Category:Letter
MONTHYEARL-2024-184, Radiological Emergency Plan Revision 772024-11-0505 November 2024 Radiological Emergency Plan Revision 77 L-2024-173, Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-31031 October 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles L-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2024-175, Cycle 34 Core Operating Report2024-10-24024 October 2024 Cycle 34 Core Operating Report ML24291A2882024-10-24024 October 2024 Westinghouse Topical Report - Request for Withholding Information from Public Disclosure L-2024-177, Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis2024-10-22022 October 2024 Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis ML24276A2302024-10-16016 October 2024 Westinghouse Topical Report – Request for Withholding Information from Public Disclosure L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes ML24289A2372024-10-15015 October 2024 Transmittal of Revision 1 Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) L-2024-157, Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-0303 October 2024 Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles IR 05000250/20243012024-10-0303 October 2024 NRC Operator License Examination Report 05000250/2024301 and 05000251/2024301 L-2024-147, Submission of Periodic Reports2024-10-0101 October 2024 Submission of Periodic Reports L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24269A1292024-09-24024 September 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis ML24260A2262024-09-18018 September 2024 NRC Examination Results Summary - Examination Reports: 05000250/2024301 and 05000251/2024301 ML24262A2272024-09-18018 September 2024 Transmittal of Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles ML24158A0052024-09-17017 September 2024 Completion of Subsequent License Renewal Site Specific Environmental Review and Modification to Subsequent Renewed Facility Operating Licenses L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24207A0342024-09-13013 September 2024 – Exemption from Certain Requirements of 10 CFR 50.46 for Use of Axiom Fuel Rod Cladding – Letter ML24256A1132024-09-13013 September 2024 Regulatory Audit Summary Related to the Review of Regarding the Updated Spent Fuel Pool Criticality Safety Analysis License Amendment Request IR 05000250/20240052024-08-23023 August 2024 Updated Inspection Plan for Turkey Point Units 3 & 4 - Report 05000250/2024005 and 05000251/2024005 ML24234A0062024-08-22022 August 2024 Project Manager Assignment L-2024-122, Core Operating Limits Report2024-08-12012 August 2024 Core Operating Limits Report L-2024-106, Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-022024-08-12012 August 2024 Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-02 ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-089, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-07-25025 July 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24184B2822024-07-16016 July 2024 – Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal 05000250/LER-2024-002-01, Condition Prohibited by Technical Specifications2024-07-10010 July 2024 Condition Prohibited by Technical Specifications ML24173A1902024-06-28028 June 2024 Withdrawal of an Amendment Request ML24159A2652024-06-26026 June 2024 Correction of Safety Evaluation for Issuance of Amendment Nos. 298 & 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-100, Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project2024-06-19019 June 2024 Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter IR 05000250/20244012024-06-0505 June 2024 – Security Baseline Inspection Report 05000250-2024401, 05000251-2024401 and 07200062-2024401 L-2024-076, Reply to Notice of Violation; NOV 05000250, 05000251/2024010-052024-05-29029 May 2024 Reply to Notice of Violation; NOV 05000250, 05000251/2024010-05 L-2024-082, 2023 Annual Radiological Environmental Operating Report2024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000250/20240012024-05-10010 May 2024 Integrated Inspection Report 05000250/2024001 and 05000251/2024001 ML24135A0942024-05-0909 May 2024 Periodic Update to the Updated Final Safety Analysis Report L-2024-060, 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report2024-05-0909 May 2024 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report ML24127A1862024-05-0909 May 2024 Request for Withholding Information from Public Disclosure ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-073, Cycle 34 Core Operating Limits Report2024-05-0101 May 2024 Cycle 34 Core Operating Limits Report L-2024-072, Cycle 33 Core Operating Limits Report2024-05-0101 May 2024 Cycle 33 Core Operating Limits Report L-2024-048, Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision2024-04-30030 April 2024 Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision L-2024-069, Radiological Emergency Plan Revision 762024-04-22022 April 2024 Radiological Emergency Plan Revision 76 L-2024-066, Sixth 10-Year Inservice Testing Interval Relief Request No. PR-022024-04-17017 April 2024 Sixth 10-Year Inservice Testing Interval Relief Request No. PR-02 2024-09-25
[Table view] Category:Operating Report
