak. Corrective actions included plugging one leaking tube. One additional tube was plugged. (Nuclear System)
SUMMARY
- Unit No. 4 operated at approximately 100X R.P. except for outage of March 20 - 26, 1977.
t APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 335 St. Lucie UNIT Unit No. 1 DATE A ril 4 1977 COMPLETED BY V. T.. Chilson TEL'EPHONE (305) 552-3769 MONTH Mar h DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY PO~r, LEVEL (MWe-Net) (MWe-Net) 732 17 358 788 18 390 787 19 642 741 20 729 488 21 780 784 22 786 783 789 791 24 793 725 25 794 10 767 26 733 621 27 789 12 161 28 778 13 371 29 797 375 760 30 375 786 371 16 NOTE: Average daily power level greater than 777 KVe due to cooler condenser cooling water.
~ ~
APPENDIX C OPERATING DATA REPORT DOCKET NO. 50 - 335 St. Lucis UNIT REPORT MONTH March, 1977 DATE A 4 COMP~~ BY V.
OPERATING STATUS TELEPHONE 30
- 1. REPORTING PERIOD: 000 THROUGH 2400 77 03 31
- 2. CUiQ~TLY AUTHORIZED POWER LEVEL (MWt): 2560 MAX DEPEND. CAPACITY (MWe-Net): 777 (Est.)
DESICN ELECTRICAL RATING (MWe-Net): 802
- 3. POWER LEVEL TO'WHICH RESTRICTED (IF ANY) (MWe-Net): NONE
- 4. REASONS FOR RESTRZCTZON (ZF ANY):
THIS MONTH YEAR TO DATE CUMULATIVE
- 5. NUMBERS OF HOURS REACTOR WAS CRITICAL. ~ ~ . ~ 744.0 2 106.2 ~23 0.2
- 6. REACTOR RESERVE SHUTDOWN HOURS. ~ ~ ~ ~ ~ ~ . ~ ~ ~ ~
- 7. HOURS GENERATOR ON LINE. ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 736 ~ 4 2 035 ~ 6 2 299.6 8 UNIT RESERVE SHUTDOWN HOURS........,,..... 9~ GROSS THERMAL EKRGY GENERATED (MWH)...... 1 592 703 4 299 297 4 646 900
- 10. GROSS ELECTRICAL ENERGY CEKRATED (MWH)... 519 150 1 411 960 1 520 230
- 11. NET ELECTRICAL ENERGY CRKRATED (MWH)..... 487 915 1 321 922 1 420 927
- 12. REACTOR SERVICE FACTOR. 97.5 97.8
- 13. REACTOR AVAILABILITYFACTOR.. ~ ~ .~ ~........ 100.0 97.5 97.8
- 14. UNIT SERVICE FACTOR .. . . ........... 99.0 94.2 94. 9
- 15. UNIT AVAILABILITYFACTOR...............,.. 99.0 94. 2 94.9
- 16. UNZT GAPA'CITY PACTOR (Using (MDC).. ~ ...... 84 4 78.8 75.4
- 17. UNIT CAPACITY FAC1%)R (Using Design MWe)... 76. 3 73.1
- 18. UNIT FORCED OUTACE RATE. .. ,..., .. . 1.0 2.7 2.4
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
- 20. ZF SHUTDOWN AT END OF REPORT PERIOD> ESTIMATED DATE OF.STARTUP:
- 21. UNZTS Lf TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- 1) REASON APPENDIX D DOCKET NO. 50 - 335 h: EgUIPMEHT PAILURE (EXPLAIN)
B! MAINT. OR TEST UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAHE St. Lucie Unit No. 1 C: REFUELIHC D: REGULATORY RESTRICTION DATE April 4, 1977 E: OPERATOR TRAININC AND LICENSE EXAMINATIOH COHPLETED BY V. T. Chilson F- ADHINISTRATIVE C: OPERATIONAL ERROR (EXPLAIH) TELEPHONE (305) 552-3769 REPORT MONTll March 1977 H: OTHER {EXPLAIN)
>) METHOD I z MANUAL METHOD OP 2: .MANUAl SCRAM TYPE SHUTTIHC DOWN 3: AUTOMATIC SCRAM P: FORCED DURATION TNE REACTOR OR 4: OillER {EXPLAIN) NO. DATE S: SCHEDULED (HOURS) REASON (1) REDUCIHC POWER(2) CORRECTIVE ACTIONS/COMMENTS 77-03-05 "4 Load reduction to clean condensate pump suction strainers. (Non-nuclear system) 10 77-03-11 7.6 Unit was removed from service to replace gasket '"
on containment escape hatch. (Nuclear system) 77-03-12 Unit was operated at approximately 50l R.P. to perform load swing tests. Power Ascension Test Program.
SUHMARY: Power Ascension Test Program continued during month.