Attached March, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. Maximum Dependable Capacity (MWe-Net) for St. Lucie No. 1 Was Revised from 802 MWe-Net to 777 MWe-Net (Estimated)
ML18227A410
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 04/04/1977
From: Schmidt A
Florida Power & Light Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML18227A410 (13)


Text

I l!!t' Dl>M'..>a

>V !lit i v.s. NVCL>>.n>>>>LVVLATvf>v coMJ.>>J'sioN DC

>'l r

~~

Doc Kf T NU>A >JL H N>>>M>>C>>

btRC Dl "TRIDVTION~.o>> RT GO DOCKET MATERIAl MONTIILY REPORT I" I!OM: OATr: oF DocvMLt4T ro:'o Florida Power & Light 4/4/77 Ro CD Fla. Co'iami, DATE f>>CCC>>Vf.o A, D, Schmidt 4/13/77

.~g C J Tef> ONOTOO>Zr. n Pflof'Nf'VT ro>>h> NVM>>sfl OF COP>ES F>>> CEIVEO Ro>>lfo>t4AL f)copY

>>f.':.c f J>i'T foN RUN C L Ass>F>e 0 tt>CLOCV f>>E

/ Se I

I L)'TT)j)J, TI(/>)IS T'rIE FOLLO'hG: I 10'<'.")!LY REPO!",T FOR MARCH, 1977 PLA!IT & CO:"JPONEhT OPERABILllY. &

AVAXLAB1'LX'LZ, ')'IIXS PZPORT TO BE USED X.'i P):EPARXhG C", 'sY BrOK BY PLANS OPERATIC:.S.*

I

!ACKNOWXZDGZD (1-P) (9-P)

'PLA'vT NA~>Z:

Turkey Point Units 3 & 4 RJL SONOT RKMOVF.

~ .) J > J.' ~ T~ I-Of'. /',CT IOP,'/IJX I'0>i .>4'l I Jf~:

MIPC lj/6 CYS FPR, r,,-(~',>

I If'JTI!If>>iAL iS>> I a I l J Lf f I >> J J'i

.1 .": 3.ULi'

~

J J ~

p f'J.

Bil!,NC!I (:) I'I!.""gi) a.ZC SSZ. (L, + I5

?xglC td>JC I >J>>>>>> >!>! IP ~ /lj)

FLORIDA POWER & LIGHT COMPANY

@mNF Wp'~g April 4, 1977 g)) gs (

Office of Management Information and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:

Attached are the March, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit No. 1.

Maximum Dependable Capacity (MWe-Net) for St. Lucie Unit No. 1 was revised from 802 MWe-Net to 777 MWe-Net (Estimated).

The revised capacity was calculated using anticipated summer conditions and data obtained when the unit 'was operating at 100% R.P.

Very truly yours, chmi t Vice President Power Resources VTC/DDC cc: Mr. Norman C. Moseley Robert Lowenstein, Esquire g7/yfoVI PEOPLE... SERVING PEOPLE

t APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 250 Turkey Point UNIT Unit No. 3 DATE A ril 4 1977 COMPLETED BY V. T. Chilson TEL'EPHONE (305) 552-3769 MONTH March, 1977 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) P57e-Net) 684 17 672 686 670 690 19 671 685 20 669 683 21 667 679 22 669 67-7 23 673 681 24 676 690 686 10 688 26 692 685 27 690 12 681 28 686 13 679 29 685 674 30 678'78 668 16 671 iCOTE: Average daily power level greater than 666 Kfe due to cooler condenser cooling water.

APPENDIX C OPERATING DATA REPORT DOCKET NQ. 50" 250 Turkey Point UNIT Unit No.

