Withdrawal of an Amendment Request
ML24173A190
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 06/28/2024
From: Marshall M
Plant Licensing Branch II
To: Coffey B
Florida Power & Light Co
Mahoney, M NRR/DORL 415-3867
References
EPID L-2022-LLA-0105
Download: ML24173A190 (1)


Text

June 28, 2024

Bob Coffey Executive Vice President, Nuclear Division and Chief Nuclear Officer Florida Power & Light Company Mail Stop: EX/JB 700 Universe Blvd.

Juno Beach, FL 33408

SUBJECT:

TURKEY POINT NUCLEAR GENERATING UNIT NOS. 3 AND 4 -

WITHDRAWAL OF AN AMENDMENT REQUEST (EPID L-2022-LLA-0105)

Dear Bob Coffey:

By letter dated July 30, 2022 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML222136A045), as supplem ented by letters dated October 5, 2022, January 17, 2023, and February 10, 2023 (ML22278A076, ML23017A226, and ML23041A341, respectively), Florida Power & Light Company applied for amendments for the Turkey Point Nuclear Generating Unit Nos. 3 and 4 (Subsequent Renewed Operating License Nos. DPR-31 and DPR-41, respectively). The proposed license amendment requests would permit the use of digital instrumentation and controls for the reactor protection system, engineered safety features actuation system, and nuclear instrumentation system. In addition, the proposed amendments would allow use of safety related video display units; allow use of a non-safety-related diverse actuation system; allow changes to the control room; allow the automation of channel checks, channel operational tests, and actuation logic tests; change instrumentation allowable values for affected functions; change the definitions of channel check and channel operational test to account for the automation; and change the surveillance frequencies of affected channel checks, channel operational tests, and actuation logic tests.

B. Coffey

Subsequently, by letter dated June 19, 2024 (ML24171A005), you withdrew the amendment request. The purpose of this letter is to advise that the above-cited application is being treated as withdrawn. Notice of Consideration of Issuance of the proposed amendment had not been published in the Federal Register.

Sincerely,

/RA/

Michael L. Marshall, Jr., Senior Project Manager Plant Licensing Branch 1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Docket Nos. 50-250 and 50-251

cc: Listserv B. Coffey

SUBJECT:

TURKEY POINT NUCLEAR GENERATING UNIT NOS. 3 AND 4 -

WITHDRAWAL OF AN AMENDMENT REQUEST (EPID L-2022-LLA-0105)

DATED JUNE 28, 2024

DISTRIBUTION:

PUBLIC JSeymour, NRR RidsACRS_MailCTR Resource BJain, NRR RidsNrrDorl Resource MMarshall, NRR RidsNrrDex Resource TSweat, NRR RidsNrrDro Resource KWest, NRR RidsNrrDorlLpl2-2 Resource SSun, NRR RidsNrrLAABaxter Resource HWagage, NRR RidsNrrPMTurkeyPoint Resource CLi, NRR RidsRgn2MailCenter Resource EReichelt, NRR RidsNrrDraAplc Resource GGalletti, NRR RidsNrrDraArcb Resource DZhang, NRR RidsNrrDexEicb Resource MBreach, NRR RidsNrrDexEltb Resource SWyman, NRR RidsNrrDexEmib Resource SDarbali, NRR RidsNrrDroIolb Resource JZhao, NRR RidsNrrDroIqvb Resource DRahn, NRR RidsNrrDnrlNphp Resource SMeighan, NRR RidsNrrDssScpb Resource DHalverson, RES RidsNrrDssSnsb Resource RTaylor, RII RidsNrrDssStsb Resource NChilds, RII SAlferink, NRR ADonley, RII RAvarado, NRR