Category:Letter
MONTHYEARL-2024-184, Radiological Emergency Plan Revision 772024-11-0505 November 2024 Radiological Emergency Plan Revision 77 L-2024-173, Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-31031 October 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles L-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums ML24291A2882024-10-24024 October 2024 Westinghouse Topical Report - Request for Withholding Information from Public Disclosure L-2024-175, Cycle 34 Core Operating Report2024-10-24024 October 2024 Cycle 34 Core Operating Report L-2024-177, Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis2024-10-22022 October 2024 Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis IR 05000335/20250102024-10-21021 October 2024 Notification of St. Lucie Plant Units 1 & 2 Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000335/2025010 and 05000389/2025010 ML24227A9702024-10-18018 October 2024 Letter to Kenneth Mack Dir, License and Reg Compliance, NextEra Energy, Inc Response to Request Re Engagement Re Sub License Renewal Environmental Review - St Lucie Nuclear Plant 1 and 2 ML24276A2302024-10-16016 October 2024 Westinghouse Topical Report – Request for Withholding Information from Public Disclosure ML24289A2372024-10-15015 October 2024 Transmittal of Revision 1 Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles L-2024-085, Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results2024-10-15015 October 2024 Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes L-2024-165, Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made2024-10-14014 October 2024 Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) L-2024-157, Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-0303 October 2024 Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles IR 05000250/20243012024-10-0303 October 2024 NRC Operator License Examination Report 05000250/2024301 and 05000251/2024301 L-2024-147, Submission of Periodic Reports2024-10-0101 October 2024 Submission of Periodic Reports ML24255A3092024-09-30030 September 2024 SLRA - Revised SE Letter L-2024-155, Subsequent License Renewal Application, Third Annual Update2024-09-27027 September 2024 Subsequent License Renewal Application, Third Annual Update L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes 05000335/LER-2024-001, Unplanned Reactor Scram2024-09-25025 September 2024 Unplanned Reactor Scram ML24269A1292024-09-24024 September 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis ML24260A2262024-09-18018 September 2024 NRC Examination Results Summary - Examination Reports: 05000250/2024301 and 05000251/2024301 ML24262A2272024-09-18018 September 2024 Transmittal of Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles IR 05000335/20240112024-09-18018 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000335/2024011 and 05000389/2024011 ML24158A0052024-09-17017 September 2024 Completion of Subsequent License Renewal Site Specific Environmental Review and Modification to Subsequent Renewed Facility Operating Licenses L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24207A0342024-09-13013 September 2024 – Exemption from Certain Requirements of 10 CFR 50.46 for Use of Axiom Fuel Rod Cladding – Letter ML24256A1132024-09-13013 September 2024 Regulatory Audit Summary Related to the Review of Regarding the Updated Spent Fuel Pool Criticality Safety Analysis License Amendment Request L-2024-138, License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles2024-09-11011 September 2024 License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles L-2024-148, Submittal of Offsite Dose Calculation Manual (Odcm), Revision 552024-09-0909 September 2024 Submittal of Offsite Dose Calculation Manual (Odcm), Revision 55 IR 05000250/20240052024-08-23023 August 2024 Updated Inspection Plan for Turkey Point Units 3 & 4 - Report 05000250/2024005 and 05000251/2024005 ML24234A0062024-08-22022 August 2024 Project Manager Assignment IR 05000335/20240052024-08-22022 August 2024 Updated Inspection Plan for St. Lucie, Units 1 & 2 - Report 05000335/2024005 and 05000389/2024005 L-2024-133, Snubber Program Plan Submittal2024-08-14014 August 2024 Snubber Program Plan Submittal L-2024-140, Cycle 28 Core Operating Limits Report2024-08-14014 August 2024 Cycle 28 Core Operating Limits Report IR 