MONTHYEARML24023A0342024-02-0505 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0038 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000335/20230102024-01-26026 January 2024 NRC Quadrennial Focused Engineering Inspection (FEI) Commercial Grade Dedication Report 05000335/2023010 and 05000389/2023010 L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) IR 05000335/20230042024-01-24024 January 2024 Integrated Inspection Report 05000335/2023004 and 05000389/2023004 ML23320A3062024-01-22022 January 2024 Issuance of Amendment Nos. 298 and 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project ML23341A2102024-01-22022 January 2024 LTR-23-0216-1 - Closure Letter - 2.206 Petition for License Renewal Plant Reactor Pressure Vessel Embrittlement L-2024-007, Inservice Inspection Program Owner'S Activity Report (OAR-1)2024-01-18018 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2024-004, Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years2024-01-18018 January 2024 Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-002, Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2024-01-0808 January 2024 Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-179, Unusual or Important Environmental Event - Turtle Mortality2023-12-14014 December 2023 Unusual or Important Environmental Event - Turtle Mortality L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2023-166, Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report2023-12-0606 December 2023 Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report ML23340A0332023-12-0101 December 2023 FPL to Fws, Comments Submitted by Florida Power and Light on the Species Status Assessment Accompanying the September 20, 2023 Proposed Threatened Species Status with Section 4(d) Rule for the Miami Cave Crayfish L-2023-172, Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule ML23332A1772023-11-28028 November 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, ML23333A0102023-11-27027 November 2023 Attachment B - 11/07/2022 - Waterkeeper Scoping Comments-1 ML23333A0152023-11-27027 November 2023 Attachment G - Arcadis Memo Re FPL Year 4 Raasr Final (June 2, 2023, Appended to Derm letter)-1 L-2023-162, Response to 50.69 2nd Round of Rals2023-11-21021 November 2023 Response to 50.69 2nd Round of Rals L-2023-146, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles2023-11-15015 November 2023 License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles IR 05000250/20230032023-11-0909 November 2023 Integrated Inspection Report 05000250/2023003 and 05000251/2023003 IR 05000335/20230032023-11-0606 November 2023 Integrated Inspection Report 05000335/2023003 and 05000389/2023003 ML23310A1342023-11-0404 November 2023 10 CFR 2.206 Petition - LTR-23-0216-1 Petition Amendment; Turkey Point Subsequent Renewal with Petitioner 11/04/2023 ML24016A2622023-10-25025 October 2023 Subsequent License Renewal Updated List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected Project ML23270B8882023-10-23023 October 2023 Regulatory Audit Summary Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structure, Systems, and Components for Nuclear Power Reactors EPID L-2022-LLA-0182 L-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis2023-10-11011 October 2023 License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23275A1102023-10-0202 October 2023 License Amendment Request Revision 2 for the Technical Specifications Conversion to NUREG-1432, Revision 5 IR 05000250/20230102023-09-29029 September 2023 Biennial Problem Identification and Resolution Inspection Report 05000250/2023010 and 05000251/2023010 L-2023-131, Subsequent License Renewal Application - Second Annual Update2023-09-28028 September 2023 Subsequent License Renewal Application - Second Annual Update ML23234A1922023-09-27027 September 2023 Issuance of Amendment Nos. 297 and 290 Regarding Conversion to Improved Standard Technical Specifications L-2023-136, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-26026 September 2023 Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML23265A5492023-09-22022 September 2023 Transmittal of WCAP-18830-P/NP Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles to Support a License Amendment