MONTHYEARL-2022-039, and Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2022-04-14014 April 2022 and Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2021-097, and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report2021-05-13013 May 2021 and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report L-2021-096, 10 CFR 50.59(d)(2) Summary Report2021-05-11011 May 2021 10 CFR 50.59(d)(2) Summary Report L-2021-018, 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report2021-02-16016 February 2021 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report L-2020-065, Submission of Periodic Reports2020-04-0909 April 2020 Submission of Periodic Reports ML18227A9832018-08-15015 August 2018 Submit First Year Operation Report. L-2008-245, Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/082008-11-10010 November 2008 Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/08 L-2007-053, Annual Radiological Environmental Operating Report2007-05-0404 May 2007 Annual Radiological Environmental Operating Report L-2004-097, Annual Radiological Environmental Operating Report2004-05-11011 May 2004 Annual Radiological Environmental Operating Report ML18227B0771978-03-17017 March 1978 03/17/1978 Letter Operating Summary Reports of February 1978 ML18227A4231978-03-0404 March 1978 Attached February, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0631978-03-0404 March 1978 03/04/1978 Letter Operating Status Reports of February 1978 ML18227A4221978-02-14014 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0641978-02-14014 February 1978 02/14/1978 Letter Operating Status Reports of January 1978 ML18227A4211978-02-0404 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0651978-02-0404 February 1978 02/04/1978 Letter Operating Status Reports of January 1978 ML18227A4201978-01-0707 January 1978 Attached December, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0671978-01-0707 January 1978 01/07/1978 Letter Operating Status Reports of December 1977 ML18227A4191977-12-0303 December 1977 Attached November, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0681977-12-0303 December 1977 12/03/1977 Letter Operating Status Reports of November 1977 ML18227A4171977-11-0505 November 1977 Attached October, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0691977-11-0505 November 1977 11/05/1977 Letter Operating Status Reports of October 1977 ML18227B0701977-10-0505 October 1977 10/05/1977 Letter Operating Status Reports of September 1977 ML18227B0711977-09-0303 September 1977 09/03/1977 Letter Operating Status Reports of August 1977 ML18227A4151977-09-0303 September 1977 Attached August, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0731977-08-0505 August 1977 08/05/1977 Letter Operating Status Reports of July 1977 ML18227A4141977-08-0505 August 1977 Attached July, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0741977-07-0707 July 1977 07/07/1977 Letter Operating Status Reports of June 1977, and a Revised Operating Data Report for May 1997 for Turkey Point Unit 3 ML18227A4131977-07-0707 July 1977 Attached June, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. May, 1977 for Unit 3 Incorrectly Reported for Some Values. Attached Revised May, 1977 Operating Data Report for Unit 3 ML18227B0751977-06-0606 June 1977 06/06/1977 Letter Operating Status Reports of May 1977 ML18227A4121977-06-0606 June 1977 Attached May, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0761977-05-0505 May 1977 05/05/1977 Letter Operating Status Reports of April 1977 ML18227A4111977-05-0505 May 1977 Attached April, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227A4101977-04-0404 April 1977 Attached March, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. Maximum Dependable Capacity (MWe-Net) for St. Lucie No. 1 Was Revised from 802 MWe-Net to 777 MWe-Net (Estimated) ML18227B0781977-04-0404 April 1977 04/04/1977 Letter Operating Status Reports of March 1977 ML18227B0791977-03-0707 March 1977 03/07/1977 Letter Operating Status Reports of February 1977 ML18227A4091977-03-0707 March 1977 Attached February, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0801977-02-0707 February 1977 02/07/1977 Letter Operating Status Reports of January 1977 ML18227B0811977-01-0707 January 1977 01/07/1977 Letter Operating Status Reports of December 1976 ML18227A4081977-01-0707 January 1977 Attached December, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0821976-12-0606 December 1976 12/06/1976 Letter Operating Status Reports of November 1976 ML18227B0831976-11-15015 November 1976 11/15/1976 Letter Corrected Copies of Operating Data Reports for October 1976 ML18227B0841976-11-0808 November 1976 11/08/1976 Letter Operating Status Reports of October 1976 ML18227A4061976-11-0808 November 1976 Attached October, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227A4071976-11-0505 November 1976 Attached Corrected Copies of October, 1976 Operating Data Reports for Turkey Point Unit Nos. 3 and 4 ML18227A4051976-10-0808 October 1976 Attached September, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0861976-09-0707 September 1976 09/07/1976 Letter Operating Status Reports of August 1976 ML18227A4031976-09-0707 September 1976 Attached August, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0871976-08-0505 August 1976 08/05/1976 Letter Operating Status Reports of July 1976 ML18227A4021976-08-0505 August 1976 Attached July, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. St. Lucie Unit No. 1 Was Previously Reported to Be in Commercial Operation, in Error. Attached Corrected June 1976 for St. Lucie No. 1 2022-04-14
[Table view] |
Text
NRQ FORM 195 I2.78)
~ ... '.S.
