Letter Operating Status Reports of February 1978
ML18227B063
Person / Time
Site: Saint Lucie, Turkey Point  NextEra Energy icon.png
Issue date: 03/04/1978
From: Schmidt A
Florida Power & Light Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML18227B063 (16)


Text

REC:

NRC REGULATORY INFORMATION DlSTRIBUTION SYSTEM DISTRIBUTION FOR INCOMING MATERIAL ORG:

SCHMIDT A D FL PWR 8c LIGHT (RID 0-2 251/335 DOCDATE: 03/04/78 DATE RCVD: 03/14/78 DOCTYPE:

LETTER NOTARIZED:

NO

SUBJECT:

MONTHLY OPERATING REPORTS FOR THE MONTH OF FEBRUARY.

COPIES RECEIVED LTR 1

ENCL 1

PLANT NAME: TURKEY PT 03 TURKEY PT N3 ST LUCIE Ol REVIEWER INITIAL:

XRS DISTRIBUTER INITIAL:P4 DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS +444%4<<+<<<+4%<++

MONTHLY OPERATING REPORT FOR GRAY BOOK PREPARATION.

(DISTRIBUTlON CODE A003)

FOR ACTION:

INTERNAL:

EXTERNAL:

BR CHIEF SCHWENCER++W/2 ENCL FILE4+W/ENCL /2 ENCL LPDR~S MIAMII FL4 +W/ENCL T ICE< W/ENCL NSI C++W/ENCL BNL(NATLAB)++W/ENCL ACRS CAT B++W/0 ENCL NRC PDR4+W/ENCL DISTRIBUTION:

LTR 10 ENCL 10 SIZE:

1P+3P+bP THE END CONTROL NBR:

780740142

0 t

Qlllgg~

~<4~

FLORIDAPOWER tk LIGHTCOMPANY March 4, l978 Office of Management Information and Program Controls U. S. Nuclear Regulatory Commission Washington, D.

C.

20555 a)

'QgEtpg -~

<<4@v~'

e~

AR'gq

)g ROJQQQ~~~

l@g~

Gp 4

Gentlemen:

Attached are the February, l978, Operating Status Reports for Turkey Point Unit Nos.

3 and 4 and St. Lucie Unit No. l.

Very truly yours, Vice President Power Resources VTC/DDC cc:

Mr. James P. O'Reilly Robert Lowenstein, Esquire

)

P" 80740l4Z P EOPLE... SERVING P EOP LE

AVERAGE DAILY UiVIT POWER LEVEL DOCKET iVO.

50 250 Turkey Point UNIT Unit No.

3 DATE March 4

1978 COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3824 MONTH FEBRUARYi 1978 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 17 ll 2,

18 19 20 127 400 638 21 680 22 683 23 687 25 686 10 26 27 681 12 28 675 13 15 16 NOTE:

Average daily power greater than 666 MNe due to cooler condenser cooling water.

OPERATING DATAREPORT DOCKET NC.

D4TE Mnn.4 1978 CDhfPLETED BY Yp~bilnon TELEPHONE CRLB 'i5?=3824 OPERATING STATUS 760 700

l. Unit Name Turkey Point Unit No.

3

g. Reporting period:

Februar 1978

3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net hEPIWe):
6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):

Notes -

Urd;t No.

3 operated at approximately 100X R.P..

after the unit was returned to serviceifollowing comple-tion of scheduled refueling, maintenance,

.inspections,and

tests, except for the outage.
8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since-Last Report, Give Reasons:
9. Power Level To which Restricted, IfAny (Net MWe):
10. Reasons For Restrictions, IfAny:

NONE This Month Yr.-to-Date Cumulative 4

343.8 35 569.7

-'0-ill;1 265.4 34 351.8 85.0 521 921 '7 296 113 21 452 87 20'99'19 74.8 7.0 63.8 2.8