Request from FPL - License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis L-2023-122, Corrections to the 2022 Annual Radiological Environmental Operating Report2023-09-20020 September 2023 Corrections to the 2022 Annual Radiological Environmental Operating Report IR 05000335/20233012023-09-20020 September 2023 NRC Operator License Examination Report 05000335/2023301 and 05000389/2023301 L-2023-127, Correction to the 2022 Annual Radioactive Effluent Release Report2023-09-18018 September 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-113, Correction to the 2020 Annual Radiological Environmental Operating Report2023-09-14014 September 2023 Correction to the 2020 Annual Radiological Environmental Operating Report L-2023-108, Report of 10 CFR 50.59 Plant Changes2023-09-11011 September 2023 Report of 10 CFR 50.59 Plant Changes L-2023-118, Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-11011 September 2023 Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML23243A9552023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application - Tribe- Section 106 Letters ML23243A9522023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9532023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9542023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application L-2023-107, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42023-09-0606 September 2023 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 L-2023-112, Corrections to the 2021 Annual Radioactive Effluent Release Report2023-09-0606 September 2023 Corrections to the 2021 Annual Radioactive Effluent Release Report ML23199A2352023-09-0505 September 2023 Letter to EPA-Turkey Point Nuclear Generating Station, Units 3 and 4 - Notice of Availability of Draft Site-Specific Environmental Impact Statement for Subsequent License Renewal 2024-02-05
[Table view] Category:Operating Report
MONTHYEARL-2023-051, Report of 10 CFR 50.59 Plant Changes2023-04-0404 April 2023 Report of 10 CFR 50.59 Plant Changes L-2022-039, and Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2022-04-14014 April 2022 and Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2022-016, Report of 10 CFR 50.59 Plant Changes2022-02-28028 February 2022 Report of 10 CFR 50.59 Plant Changes L-2021-097, and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report2021-05-13013 May 2021 and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report L-2021-096, 10 CFR 50.59(d)(2) Summary Report2021-05-11011 May 2021 10 CFR 50.59(d)(2) Summary Report L-2021-018, 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report2021-02-16016 February 2021 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report L-2020-065, Submission of Periodic Reports2020-04-0909 April 2020 Submission of Periodic Reports ML18227A9832018-08-15015 August 2018 Submit First Year Operation Report. L-2017-165, Report of 10 CFR 50.59 Plant Changes2017-09-20020 September 2017 Report of 10 CFR 50.59 Plant Changes L-2012-367, Cycle 20 Core Operating Limits Report2012-10-0202 October 2012 Cycle 20 Core Operating Limits Report L-2012-169, Annual Radiological Environmental Operating Report for Calendar Year 20112012-04-24024 April 2012 Annual Radiological Environmental Operating Report for Calendar Year 2011 L-2009-284, Submittal of Report of Changes, Tests & Experiments for Period April 4, 2008 Through June 13, 20092009-12-10010 December 2009 Submittal of Report of Changes, Tests & Experiments for Period April 4, 2008 Through June 13, 2009 L-2008-245, Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/082008-11-10010 November 2008 Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/08 L-2007-053, Annual Radiological Environmental Operating Report2007-05-0404 May 2007 Annual Radiological Environmental Operating Report L-2005-101, Inservice Inspection Program Third Interval - First Period - First Outage (SL2-15) Owner'S Activity Report (OAR-1)2005-05-0202 May 2005 Inservice Inspection Program Third Interval - First Period - First Outage (SL2-15) Owner'S Activity Report (OAR-1) L-2004-097, Annual Radiological Environmental Operating Report2004-05-11011 May 2004 Annual Radiological Environmental Operating Report ML18227B0771978-03-17017 March 1978 