NRC'DISTRIBUTION FoR PART 50 DOCKET MATERIAL" NUCLEAR REGULATORV C SS I ON DOCKET NUMB F
Sd-.25P I LE" NUM8 MONTHLY 8
~l R
S~
TO: FROM: DATE OF DOCUMENT
"'Florida Pwr & light Compa'ny 6/6/77 N, Rs Co . Miami, 'Fla, 'DATE RECEIVED
. A~ D~'chmidt 6/8/77 ETTER QNOTORIZED PROP INPUT FORM NUMBER OF COPIES RECEIVED PfOR IGINAL Dcopv DESCRIPTION
~UN C LASS I F I E D
- / sr~~~~
f ENCLOSURE'onth~.,Report
, Letter trans the following:......
P1ant':
for Component 'perabi1ity 5,'vai18bg:3;ity. '
This Report to be used in preparing Gray Book-by. Planh 5 Operations.
(1-P) ggOVg PLAIT NAME Turkey Point Units 3 & 4 ACKNOWLEDGE9 RJL FOR ACTION/INFORMATION CYS FOR CTI N INTERNAL D IST RIBUTION.....
eg es rane C 88 EXTERNAL DISTRIBUTION CO ROL NUMBER C4m r i6000i4
FLORIDA POWER & LIGHT COMPANY Q gg Qg June 6. 1977 Office of Manaqement Information and Proqram Controls U. S. Nuclear Requlatorv Commission Washington, D. C. 20555 jgygII)gPg DPCRB't Ft~je Gentlemen:
Attached are the Mav, 1977, Overatinq Status Revorts for Turkev Point Unit Nos. 3 and 4 and St. Lucie Unit No. l.
Verv trulv vours, A. D. Schmidt Vice President Power Resources VTC/DDC cc: Mr. Norman C. Moseley Robert Lowenstein, Esquire 77)60001~
PEOPLE... SERVING PEOPLE
APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 250 Turkey Point UNIT Unit No. 3 DATE June 3 g 1977 COMPLETED BY V. T. Chilson TELEPHONE (305) 552 3769 MONTH DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (Kfe-Net) (MWe-Net) 682 679 681 684 20 681 682 21 682 676 22 682 672 23 679 668 672 669 671 10 671 26 665 6.78 27 669 679 28 671 13 682 29 678 14 683. 30 679 15 683 31 679 16 311 NOTE: Average daily power greater than 666 MNe due to cooler condenser cooling water.
APPENDS C OPERATING DATA REPORT DOCKET NO.
Turkey Point UNIT REPORT MONTH Ma 1 77 DATE June COMPLETED BY V. 0 OPERATING STATUS TELEPHONE 305 2
- 1. REPORTING PERIOD: 0001,77,05POI GROSS HOURS ZN REPORTING PERIOD: 44.0 2400 77 05 31 T.
THROUGH CURRY'.ILLY AIITEORZZED POWER LEVEL MAX.DEPEND. CAPACITY (MWe-Net):
(RWVZ:~
- 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net):
- 4. REASONS FOR RESTRICTION (ZF ANY):
THIS MONTH YEAR TO DATE CUAAATIVE
- 5. WIIWEERE OF ROIIRE REACTOR IIAE CRZ ZCAL. ~ ~ ~ ~ ~7A ~LE
- 6. REACTOR RESERVE SHUTDOWN HOURS. ~ ~ ~ . ~ ...... 7. HOURS GENERATOR ON LINE.................. ~ 732.8 2 979.3 30 018.5 8~ UNIT RESERVE SHUTDOWN HOURS............ .. ~
- 85. 0
- 9. GROSS THERMAL ENERGY GENERATED (MWH)....,. 1 599 328 6 382 473 58 112 061
- 10. GROSS ELECTRICAL BKRGY GENERATED (MWH)... 519 030 2 073 610 18 644 061
- 11. NET ELECTRICAL ENERGY GRKBATED (MWH)..... 494 541 1 969 246 17 645 181 IZ. REACTOR SERVICE FACTOR.................... 99.0 86.3 79.2
- 13. REACTOR AVAILABILITYFACTOR... ~ ~ ~ ~ ~ ~ 86.3 79.4 14 'NIT SERVICE FACTOR.. 82.2 76.3
- 15. UNIT AVAILABILITYFACTOR......,.........., 98.5 82.2 76.5
- 16. UNIT CAPACITY FACTOR (Us~ (MDC)...,..... 99.8 81.6 68.1
- 17. UNIT CAPACITY FACTOR (Using Design MWe)... 95 ' 78.4 64.7
- 18. UNIT FORCED OUTAGE RATE...... 1.5 2.8 19P SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPED DATE, AND DURATZON OF EACH):
Steam Generator Inspection - July 10 - Aug. 6, 1977 2D. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): PORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCZAL OPERATION
~ l
~ ~ I ~
~ ~ ~
I t ~
' ' ~ t
1 APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 Turkey Point UNIT Unit No DATE t'une 3 1977 COMPLETED BY V. T. Chilson TELEPHONE (305) 552 - 3769 MONTH ~ay DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Ne t) 17 18 19 563 20 675 21 673 22 669 23 661 49 25 10 26 27 12 28 13 29 14 30 15 31 16 NOTE: Average daily power greater than 666 MWe due to cooler condenser cooling water.
