Category:Letter
MONTHYEARML24023A0342024-02-0505 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0038 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML23341A2102024-01-22022 January 2024 LTR-23-0216-1 - Closure Letter - 2.206 Petition for License Renewal Plant Reactor Pressure Vessel Embrittlement ML23320A3062024-01-22022 January 2024 Issuance of Amendment Nos. 298 and 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2024-007, Inservice Inspection Program Owner'S Activity Report (OAR-1)2024-01-18018 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-166, Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report2023-12-0606 December 2023 Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report ML23340A0332023-12-0101 December 2023 FPL to Fws, Comments Submitted by Florida Power and Light on the Species Status Assessment Accompanying the September 20, 2023 Proposed Threatened Species Status with Section 4(d) Rule for the Miami Cave Crayfish L-2023-172, Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, ML23333A0152023-11-27027 November 2023 Attachment G - Arcadis Memo Re FPL Year 4 Raasr Final (June 2, 2023, Appended to Derm letter)-1 ML23333A0102023-11-27027 November 2023 Attachment B - 11/07/2022 - Waterkeeper Scoping Comments-1 L-2023-146, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles2023-11-15015 November 2023 License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles IR 05000250/20230032023-11-0909 November 2023 Integrated Inspection Report 05000250/2023003 and 05000251/2023003 ML23310A1342023-11-0404 November 2023 10 CFR 2.206 Petition - LTR-23-0216-1 Petition Amendment; Turkey Point Subsequent Renewal with Petitioner 11/04/2023 ML24016A2622023-10-25025 October 2023 Subsequent License Renewal Updated List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected Project L-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis2023-10-11011 October 2023 License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published IR 05000250/20230102023-09-29029 September 2023 Biennial Problem Identification and Resolution Inspection Report 05000250/2023010 and 05000251/2023010 ML23234A1922023-09-27027 September 2023 Issuance of Amendment Nos. 297 and 290 Regarding Conversion to Improved Standard Technical Specifications ML23265A5492023-09-22022 September 2023 Transmittal of WCAP-18830-P/NP Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles to Support a License Amendment Request from FPL - License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis ML23243A9522023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9542023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9532023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9552023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application - Tribe- Section 106 Letters ML23199A2352023-09-0505 September 2023 Letter to EPA-Turkey Point Nuclear Generating Station, Units 3 and 4 - Notice of Availability of Draft Site-Specific Environmental Impact Statement for Subsequent License Renewal ML23199A2482023-09-0505 September 2023 Ltr to Florida Power and Light Co - Turkey Point Nuclear Generating Units 3 and 4 - Notice of Availability of Draft Site-Specific Environmental Impact Statement for Subsequent License Renewal L-2023-110, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-08-25025 August 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project IR 05000250/20230052023-08-21021 August 2023 Updated Inspection Plan for Turkey Point, Units 3 & 4 (Report 05000250/2023005 and 05000251/2023005) L-2023-115, Inservice Inspection Program Owner'S Activity Report (OAR-1)2023-08-21021 August 2023 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update IR 05000250/20230022023-08-14014 August 2023 Integrated Inspection Report 05000250/2023002 and 05000251/2023002 L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 ML23242A0922023-08-0606 August 2023 Request for Withholding Information from Public Disclosure for Turkey Point Nuclear