03/04/1978 Letter Operating Status Reports of February 1978
ML18227B063
Person / Time
Site: Saint Lucie, Turkey Point  NextEra Energy icon.png
Issue date: 03/04/1978
From: Schmidt A
Florida Power & Light Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML18227B063 (16)


Text

REGULATORY INFORMATION DlSTRIBUTION SYSTEM (RID DISTRIBUTION FOR INCOMING MATERIAL 0-2 251/335 REC: ORG: SCHMIDT A D DOCDATE: 03/04/78 NRC FL PWR 8c LIGHT DATE RCVD: 03/14/78 DOCTYPE: LETTER NOTARIZED: NO COPIES RECEIVED

SUBJECT:

LTR 1 ENCL 1 MONTHLY OPERATING REPORTS FOR THE MONTH OF FEBRUARY.

PLANT NAME: TURKEY PT 03 REVIEWER INITIAL: XRS TURKEY PT N3 DISTRIBUTER INITIAL:P4 ST LUCIE Ol DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS +444%4<<+<<<+4%<++

MONTHLY OPERATING REPORT FOR GRAY BOOK PREPARATION.

(DISTRIBUTlON CODE A003)

FOR ACTION: BR CHIEF SCHWENCER++W/2 ENCL INTERNAL: FILE4+W/ENCL NRC PDR4+W/ENCL

/2 ENCL EXTERNAL: LPDR~S MIAMII FL4 +W/ENCL T ICE< W/ENCL NSI C++W/ENCL BNL(NATLAB)++W/ENCL ACRS CAT B++W/0 ENCL DISTRIBUTION: LTR 10 ENCL 10 CONTROL NBR: 780740142 SIZE: 1P+3P+bP THE END

0 t

Ql llgg~

~<4~

FLORIDA POWER tk LIGHT COMPANY March 4, l978 a)

'QgEtpg -~

AR'gq Office of Management Information <<4@v~' )g e~

and Program Controls ROJQQQ~~~

U. S. Nuclear Regulatory Commission l@g~

4 Washington, D. C. 20555 Gp Gentlemen:

Attached are the February, l978, Operating Status Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit No. l.

Very truly yours, Vice President Power Resources VTC/DDC

)

cc: Mr. James P. O'Reilly P" Robert Lowenstein, Esquire 80740l4Z P EOPLE... SERVING P EOP LE

AVERAGE DAILY UiVIT POWER LEVEL DOCKET iVO. 50 250 Turkey Point UNIT Unit No. 3 DATE March 4 1978 COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3824 MONTH FEBRUARY i 1978 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 17 ll 2, 18 127 19 400 20 638 21 680 22 683 23 687 25 686 10 26 27 681 12 28 675 13 15 16 NOTE: Average daily power greater than 666 MNe due to cooler condenser cooling water.

OPERATING DATA REPORT DOCKET NC.

D4TE Mnn.4 1978 CDhfPLETED BY Yp~bilnon TELEPHONE CRLB 'i5?=3824 OPERATING STATUS

l. Unit Name Turkey Point Unit No. 3 Notes - Urd;t No. 3 operated Februar 1978 at approximately 100X R.P..
g. Reporting period: after the unit was returned
3. Licensed Thermal Power (MWt):

760 to serviceifollowing comple-

4. Nameplate Rating (Gross MWe): tion of scheduled refueling,
5. Design Electrical Rating (Net hEPIWe): maintenance, .inspections,and
6. Maximum Dependable Capacity (Gross MWe): 700 tests, except for the outage.
7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since-Last Report, Give Reasons:
9. Power Level To which Restricted, IfAny (Net MWe): NONE
10. Reasons For Restrictions, If Any:

This Month Yr.-to-Date Cumulative 4

12. Number Of Hours Reactor Was Critical 343.8 35 569.7
13. Reactor Reserve Shutdown Hours

-'0- ill;1 14, Hours Generator On-Line 265.4 34 351.8

15. Unit Reserve Shutdown Hours 521 921 '7 85.0

-'52 16, Gross Thermal Energy Generated (MWH) 296 113

17. Gross Electrical Energy Generated (MWH) 21 452 87
18. Net Electrical Energy Generated (MWH) 154 909 669 20'99'19
19. Unit Service Factor 74.8
20. Unit Availability Factor 39.5 7 .0
21. Unit Capacity Factor (Using hMDC Net) 34.6
22. Unit Capacity Factor (Using DER Net) 33.3 . 15.6 63.8 23, Unit Forced Outage Rate 1.4 1.4 2.8
24. Shutdowns Scheduled Over Next 6 Months {Type. Date. and Duration of Each):