05000335/20240022024-08-13013 August 2024 Integrated Inspection Report 05000335-2024002 and 05000389-2024002 L-2024-132, 2024 Population Update Analysis2024-08-13013 August 2024 2024 Population Update Analysis L-2024-122, Core Operating Limits Report2024-08-12012 August 2024 Core Operating Limits Report L-2024-106, Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-022024-08-12012 August 2024 Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-02 L-2024-129, Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval2024-08-0707 August 2024 Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval 05000389/LER-2024-003, Unplanned Reactor Scram2024-08-0505 August 2024 Unplanned Reactor Scram ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-121, Subsequent License Renewal Commitment 30 Revision2024-07-30030 July 2024 Subsequent License Renewal Commitment 30 Revision L-2024-123, Submittal of In-Service Inspection Program Owners Activity Report (OAR-1)2024-07-29029 July 2024 Submittal of In-Service Inspection Program Owners Activity Report (OAR-1) L-2024-089, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-07-25025 July 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24184B2822024-07-16016 July 2024 – Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan 05000389/LER-2024-002-01, Safety Injection Tank Vent Through Wall Leakage2024-07-11011 July 2024 Safety Injection Tank Vent Through Wall Leakage 2024-09-09
[Table view] Category:Operating Report
MONTHYEARL-2023-051, Report of 10 CFR 50.59 Plant Changes2023-04-0404 April 2023 Report of 10 CFR 50.59 Plant Changes L-2022-039, and Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2022-04-14014 April 2022 and Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2022-016, Report of 10 CFR 50.59 Plant Changes2022-02-28028 February 2022 Report of 10 CFR 50.59 Plant Changes L-2021-097, and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report2021-05-13013 May 2021 and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report L-2021-096, 10 CFR 50.59(d)(2) Summary Report2021-05-11011 May 2021 10 CFR 50.59(d)(2) Summary Report L-2021-018, 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report2021-02-16016 February 2021 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report L-2020-065, Submission of Periodic Reports2020-04-0909 April 2020 Submission of Periodic Reports ML18227A9832018-08-15015 August 2018 Submit First Year Operation Report. L-2017-165, Report of 10 CFR 50.59 Plant Changes2017-09-20020 September 2017 Report of 10 CFR 50.59 Plant Changes L-2012-367, Cycle 20 Core Operating Limits Report2012-10-0202 October 2012 Cycle 20 Core Operating Limits Report L-2012-169, Annual Radiological Environmental Operating Report for Calendar Year 20112012-04-24024 April 2012 Annual Radiological Environmental Operating Report for Calendar Year 2011 L-2009-284, Submittal of Report of Changes, Tests & Experiments for Period April 4, 2008 Through June 13, 20092009-12-10010 December 2009 Submittal of Report of Changes, Tests & Experiments for Period April 4, 2008 Through June 13, 2009 L-2008-245, Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/082008-11-10010 November 2008 Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/08 L-2007-053, Annual Radiological Environmental Operating Report2007-05-0404 May 2007 Annual Radiological Environmental Operating Report L-2005-101, Inservice Inspection Program Third Interval - First Period - First Outage (SL2-15) Owner'S Activity Report (OAR-1)2005-05-0202 May 2005 Inservice Inspection Program Third Interval - First Period - First Outage (SL2-15) Owner'S Activity Report (OAR-1) L-2004-097, Annual Radiological Environmental Operating Report2004-05-11011 May 2004 Annual Radiological Environmental Operating Report ML18227B0771978-03-17017 March 1978 03/17/1978 Letter Operating Summary Reports of February 1978 ML18227B0631978-03-0404 March 1978 03/04/1978 Letter Operating Status Reports of February 1978 ML18227A4231978-03-0404 March 1978 Attached February, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0641978-02-14014 February 1978 02/14/1978 Letter Operating Status Reports of January 1978 ML18227A4221978-02-14014 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0651978-02-0404 February 1978 02/04/1978 Letter Operating Status Reports of January 1978 ML18227A4211978-02-0404 