03/17/1978 Letter Operating Summary Reports of February 1978 ML18227B0631978-03-0404 March 1978 03/04/1978 Letter Operating Status Reports of February 1978 ML18227A4231978-03-0404 March 1978 Attached February, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0641978-02-14014 February 1978 02/14/1978 Letter Operating Status Reports of January 1978 ML18227A4221978-02-14014 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0651978-02-0404 February 1978 02/04/1978 Letter Operating Status Reports of January 1978 ML18227A4211978-02-0404 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0671978-01-0707 January 1978 01/07/1978 Letter Operating Status Reports of December 1977 ML18227A4201978-01-0707 January 1978 Attached December, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0681977-12-0303 December 1977 12/03/1977 Letter Operating Status Reports of November 1977 ML18227A4191977-12-0303 December 1977 Attached November, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0691977-11-0505 November 1977 11/05/1977 Letter Operating Status Reports of October 1977 ML18227A4171977-11-0505 November 1977 Attached October, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0701977-10-0505 October 1977 10/05/1977 Letter Operating Status Reports of September 1977 ML18227A4151977-09-0303 September 1977 Attached August, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0711977-09-0303 September 1977 09/03/1977 Letter Operating Status Reports of August 1977 ML18227A4141977-08-0505 August 1977 Attached July, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0731977-08-0505 August 1977 08/05/1977 Letter Operating Status Reports of July 1977 ML18227A4131977-07-0707 July 1977 Attached June, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. May, 1977 for Unit 3 Incorrectly Reported for Some Values. Attached Revised May, 1977 Operating Data Report for Unit 3 ML18227B0741977-07-0707 July 1977 07/07/1977 Letter Operating Status Reports of June 1977, and a Revised Operating Data Report for May 1997 for Turkey Point Unit 3 ML18227A4121977-06-0606 June 1977 Attached May, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0751977-06-0606 June 1977 06/06/1977 Letter Operating Status Reports of May 1977 ML18227A4111977-05-0505 May 1977 Attached April, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0761977-05-0505 May 1977 05/05/1977 Letter Operating Status Reports of April 1977 ML18227A4101977-04-0404 April 1977 Attached March, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. Maximum Dependable Capacity (MWe-Net) for St. Lucie No. 1 Was Revised from 802 MWe-Net to 777 MWe-Net (Estimated) ML18227B0781977-04-0404 April 1977 04/04/1977 Letter Operating Status Reports of March 1977 ML18227B0791977-03-0707 March 1977 03/07/1977 Letter Operating Status Reports of February 1977 ML18227A4091977-03-0707 March 1977 Attached February, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0801977-02-0707 February 1977 02/07/1977 Letter Operating Status Reports of January 1977 ML18227B0811977-01-0707 January 1977 01/07/1977 Letter Operating Status Reports of December 1976 ML18227A4081977-01-0707 January 1977 Attached December, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0821976-12-0606 December 1976 12/06/1976 Letter Operating Status Reports of November 1976 ML18227B0831976-11-15015 November 1976 11/15/1976 Letter Corrected Copies of Operating Data Reports for October 1976 ML18227A4061976-11-0808 November 1976 Attached October, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 2023-04-04
[Table view] Category:Monthly
MONTHYEARL-2020-065, Submission of Periodic Reports2020-04-0909 April 2020 Submission of Periodic Reports ML18227B0771978-03-17017 March 1978 03/17/1978 Letter Operating Summary Reports of February 1978 ML18227B0631978-03-0404 March 1978 03/04/1978 Letter Operating Status Reports of February 1978 ML18227B0641978-02-14014 February 1978 02/14/1978 Letter Operating Status Reports of January 1978 ML18227B0651978-02-0404 February 1978 02/04/1978 Letter Operating Status Reports of January 1978 ML18227B0671978-01-0707 January 1978 01/07/1978 Letter Operating Status Reports of December 1977 ML18227B0681977-12-0303 December 1977 12/03/1977 Letter