Generating Unit Nos. 3 and 4 ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment ML23198A2702023-08-0303 August 2023 Issuance of the Site-Specific Environmental Impact Statement Scoping Process Summary Report Associated with the Turkey Point Nuclear Generating Unit Numbers 3 and 4, Subsequent License Renewal Application, Environmental Report Supplement 2 L-2023-094, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-07-27027 July 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project ML23178A1872023-07-25025 July 2023 Review of the Spring 2022 Steam Generator Tube Inspections During Refueling Outage No. 33 ML23188A1242023-07-20020 July 2023 Acknowledgment of Temporary Suspension Request for License Request for License Amendment Request Reactor Protection System, Engineered Safety Features System, and Nuclear Instrumentation System ML23200A0672023-07-18018 July 2023 Tp 2023 RQ Inspection Notification Letter ML23173A0812023-07-17017 July 2023 Supplement to Regulatory Audit Plan in Support of Review of License Amendment Request Supporting Digital Instrumentation & Control Modernization Project (EPID L-2022-LLA-0105) - Non-Proprietary L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) 2024-02-05
[Table view] Category:Operating Report
MONTHYEARL-2022-039, and Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2022-04-14014 April 2022 and Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2021-097, and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report2021-05-13013 May 2021 and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report L-2021-096, 10 CFR 50.59(d)(2) Summary Report2021-05-11011 May 2021 10 CFR 50.59(d)(2) Summary Report L-2021-018, 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report2021-02-16016 February 2021 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report L-2020-065, Submission of Periodic Reports2020-04-0909 April 2020 Submission of Periodic Reports ML18227A9832018-08-15015 August 2018 Submit First Year Operation Report. L-2008-245, Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/082008-11-10010 November 2008 Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/08 L-2007-053, Annual Radiological Environmental Operating Report2007-05-0404 May 2007 Annual Radiological Environmental Operating Report L-2004-097, Annual Radiological Environmental Operating Report2004-05-11011 May 2004 Annual Radiological Environmental Operating Report ML18227B0771978-03-17017 March 1978 03/17/1978 Letter Operating Summary Reports of February 1978 ML18227A4231978-03-0404 March 1978 Attached February, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0631978-03-0404 March 1978 03/04/1978 Letter Operating Status Reports of February 1978 ML18227A4221978-02-14014 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0641978-02-14014 February 1978 02/14/1978 Letter Operating Status Reports of January 1978 ML18227A4211978-02-0404 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0651978-02-0404 February 1978 02/04/1978 Letter Operating Status Reports of January 1978 ML18227A4201978-01-0707 January 1978 Attached December, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0671978-01-0707 January 1978 01/07/1978 Letter Operating Status Reports of December 1977 ML18227A4191977-12-0303 December 1977 Attached November, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0681977-12-0303 December 1977 12/03/1977 Letter Operating Status Reports of November 1977 ML18227A4171977-11-0505 November 1977 Attached October, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0691977-11-0505 November 1977 11/05/1977 Letter Operating Status Reports of October 1977 ML18227B0701977-10-0505 October 1977 10/05/1977 Letter Operating Status Reports of September 1977 ML18227B0711977-09-0303 September 1977 09/03/1977 Letter Operating Status Reports of August 1977 ML18227A4151977-09-0303 September 1977 Attached August, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0731977-08-0505 August 1977 08/05/1977 Letter Operating