APPRG)ZX C OPERATING DATA REPORT DOCKET NO. 50 - 251 r y oat UNIT Unit No. 4 REPORT MONTH DATE June 3 1977 4
COMPLETED BY V. T. Chilson OPERATING STATUS TELEPHONE (305) 552 - 3769 1~ REPORTING PERIOD: 77 05 01 GROSS HOURS ZN REPORTING PERIOD:
THROUGH 2400 77 05 31 2 CERREEYLY AIIYREREEEE 202ER IEOEL 4IIEO):~2 MAX.DEPEND. CAPACITY (MWe-Net): 666
- 3. POWER LEVEL TO WHICH RESTRICTED {IF ANY) {MWe-Net):
- 4. REASONS FOR RESTRICTION (ZF ANY):
THZS MONTH YEAR TO DATE CUMULATIVE 5- NUMBERS OF HOURS REACTOR WAS CRITICAL..... 127.0 2 521.9 ~24 24
- 6. REACTOR RESERVE SHUTDOWN HOURS.....,...... 0- 138.8 7 ~ HOURS GBKRATOR OH LINE.... .,.. ., . 121.5 2 496.7 23 038.8 8~ UNIT RESERVE SHUTDOWN HOURS ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
- 9. GROSS THERMAL ENERGY GRKRATED (Ml%).... ~ . 259 799 5 424 235 48 483 605
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH)... 83 320 1 768 3S5 15 726 068
- 11. NET ELECTRICAL ENERGY GEKRATED (MWH)..... 77 271 1 680 145 14 910 611
- 12. REACTOR SERVICE FACTOR.................... 69.6 73.3
- 13. REACTOR AVAILABILITYFACTOR... ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
69.6 73.7 14 'NIT SERVICE FACTOR. ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
16.3 68.9 69.7
- 15. UNIT AVAILABILITYFACTOR.......... 4... ~ . 4 ~
16;3 68. 9 69.7
- 16. UNIT CAPA'CITY FACTOR (Using (MDC)......... 15.6 69.6 68.3
- 17. .UNIT CAPACITY FACTOR (Using Design MWe)... 15.0 66.9 65.1 Igo UHZT FORCED OUTAGE RATEo ~ ~ ~ ~ o>> ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
3.2
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPEE DATE, AND DURATION OF EACH):
- 20. IF SHUTDOWH AT END OF REPORT PERIODS ESTIMATED DATE OF STARTUP:
- 21. UHITS ZN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED IHITIAL CRITICALITY INITIAL ELECTRICITY COMYERCIAL OPERATION
APPENDIX D DOCXET NO. 50 - 251
- 1) REASON A: EQUIPMENT PAILlIRE (EXPLAIN)
B: UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Turke Point U 5 o MAINT. OR TEST C: REFUELING-D: RECULATORY RESTRICTION DATE Ju E- OPERATOR lTRAINING AND COMPLETED BY LICENSE EXAMINATION P: ADHINISTRATIVE G: TELEPHONE OPERATIONAI. ERROR (EXPLAIN)
H: OTHER (EXPIJLIN)
I) HETHOD 1: HANUAL HETHOD OF 2::.MANUAL SCRAH TYPE SHUTTING DOWN
~ 3: AUTOMATIC SCRAM P: PORCH) DURATION THE REACTOR OR 4: DINER (EXPIAIN) NO- DATE S: SCHEDULED (HOURS) REASON(l) REDUCING POWER(2) CORRECTIVE ACTIONS/COMMENTS 4 77-04-26 74.3 Unit No. 4 was removed from service to repair steam generator No. 4C tube leak. (Continued from previous month) (Nuclear System) 5 77-05-09 548.2 Unit was removed from service for refueling, maint-enance, and inspections. (Nuclear and Non-nuclear Systems)
Unit No. 4 was removed from service for schedueled refueling, maintenance, and inspections on May 9, 1977.
APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 335 St. Lucre UNIT. Una.t No. 1 DATE June 3 ~ 1977 COMPLETED BY V. T. Chilson TELEPHONE (305) 552 3769 MONTH DAY AVERAGE DAlLY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (me-Net) (NVe-Net) 670 17 585 678 18 748 3 692 742 702 20 526 687 21 748 684 22 716 678 23 743 665 24 745 657 25 683 10 584 26 697 27 492 12 28 740 13 197 739 29 14 712 731 30 672 480 336
6 'I APPENDIX C OPERATING DATA REPORT DOCZET NO. 50 - 335
- t. uc e UNIT Unit No. 1 REPORT MONTH DATE June 3, 1977 COMPLETED BY V. T ChiIeon OPERATING STATUS TELEPHONE (305) 552 - 3769
- 1. REPORTING PERIOD: 0 THROUGH
- 2. CIIIIREFZLY AIIYHORZYEO FOUER LEVEL (HHYZ:J~A MAX.DEPEND. CAPACITY (MWe-Net): 777 Est.)
DESIGN ELECTRICAL RATING (MWe-Net): 802
- 3. POWER LEVEL TO WHICH RESTRICTED (ZF ANY) (MWe-Net): NONE
- 4. REASONS FOR RESTRICTION (IF ANY):
THIS MONTH YEAR TO DATE CUMULATIVE 5 ~ HLHRERS OF HOURS RRACYOR UIIS CRYYZCAL..... 665.5 2 9199
- 6. REACTOR RESERVE SHUTDOWN HOURS............ 8.2 8.2
- 7. HOURS GENERATOR ON LINE. ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ........ 655.1 2 872.5 8~ UNIT RESERVE SHUTDOWN HOURS ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
9, GROSS THERMAL ENERGY GERKRATED (MWH)....,. 1 519 476 6 225 958 6 573 561
- 10. GROSS ELECTRICAL EKRGY GENERATED (MWH)... 478 400 2 023 400 2 131 670
- 11. NET ELECTRICAL ENERGY GELKRATED (MWH)..... 448 820 1 889 396 1 988 371
- 12. REACTOR SERVICE FACTOR..............,...., 89.4 82.2 83.4
- 13. REACTOR AVAILABILITYFACTOR......,........ 90 5 82.4 83.6
- 14. UNIT SERVICE FACTOR.... . , . .., 88.0 79.3 80.7 15 'NIT AVAILABILITY FACTORA ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
88.0 79.3 80.7
- 16. UNIT CAPACITY FACTOR (Using (MDC)... 77.6 67.1 65.8
- 17. UNIT CAPACITY PACTOR (Using Design MVe). ~ . 65.0 63. 8
- 18. UNIT FORCED OUTAGE RATEA ~ ~ ~ ~ ~ >> ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
12.0, 19.2 17. 9
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
- 20. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITIC.Q.ITY INITIAL ELECTRICITY CORDKRCIAL OPERATION
I) REASON APPENDIX D DOCKET NO. 50 - 335 h: EQUIPMENT FAILURE (EXPLAIN)
B: MAINT. OR TEST UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAHE St. Lucie Unit No. 1 C: REFUELINC DATE June 3, 1977 D: RECULATORY RESTRICTION E: OPERATOR TRAINING AND COMPLETED BY V. T. Cbilson LICENSE EXAMINATION F: ADHINISTRATIVE C: OPERATIONAL ERROR (EXPLAIN) TELEPHONE (305) 552 3769 H: OTIIER (EXPLAIN)
!) METiiOD 1: HANUAL HETHOD OF 2: ~MANUAL SCRAM TYPE SHUTTINC DOWN 3: AUTOHATIC SCRAM F: FORCED DURATION T)lg REACTOR OR OTHER (EXPLAIN) NO. DATE S: SCHEDULED (BOURS) REASON(l) REDUCING POWER(2) CORRECTIVE ACTIONS/CRDiENTS 15 77-05-10 63.5 Unit was removed from service to repair a leek located inside the containment building that could not be isolated. (Nuclear System) 16 77-05-16 11.6 Unit was removed from service due to transient condition on the transmission system. (Non-nuclear System) 17 77-05-27 5.6 Unit was tripped during a transient condition by the steam generator level protection system. (Nuclear System 18 77-05-31 8.2 Unit was tripped by actuation of the Loss of Field Relay. Corrective actions included replacement-of generator exciter conponcnts. (Nonnuclear System)
SUMMARY
- Unit was operated at an avera'ge reactor power level of 95 X R.P. during month except for outages on May 10, May 16, Hsy 27, snd May 31, 1977.