Operating Status Reports of November 1977 ML18227B0691977-11-0505 November 1977 11/05/1977 Letter Operating Status Reports of October 1977 ML18227B0701977-10-0505 October 1977 10/05/1977 Letter Operating Status Reports of September 1977 ML18227B0711977-09-0303 September 1977 09/03/1977 Letter Operating Status Reports of August 1977 ML18227B0731977-08-0505 August 1977 08/05/1977 Letter Operating Status Reports of July 1977 ML18227B0741977-07-0707 July 1977 07/07/1977 Letter Operating Status Reports of June 1977, and a Revised Operating Data Report for May 1997 for Turkey Point Unit 3 ML18227B0751977-06-0606 June 1977 06/06/1977 Letter Operating Status Reports of May 1977 ML18227B0761977-05-0505 May 1977 05/05/1977 Letter Operating Status Reports of April 1977 ML18227B0781977-04-0404 April 1977 04/04/1977 Letter Operating Status Reports of March 1977 ML18227B0791977-03-0707 March 1977 03/07/1977 Letter Operating Status Reports of February 1977 ML18227B0801977-02-0707 February 1977 02/07/1977 Letter Operating Status Reports of January 1977 ML18227B0811977-01-0707 January 1977 01/07/1977 Letter Operating Status Reports of December 1976 ML18227B0821976-12-0606 December 1976 12/06/1976 Letter Operating Status Reports of November 1976 ML18227B0831976-11-15015 November 1976 11/15/1976 Letter Corrected Copies of Operating Data Reports for October 1976 ML18227B0841976-11-0808 November 1976 11/08/1976 Letter Operating Status Reports of October 1976 ML18227B0861976-09-0707 September 1976 09/07/1976 Letter Operating Status Reports of August 1976 ML18227B0871976-08-0505 August 1976 08/05/1976 Letter Operating Status Reports of July 1976 ML18227B0881976-07-0202 July 1976 07/02/1976 Letter Operating Status Reports of June 1976 ML18227B0951975-10-0909 October 1975 10/09/1975 Letter Operating Summary Reports of September 1975 ML18227B0961975-09-0909 September 1975 09/09/1975 Letter Operating Summary Reports of August 1975 ML18227B0971975-08-0101 August 1975 08/01/1975 Letter Operating Status Reports of July 1975 ML18227B0981975-07-0303 July 1975 07/03/1975 Letter Operating Status Reports of June 1975 ML18227B0991975-06-0505 June 1975 06/05/1975 Letter Operating Status Reports of May 1975 ML18227B1001975-05-0505 May 1975 05/05/1975 Letter Operating Status Reports of April 1975 ML18227B1011975-04-0404 April 1975 04/04/1975 Letter Operating Status Reports of March 1975 ML18227B1021975-03-0606 March 1975 03/06/1975 Letter Operating Status Reports of February 1975 ML18227B1041975-02-0707 February 1975 02/07/1975 Letter Operating Status Reports of January 1975 ML18227B1031975-02-0707 February 1975 02/07/1975 Letter Operating Status Reports of January 1975 2020-04-09
[Table view] |
Text
NRC FORM 195 U.S. NUCLEAR REGULATORY COMMISSION DOCKET NUMBE l2 7Q)
NRC DJSTRIBUTlON FoR .,RT 50 DOCKET MATERIAL FILE NUMB MONTHLY REPORT "ROM:Florida Power h Light Co. DATE OF DOCUMENT NHC . ~
.'iami;.. Florida 33101 .2-7-77 A. D. Schmidt DATE flECEIVED 2-11-77 CETTER QNOTORIZED PROP INPUT FORM NUMBER OF COPIES RECEIVED PfUNC LASSIFI E D 1 signed OCOPY ' copies DES C flI P T I 0 N
-=.-;....LETTER TRANS THE FOLLOWING: MONTHLY REPORT FOR ~anUaW~ >972 "-- ':.-.- -.
a 4 PLANT & COMPONENT .OPERABXLITY & ~
( 1 page ) AVAILABILITY, THIS= REPORT TO BE..USED IN i ~ PREPARING GRAY BOOK BY PLANS & OPERATIONS.
(" 3 enc1 rec'd )
( 9 pages,}
TURKEY PT. UNITS 3 8e 4 PLANT NAME: ST LUCIE UNIT $ 1 FOR ACTION/INFORMATION JCM 2-1 MXPC CYS FO AC ON
='NTERNAL D IST Rl BUTION DR BRANCH CHIEF L IZAH KIEMIII.NN KHHXSH DIGGS LPDH: Miami FLA EXTERNAL DISTR II3UTION CONTROL NUMBE R p, lt. Pierce FLA NflC FORM 1D5 I2 7BI 1
~ P f'. 0 f308 013101), I'1IAI'I, f L 33101
~kfI/zz C~~&f'f~
FLORIDA POWER 8 LIGfIT~OMPANY P'ebruary 7, 1977 Go~I(<f 4o. 5e- 99S/gso/zgp Office of Management information and Program Controls U. S.'uclear Regulatory Commission Washington, D. C. 20555 Gentlemen:
Attached are the January, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit No.
l.'ery truly yours, A. D. Schmidt, Vice President Power Resources VTC/DDC cc: Mr. Norman.C. Moseley Robert Lowenstein, Esquire 9.4'i'8 PEOPLf:... SERVING PEOPLE
~ APPENDIX B
~
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. '0 UNIT Turkey Point Unit No.