Status Reports of July 1977 ML18227A4141977-08-0505 August 1977 Attached July, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0741977-07-0707 July 1977 07/07/1977 Letter Operating Status Reports of June 1977, and a Revised Operating Data Report for May 1997 for Turkey Point Unit 3 ML18227A4131977-07-0707 July 1977 Attached June, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. May, 1977 for Unit 3 Incorrectly Reported for Some Values. Attached Revised May, 1977 Operating Data Report for Unit 3 ML18227B0751977-06-0606 June 1977 06/06/1977 Letter Operating Status Reports of May 1977 ML18227A4121977-06-0606 June 1977 Attached May, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0761977-05-0505 May 1977 05/05/1977 Letter Operating Status Reports of April 1977 ML18227A4111977-05-0505 May 1977 Attached April, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227A4101977-04-0404 April 1977 Attached March, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. Maximum Dependable Capacity (MWe-Net) for St. Lucie No. 1 Was Revised from 802 MWe-Net to 777 MWe-Net (Estimated) ML18227B0781977-04-0404 April 1977 04/04/1977 Letter Operating Status Reports of March 1977 ML18227B0791977-03-0707 March 1977 03/07/1977 Letter Operating Status Reports of February 1977 ML18227A4091977-03-0707 March 1977 Attached February, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0801977-02-0707 February 1977 02/07/1977 Letter Operating Status Reports of January 1977 ML18227B0811977-01-0707 January 1977 01/07/1977 Letter Operating Status Reports of December 1976 ML18227A4081977-01-0707 January 1977 Attached December, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0821976-12-0606 December 1976 12/06/1976 Letter Operating Status Reports of November 1976 ML18227B0831976-11-15015 November 1976 11/15/1976 Letter Corrected Copies of Operating Data Reports for October 1976 ML18227B0841976-11-0808 November 1976 11/08/1976 Letter Operating Status Reports of October 1976 ML18227A4061976-11-0808 November 1976 Attached October, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227A4071976-11-0505 November 1976 Attached Corrected Copies of October, 1976 Operating Data Reports for Turkey Point Unit Nos. 3 and 4 ML18227A4051976-10-0808 October 1976 Attached September, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0861976-09-0707 September 1976 09/07/1976 Letter Operating Status Reports of August 1976 ML18227A4031976-09-0707 September 1976 Attached August, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0871976-08-0505 August 1976 08/05/1976 Letter Operating Status Reports of July 1976 ML18227A4021976-08-0505 August 1976 Attached July, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. St. Lucie Unit No. 1 Was Previously Reported to Be in Commercial Operation, in Error. Attached Corrected June 1976 for St. Lucie No. 1 2022-04-14
[Table view] Category:Monthly
MONTHYEARL-2020-065, Submission of Periodic Reports2020-04-0909 April 2020 Submission of Periodic Reports ML18227B0771978-03-17017 March 1978 03/17/1978 Letter Operating Summary Reports of February 1978 ML18227B0631978-03-0404 March 1978 03/04/1978 Letter Operating Status Reports of February 1978 ML18227B0641978-02-14014 February 1978 02/14/1978 Letter Operating Status Reports of January 1978 ML18227B0651978-02-0404 February 1978 02/04/1978 Letter Operating Status Reports of January 1978 ML18227B0671978-01-0707 January 1978 01/07/1978 Letter Operating Status Reports of December 1977 ML18227B0681977-12-0303 December 1977 12/03/1977 Letter Operating Status Reports of November 1977 ML18227B0691977-11-0505 November 1977 11/05/1977 Letter Operating Status Reports of October 1977 ML18227B0701977-10-0505 October 1977 10/05/1977 Letter Operating Status Reports of September 1977 ML18227B0711977-09-0303 September 1977 09/03/1977 Letter Operating Status Reports of August 1977 ML18227B0731977-08-0505 August 1977 08/05/1977 Letter Operating Status Reports of July 1977 ML18227B0741977-07-0707 July 1977 07/07/1977 