Attached May, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1
ML18227A412
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 06/06/1977
From: Schmidt A
Florida Power & Light Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML18227A412 (16)


Text

TO:

N, Rs Co FROM:

"'Florida Pwr & light Compa'ny

. Miami, 'Fla,

. A~ D~'chmidt NRQ FORM 195

~...

'.S. NUCLEAR REGULATORV C I2.78)

NRC'DISTRIBUTION FoR PART 50 DOCKET MATERIAL" SS I ON DOCKET NUMB Sd-.25P

~l S~

FI LE"NUM8 MONTHLY 8 R

DATE OF DOCUMENT 6/6/77

'DATE RECEIVED 6/8/77 ETTER PfOR IGINAL

, Dcopv QNOTORIZED

~UN C LASS I F I E D PROP INPUT FORM NUMBER OF COPIES RECEIVED

/ sr~~~~

DESCRIPTION f

, Letter trans the following:......

ENCLOSURE'onth~.,Report for P1ant': Component 'perabi1ity 5,'vai18bg:3;ity.

This Report to be used in preparing Gray Book-by. Planh 5 Operations.

PLAIT NAME Turkey Point Units 3 & 4 RJL CYS FOR CTI N (1-P)

FOR ACTION/INFORMATION ggOVg ACKNOWLEDGE9 INTERNALD ISTRIBUTION.....

eg es rane C

88 EXTERNALDISTRIBUTION C4m r CO ROL NUMBER i6000i4

FLORIDA POWER & LIGHTCOMPANY Q gg Q g June 6.

1977 Office of Manaqement Information and Proqram Controls U. S. Nuclear Requlatorv Commission Washington, D. C.

20555 Gentlemen:

jgygII)gPg DPCRB't Ft~je Attached are the Mav, 1977, Overatinq Status Revorts for Turkev Point Unit Nos.

3 and 4 and St. Lucie Unit No. l.

Verv trulv vours, A. D. Schmidt Vice President Power Resources VTC/DDC cc:

Mr. Norman C. Moseley Robert Lowenstein, Esquire 77)60001~

PEOPLE... SERVING PEOPLE

APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50 250 Turkey Point UNIT Unit No.

3 DATE June 3 g 1977 COMPLETED BY V. T. Chilson TELEPHONE (305) 552 3769 MONTH DAY AVERAGE DAILY POWER LEVEL (Kfe-Net)

DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 10 13 14 15 16 679 684 682 676 672 668 669 671 6.78 679 682 683.

683 311 20 21 22 23 26 27 28 29 30 31 NOTE:

682 681 681 682 682 679 672 671 665 669 671 678 679 679 Average daily power greater than 666 MNe due to cooler condenser cooling water.

APPENDS C

OPERATING DATA REPORT DOCKET NO.

Turkey Point UNIT REPORT MONTH Ma 1 77 OPERATING STATUS DATE June COMPLETED BY V.

0 TELEPHONE 305 2

1.

REPORTING PERIOD: 0001,77,05POI GROSS HOURS ZN REPORTING PERIOD:

THROUGH 2400 77 05 31 T.

CURRY'.ILLY AIITEORZZED POWER LEVEL (RWVZ:~

MAX.DEPEND. CAPACITY (MWe-Net):

44.0 3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY)

(MWe-Net):

4.

REASONS FOR RESTRICTION (ZF ANY):

THIS MONTH YEAR TO DATE CUAAATIVE 5.

WIIWEERE OF ROIIRE REACTOR IIAE CRZ ZCAL. ~ ~

~

~ ~7A

~LE 6.

REACTOR RESERVE SHUTDOWN HOURS.

~ ~ ~. ~...... 7.

HOURS GENERATOR ON LINE..................

~

732.8 2 979.3 8 ~

UNIT RESERVE SHUTDOWN HOURS............

~.. 9.

GROSS THERMAL ENERGY GENERATED (MWH)....,. 1 599 328 6 382 473 10.

GROSS ELECTRICAL BKRGY GENERATED (MWH)...

519 030 2 073 610 11.

NET ELECTRICAL ENERGY GRKBATED (MWH).....

494 541 1 969 246 30 018.5

85. 0 58 112 061 18 644 061 17 645 181 IZ.

REACTOR SERVICE FACTOR....................