12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours 14, Hours Generator On-Line
15. Unit Reserve Shutdown Hours 16, Gross Thermal Energy Generated (MWH)
17. Gross Electrical Energy Generated (MWH)
18. Net Electrical Energy Generated (MWH) 154 909 -'52 669
19. Unit Service Factor
20. Unit AvailabilityFactor 39.5
21. Unit Capacity Factor (Using hMDC Net) 34.6
22. Unit Capacity Factor (Using DER Net) 33.3 15.6 23, Unit Forced Outage Rate 1.4 1.4
24. Shutdowns Scheduled Over Next 6 Months {Type. Date. and Duration of Each):

Steam Generator Tube Inspection Program - August 17 September 11, 1978

25. IfShut Down At End Of Report Period, Estimated Date of Startup:
26. Units ln Test Status {Priorto Commercial Operation):

N/A Forecast Achieved INITIAL CRITICALITY INITIALELECTRICITY COiblhlIERCIALOPERATION (4)/77 I

UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

REPORT MONTH FEBRUARY 1978 No.

Date ri 5

.JQ c '>

c U

Licensee Event Rcport e c~m OC QE~

O Cause h. Corrective Action to Prevent Rccurrcnce 28 77-11-23 S

402. 9 C

N/A N/A CB N/A PUMPXX (B)

Unit No.

3 was removed from service for. scheduled refueling, maintenance, and inspections.

(Continued from previous month)

(Nuclear and non-nuclear systems)

Outage was extended to repair mechani cal seal on reactor coolant pumps.

(Nuclear system) 78-02-18 3.7 N/A H/A'ENERA (A)

Unit was removed-from service to balance the generator exciter.

(Non-nuclear system)

I F: Forced S: Scheduled

<<)/>7)

Reason:

A-Equipment Failure (Explain)

B.Maintcnancc or Test C-Refueling D-Regulatory Restriction E-Operator Training'icense Examination F.Administrative G.Operational Error (Explain)

I I-Other (Explain) 3 Method:

-Manual 2-Manual Scram.

3-Automatic Scratn.

4-Other (Explain) 4 Exhibit G - Instructions for Preparation of Data Entry Sheets for Liccnsec Event Report (LER) File (NUREG-

~ 0 I61)

Exhibit I ~ Satnc Source

AVER'AGE DAILY UNIT POWER LEVEL DOCKET NO. 50 Turkey Point UNIT DATE a

II COMPLETED BY V..

h '

MONTH FEBRUARY, 1978 DAY AVERAGE DAILY POWER.LEVEL (M!Ve-Net) 666 660 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 17 18 3

10 12 13 654 651 661 668 671 671 662 659.

660 659 654 390.

20 21 22 23 24 25 26 27 28 15 16 NOTE:.

Average daily power greater than 666 NWe due to cooler condenser cooling water.

OPERATING DATAREPORT DOCKET NO. liLL253 DArE8~~8 COMPLETED IIY V.T-Chilson TELEPHONE (3305

,'i2-3624 OPERATING STATUS 760 700 666

1. Umt Name:

Turke Point Unit No.

4

g. Reporting period:
Pebruay, 1978
3. Licensed Thermal Power (MWt):

2200

4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):

693

6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):

Notes - Unit No.

4 operated at approximately 100% R.P.

until. the unit was removed from. service to perform steam generator tube inspec-tion and repairs...

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, IfAny (Net MWe):
10. Reasons For Restrictions, IfAny:

NONE This Month Yr:to-Date Cumuhtive 39 625..0 1 416.0 0 2.

0 138.8 1 060.6 27 18 57. 404.906 2 319 238 740 370 18 564 295 74.9 68.6 74.9 68.6 74.6 71.7 64.1 3.2

11. Houri In Reporting Period 672.

0'3.

Reactor Reserve Shutdown Hours

14. Hours Generator On-l.ine 327.7
15. Unit Reserve Shutdown Hours

'6.

Gross Thermal Energy Generated (MWH)

I'7. Gross Electrical Energy Generated (MWH)

18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor 48.8
20. Unit AvailabilityFactor 48.8
21. Unit Capacity Factor (Using 4%IDC Net)
48. 0:
22. Unit.Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
25. IfShut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

March 8, 1978 Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION (4)/77 )

UNITSIIUTDOWNS ANDPOWER REDUCTIONS REPORT MONTH FEBRUARY 1978 r

DOCKET NO.

~0 251 UNITNAME Turke Point Unit No.