Letter Operating Status Reports of June 1977, and a Revised Operating Data Report for May 1997 for Turkey Point Unit 3 ML18227B0751977-06-0606 June 1977 06/06/1977 Letter Operating Status Reports of May 1977 ML18227B0761977-05-0505 May 1977 05/05/1977 Letter Operating Status Reports of April 1977 ML18227B0781977-04-0404 April 1977 04/04/1977 Letter Operating Status Reports of March 1977 ML18227B0791977-03-0707 March 1977 03/07/1977 Letter Operating Status Reports of February 1977 ML18227B0801977-02-0707 February 1977 02/07/1977 Letter Operating Status Reports of January 1977 ML18227B0811977-01-0707 January 1977 01/07/1977 Letter Operating Status Reports of December 1976 ML18227B0821976-12-0606 December 1976 12/06/1976 Letter Operating Status Reports of November 1976 ML18227B0831976-11-15015 November 1976 11/15/1976 Letter Corrected Copies of Operating Data Reports for October 1976 ML18227B0841976-11-0808 November 1976 11/08/1976 Letter Operating Status Reports of October 1976 ML18227B0861976-09-0707 September 1976 09/07/1976 Letter Operating Status Reports of August 1976 ML18227B0871976-08-0505 August 1976 08/05/1976 Letter Operating Status Reports of July 1976 ML18227B0881976-07-0202 July 1976 07/02/1976 Letter Operating Status Reports of June 1976 ML18227B0951975-10-0909 October 1975 10/09/1975 Letter Operating Summary Reports of September 1975 ML18227B0961975-09-0909 September 1975 09/09/1975 Letter Operating Summary Reports of August 1975 ML18227B0971975-08-0101 August 1975 08/01/1975 Letter Operating Status Reports of July 1975 ML18227B0981975-07-0303 July 1975 07/03/1975 Letter Operating Status Reports of June 1975 ML18227B0991975-06-0505 June 1975 06/05/1975 Letter Operating Status Reports of May 1975 ML18227B1001975-05-0505 May 1975 05/05/1975 Letter Operating Status Reports of April 1975 ML18227B1011975-04-0404 April 1975 04/04/1975 Letter Operating Status Reports of March 1975 ML18227B1021975-03-0606 March 1975 03/06/1975 Letter Operating Status Reports of February 1975 ML18227B1041975-02-0707 February 1975 02/07/1975 Letter Operating Status Reports of January 1975 ML18227B1031975-02-0707 February 1975 02/07/1975 Letter Operating Status Reports of January 1975 2020-04-09
[Table view] |
Text
MO'IVZHLY REPORTS (FOR GRAY BOOK PREPARATI+)
NRC I RIBUTION FOR PART 50 DOCKE%ATERIAL (TEMPORARY FORM)
CONTROL FILETS NO:
MONTHLY REPORT FILE F ROM. Florida P ower 6 Ligh t Co DATE OF DOC DATE REC'D LTR TWX RPT OTHER Miami, Fla TO: ORIG CC OTHER SENT AEC PDR xxxxxx Office of Management Info 1-signed SENT LQCAL PDR xxxx CLASS UNCLASS PROPINFO INPUT NO CYS REC'D DOCKET NO:
xxxxx 1 50-25 and 251 DESCR IPTION: ENCLOSURES:
Ltr trans the following: MoethlP RePort for ~A ril 1975 Plant 6 Component Operability 6 Availability rlj. This Report to be used in preparing Gray Hook
~jl by Plans 6 Operations.
NBIBER OF CO/IES REC'D:
PLANT NAME',Turkey Point 83 and 4 FQR ACTION/INFORMATION BUTLER (L) SCHWENCER (L) ZIEMANN (L) REGAN (E)
W/ Copies W/ Copies W/ Copies W Copies CLARK (L) STOLZ (L) DICKER (E) AR (L)
W/ Copies W/ Copies W/ Copies W/ fCopies t%pwwr r w I rrht tIr t t~nht Ic r I< I \ Il 'll \ lirvIVI I I Vl'9 Ll I SPI" Lb
~
~
VWVVAI I V LI f W/ Copies W/ Copies W/ Copies W/ Copies KNIEL (L) PURPLE (L) YOUNGBLOOD (E)~
W/ Copies W/ Copies W/ Copies W Copies INTERNAL DISTRIBUTION E FIL TECH REVIEW DENTON LIC ASST A/T I ND ~
SCHROEDER G R IMES R. DIGGS (L) BRAITMAN OGC, ROOM P-506A MACCARY GAMMILL H. GEAR IN (L) SALTZMAN GOSSI CK/STAF F KNIGHT KASTNER E. GOULBOURNE (L) ME LTZ CASE PAWLICKI BALLARD P. KREUTZER (E)
GIAMBUSSO SHAO SPANGLER J. LEE (L),, PLANS BOYD MOORE (L)
STE lLO HOUSTON ENVI RO M. MAIGRET (L)
S. REED,(E)
~~CHAPMAN MCDONAlD DEYOUNG (L) NOVAK MULLER M. SERVICE (L) DUBE (Ltr)
SKOVHOLT (L) ROSS D I CK E R S. SHE PPAR D (L) E. COUPE GOLLER (L) (Ltr) IPPOLITO KNIGHTON M. SLATER (E) PETERSON P. COLLINS DENISE REG OPR FILE 5 REGION (2)
T.R. Wl LSQN TEDESCO LONG LAIN AS BENAROYA VOLLMER YOUNGBLOOD BEGAN PROJECT LDR HAR LESS
'.H. SMITH (L)
S.
