ML18227B063
| ML18227B063 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie, Turkey Point |
| Issue date: | 03/04/1978 |
| From: | Schmidt A Florida Power & Light Co |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| Download: ML18227B063 (16) | |
Text
REC:
NRC REGULATORY INFORMATION DlSTRIBUTION SYSTEM DISTRIBUTION FOR INCOMING MATERIAL ORG:
SCHMIDT A D FL PWR 8c LIGHT (RID 0-2 251/335 DOCDATE: 03/04/78 DATE RCVD: 03/14/78 DOCTYPE:
LETTER NOTARIZED:
NO
SUBJECT:
MONTHLY OPERATING REPORTS FOR THE MONTH OF FEBRUARY.
COPIES RECEIVED LTR 1
ENCL 1
PLANT NAME: TURKEY PT 03 TURKEY PT N3 ST LUCIE Ol REVIEWER INITIAL:
XRS DISTRIBUTER INITIAL:P4 DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS +444%4<<+<<<+4%<++
MONTHLY OPERATING REPORT FOR GRAY BOOK PREPARATION.
(DISTRIBUTlON CODE A003)
FOR ACTION:
INTERNAL:
EXTERNAL:
BR CHIEF SCHWENCER++W/2 ENCL FILE4+W/ENCL /2 ENCL LPDR~S MIAMII FL4 +W/ENCL T ICE< W/ENCL NSI C++W/ENCL BNL(NATLAB)++W/ENCL ACRS CAT B++W/0 ENCL NRC PDR4+W/ENCL DISTRIBUTION:
LTR 10 ENCL 10 SIZE:
1P+3P+bP THE END CONTROL NBR:
780740142
0 t
Qlllgg~
~<4~
FLORIDAPOWER tk LIGHTCOMPANY March 4, l978 Office of Management Information and Program Controls U. S. Nuclear Regulatory Commission Washington, D.
C.
20555 a)
'QgEtpg -~
<<4@v~'
e~
AR'gq
)g ROJQQQ~~~
l@g~
Gp 4
Gentlemen:
Attached are the February, l978, Operating Status Reports for Turkey Point Unit Nos.
3 and 4 and St. Lucie Unit No. l.
Very truly yours, Vice President Power Resources VTC/DDC cc:
Mr. James P. O'Reilly Robert Lowenstein, Esquire
)
P" 80740l4Z P EOPLE... SERVING P EOP LE
AVERAGE DAILY UiVIT POWER LEVEL DOCKET iVO.
50 250 Turkey Point UNIT Unit No.
3 DATE March 4
1978 COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3824 MONTH FEBRUARYi 1978 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 17 ll 2,
18 19 20 127 400 638 21 680 22 683 23 687 25 686 10 26 27 681 12 28 675 13 15 16 NOTE:
Average daily power greater than 666 MNe due to cooler condenser cooling water.
OPERATING DATAREPORT DOCKET NC.
D4TE Mnn.4 1978 CDhfPLETED BY Yp~bilnon TELEPHONE CRLB 'i5?=3824 OPERATING STATUS 760 700
- l. Unit Name Turkey Point Unit No.
3
- g. Reporting period:
Februar 1978
- 3. Licensed Thermal Power (MWt):
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net hEPIWe):
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
Notes -
Urd;t No.
3 operated at approximately 100X R.P..
after the unit was returned to serviceifollowing comple-tion of scheduled refueling, maintenance,
.inspections,and
- tests, except for the outage.
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since-Last Report, Give Reasons:
- 9. Power Level To which Restricted, IfAny (Net MWe):
- 10. Reasons For Restrictions, IfAny:
NONE This Month Yr.-to-Date Cumulative 4
343.8 35 569.7
-'0-ill;1 265.4 34 351.8 85.0 521 921 '7 296 113 21 452 87 20'99'19 74.8 7.0 63.8 2.8
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours 14, Hours Generator On-Line
- 15. Unit Reserve Shutdown Hours 16, Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH) 154 909 -'52 669
- 19. Unit Service Factor
- 20. Unit AvailabilityFactor 39.5
- 21. Unit Capacity Factor (Using hMDC Net) 34.6
- 22. Unit Capacity Factor (Using DER Net) 33.3 15.6 23, Unit Forced Outage Rate 1.4 1.4
- 24. Shutdowns Scheduled Over Next 6 Months {Type. Date. and Duration of Each):
Steam Generator Tube Inspection Program - August 17 September 11, 1978
- 25. IfShut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units ln Test Status {Priorto Commercial Operation):
N/A Forecast Achieved INITIAL CRITICALITY INITIALELECTRICITY COiblhlIERCIALOPERATION (4)/77 I
UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
REPORT MONTH FEBRUARY 1978 No.