Steam Generator Tube Inspection Program - August 17 September 11, 1978

25. IfShut Down At End Of Report Period, Estimated Date of Startup: N/A
26. Units ln Test Status {Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIALELECTRICITY COiblhlIERCIAL OPERATION (4)/77 I

DOCKET NO.

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH FEBRUARY 1978 ri c c '> Licensee

~m C Cause h. Corrective 5 O No. Date .J Q

cU Event Q E~

Action to Rcport e O Prevent Rccurrcnce 28 77-11-23 S 402. 9 C N/A N/A N/A Unit No. 3 was removed from service for. scheduled refueling, maintenance, and inspections. (Continued from previous month) (Nuclear and non-nuclear systems)

CB PUMP XX Outage was extended to repair mechani (B) cal seal on reactor coolant pumps.

(Nuclear system) 78-02-18 3.7 N/A H/A'ENERA Unit was removed-from service to (A) balance the generator exciter. (Non-nuclear system)

I 3 4 F: Forced Reason: ' Method: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) -Manual for Preparation of Data B.Maintcnancc or Test 2-Manual Scram. Entry Sheets for Liccnsec C-Refueling 3-Automatic Scratn. Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) ~ 0 I 61)

E-Operator Training'icense Examination F.Administrative G.Operational Error (Explain) Exhibit I Satnc Source

~

<<)/>7) I I-Other (Explain)

AVER'AGE DAILY UNIT POWER LEVEL DOCKET NO. 50 Turkey Point UNIT DATE a II COMPLETED BY V h MONTH FEBRUARY, 1978 DAY AVERAGE DAILY POWER .LEVEL DAY AVERAGE DAILY POWER LEVEL (M!Ve-Net) (MWe-Net) 666 17 660 18 3 654 651 20 661 21 668 22 671 23 671 24 662 25 10 659. 26 660 27 12 659 28 13 654 390.

15 16 NOTE:. Average daily power greater than 666 NWe due to cooler condenser cooling water.

OPERATING DATA REPORT DArE 8~~8 DOCKET NO. liLL253 COMPLETED IIY V.T- Chilson TELEPHONE (3305 ,'i2-3624 OPERATING STATUS

1. Umt Name: Turke Point Unit No. 4 Notes - Unit No. 4 operated Pebruay, 1978 at approximately 100% R.P.
g. Reporting period: until. the unit 2200 was removed
3. Licensed Thermal Power (MWt): from. service to perform
4. Nameplate Rating (Gross MWe): 760 693 steam generator tube inspec-
5. Design Electrical Rating (Net MWe):

700 tion and repairs...

6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe): 666
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, IfAny (Net MWe): NONE
10. Reasons For Restrictions, If Any:

This Month Yr:to-Date Cumuhtive

11. Houri In Reporting Period 672. 1 416.0 39 625..0 0'3.

0 2.

Reactor Reserve Shutdown Hours 0 138.8

14. Hours Generator On-l.ine 327.7 1 060.6 27 18
15. Unit Reserve Shutdown Hours '6.

Gross Thermal Energy Generated (MWH) 2 319 238 57. 404 .906 I'7. Gross Electrical Energy Generated (MWH) 740 370 18 564 295

18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor 48.8 74.9 68.6
20. Unit Availability Factor 48.8 74.9 68.6
21. Unit Capacity Factor (Using 4%IDC Net) 48. 0: 74.6
22. Unit. Capacity Factor (Using DER Net) 71.7 64.1
23. Unit Forced Outage Rate 3.2
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
25. If Shut Down At End Of Report Period, Estimated Date of Startup: March 8, 1978
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION (4)/77 )

r DOCKET NO. ~0 251 UNIT SIIUTDOWNS AND POWER REDUCTIONS Point Unit No.