V TEETS (L)
WILLIAMS(E)
ILSON (I )
HARTFIELD (2)
KLECKER EISENHUT WIG G I NTON
. IN G RAM (L)
STEELE EXTERNAL DISTRIBUTION
~] TIC LQCAL PDR Homestead, Fla (ABERNATHY) (1)(2)(10) NATIONAL LABS 1 P D R-SAN/LA/NY
~1 W. PENNINGTON, Rm E-201 GT BROQKHAVEN NAT LAB
~1 NSI C (BUCHANAN) 1 CONSULTANTS 1
G. ULRIKSON, ORNL 1 ASLB 1
1 1 Newton Anderson NEWMARK/8 LUME/AGBABIAN 1 AGMED (RUTH GUSSMAN)
ACRS HOLDING/SENT Rm 8-127 GT 1 J. D. RUNKLES, Rm E-201 GT
h> 1
~ ~ 4
P.O. aeX 3100 MIAMI, FtealOA 3310I FLORIDA POWER 8L UGHT COMPANY May 5, l975 8 I cp Og~ 4p,~ ~o
~~cy Office of Management information and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:.
Attached are the April, l975 Operating Status Reports for Turkey Point Unit Nos. 3 and 4.
Very truly yours, Jg D. Schmidt Vice President Power Resources VTC/mjs Attachments cc: Mr. Norman C. Moseley Jack R. Newman, Esquire HELPING BUILD FLORIDA
P.O. I CX 0100 NIAMI, FLOAIDA 35101
,;-... W. 8" FLORIDA POWER 8L LIGHT COMPANY May 5, 1975 Office of Management Information
. and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C.
'I 20555 Gentlemen:.
Attached are the April, 1975 Operating Status Reports for- Turkey Point Unit Nos. 3 and 4.
Very truly yours, Jg D. Schmidt Vice President Power Resources VTC/mjs Attachments cc: Mr. Norman C. Moseley Jack R. Newman, Esquire A II W HELPING BUILD FLORIDA
HNCI.OSURE A DOCKI'T NO 50-25P NAME TURKE'Y POINT UNIT.NO. 3 DAqr. May 5, 1975 CO~IPLETED BY V- T. CHILSON TELEPI IOAE NO. 445-6211 EXT. 2177 DAlLY UiilIT PONER OUTPUT APRIL, '1975 DAY AVBRAGi=. DAILY Ml(e-net DAY AVERAGE DAlLY M<c-net
'641 .. 671 20 2'.. ~
676 660 676 22 652 683 23 5,54 684 24 6 690 25' 569 681 26 678 683 27 673 ~
~
681 671 28'9 10 . 680 ' . 671, 637 30
. '68 12 '473 31 13 671 676 la'5 645 NOTE: Daily average'power level greater than 666 NNe, due 16 557 to cooler condenser cool'-
water.'
669 672 672
1 ~
DOCKET N0.50-250 UVIT NAhg 'KEY POINT UNIT NO. 3 R T MONTH APRIL, 1975 MAY 5, 1975 COhtPL)q'ED BY V. T ~ CHILSON TELEPJME <30 445 - 62ll - Ext.
OPERATING STATUS
- 1. REPORTING PERIOD: 0001, 75, 04,01 THROUGH 2400, 75, 04, 30 GROSS IlOURS IN REPORTING PERIOD: 720: 00
- 2. CUISBA'LY AUTIDRIZED POt@R LEVEI (hNt) 2200
- 3. PONER LEVEL TO hHICH RESIRICTED (IF ANY): (M4lo NET) None
- 4. REAS04VS FOR RESTRICTIONS (IF ANY):
'IHIS CUhSLATIVE hG%H YR-TQ-DATE . TO DATE
- 5. NOSER OF HOURS THE REACIQR WAS CRITICAL ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
720.0 2 751.4 16 779.1
- 6. REACIQR RESERVE SHUTDOWN HOURS ........
7>> RR949 RRRRR49l9R iiv RiRR .......... 16 136.1 UNIT RESERVE SHtJIDOiW HOURS .. ~.... ~... 85.0 8.'.