99.0 86.3 13.

REACTOR AVAILABILITYFACTOR... ~ ~ ~ ~ ~ ~

86.3 14'NIT SERVICE FACTOR..

82.2 79.2 79.4 76.3 15.

UNIT AVAILABILITYFACTOR......,..........,

98.5 16.

UNIT CAPACITY FACTOR (Us~ (MDC)...,.....

99.8 82.2 81.6 76.5 68.1 17.

UNIT CAPACITY FACTOR (Using Design MWe)...

95 '

78.4 18.

UNIT FORCED OUTAGE RATE......

1.5 19P SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPED DATE, AND DURATZON OF EACH):

Steam Generator Inspection -

July 10 - Aug. 6, 1977 2D.

IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

64.7 2.8 21.

UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

PORECAST ACHIEVED INITIALCRITICALITY INITIALELECTRICITY COMMERCZAL OPERATION

~

l

~

~

I

~

~

~

~

I t

~

~

t

1 APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50 Turkey Point UNIT Unit No DATE t'une 3

1977 COMPLETED BY V. T. Chilson TELEPHONE (305) 552 - 3769 MONTH

~ay DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 17 18 10 563 675 673 669 661 49 19 20 21 22 23 25 26 12 13 14 15 16 27 28 29 30 31 NOTE:

Average daily power greater than 666 MWe due to cooler condenser cooling water.

APPRG)ZX C OPERATING DATA REPORT REPORT MONTH 4

OPERATING STATUS DOCKET NO.

50 - 251 r

y oat UNIT Unit No. 4 DATE June 3

1977 COMPLETED BY V. T. Chilson TELEPHONE (305) 552 - 3769 1 ~

2 REPORTING PERIOD:

77 05 01 GROSS HOURS ZN REPORTING PERIOD:

THROUGH 2400 77 05 31 CERREEYLY AIIYREREEEE 202ER IEOEL 4IIEO):~2 MAX.DEPEND.

CAPACITY (MWe-Net):

666 3.

POWER LEVEL TO WHICH RESTRICTED {IF ANY)

{MWe-Net):

4.

REASONS FOR RESTRICTION (ZF ANY):

THZS MONTH YEAR TO DATE CUMULATIVE 5-NUMBERS OF HOURS REACTOR WAS CRITICAL.....

127.0 2 521.9 6.

REACTOR RESERVE SHUTDOWN HOURS.....,......

0-7 ~

HOURS GBKRATOR OH LINE.....,..

121.5 2 496.7 8 ~

UNIT RESERVE SHUTDOWN HOURS ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

9.

GROSS THERMAL ENERGY GRKRATED (Ml%).... ~.

259 799 5 424 235 10.

GROSS ELECTRICAL ENERGY GENERATED (MWH)...

83 320 1 768 3S5 11.

NET ELECTRICAL ENERGY GEKRATED (MWH).....

77 271 1 680 145 12.

REACTOR SERVICE FACTOR....................

69.6 13.

REACTOR AVAILABILITYFACTOR...

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

69.6 14'NIT SERVICE FACTOR. ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

16.3 68.9 15.

UNIT AVAILABILITYFACTOR.......... 4...

~. 4

~

16;3

68. 9

~24 24 138.8 23 038.8 48 483 605 15 726 068 14 910 611 73.3 73.7 69.7 69.7 16.

UNIT CAPA'CITY FACTOR (Using (MDC).........

17.

.UNIT CAPACITY FACTOR (Using Design MWe)...

15.6 15.0 69.6 66.9 68.3 65.1 Igo UHZT FORCED OUTAGE RATEo ~ ~ ~ ~ o>> ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

19.

SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPEE DATE, AND DURATION OF EACH):

3.2 20.

IF SHUTDOWH AT END OF REPORT PERIODS ESTIMATED DATE OF STARTUP:

21.

UHITS ZN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED IHITIALCRITICALITY INITIALELECTRICITY COMYERCIAL OPERATION

1)

REASON A:

EQUIPMENT PAILlIRE (EXPLAIN)

B:

MAINT. OR TEST C:

REFUELING-D:

RECULATORY RESTRICTION E-OPERATOR lTRAINING AND LICENSE EXAMINATION P:

ADHINISTRATIVE G:

OPERATIONAI. ERROR (EXPLAIN)

H:

OTHER (EXPIJLIN)

APPENDIX D UNIT SHUTDOWNS AND POWER REDUCTIONS DATE Ju COMPLETED BY TELEPHONE DOCXET NO.