DATE Feb. 5, 1977
'COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3830 MONTH Januar, 1977 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net} (MWe-Net) 18 3 19 60 20 418
~ 21 306 22 669 23 543 24 185 25 239 10 26, 677 27 681 28 682 13 29 680 14 30 683 685 NOTE: Average daily power level greater than 666 MWe due to cooler condenser cooling water.
APPENDIX C OPERATING DATA REPORT DOCKET NO. 50 - 250 UNIT Turkey Poinc Unic No. 3 4
RPJ'GRZ HOHZH Ja uuuP, 1977 DATF Feb. 59 1977 COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3830 OPERATIiNG STATUS 1.
2.
0~
REPOREDIG PERZOO: 0001 77 01 01 ZIIROUGH 2409&J GURRP-'IELV AUZ'HGRzzEU POSER LEvEL MAX.DEPEND. CAPACITY (MNe-Nec):
GROSS HOURS LV REPOREZIIG PERZOO:
Ouuu)i~220 666 744.0 DESIGN ELECTRICAL RATING (MNe-ZNec): 693
- 3. PONER I.EVEL TO WHICH RESTRICTED (ZF ANY) ('Ble-Nec): NONE
- 4. REASONS FOR RESTRICTIO'l (IF AAAY):
THIS MONTH YEAR TO DATE CUMUIATIVE 5~ NUMBERS OF HOURS REACTOR NAS CRITICAL..... 388.6 388.6 28 428.7 6~ REACTOR RESERVE SHUTDONN HOURS..........,. 67.4 7~ HOURS GENERATOR ON LINE . . ....... . 267.0 267.0 27 306.1
- 8. UNIT RESERVE SHUTDOIPil HOURSV au. ~ ~ ~ ~ ~ ~ ~ .. ~
85.0
- 9. GROSS THERE(AL ENERGY GENERATED (MHH)...... 512 809 512 809 52 242 397 10 GROSS ELEC'TARICAL EilERGY GENERATED (MlsH) 165 765 165 765 16 736 216 ll NET ELECTRICAL ENERGY GENERATED (WH) 153 475 153 475 '5 829 410
- 12. REACTOR SERVICE FACTOR. 52.2 52. 2 77.9
'3 'EACTOR AVAILABILZTYFACTOR..........,,... 52.2 52. 2 78. 1
- 14. lPilIT SERVICE FACTOR. ~ .~. ~ ~ ~ ~ \ ~ ~ 35.9 DATSUN 35.9
- 15. UiNIT AVAILABILITY FACTOR.................. 35 ~ 9 35.9 75.1
- 16. 'UNIT CAPACITY FACTOR (Using (MDC).... .. .. ~ ~ 31.0 31.0 66.0 17 ~ " UNIT CAPACITY FACTOR (Using Design M<e) ~ . ~ 29 ~ 8 29.8 62.6
- 18. UNIT FORCED OUTAGE RATE........ .. ..