GROSS THERhM, ENERGY GENERATED(h5)H).... 1 457 721 5 698 194 28 378 218
- 10. GROSS ELECTRICAL ENERGY GENERATED 447 437 1 838 226 266 031 (I8) ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
9 ll. fKI'LECTRICAL~GY GBKRA'IK) (MG) .. 8 758 340
- 12. REACIQR AVAILABILITYFACIQR +I 100.0 95. 6 79.6
- 13. UNIT AVAILABILITYFACIQR J2'............ 97.4 94.4 76.6
- 14. UNIT CAPACITY FACTOR J3>>............ ~" 94.7 92. 7 63.8
- 15. UNIT FORCED OUTAGE RATE J4............. 2.6 5.6 4.5
- 16. SETKONNS SCHEDULED OVER NEXI' h64VIHS (TYPE, DATE AND DURATIOV OF EACH):
June 21 - 26, 1975 -'eismic Restraint Inspection Oct. 20 - Nov. 30, 1975 - Refueling, Maintenance, and Inspections.
- 17. IF SHUTTmtAI AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
Jf REACIQR AVAILABILITYFACIE 99 HOURS ~GKR 1<AS 6 ITI ~ X 1 00 I
HOURS GB4ERATQR ON LlfK X 100 UNIT AVAILABILITYFACIQR ~
G HOU T ER OD NET ELEC%ICAL POt~'ER GFi TED X 100 3 UNIT CAPACITY FACIQR ~ h .DL . A R HOURS IN REPORT PERIOD FORCED OtJrAGE ilOURS X 100 UiNIT OUTAGE RATE g4 I 4LVEi 0 R 0.
FORCED OUJAGE IIOURS
'0 0 1
<<<<, f<<~ DOCKET NO. 50-250 SOPPY: Unit No. 3 operation was UNIT NIXIE TURKEY POINT UNIT NO. 3 satisfactory for month except for steam generator DATE hIA'( 5, 1975 feedwater control valve problem on April 23, 1975 PREPARED BY V. T - CH1LSON condenser tube repaii: 'nd
'IELEPHOiVE on April 24-25, 1975.
REPORT. hoi~ APRIL, "'975
- UNIT SHUTDOWNS/REDUCTIONS E hKIHOD F-FORCED DURATIGV Ol'HUITING DOlsV S-SCHEDULED URS REASOV * 'IHE REACIOR 12 75 04 ll ,<<0 N/A Load on the unit was reduced to perform perodic test on turbine main steam stop and control valves, reheat intercept, and reheat stop valves. (Non-nuclear System) 13 75 04 15 N/A Load on the unit was reduced to clean steam generator feedwater pump Nos. 3A and 3B suction strainers. (Non-nuclear System) 14 75 04 23 18.8 B N/A Unit was .removed from service to repair steam generator feedwater control valve Nos. 3A, 3B, and 3C valve operator (Non-.nuclear System) 15 75 04 24 <<0- N/A Load on the unit was maintained below approximately 50% R.P. to-epair condenser tube leak. (Non-nuclear System) 4
( A-EQUIPAGE FAILURE (EXPLAIN 1-i%UAL
'B-hfAINF. OR 'IEST 2-hi~'JAL SCRuI C-REFUELING 5-AUIchQTIC SCRAM D-REGULATORY RFSIRICTIOV E-OPERATOR TRAINING M)
LICENSE EXAMIiVATION F-AIMNISTRATIVE G-OPERATIONAL ERROR H-OIHER (EXPLAIN)
I ~ ~
~ ~ ~ ~
lO I'
~ ~
~ 0 ~
) s ) s I
1 I ~ ~
I
DOCKET NO. 50-251 UIAIIf NAhjE KEY POINT UNIT NO ~ 4 REP T MOPTH 'PRIL, 1975 5, 1975
- CmIIRLLfED BY V. T ~ CHILSON TELEPiIONE 305 445- Ext.