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0671978-01-0707 January 1978 01/07/1978 Letter Operating Status Reports of December 1977 ML18227A4201978-01-0707 January 1978 Attached December, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0681977-12-0303 December 1977 12/03/1977 Letter Operating Status Reports of November 1977 ML18227A4191977-12-0303 December 1977 Attached November, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0691977-11-0505 November 1977 11/05/1977 Letter Operating Status Reports of October 1977 ML18227A4171977-11-0505 November 1977 Attached October, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0701977-10-0505 October 1977 10/05/1977 Letter Operating Status Reports of September 1977 ML18227A4151977-09-0303 September 1977 Attached August, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0711977-09-0303 September 1977 09/03/1977 Letter Operating Status Reports of August 1977 ML18227A4141977-08-0505 August 1977 Attached July, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0731977-08-0505 August 1977 08/05/1977 Letter Operating Status Reports of July 1977 ML18227A4131977-07-0707 July 1977 Attached June, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. May, 1977 for Unit 3 Incorrectly Reported for Some Values. Attached Revised May, 1977 Operating Data Report for Unit 3 ML18227B0741977-07-0707 July 1977 07/07/1977 Letter Operating Status Reports of June 1977, and a Revised Operating Data Report for May 1997 for Turkey Point Unit 3 ML18227A4121977-06-0606 June 1977 Attached May, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0751977-06-0606 June 1977 06/06/1977 Letter Operating Status Reports of May 1977 ML18227A4111977-05-0505 May 1977 Attached April, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0761977-05-0505 May 1977 05/05/1977 Letter Operating Status Reports of April 1977 ML18227A4101977-04-0404 April 1977 Attached March, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. Maximum Dependable Capacity (MWe-Net) for St. Lucie No. 1 Was Revised from 802 MWe-Net to 777 MWe-Net (Estimated) ML18227B0781977-04-0404 April 1977 04/04/1977 Letter Operating Status Reports of March 1977 ML18227B0791977-03-0707 March 1977 03/07/1977 Letter Operating Status Reports of February 1977 ML18227A4091977-03-0707 March 1977 Attached February, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0801977-02-0707 February 1977 02/07/1977 Letter Operating Status Reports of January 1977 ML18227B0811977-01-0707 January 1977 01/07/1977 Letter Operating Status Reports of December 1976 ML18227A4081977-01-0707 January 1977 Attached December, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0821976-12-0606 December 1976 12/06/1976 Letter Operating Status Reports of November 1976 ML18227B0831976-11-15015 November 1976 11/15/1976 Letter Corrected Copies of Operating Data Reports for October 1976 ML18227A4061976-11-0808 November 1976 Attached October, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 2023-04-04
[Table view] Category:Monthly
MONTHYEARL-2020-065, Submission of Periodic Reports2020-04-0909 April 2020 Submission of Periodic Reports ML18227B0771978-03-17017 March 1978 03/17/1978 Letter Operating Summary Reports of February 1978 ML18227B0631978-03-0404 March 1978 03/04/1978 Letter Operating Status Reports of February 1978 ML18227B0641978-02-14014 February 1978 02/14/1978 Letter Operating Status Reports of January 1978 ML18227B0651978-02-0404 February 1978 02/04/1978 Letter Operating Status Reports of January 1978 ML18227B0671978-01-0707 January 1978 01/07/1978 Letter Operating Status Reports of December 1977 ML18227B0681977-12-0303 December 1977 12/03/1977 Letter Operating Status Reports of November 1977 ML18227B0691977-11-0505 November 1977 11/05/1977 Letter Operating Status Reports of October 1977 ML18227B0701977-10-0505 October 1977 10/05/1977 Letter Operating Status Reports of September 1977 ML18227B0711977-09-0303 September 1977 09/03/1977 Letter Operating Status Reports of August 1977 ML18227B0731977-08-0505 August 1977 08/05/1977 Letter Operating Status Reports of July 1977 ML18227B0741977-07-0707 July 1977 07/07/1977 Letter Operating Status Reports of June 1977, and a Revised Operating Data Report for May 1997 for Turkey Point Unit 3 ML18227B0751977-06-0606 June 1977 06/06/1977 Letter Operating Status