REPORT MONTH March, 1977 DATE A ril 4 1977 COMP~i BY V. T. Chilson OPERATING STATUS

1. REPORTING PERIOD:0001,77,03 01 GROSS HOURS ZN REPORTING PERIOD: 744. 0 THROUGH 2400 77 03 1
2. UJRRENTLY AUTHORIZED POWER LEVEL (MWt): 2200 MAX.DEPEND. CAPACITY (MWe-Net): 666 DESIGN ELECTRICAL RATING (MWe-Net): 693
3. POWER LEVEL TO WHICH RESTRICTED (ZF ANY) (MWe-Net): NONE
4. REASONS FOR RESTRICTION (IF ANY):

THIS MONTH YEAR TO DATE CUMULATIVE

5. NUMBERS OF HOURS REACTOR WAS CRITICAL..... 744 ~ 0 1 794.6 29 834.7
6. REACTOR RESERVE SHUTDOWN HOURS.. ~ ~ . ~ ...... 0 67.4
7. HOURS GENERATOR ON LliK. 744.0 1 666.9 28 706.1 8~ UNIT RESERVE SHUTDOWN HOURS ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

0 85.0 9 ~ GROSS THER%6. ENERGY GENERATED (MWH)...,.. 1 629 974 3 538 470 5~2 1Q GRQSS ELECTRICAL ENERGY GENERATED NWH) 530 368 1 153 360 17 723 811 ll. NET ELECTRICAL ENERGY GL3JERATED (MWH),..., 505 511 1 094 112 16 770 047

12. REACTOR SERVICE FACTOR. 100.0 83.1
13. REACTOR AVAILABILITYPACTOR. ~ . . ~ ~ ~ ~,....., 100. 0 83.1 ~78.
14. UNIT SERVICE FACTOR,. ~ ...,,.....,......... 100.0 77.2 75.7
15. UNIT AVAILABILITYFACTOR. , . ... ,......

~ ~ ~ ~ ~ 100.0 77 ' 76.0 16 'NIT CAPACITY FACTOR (Using (MDC) ~ ..>>.... 102.0 (1) 76.1 67.4

17. UNIT CAPACITY FACTOR (Using Design MWe)... 98 ' 73.1 63.9 18 'NIT FORCED OUTAGE RATE...,.,....,....... 0.0 1.5 2.8
19. SHUTDOWiNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OP EACH):
20. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

21 'NITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION NOTEJ (1) Unit Capacity Factor (using MDC) greater than 100K due to cooler condenser cooling water.

APPEHDIX D DOCKET NO. 50 - 250

'.) REASON h: EQUIPMEHT FAILURE (EXPLAIN) UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Turne Point Unit No. 3 B: MAIHT. OR TEST C:

D:

REPUELIHG REGULATORY RESTRICTIOH DATE A ril 4 1977 E: OPERATOR TRAINING AHD COMPLETED BY V. T. Chileon LICENSE EXAMINATION F: ADMINISTRATIVE TELEPHONE (305) 552-3769 G: OPERATIONAL ERROR (EXPLAIN) REPORT MONTH March 1977 H: OTHER (EXPLAIN)

) METHOD 1: HANUAL METHOD OF 2: .MANUAL SCRAM TYPE SHUTTING DOWN 3t AUTOMATIC SCRAM F: FORCED DURATION Tllg REACTOR OR 4: OTHER (EXPLAIN) NO. DATE S: SCHEDULED (HOURS) REASON(l) REDUCING POWER(2) CORRECTIVE ACTIONS/COMMENTS NONE

SUMMARY

Unit No. 3 operated at approximately 100X R.P. during month.

t APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 251 Turkey Point UNIT DATE April 4, 1977 COMPLETED BY V. T. Chilson TEL'EPHONE (305) 552-3769 MONTH March, 1977 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 662 688 18 662 690 19 663 4 685 20 319 680 21 "6 677 22 673 23 675 24 675 10 677 26 27 644 12 671 28 677 13 671 29 683 14 665 30 679 15 661 31 672 16 609 NOTE: Average daily power level greater than 666 MWe due to cooler condenser cooling water.