Date ri 5
.JQ c '>
c U
Licensee Event Rcport e c~m OC QE~
O Cause h. Corrective Action to Prevent Rccurrcnce 28 77-11-23 S
402. 9 C
N/A N/A CB N/A PUMPXX (B)
Unit No.
3 was removed from service for. scheduled refueling, maintenance, and inspections.
(Continued from previous month)
(Nuclear and non-nuclear systems)
Outage was extended to repair mechani cal seal on reactor coolant pumps.
(Nuclear system) 78-02-18 3.7 N/A H/A'ENERA (A)
Unit was removed-from service to balance the generator exciter.
(Non-nuclear system)
I F: Forced S: Scheduled
<<)/>7)
Reason:
A-Equipment Failure (Explain)
B.Maintcnancc or Test C-Refueling D-Regulatory Restriction E-Operator Training'icense Examination F.Administrative G.Operational Error (Explain)
I I-Other (Explain) 3 Method:
-Manual 2-Manual Scram.
3-Automatic Scratn.
4-Other (Explain) 4 Exhibit G - Instructions for Preparation of Data Entry Sheets for Liccnsec Event Report (LER) File (NUREG-
~ 0 I61)
Exhibit I ~ Satnc Source
AVER'AGE DAILY UNIT POWER LEVEL DOCKET NO. 50 Turkey Point UNIT DATE a
II COMPLETED BY V..
h '
MONTH FEBRUARY, 1978 DAY AVERAGE DAILY POWER.LEVEL (M!Ve-Net) 666 660 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 17 18 3
10 12 13 654 651 661 668 671 671 662 659.
660 659 654 390.
20 21 22 23 24 25 26 27 28 15 16 NOTE:.
Average daily power greater than 666 NWe due to cooler condenser cooling water.
OPERATING DATAREPORT DOCKET NO. liLL253 DArE8~~8 COMPLETED IIY V.T-Chilson TELEPHONE (3305
,'i2-3624 OPERATING STATUS 760 700 666
- 1. Umt Name:
Turke Point Unit No.
4
- g. Reporting period:
- Pebruay, 1978
- 3. Licensed Thermal Power (MWt):
2200
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
693
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
Notes - Unit No.
4 operated at approximately 100% R.P.
until. the unit was removed from. service to perform steam generator tube inspec-tion and repairs...
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, IfAny (Net MWe):
- 10. Reasons For Restrictions, IfAny:
NONE This Month Yr:to-Date Cumuhtive 39 625..0 1 416.0 0 2.
0 138.8 1 060.6 27 18 57. 404.906 2 319 238 740 370 18 564 295 74.9 68.6 74.9 68.6 74.6 71.7 64.1 3.2
- 11. Houri In Reporting Period 672.
0'3.
Reactor Reserve Shutdown Hours
- 14. Hours Generator On-l.ine 327.7
- 15. Unit Reserve Shutdown Hours
'6.
Gross Thermal Energy Generated (MWH)
I'7. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor 48.8
- 20. Unit AvailabilityFactor 48.8
- 21. Unit Capacity Factor (Using 4%IDC Net)
- 48. 0:
- 22. Unit.Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
- 25. IfShut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
March 8, 1978 Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION (4)/77 )
UNITSIIUTDOWNS ANDPOWER REDUCTIONS REPORT MONTH FEBRUARY 1978 r
DOCKET NO.
~0 251 UNITNAME Turke Point Unit No.