Reports of May 1977 ML18227B0761977-05-0505 May 1977 05/05/1977 Letter Operating Status Reports of April 1977 ML18227B0781977-04-0404 April 1977 04/04/1977 Letter Operating Status Reports of March 1977 ML18227B0791977-03-0707 March 1977 03/07/1977 Letter Operating Status Reports of February 1977 ML18227B0801977-02-0707 February 1977 02/07/1977 Letter Operating Status Reports of January 1977 ML18227B0811977-01-0707 January 1977 01/07/1977 Letter Operating Status Reports of December 1976 ML18227B0821976-12-0606 December 1976 12/06/1976 Letter Operating Status Reports of November 1976 ML18227B0831976-11-15015 November 1976 11/15/1976 Letter Corrected Copies of Operating Data Reports for October 1976 ML18227B0841976-11-0808 November 1976 11/08/1976 Letter Operating Status Reports of October 1976 ML18227B0861976-09-0707 September 1976 09/07/1976 Letter Operating Status Reports of August 1976 ML18227B0871976-08-0505 August 1976 08/05/1976 Letter Operating Status Reports of July 1976 ML18227B0881976-07-0202 July 1976 07/02/1976 Letter Operating Status Reports of June 1976 ML18227B0951975-10-0909 October 1975 10/09/1975 Letter Operating Summary Reports of September 1975 ML18227B0961975-09-0909 September 1975 09/09/1975 Letter Operating Summary Reports of August 1975 ML18227B0971975-08-0101 August 1975 08/01/1975 Letter Operating Status Reports of July 1975 ML18227B0981975-07-0303 July 1975 07/03/1975 Letter Operating Status Reports of June 1975 ML18227B0991975-06-0505 June 1975 06/05/1975 Letter Operating Status Reports of May 1975 ML18227B1001975-05-0505 May 1975 05/05/1975 Letter Operating Status Reports of April 1975 ML18227B1011975-04-0404 April 1975 04/04/1975 Letter Operating Status Reports of March 1975 ML18227B1021975-03-0606 March 1975 03/06/1975 Letter Operating Status Reports of February 1975 ML18227B1041975-02-0707 February 1975 02/07/1975 Letter Operating Status Reports of January 1975 ML18227B1031975-02-0707 February 1975 02/07/1975 Letter Operating Status Reports of January 1975 2020-04-09
[Table view] |
Text
REGULATORY INFORMATION DlSTRIBUTION SYSTEM (RID DISTRIBUTION FOR INCOMING MATERIAL 0-2 251/335 REC: ORG: SCHMIDT A D DOCDATE: 03/04/78 NRC FL PWR 8c LIGHT DATE RCVD: 03/14/78 DOCTYPE: LETTER NOTARIZED: NO COPIES RECEIVED
SUBJECT:
LTR 1 ENCL 1 MONTHLY OPERATING REPORTS FOR THE MONTH OF FEBRUARY.
PLANT NAME: TURKEY PT 03 REVIEWER INITIAL: XRS TURKEY PT N3 DISTRIBUTER INITIAL:P4 ST LUCIE Ol DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS +444%4<<+<<<+4%<++
MONTHLY OPERATING REPORT FOR GRAY BOOK PREPARATION.
(DISTRIBUTlON CODE A003)
FOR ACTION: BR CHIEF SCHWENCER++W/2 ENCL INTERNAL: FILE4+W/ENCL NRC PDR4+W/ENCL
/2 ENCL EXTERNAL: LPDR~S MIAMII FL4 +W/ENCL T ICE< W/ENCL NSI C++W/ENCL BNL(NATLAB)++W/ENCL ACRS CAT B++W/0 ENCL DISTRIBUTION: LTR 10 ENCL 10 CONTROL NBR: 780740142 SIZE: 1P+3P+bP THE END
0 t
Ql llgg~
~<4~
FLORIDA POWER tk LIGHT COMPANY March 4, l978 a)
'QgEtpg -~
AR'gq Office of Management Information <<4@v~' )g e~
and Program Controls ROJQQQ~~~
U. S. Nuclear Regulatory Commission l@g~
4 Washington, D. C. 20555 Gp Gentlemen:
Attached are the February, l978, Operating Status Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit No. l.
Very truly yours, Vice President Power Resources VTC/DDC
)
cc: Mr. James P. O'Reilly P" Robert Lowenstein, Esquire 80740l4Z P EOPLE... SERVING P EOP LE
AVERAGE DAILY UiVIT POWER LEVEL DOCKET iVO. 50 250 Turkey Point UNIT Unit No. 3 DATE March 4 1978 COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3824 MONTH FEBRUARY i 1978 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 17 ll 2, 18 127 19 400 20 638 21 680 22 683 23 687 25 686 10 26 27 681 12 28 675 13 15 16 NOTE: Average daily power greater than 666 MNe due to cooler condenser cooling water.
OPERATING DATA REPORT DOCKET NC.
D4TE Mnn.4 1978 CDhfPLETED BY Yp~bilnon TELEPHONE CRLB 'i5?=3824 OPERATING STATUS
- l. Unit Name Turkey Point Unit No. 3 Notes - Urd;t No. 3 operated Februar 1978 at approximately 100X R.P..
- g. Reporting period: after the unit was returned
- 3. Licensed Thermal Power (MWt):
760 to serviceifollowing comple-
- 4. Nameplate Rating (Gross MWe): tion of scheduled refueling,
- 5. Design Electrical Rating (Net hEPIWe): maintenance, .inspections,and
- 6. Maximum Dependable Capacity (Gross MWe): 700 tests, except for the outage.