~ ~ ~ .... 3~3 3~ 3 2.9 19 SHUTDONNS SCHEDULED OVER NEXT 6 MONTHS (TYPE> AND DURATION OF EACH)'ONE
- 20. IF SHUTDOl&4 AT END OF REPORT PERIOD> ESTIMATED DATE OF STARTUP:
- 21. UNITS IN TEST STATUS (PRIOR TO COADlERCIAL OPERATION): FORECAST ACHIEVED ZiNITIAL CRZTICALITY INITIAL ELECTRICITY COl0lERCIAL OPERATION
(1) REASON
.APPENDIX D DOCKET NO. 50 - 250 A:
EQUIPMENT FAILURE(EXPLAIN)
B: MAINT. OR TEST UNIT SHUTDOWig AND POHER REDUCTIONS UNIT NAME Turkey Point Unit No: 3 C: REFUELING D: REGULATORY RESTRICTION DATE Feb. 5, 1977 E: OPERATOR TRAINING AND LICENSE EXAMINATION COiMPLETED BY V. T. Chilson 4
F: ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN) TELEPHONE (305) 552-3830 H: OTHER (EXPLAIN)
(2) METHOD 1: MiANUAL METIIOD OF 2: M/iNUAL SCRAM TYPE SHUTTING DOHN 3: AUTOMATIC SCRAM F: FORCED DURATION THE REACTOR. OR 4: OIHER (EXPLAIN) NO. S SCHEDULED (HOURS) REASON (1) REDUCING POHER(2) 21 76-11-14 443.2 Unit No. 3 removed from service for refueling, main-tenance, and inspections. (Continued from previous month) (Nuclear and Non-nuclear systems) 1 77-01-19 Reactor tripped during transient condition caused by partially closed instrument air supply valve to steam generator No. 3A feedwater control valve.
2 77-01-19 1.2 Unit tripped by sudden drop in control oil pressure in turbine control system. (Non-nuclear system) 3 77-01-21 5.3 Reactor tripped during performance of periodic test of nuclear instrumcntatlcn system when second channel was placed in test mode, in error. (Nuclear system) 4 77-01-24 Reactor tripped by momentary decrease in signal from reactor coolant system loop 3C flow transmitter, 1.4'4.8 Channel III, while flow transmitter, ChanncI-Ilq- was being returned to service after repairs. (Nuclear sys.)
I 5 77-01-25 Unit was removed from service to perform test on turbine I
overspeed.trip device.'utage was extended to perform maintenance work, including work on turb/nc control system. (Non-nuclear system) t Unit No. 3 was returned to service on January 19, 1977 following completion of refueling, maintenance, and inspections. Unit operated at approximateiy 100X R.P. during month except for outages on January 19, 21, 24, and 25, 1977 1
I
~
APPENDIX B 0
AVERAGE. DAILY UNIT POWER LEVEL
/ DOCKET NO. 50 251 UNIT Turkey Point. Unit No. 4 DATE Feb 5 1977 COMPLETED BY V- T. Chilson TELEPHONE (305) 552-3830 MONTH Januar , 1977 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-'Ne t)
""'8 686 17 690 687 3 684 '92'92 685 20 693 631 21 690 6 22 688 23 691 8 '68 6
'318 10* 26 327 27 12 683 28 13 14 693'5 689 689 685 29 30 31 NOTE:
406 674 Average daily power level greater than 666 MWe due. to cooler
'co'nde'nser'ooling water.