4 COMPLETED BY No.
Date BK d
C I 0
IA tJ A>>
4P
~CA $Q Licensee Event Rcport 8 O
Eo 0
Cause &Correct tve Action to Prevent Recurrence 78-02-14 S
344.3 A
Steam Ghnemator Inspection Program Report-Feb.
1978 (Transmitted March 1, 19f8 CB HTEXCH (F)
Unit No.
4 was removed from service to perform steam generator tube inspection and repair leaks.
(Nuclea system)
I F: Forced S: Scheduled
('>/77)
Reason:
A-Equipmcnt Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training k, Liccnsc Examination F-Administrative G-Operational Error (Explain)
II-Other (Explain) 3 Method:
I-Manual 2.Manual Scram.
3-Autonmtic Scram.
4-Other (Explain) 4 Exhibit G - Instructions for Preparation of Data
~ Entry Sheets for Licensee
'vent Report (LER) File (NUREG-016I )
5 Exhibit I - Satnc Source
AVERAGE DAILY UNIT POWER LEVEL
~,cP DOCKET NO.
50 335 UNIT St. Lucie Unit No.
1 DATE March 4
1978 COMPLETED BY V. T. Chilson 305 552-3824 MONTH FEBRUARYI 1 978 DAY AVERAGE DAILY POWER.LEVEL (Kfe-Net)
DAY AVERAGE DAILY POWER LEVEL (HWe-Net) 10 12 13 14 15 16 728 743 738 772 787.
781 795 748 547 793.
795 797 795 794 792 791 17 18 19 20 21 22 23 24 25 26 27 28 NOTE:
7 3
77
'8 78 770 785 791 795 Average daily power greater than 777 MWe due to cooler condenser cooling water.
jib
j i
~
~
OPERATING DATAREPORT DOCKET NO.
DgTE
~Mar 4.78 COMPLETED BY Z '~hilson TELEPHONE ~~-3824 OPERATING STATUS
- 1. Unit Name:
St; Lucie Unit No. 1
- p. Reporting period:
Februa 1978
- 3. Licensed Thermal Power (MWt):
. 2560
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
822 777 Notes Unit No. 1 operated at approximately 100% R.P.
except for load reduction=
of Feb. 8-9, 1978..
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
,'. Power Level To Which Restricted, lfAny (Net MWe):
- 10. Reasons For Restrictions, IfAny:
NONE This Month Yr.-to-Date Cumulative 1 416.0 I 339.5
'-0-'
325.4 1 002 8
93.6 93.6 91.1
- 11. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On.Line
- 15. Unit Reserve Shutdown pours 19. Unit Service Factor 100. 0
- 20. Unit AvailabilityFactor
- 21. Unit Capacity Factor (Using MDC Net) 99.5
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date. and Duration of Each):
Refuelin maintenance and ins ections A ril 1 June 10
.1978 9
2 101.5 9 007.'2 21.0 86.3
- 86. 3 I
- 25. IfShut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units ln Test Status (Prior to Commercial Operation):
N/A Forecast Achieved INITIALCRITICALITY INlTIA1. ELECTRICITY COillMERCIALOPERATION (i>/77)
~
~
OJ
UNITSHUTDOWNS ANDPOWER REDUCTIONS a
No. 1 REPORT MONTII FEBRUARY. 1978 COMPLETED BY NII.
Date PaK a-I I o
IA 7V lP~
C 0 g CC
~ Ch Licensee Event Rcport 4F 0
E p3 0
CJ Cause &Corrective Action to Prevent Recurrence 78-02-08 N/A HH PUMPXX" (B)
Load reduction to clean steam gener-ator feedwater pump suction strainers.
(Non-nuclear system)
F: Forced S: Schcduicd
{'t/77)
Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training &. License Examination F.Administ rat ive G-Operational Error (Explain)
II.Other (Explain)
Method:
I-Manual 2-Manual Scram.
3-Automatic Scram.
4-Other (Explain) 4 Exhibit G - Instructions for Preparation uf Data Entry Sheets I'or Licensee Event Rcport (LER) File (NUREG.
0 I61)
Exhibit I - Sante Source
C
~ ~t-<i
~
C ut