4 COMPLETED BY No.

Date BK d

C I 0

IA tJ A>>

4P

~CA $Q Licensee Event Rcport 8 O

Eo 0

Cause &Correct tve Action to Prevent Recurrence 78-02-14 S

344.3 A

Steam Ghnemator Inspection Program Report-Feb.

1978 (Transmitted March 1, 19f8 CB HTEXCH (F)

Unit No.

4 was removed from service to perform steam generator tube inspection and repair leaks.

(Nuclea system)

I F: Forced S: Scheduled

('>/77)

Reason:

A-Equipmcnt Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training k, Liccnsc Examination F-Administrative G-Operational Error (Explain)

II-Other (Explain) 3 Method:

I-Manual 2.Manual Scram.

3-Autonmtic Scram.

4-Other (Explain) 4 Exhibit G - Instructions for Preparation of Data

~ Entry Sheets for Licensee

'vent Report (LER) File (NUREG-016I )

5 Exhibit I - Satnc Source

AVERAGE DAILY UNIT POWER LEVEL

~,cP DOCKET NO.

50 335 UNIT St. Lucie Unit No.

1 DATE March 4

1978 COMPLETED BY V. T. Chilson 305 552-3824 MONTH FEBRUARYI 1 978 DAY AVERAGE DAILY POWER.LEVEL (Kfe-Net)

DAY AVERAGE DAILY POWER LEVEL (HWe-Net) 10 12 13 14 15 16 728 743 738 772 787.

781 795 748 547 793.

795 797 795 794 792 791 17 18 19 20 21 22 23 24 25 26 27 28 NOTE:

7 3

77

'8 78 770 785 791 795 Average daily power greater than 777 MWe due to cooler condenser cooling water.

jib

j i

~

~

OPERATING DATAREPORT DOCKET NO.

DgTE

~Mar 4.78 COMPLETED BY Z '~hilson TELEPHONE ~~-3824 OPERATING STATUS

1. Unit Name:

St; Lucie Unit No. 1

p. Reporting period:

Februa 1978

3. Licensed Thermal Power (MWt):

. 2560

4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):

822 777 Notes Unit No. 1 operated at approximately 100% R.P.

except for load reduction=

of Feb. 8-9, 1978..

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

,'. Power Level To Which Restricted, lfAny (Net MWe):

10. Reasons For Restrictions, IfAny:

NONE This Month Yr.-to-Date Cumulative 1 416.0 I 339.5

'-0-'

325.4 1 002 8

93.6 93.6 91.1

11. Hours In Reporting Period
12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours
14. Hours Generator On.Line
15. Unit Reserve Shutdown pours 19. Unit Service Factor 100. 0
20. Unit AvailabilityFactor
21. Unit Capacity Factor (Using MDC Net) 99.5
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type, Date. and Duration of Each):

Refuelin maintenance and ins ections A ril 1 June 10

.1978 9

2 101.5 9 007.'2 21.0 86.3

86. 3 I
25. IfShut Down At End Of Report Period. Estimated Date of Startup:
26. Units ln Test Status (Prior to Commercial Operation):

N/A Forecast Achieved INITIALCRITICALITY INlTIA1. ELECTRICITY COillMERCIALOPERATION (i>/77)

~

~

OJ

UNITSHUTDOWNS ANDPOWER REDUCTIONS a

No. 1 REPORT MONTII FEBRUARY. 1978 COMPLETED BY NII.

Date PaK a-I I o

IA 7V lP~

C 0 g CC

~ Ch Licensee Event Rcport 4F 0

E p3 0

CJ Cause &Corrective Action to Prevent Recurrence 78-02-08 N/A HH PUMPXX" (B)

Load reduction to clean steam gener-ator feedwater pump suction strainers.

(Non-nuclear system)

F: Forced S: Schcduicd

{'t/77)

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training &. License Examination F.Administ rat ive G-Operational Error (Explain)

II.Other (Explain)

Method:

I-Manual 2-Manual Scram.

3-Automatic Scram.

4-Other (Explain) 4 Exhibit G - Instructions for Preparation uf Data Entry Sheets I'or Licensee Event Rcport (LER) File (NUREG.