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since-Last Report, Give Reasons:
- 9. Power Level To which Restricted, IfAny (Net MWe): NONE
- 10. Reasons For Restrictions, If Any:
This Month Yr.-to-Date Cumulative 4
- 12. Number Of Hours Reactor Was Critical 343.8 35 569.7
- 13. Reactor Reserve Shutdown Hours
-'0- ill;1 14, Hours Generator On-Line 265.4 34 351.8
- 15. Unit Reserve Shutdown Hours 521 921 '7 85.0
-'52 16, Gross Thermal Energy Generated (MWH) 296 113
- 17. Gross Electrical Energy Generated (MWH) 21 452 87
- 18. Net Electrical Energy Generated (MWH) 154 909 669 20'99'19
- 19. Unit Service Factor 74.8
- 20. Unit Availability Factor 39.5 7 .0
- 21. Unit Capacity Factor (Using hMDC Net) 34.6
- 22. Unit Capacity Factor (Using DER Net) 33.3 . 15.6 63.8 23, Unit Forced Outage Rate 1.4 1.4 2.8
- 24. Shutdowns Scheduled Over Next 6 Months {Type. Date. and Duration of Each):
Steam Generator Tube Inspection Program - August 17 September 11, 1978
- 25. IfShut Down At End Of Report Period, Estimated Date of Startup: N/A
- 26. Units ln Test Status {Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIALELECTRICITY COiblhlIERCIAL OPERATION (4)/77 I
DOCKET NO.
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH FEBRUARY 1978 ri c c '> Licensee
~m C Cause h. Corrective 5 O No. Date .J Q
cU Event Q E~
Action to Rcport e O Prevent Rccurrcnce 28 77-11-23 S 402. 9 C N/A N/A N/A Unit No. 3 was removed from service for. scheduled refueling, maintenance, and inspections. (Continued from previous month) (Nuclear and non-nuclear systems)
CB PUMP XX Outage was extended to repair mechani (B) cal seal on reactor coolant pumps.
(Nuclear system) 78-02-18 3.7 N/A H/A'ENERA Unit was removed-from service to (A) balance the generator exciter. (Non-nuclear system)
I 3 4 F: Forced Reason: ' Method: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) -Manual for Preparation of Data B.Maintcnancc or Test 2-Manual Scram. Entry Sheets for Liccnsec C-Refueling 3-Automatic Scratn. Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) ~ 0 I 61)
E-Operator Training'icense Examination F.Administrative G.Operational Error (Explain) Exhibit I Satnc Source
~
<<)/>7) I I-Other (Explain)
AVER'AGE DAILY UNIT POWER LEVEL DOCKET NO. 50 Turkey Point UNIT DATE a II COMPLETED BY V h MONTH FEBRUARY, 1978 DAY AVERAGE DAILY POWER .LEVEL DAY AVERAGE DAILY POWER LEVEL (M!Ve-Net) (MWe-Net) 666 17 660 18 3 654 651 20 661 21 668 22 671 23 671 24 662 25 10 659. 26 660 27 12 659 28 13 654 390.
15 16 NOTE:. Average daily power greater than 666 NWe due to cooler condenser cooling water.
OPERATING DATA REPORT DArE 8~~8 DOCKET NO. liLL253 COMPLETED IIY V.T- Chilson TELEPHONE (3305 ,'i2-3624 OPERATING STATUS
- 1. Umt Name: Turke Point Unit No. 4 Notes - Unit No. 4 operated Pebruay, 1978 at approximately 100% R.P.
- g. Reporting period: until. the unit 2200 was removed
- 3. Licensed Thermal Power (MWt): from. service to perform
- 4. Nameplate Rating (Gross MWe): 760 693 steam generator tube inspec-
- 5. Design Electrical Rating (Net MWe):
700 tion and repairs...
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe): 666
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, IfAny (Net MWe): NONE
- 10. Reasons For Restrictions, If Any:
This Month Yr:to-Date Cumuhtive
- 11. Houri In Reporting Period 672. 1 416.0 39 625..0 0'3.
0 2.
Reactor Reserve Shutdown Hours 0 138.8
- 14. Hours Generator On-l.ine 327.7 1 060.6 27 18
- 15. Unit Reserve Shutdown Hours '6.
Gross Thermal Energy Generated (MWH) 2 319 238 57. 404 .906 I'7. Gross Electrical Energy Generated (MWH) 740 370 18 564 295
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor 48.8 74.9 68.6
- 20. Unit Availability Factor 48.8 74.9 68.6
- 21. Unit Capacity Factor (Using 4%IDC Net) 48. 0: 74.6
- 22. Unit. Capacity Factor (Using DER Net) 71.7 64.1
- 23. Unit Forced Outage Rate 3.2
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup: March 8, 1978
- 26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION (4)/77 )
r DOCKET NO. ~0 251 UNIT SIIUTDOWNS AND POWER REDUCTIONS Point Unit No.
