Withdrawal of an Amendment Request
ML24173A190
Person / Time
Site: Turkey Point  
Issue date: 06/28/2024
From: Marshall M
Plant Licensing Branch II
To: Coffey B
Florida Power & Light Co
Mahoney, M NRR/DORL 415-3867
References
EPID L-2022-LLA-0105
Download: ML24173A190 (1)


Text

June 28, 2024 Bob Coffey Executive Vice President, Nuclear Division and Chief Nuclear Officer Florida Power & Light Company Mail Stop: EX/JB 700 Universe Blvd.

Juno Beach, FL 33408

SUBJECT:

TURKEY POINT NUCLEAR GENERATING UNIT NOS. 3 AND 4 -

WITHDRAWAL OF AN AMENDMENT REQUEST (EPID L-2022-LLA-0105)

Dear Bob Coffey:

By letter dated July 30, 2022 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML222136A045), as supplemented by letters dated October 5, 2022, January 17, 2023, and February 10, 2023 (ML22278A076, ML23017A226, and ML23041A341, respectively), Florida Power & Light Company applied for amendments for the Turkey Point Nuclear Generating Unit Nos. 3 and 4 (Subsequent Renewed Operating License Nos. DPR-31 and DPR-41, respectively). The proposed license amendment requests would permit the use of digital instrumentation and controls for the reactor protection system, engineered safety features actuation system, and nuclear instrumentation system. In addition, the proposed amendments would allow use of safety related video display units; allow use of a non-safety-related diverse actuation system; allow changes to the control room; allow the automation of channel checks, channel operational tests, and actuation logic tests; change instrumentation allowable values for affected functions; change the definitions of channel check and channel operational test to account for the automation; and change the surveillance frequencies of affected channel checks, channel operational tests, and actuation logic tests.

Subsequently, by letter dated June 19, 2024 (ML24171A005), you withdrew the amendment request. The purpose of this letter is to advise that the above-cited application is being treated as withdrawn. Notice of Consideration of Issuance of the proposed amendment had not been published in the Federal Register.

Sincerely,

/RA/

Michael L. Marshall, Jr., Senior Project Manager Plant Licensing Branch 1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-250 and 50-251 cc: Listserv

SUBJECT:

TURKEY POINT NUCLEAR GENERATING UNIT NOS. 3 AND 4 -

WITHDRAWAL OF AN AMENDMENT REQUEST (EPID L-2022-LLA-0105)

DATED JUNE 28, 2024 DISTRIBUTION:

PUBLIC RidsACRS_MailCTR Resource RidsNrrDorl Resource RidsNrrDex Resource RidsNrrDro Resource RidsNrrDorlLpl2-2 Resource RidsNrrLAABaxter Resource RidsNrrPMTurkeyPoint Resource RidsRgn2MailCenter Resource RidsNrrDraAplc Resource RidsNrrDraArcb Resource RidsNrrDexEicb Resource RidsNrrDexEltb Resource RidsNrrDexEmib Resource RidsNrrDroIolb Resource RidsNrrDroIqvb Resource RidsNrrDnrlNphp Resource RidsNrrDssScpb Resource RidsNrrDssSnsb Resource RidsNrrDssStsb Resource SAlferink, NRR RAvarado, NRR JSeymour, NRR BJain, NRR MMarshall, NRR TSweat, NRR KWest, NRR SSun, NRR HWagage, NRR CLi, NRR EReichelt, NRR GGalletti, NRR DZhang, NRR MBreach, NRR SWyman, NRR SDarbali, NRR JZhao, NRR DRahn, NRR SMeighan, NRR DHalverson, RES RTaylor, RII NChilds, RII ADonley, RII ADAMS Accession No. ML24173A190 OFFICE NRR/DORL/LPL1/PM NRR/DORL/LPL2-2/LA NRR/DORL/LPL2-2/BC NRR/DORL/LPL1/PM NAME MMarshall ABaxter DWrona MMarshall DATE 06/24/2024 06/26/2024 06/28/2024 06/28/2024 OFFICIAL AGENCY RECORD