UNITNAME Turke 4 1978 COMPLETED BY REPORT MONTH FEBRUARY C I A>> Licensee Cause & Correct tve 0 4P O

No. Date IA Event Action to dBK 0Eo tJ

~CA $ Rcport 8 Prevent Recurrence Q

78-02-14 S 344.3 A Steam CB HTEXCH Unit No. 4 was removed from service Ghnemator (F) to perform steam generator tube Inspection inspection and repair leaks. (Nuclea Program system)

Report-Feb. 1978 (Transmitted March 1, 19f8 I 3 4 F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A-Equipmcnt Failure (Explain) I-Manual for Preparation of Data B-Maintenance or Test 2.Manual Scram. ~

Entry Sheets for Licensee C-Refueling 3-Autonmtic Scram. 'vent Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 016I )

E-Operator Training k, Liccnsc Examination F-Administrative 5 G-Operational Error (Explain) Exhibit I - Satnc Source

('>/77) II-Other (Explain)

AVERAGE DAILY UNIT POWER LEVEL ' ~,cP DOCKET NO. 50 335 St. Lucie UNIT Unit No. 1 DATE March 4 1978 COMPLETED BY V. T. Chilson 305 552-3824 MONTH FEBRUARY I 1 978 DAY AVERAGE DAILY POWER .LEVEL DAY AVERAGE DAILY POWER LEVEL (Kfe-Net) (HWe-Net) 728 17 7 3 743 18 77

'8 738 19 772 20 787. 21 781 22 795 23 748 24 78 547 25 770 10 793. 26 785 795 27 791 12 797 28 795 13 795 14 794 15 792 16 791 NOTE: Average daily power greater than 777 MWe due to cooler condenser cooling water.

jib j i

~ ~

OPERATING DATA REPORT DOCKET NO.

DgTE ~Mar 4 .78

'~hilson COMPLETED BY Z TELEPHONE ~~-3824 OPERATING STATUS St; Lucie Unit No. Notes Unit No. 1 operated

1. Unit Name: 1 Februa 1978 at approximately 100% R.P.
p. Reporting period: except for load reduction=

. 2560

3. Licensed Thermal Power (MWt): of Feb. 8-9, 1978..
4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe): 822
7. Maximum Dependable Capacity (Net MWe): 777
8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

, '. Power Level To Which Restricted,

10. Reasons For Restrictions, If Any:

lf Any (Net MWe): NONE This Month Yr.-to-Date Cumulative

11. Hours In Reporting Period 1 416.0
12. Number Of Hours Reactor Was Critical I 339.5

'-0-'

9 2

13. Reactor Reserve Shutdown Hours 101.5
14. Hours Generator On. Line 325.4 9 007.'2
15. Unit Reserve Shutdown pours 21.0 1 002 8
19. Unit Service Factor 100. 0 93.6 86.3
20. Unit Availability Factor 93.6 86. 3
21. Unit Capacity Factor (Using MDC Net) 99.5 91.1
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type, Date. and Duration of Each):

Refuelin maintenance and ins ections A ril 1 June 10 .1978 I

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

N/A

26. Units ln Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INlTIA1. ELECTRICITY COillMERCIALOPERATION (i>/77)

~ ~

OJ

a UNIT SHUTDOWNS AND POWER REDUCTIONS No. 1 COMPLETED BY REPORT MONTII FEBRUARY. 1978 lP~

I I C Licensee 0 Cause & Corrective oIA 0 NI I. Date P 7 g CC Event Action to a-aK V

~ Ch Rcport 4F E p3 0

CJ Prevent Recurrence 78-02-08 N/A HH PUMPXX" Load reduction to clean steam gener-(B) ator feedwater pump suction strainers.

(Non-nuclear system) 4 F: Forced Reason: Method: Exhibit G - Instructions .

S: Schcduicd A-Equipment Failure (Explain) I-Manual for Preparation uf Data B-Maintenance or Test 2-Manual Scram. Entry Sheets I'or Licensee C-Refueling 3-Automatic Scram. Event Rcport (LER) File (NUREG.

D-Regulatory Restriction 4-Other (Explain) 0 I 61)

E-Operator Training &. License Examination F.Administ rat ive G-Operational Error (Explain) Exhibit I - Sante Source

{'t/77) I I.Other (Explain)

C ~

~ t-<i ~

C ut