APPENDIX C OPERATING DATA REPORT DOCKET NO. 50 - 251 UNIT Turkey Point Unit No. 4.>>
- 'REPORT MONTH Januar 1977 DATE Feb. 5, 1977 COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3830 OPERATING STATUS
- 1. REPORTIiNG PERIOD: 0001 77 01 01 GROS'OURS IN REPORTING PERIOD: 744.0 THROUGH 4
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2200 MAX.DEPEiiD. CAPACITY (iMWe-Net): 666 6 3
- 3. POWER LEVEL TO WHICH RESTRICTED (IF AEVI) (MWe-Net): NONE
- 4. REASONS FOR RESTRICTION (IF AÃf):
THIS MONTH YEAR TO DATE ClkmLATIVE
- 5. NUMBERS OF HOURS REACTOR WAS CRITICAL..... 514.1 514.l. 22 235.9 6~ REACTOR RESERVE SHUTDOlv'N HOURS ~ ~...,... ~ ~ ~ 0 138.8
- 7. HOURS GENERATOR ON LINE. 500.9 500.9 21 042.9
- 8. UNIT RESERVE SHUTDOWN HOURS... ~ .. ~ ~ ~ ...... 9. GROSS THERi%Q ENERGY GENERATED (NW11) 1 078 808 1 078 808 44 138 178 10 GROSS ELECTRIC iL ENERGY GENERATED (Mv'H) 354 515 354 515 14 312 203
- 11. NET ELECTRICAL EiNERGY GENERATED (i'))..... 336 265 336 265 13 566 731
- 12. REACTOR SERVICE FACTOR 69. 1 69.1 73.6 13 'EACTOR AVAILABILITYFACTOR..........,.... 69.1 69.1 74.1 14 ~ UNIT SERVICE FACTOR. 67,3 67.3 69.7 15 'NIT AVAILABILITYFACTOR... ~ ~ .. ~ . ~ ........ 67.3 67.3 69.7 16 ~ WIT CAPACITY FACTOR (Using (MDC) .......... 67.9 67. 9 68.2
- 17. UNIT CAPACITY FACTOR (Using Design iiWe)... 65 ' 65.2 64.8
- 18. UNIT FORCED OUTAGE RATE ~
3.4
- 19. SHUTDOWiNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AMP DURATIOiN OF HACH):
Refueling, raaintenance, and inspections - April 25 through June ll> 1977
- 20. IF SHUTDOWN AT END OF REPORT PERIOD, ESTL(ATED DATE OF STARTUP:
- 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COKKRCIAL OPFRA'IION
(1) REASON APPENDIX D DOCKET NO. 50 - 251 A: EQUIPMENT FAILURE (EXPLAIN)
B: MAINT. OR TEST UNIT SHUTDONNS AND'POHER REDUCTIONS UNIT NAME Turkey Point Unit No. 4 C: REFUELING D: REGULATORY RESTRICTION DATE Feb.. 5, 1977.
E: OPERATOR TRAINING hbD LICENSE EXAMINATION COMPLETED BY V. T. Chilson.
F: hDMINISTRATIVE TELEPHONE (305) 552-3830 G: OPERATIONAL ERROR (EXPLAIN) REPORT MONTH January, 1977 H: OTHER (FXPLAIN)
(2) Mv TH.D n
1: MANUAL METHOD Oa" 2: Mi'iNUAL SCRAM TYPE SHUTTING DOWN 3: AUTOMATIC SCRAM F: FORCED DURATIOH THE RFACTOR OR 4: OI HER (EXPLAIN) NO. DATE S: SQKDULED (HOURS) REASON(l) REDUCING POHER(2) CORRECTIVE ACTIONS/COi'Q/ENTS 77-01-06 129.7 Unit No. 4 was removed from service to repair steam generator No. 4C tube leak. Corrective actions included Plug one leaking tube and rcPair one leaking plug. (Nuclear System) 77-01-25 113.4 A Unit No. 4 was removed from service to repair steam generator No. 4C tube leak. Corrective actions included plugging two tubes two additional tubes were plugged as a preventative measure. (Nuclear system) i f
SlMARY: Unit No. 4 operated at approximately 100X R.P. except for unit outages January 6 " ll, and January 25 - 30, $ 977.
APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 335 UNIT St. Lucie-Unit No. 1 DATE Feb. 5, 1977 COMPLETED BY V. T. Chilson TELEPHONE (305} 552-3830
. MONTH Januar, 1977 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (M<e-Ne t) (M<e-Ne t) 379 667 381 18 669 3 232 670 20 676 134 21 674 372 22 670
'93 23 664 399 24 567 450 '6 578 10 520 667 608 27 67l 666 28 658 13 670 29 664 14 669 30 662 665 31 665 664
I APPEAfDL( C OPERATING DATA REPORT DOCKET NO. 50 UNIT St. Lu ie i 1
'REPORT .fONTH Ja DATE Feb. 5 1977 COMPLE ED BY V. T. Chilson h
OPERATING STATUS
- 1. REPORTING PERIOD: 0001 77 Ol 01 GROSS HOURS IN REPORTIASG PERIOD:
THROUGH
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt) 2560 tfPLY.DEPEND. CAPACITY (MWe-Net): 802 Estimated)
DESIGN ELECTRICAL RATING (>fWe-Net): 802
- 3. POWER LEVEL TO WHICH RESTRICTED (IF AfEY) ('fWe-Net): 722 h
.4. REASONS FOR RESTRICTION (IF ANY):
"Temporary 90Z restriction pending reactor coolant flow analysis" THIS MONTH YEAR TO DATE CfDfULATIVE
- 5. PROCPERS OF EOUPA REACTOR IFAS CRTTTCAL..... 731.6 ~7
- 6. REACTOR RESERVE SHUTDOWN HOURS............ 7 ~ HOURS GENERATOR ON LINE ~ ~ 699.2 699.2 963.2
- 8. UNIT RESERVE SHUTDOWN HOURS............... 9. ~... ~16
'38 GROSS THERAfAL ENERGY GENERATED (MWH). ~ 1 317 560 1 317 560
- 10. GROSS ELECTRICAL ENERGY GENERATED (PAH)... 438 120 120 ~46 '~~
- 11. NET ELECTRICAL ENERGY GENERATED ( Mf)..... 407 781 407 781 506 756
- 12. REACTOR SERVICE FACTOR. 98.3 98.3 98.8 13 'EACTOR AVAILABILITYFACTOR...........,... 98.3 98.3 98.8
- 14. UNIT SERVICE FACTOR 94.0 94.0 95.6
- 15. UNIT AVAILABILITYFACTOR....... ~ .......... 94.0 95.6 16 'NIT CAPACITY FACIOR (Using (MDC).......... I3 ~ 4 73.4 67.6 17 'NIT CAPACITY FACTOR (Using Design MWe). ~ . 73.4'3.4 67.6 18 'NIT FORCED OUTAGE RATE ~ 6.1 6.1 4.5 19 SHUTDOWNS SCHEDULED OVER NE:<T 6 fONTHS (TYPES DATE, AND DURATION OF EACH):
- 20. IF SHUTDOWN AT EA'fD OF REPORT PERIOD> ESTLEATED DATE OF STARTUP:
21 ~ UNiTS LN TEST STATUS (PRIOR TO CONiERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY A PU22 2222 1976 INITIAL ELECTRICITY 7~la 7 1976 COMMERCIAL OPERATION Dec. 21, 1976
'I l
(I) REASON APPENDIX D DOCKET NO. 50 - 335,'\
A: EQUIPMENT FAILURE (EXPLAIN)
D- Kilaii. OR TEST UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME St. Lucie Unit No. 1 C: REFUELING "
D: REGULATORY RESTRICTION DATE Fcb. 5 1977 E: OPEPiATOR TRAINING AND LICEiNSE EXAMINATION COiMPLETED BY V. T. Chilson F: ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN) TELEPHONE 305 552-3830 H: OTHER (FZZLAIN)
(2) METHOD 1: MAiNUAL METHOD OF 2: MliNUAL SCRAM TYPE SHUTTING DOWN 3: AUTOMATIC SCRAf F: FORCED DURATION THE REACTOR OR 4: 01HER (E)Q'LAIN) NO. S: SQKDULED (HOURS) REASON(1) REDUCING POWER(2) CORRECTIVE ACTIONS/COMMENTS 1 76-01-03 44.8 Unit tripped during transient condition caused by loss of steam generator feedwater pumps. Outage was extended to perform maintenance work (Non-nuclear sysiem) 2 76-01-24 Unit load was reduced to .clean condensate pump suction strainers. (Non-nuclear system ) ~
SCARY: Unit No. 1 operated at approximately 502 R.P. (except unit outage on January 3-5, 1977) through January 8, 1977."
was operated at approximately 802 R.P. from January 11, 1977 through end of month, except for load reduction 'nit of January 24, 1977.
i