APPEHDZX C OPERATING DATA REPORT DOCKET NO. 50-251 Turkey Point UNIT Unit Ho. 4 REPORT MONTH March, 1977 DATE A ril 4 1977 COMPLE ED BY V. T. Chilson TELEPHONE OPERATING STATUS

1. REPORTINC PERIOD: 0001,77,03.01 CROSS HOURS IN REPORTING PE.'GOD: 744.0 THROUGH
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2200 MAX.DEFOG). CAPACITY (MWe-Het): 666 DESlGN ELECTRICAL RATING (MWe-Net): 93
3. POWER LEVEL TO WHZCH RESTRICTED (IF AHY) (MWe-Net): HONE
4. REASONS FOR RESTRICTION {IF ANY):

THIS MONTH YEAR TO DATE,CUAAATIVE S. IIIIUSERS OF HOURS REACTOR WAS CRETICA1..... 397.3 ~S 23 'M 2

6. REACTOR RESERVE SHUTDOWN HOURS ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

138.8

7. HOURS GENERATOR ON LINE................... 591.3 1 764.2 22 306.2
8. UiHZT RESERVE SHUTDOWH HOURS............... 9. GROSS THERMAL EKRGY GENERATED (MWH) ~ . ~ . ~ ~ 1 280 629 3 830 353 46 889 723
10. GROSS ELECTRICAL ENERGY GBKRATED (KiH)... 414 125 1 251 665 15 209 348 ll. NET ELECTRICAL ENERGY GENERATED (ARHH)..... 393 600 1 190 501 ~>~7
12. REACTOR SERVICE FACTOR.. ~..... ~ - ~ ~ -- ~ ~ -~~. 82.6 74.4
13. REACTOR AVAILABILITYFACTOR.. ~ ............ 80.3 82.6 74.8
14. UNIT SERVZCE FACTOR. 79.5 81.7 70.6
15. UNIT AVAILABILITYFACTOR...............,.. 79.5 81.7 70.6
16. KNIT GAPA'CITY FACTOR (Using (MDC)......... 79 ' 82.8 69.2
17. UNIT CAPACITY FACTOR (Using Design MWe)... 76 ' 79 ' 65.8
18. UNIT FORCED OUTAGE RATE. 0.0 39 3
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Refueling, maintenance, end inspections - April 25 through June 11, 1977 IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: '0.

21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED ZNITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

APPENDIX D DOCKET NO. 50 - 251 I) REASON h: EQUIPHEHT FAILURE (EXPLAIN)

UNIT SHUTDOWNS AHD POWER REDUCTIONS UNIT NAME Turke Point Unit No. 4 B: HAINT. OR TEST C: REFUELINC, April 4, 1977 D: RECULATORY RESTRICTIOH E: OPERATOR TRAININC AND V. T. Chilson COMPLETED BY LICENSE EXAHINATIOH P: ADHINISTRATIVE TELEPHONE (305) 552-3769 C: OPERATIONAL ERROR (EXPLAIN) REPORT MONTH March, 1977 H: OTIIER (PJ(PLAIN)

!) HETllOD 1: MANUAL HETNOD OP 2: .MANUAL SCRAH TYPE SHUTTINC DOWH 3: AUTOHATIC SCRAM P: FORCED DURATION THE REACTOR OR 4: OTHER (EXPLAIN) NO. S: SCHEDULED (BOURS) REASON(1) REDUCIHC POWER(2) CORRECTIVE ACTIONS/CQDlEHTS 77-03-20 152. 7 Unit No. 4 uas removed from service to repair steam generator No. 4C tube leak. Corrective actions included plugging one leaking tube. One additional tube was plugged. (Nuclear System)

SUMMARY

Unit No. 4 operated at approximately 100X R.P. except for outage of March 20 - 26, 1977.

t APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 335 St. Lucie UNIT Unit No. 1 DATE A ril 4 1977 COMPLETED BY V. T.. Chilson TEL'EPHONE (305) 552-3769 MONTH Mar h DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY PO~r, LEVEL (MWe-Net) (MWe-Net) 732 17 358 788 18 390 787 19 642 741 20 729 488 21 780 784 22 786 783 789 791 24 793 725 25 794 10 767 26 733 621 27 789 12 161 28 778 13 371 29 797 375 760 30 375 786 371 16 NOTE: Average daily power level greater than 777 KVe due to cooler condenser cooling water.

