September 13, 2024 Robert Coffey Executive Vice President, Nuclear and Chief Nuclear Officer Florida Power & Light Company Mail Stop: EX/JB 700 Universe Blvd.
Juno Beach, FL 33408
SUBJECT:
TURKEY POINT NUCLEAR GENERATING, UNIT NOS. 3 AND 4 -
REGULATORY AUDIT
SUMMARY
RELATED TO THE REVIEW OF REGARDING THE UPDATED SPENT FUEL POOL CRITICALITY SAFETY ANALYSIS LICENSE AMENDMENT REQUEST (EPID L-2023-LLA-0142)
Dear Robert Coffey:
By letter L-2023-077, dated October 11, 2023, Florida Power and Light Company (FPL, the licensee) submitted a license amendment request to revise the technical specifications (TSs) for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 (Turkey Point).
Specifically, the proposed amendments would revise the Turkey Point TSs by incorporating changes to TS 3.7.13, Fuel Storage Pool Boron Concentration, TS 3.7.14, Spent Fuel Storage, and TS 4.3, Fuel Storage, to allow for an updated spent fuel pool criticality safety analysis which accounts for the impact on the spent fuel from a proposed transition to 24-month fuel cycles.
To enhance the review of the licensees request, the U.S. Nuclear Regulatory Commission (NRC) staff conducted a virtual regulatory audit that included discussions with your staff on May 21, 23, and June 20, 2024. A summary of the regulatory audit is enclosed. The NRC staff did not identify any significant issues during the audit.
If you have any questions, please contact me at (301) 415-3867, or Michael.Mahoney@nrc.gov.
Sincerely,
/RA/
Michael Mahoney, Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-250 and 50-251
Enclosure:
Regulatory Audit Summary cc: Listserv
Enclosure REGULATORY AUDIT
SUMMARY
REGARDING UPDATED SPENT FUEL POOL CRITICALITY SAFETY ANALYSIS LICENSE AMENDMENT REQUEST FLORIDA POWER AND LIGHT COMPANY TURKEY POINT NUCLEAR GENERATING, UNIT NOS. 3 AND 4 DOCKET NOS. 50-250 AND 50-251
1.0 BACKGROUND
A regulatory audit is an activity undertaken by the U.S. Nuclear Regulatory Commission (NRC) staff to examine and evaluate licensee information with the intent to gain an understanding of, verify, or identify information that will require docketing to support the basis of a licensing or regulatory decision.
By letter L-2023-077, dated October 11, 2023 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML23285A035), Florida Power and Light Company (FPL, the licensee) submitted a license amendment request (LAR) to revise the Turkey Point Nuclear Generating, Unit Nos. 3 and 4 (Turkey Point) technical specifications (TSs).
Specifically, the proposed amendments would revise the Turkey Point TSs by incorporating changes to TS 3.7.13, Fuel Storage Pool Boron Concentration, TS 3.7.14, Spent Fuel Storage, and TS 4.3, Fuel Storage, to allow for an updated spent fuel pool criticality safety analysis which accounts for the impact on the spent fuel from a proposed transition to 24-month fuel cycles.
The NRC staff performed a preliminary review of the license amendment request and determined that a regulatory audit would assist in the timely completion of the review. The NRC staff conducted a virtual regulatory audit that included discussions with the licensee on May 21, 23, and June 20, 2024. The audit plan was provided to the licensee on April 11, 2024 (ML24102A277).
2.0 AUDIT ACTIVITIES AND OBSERVATIONS The remote audit was conducted using web-conferencing capabilities. The purpose of the audit was to (1) confirm internal licensee information that supports statements made in the LAR, and (2) determine whether the information included in the documents is necessary to be submitted to support a safety conclusion.
Discussions on the topics identified in the attachment of the audit plan were held with the licensee during an audit calls conducted on May 21 and June 20, 2024. The NRC staff assessed the information provided during the audit to determine whether additional information would be needed to support a regulatory finding, and therefore, would need to be submitted for NRC review.
3.0 AUDIT PARTICIPANTS NRC FPL Westinghouse Michael Mahoney Jarrett Mack Jean-Dominique LeGarrec Kevin Heller Yacine Faouzi James Smith Jack Vande Polder Emilio Fuentes Christopher Briggs Patrick Hahn Andrew Shaeffer Jason Cottrell Michael Wenner 4.0 LIST OF DOCUMENTS PROVIDED ON THE ELECTRONIC PORTAL Westinghouse and FPL provided the following supporting documents on the Westinghouse Electronic Portal during the virtual audit.
CN-CRIT-265-DRAFT, Axial Burnup Profiles for the Turkey Point pre-EPU [extended power update] Non-blanketed Fuel, Revision 0.
CN-CRIT-TP-035, EALF [energy of average lethargy of fission] Values and Alternate Fitting Coefficients for the Turkey Point Criticality Analysis Supporting WCAP-18830
[Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles], Revision 1.
CN-CRIT-TP-036, WCAP-18830 NRC Audit Support: RCCA [rod cluster control assembly] Nominal vs Conservative Confirmatory Analysis, Revision 0.
CN-CRIT-TP-037, WCAP-18830 NRC Audit Support: Pre-EPU WABA [wet annular burnable absorber] Depletion Confirmatory Analysis, Revision 0.
5.0 RESULTS OF THE AUDIT As a result of the audit, the NRC staff gained a better understanding of information in the LAR.
Requests for additional information (RAIs) were issued to the licensee on August 20, 2024 (ML24234A014). The licensee is scheduled to provide a response to the RAIs by September 20, 2024.
ML24256A113 OFFICE NRR/DORL/LPL2-2/PM NRR/DORL/LPL2-2/LA NRR/DSS/SFNB/BC NAME MMahoney ABaxter SKrepel DATE 09/06/2024 09/13/2024 09/11/2024 OFFICE NRR/DORL/LPL2-2/BC NRR/DORL/LPL2-2/PM NAME DWrona MMahoney DATE 09/13/2024 09/13/2024