UNITNAME Turke 4 1978 COMPLETED BY REPORT MONTH FEBRUARY C I A>> Licensee Cause & Correct tve 0 4P O
No. Date IA Event Action to dBK 0Eo tJ
~CA $ Rcport 8 Prevent Recurrence Q
78-02-14 S 344.3 A Steam CB HTEXCH Unit No. 4 was removed from service Ghnemator (F) to perform steam generator tube Inspection inspection and repair leaks. (Nuclea Program system)
Report-Feb. 1978 (Transmitted March 1, 19f8 I 3 4 F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A-Equipmcnt Failure (Explain) I-Manual for Preparation of Data B-Maintenance or Test 2.Manual Scram. ~
Entry Sheets for Licensee C-Refueling 3-Autonmtic Scram. 'vent Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 016I )
E-Operator Training k, Liccnsc Examination F-Administrative 5 G-Operational Error (Explain) Exhibit I - Satnc Source
('>/77) II-Other (Explain)
AVERAGE DAILY UNIT POWER LEVEL ' ~,cP DOCKET NO. 50 335 St. Lucie UNIT Unit No. 1 DATE March 4 1978 COMPLETED BY V. T. Chilson 305 552-3824 MONTH FEBRUARY I 1 978 DAY AVERAGE DAILY POWER .LEVEL DAY AVERAGE DAILY POWER LEVEL (Kfe-Net) (HWe-Net) 728 17 7 3 743 18 77
'8 738 19 772 20 787. 21 781 22 795 23 748 24 78 547 25 770 10 793. 26 785 795 27 791 12 797 28 795 13 795 14 794 15 792 16 791 NOTE: Average daily power greater than 777 MWe due to cooler condenser cooling water.
jib j i
~ ~
OPERATING DATA REPORT DOCKET NO.
DgTE ~Mar 4 .78
'~hilson COMPLETED BY Z TELEPHONE ~~-3824 OPERATING STATUS St; Lucie Unit No. Notes Unit No. 1 operated
- 1. Unit Name: 1 Februa 1978 at approximately 100% R.P.
- p. Reporting period: except for load reduction=
. 2560
- 3. Licensed Thermal Power (MWt): of Feb. 8-9, 1978..
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe): 822
- 7. Maximum Dependable Capacity (Net MWe): 777
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
, '. Power Level To Which Restricted,
- 10. Reasons For Restrictions, If Any:
lf Any (Net MWe): NONE This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 1 416.0
- 12. Number Of Hours Reactor Was Critical I 339.5
'-0-'
9 2
- 13. Reactor Reserve Shutdown Hours 101.5
- 14. Hours Generator On. Line 325.4 9 007.'2
- 15. Unit Reserve Shutdown pours 21.0 1 002 8
- 19. Unit Service Factor 100. 0 93.6 86.3
- 20. Unit Availability Factor 93.6 86. 3
- 21. Unit Capacity Factor (Using MDC Net) 99.5 91.1
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date. and Duration of Each):
Refuelin maintenance and ins ections A ril 1 June 10 .1978 I
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
N/A
- 26. Units ln Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INlTIA1. ELECTRICITY COillMERCIALOPERATION (i>/77)
~ ~
OJ
a UNIT SHUTDOWNS AND POWER REDUCTIONS No. 1 COMPLETED BY REPORT MONTII FEBRUARY. 1978 lP~
I I C Licensee 0 Cause & Corrective oIA 0 NI I. Date P 7 g CC Event Action to a-aK V
~ Ch Rcport 4F E p3 0
CJ Prevent Recurrence 78-02-08 N/A HH PUMPXX" Load reduction to clean steam gener-(B) ator feedwater pump suction strainers.
(Non-nuclear system) 4 F: Forced Reason: Method: Exhibit G - Instructions .
S: Schcduicd A-Equipment Failure (Explain) I-Manual for Preparation uf Data B-Maintenance or Test 2-Manual Scram. Entry Sheets I'or Licensee C-Refueling 3-Automatic Scram. Event Rcport (LER) File (NUREG.
D-Regulatory Restriction 4-Other (Explain) 0 I 61)
E-Operator Training &. License Examination F.Administ rat ive G-Operational Error (Explain) Exhibit I - Sante Source
{'t/77) I I.Other (Explain)