~ ~

APPENDIX C OPERATING DATA REPORT DOCKET NO. 50 - 335 St. Lucis UNIT REPORT MONTH March, 1977 DATE A 4 COMP~~ BY V.

OPERATING STATUS TELEPHONE 30

1. REPORTING PERIOD: 000 THROUGH 2400 77 03 31
2. CUiQ~TLY AUTHORIZED POWER LEVEL (MWt): 2560 MAX DEPEND. CAPACITY (MWe-Net): 777 (Est.)

DESICN ELECTRICAL RATING (MWe-Net): 802

3. POWER LEVEL TO'WHICH RESTRICTED (IF ANY) (MWe-Net): NONE
4. REASONS FOR RESTRZCTZON (ZF ANY):

THIS MONTH YEAR TO DATE CUMULATIVE

5. NUMBERS OF HOURS REACTOR WAS CRITICAL. ~ ~ . ~ 744.0 2 106.2 ~23 0.2
6. REACTOR RESERVE SHUTDOWN HOURS. ~ ~ ~ ~ ~ ~ . ~ ~ ~ ~
7. HOURS GENERATOR ON LINE. ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 736 ~ 4 2 035 ~ 6 2 299.6 8 UNIT RESERVE SHUTDOWN HOURS........,,..... 9~ GROSS THERMAL EKRGY GENERATED (MWH)...... 1 592 703 4 299 297 4 646 900
10. GROSS ELECTRICAL ENERGY CEKRATED (MWH)... 519 150 1 411 960 1 520 230
11. NET ELECTRICAL ENERGY CRKRATED (MWH)..... 487 915 1 321 922 1 420 927
12. REACTOR SERVICE FACTOR. 97.5 97.8
13. REACTOR AVAILABILITYFACTOR.. ~ ~ .~ ~........ 100.0 97.5 97.8
14. UNIT SERVICE FACTOR .. . . ........... 99.0 94.2 94. 9
15. UNIT AVAILABILITYFACTOR...............,.. 99.0 94. 2 94.9
16. UNZT GAPA'CITY PACTOR (Using (MDC).. ~ ...... 84 4 78.8 75.4
17. UNIT CAPACITY FAC1%)R (Using Design MWe)... 76. 3 73.1
18. UNIT FORCED OUTACE RATE. .. ,..., .. . 1.0 2.7 2.4
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
20. ZF SHUTDOWN AT END OF REPORT PERIOD> ESTIMATED DATE OF.STARTUP:
21. UNZTS Lf TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
1) REASON APPENDIX D DOCKET NO. 50 - 335 h: EgUIPMEHT PAILURE (EXPLAIN)

B! MAINT. OR TEST UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAHE St. Lucie Unit No. 1 C: REFUELIHC D: REGULATORY RESTRICTION DATE April 4, 1977 E: OPERATOR TRAININC AND LICENSE EXAMINATIOH COHPLETED BY V. T. Chilson F- ADHINISTRATIVE C: OPERATIONAL ERROR (EXPLAIH) TELEPHONE (305) 552-3769 REPORT MONTll March 1977 H: OTHER {EXPLAIN)

>) METHOD I z MANUAL METHOD OP 2: .MANUAl SCRAM TYPE SHUTTIHC DOWN 3: AUTOMATIC SCRAM P: FORCED DURATION TNE REACTOR OR 4: OillER {EXPLAIN) NO. DATE S: SCHEDULED (HOURS) REASON (1) REDUCIHC POWER(2) CORRECTIVE ACTIONS/COMMENTS 77-03-05 "4 Load reduction to clean condensate pump suction strainers. (Non-nuclear system) 10 77-03-11 7.6 Unit was removed from service to replace gasket '"

on containment escape hatch. (Nuclear system) 77-03-12 Unit was operated at approximately 50l R.P. to perform load swing tests. Power Ascension Test Program.

SUHMARY: Power Ascension Test Program continued during month.