OPERATING STATUS 1~ REPORTING PERIOD 000 1 75 04 0 1 THROUGH 24 00 75 R 04 R 30 GROSS HOURS IN REVOIR'I fNG Pf!RfOD: 720. 0
- 2. CUISENfLY AUfHORIZED PON ER LEVEL (hill) 2200 MAX. DEPM)."CAPACITY (Mfc NET)
- 3. POINTER LEVEl, 'IQ WHICH RESfRICfED (IF ANY): (hfTlIc NET) None
'4. REASONS FOR RESTRICTIONS (IF ANY):
'IHIS QMLATIVE
'lOVIH YR-TO"DATE TO DATE
- 5. USER OF HOURS IHE REACIQR l'IAS CRITICAL ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
2 035.7 11 369 5~
- 6. REACIQR RESERVE SHUIMI'IIV HOURS ........ 97.3 97.3.
HOURS GENERATOR ON LINE ...............
7~
2 013.3 11 071.1
- 8. UNIT RESERVE SHUIDOliN HOURS ...........
- 9. ~
GROSS THERhIAL ENERGY (K%RA'KD(MN).... 4 305 374 22 657 584
- 10. GROSS ELECTRICAL ENERGY GEIZBATED 169 639 (h5>H). ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
1 395 378 7 LIET I'I I:~CAL EA~GY GT ~gofT II (rll(H) -1 230 1 325 639 6 794 755
- 12. REACIQR AVAILABILITYFACTOR +l......... 70.7 78.8
~........... 69.9 76.8
- 13. UNIT AVAILABILITYFACIQR J2
- 14. "
UINIT CAPACITY FACIQR J3N"" ~ -"""~" 69.1 72 ~ 3 4.8
- 15. UNIT FORCED OUTAGE RATE J4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
- 16. SHUKOI'lAAIS SCHEDULED OVER NEXT 6 hGVIHS (TYPE, DATE AND DURATION OF EACH):
Mar. 30 - June 1, 1975 - Refueling, Maintenance, ana Inspections.
Oct. 13 - Oct. 18, 1975 - Seismic Restraint Inspection.
- 17. IF SIVEOQl AT END OF REPORT PERIOD, ESTIhIATED DATE OF STARIUP: June 2, 1975 HOURS REACTOR WAS CRITICAL X 100 Jl REACIQR AVAILABILITYFACIQR ~ GR J2 UNIT AVAILABII.ITYFACIQR ~ IOU 'f '
NET ELECTRICAL Oi"ER GEIKRATED X 100 IT CAPACITY FACIQR ~
HOURS IN REPORT PERIOD FORCED OUTAGE HOURS X 100 4 UNIT OUTAGE RATE . IXI FORCED OUfAGE IKURS
)~ (\ ~
DOCKET NO. 50-251 SQivdSY: UNIT NO. 4 WAS OUT OP SERVICE ENTIRE MONTH POR REPUELING, pe NAME TURKEY POINT UNIT NO 4 MAINTENANCE, AND INSPECTIONS. MAY 5, 1975 PREPARED EY V. T. CHILSON TELEPHOK 305 5 - 6211 Ext. 2177 REPORT ha~ APR>>i >>75 UNIT SHUTDOWNSjREDUCTIONS E hKIHOD OF F-FORCED DURATIQV SHUITING WQl Xa'O S-SCHEDULED URS %HE REACIQR 05 5 03 29 72'0. 0 Unit No. 4 was removed from service (deliberate manual shutdown) for refueling, maintenance, and inspections. (Nuclear and Non-nuclear Systems)
I A ~
ii I
~
REASON:
A-EQUIPiKNI'AILURE (EXP~
'* hKIHOD:
1-MAhlUAL B-MINI'. OR TEST 2-h&'UAL SCRu(
C-REFUELING 3-AUKhQTIC SCRAM D-REGULATORY RESTRICTION E-OPERATOR TRAINING AND LIAISE EXAMINATION F-ADMNISIBATIVE G-OPERATION'. ERROR H-OIHER (ZPLgg 4
I l
~ ~
~ ~ . '* ~ 'th) l'