50 - 251 UNIT NAME Turke Point U

5 o

I)

HETHOD 1:

HANUAL 2::.MANUAL SCRAH

~

3:

AUTOMATIC SCRAM 4:

DINER (EXPIAIN)

NO-DATE TYPE P:

PORCH)

S:

SCHEDULED DURATION (HOURS)

REASON(l)

HETHOD OF SHUTTING DOWN THE REACTOR OR REDUCING POWER(2)

CORRECTIVE ACTIONS/COMMENTS 4

77-04-26 74.3 Unit No.

4 was removed from service to repair steam generator No.

4C tube leak.

(Continued from previous month)

(Nuclear System) 5 77-05-09 548.2 Unit was removed from service for refueling, maint-

enance, and inspections.

(Nuclear and Non-nuclear Systems)

Unit No. 4 was removed from service for schedueled refueling, maintenance, and inspections on May 9, 1977.

APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50 335 St. Lucre UNIT. Una.t No.

1 DATE June 3 ~ 1977 COMPLETED BY V. T. Chilson TELEPHONE (305) 552 3769 MONTH DAY AVERAGE DAlLY POWER LEVEL (me-Net)

DAY AVERAGE DAILY POWER LEVEL (NVe-Net) 3 10 12 13 14 670 678 692 702 687 684 678 665 657 584 197 712 672 336 17 18 20 21 22 23 24 25 26 27 28 29 30 585 748 742 526 748 716 743 745 683 697 492 740 739 731 480

6

'I APPENDIX C OPERATING DATA REPORT REPORT MONTH OPERATING STATUS DOCZET NO.

50 - 335 t.

uc e UNIT Unit No. 1 DATE June 3, 1977 COMPLETED BY V. T ChiIeon TELEPHONE (305) 552 - 3769 1.

REPORTING PERIOD: 0 THROUGH 2.

CIIIIREFZLY AIIYHORZYEO FOUER LEVEL (HHYZ:J~A MAX.DEPEND.

CAPACITY (MWe-Net):

777 Est.)

DESIGN ELECTRICAL RATING (MWe-Net):

802 3.

POWER LEVEL TO WHICH RESTRICTED (ZF ANY)

(MWe-Net):

4.

REASONS FOR RESTRICTION (IF ANY):

NONE THIS MONTH YEAR TO DATE CUMULATIVE 5 ~

HLHRERS OF HOURS RRACYOR UIIS CRYYZCAL.....

665.5 2 9199 6.

REACTOR RESERVE SHUTDOWN HOURS............

8.2 8.2 7.

HOURS GENERATOR ON LINE. ~ ~ ~ ~ ~ ~ ~ ~ ~ ~........

655.1 2 872.5 8 ~

UNIT RESERVE SHUTDOWN HOURS ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

9, GROSS THERMAL ENERGY GERKRATED (MWH)....,.

1 519 476 6 225 958 10.

GROSS ELECTRICAL EKRGY GENERATED (MWH)...

478 400 2 023 400 11.

NET ELECTRICAL ENERGY GELKRATED (MWH).....

448 820 1 889 396 6 573 561 2 131 670 1 988 371 12.

REACTOR SERVICE FACTOR..............,....,

89.4 13.

REACTOR AVAILABILITYFACTOR......,........

90 5 82.2 82.4 83.4 83.6 14.

UNIT SERVICE FACTOR....

88.0 79.3 15'NIT AVAILABILITYFACTORA ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

88.0 79.3 80.7 80.7 16.

17.

18.

UNIT CAPACITY FACTOR (Using (MDC)...

77.6 67.1 UNIT CAPACITY PACTOR (Using Design MVe). ~.

65.0 UNIT FORCED OUTAGE RATEA ~ ~ ~ ~ ~

>> ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

12.0, 19.2 65.8

63. 8
17. 9 19.

SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

20.

IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

21.

UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIALCRITIC.Q.ITY INITIALELECTRICITY CORDKRCIAL OPERATION

I)

REASON h:

EQUIPMENT FAILURE (EXPLAIN)

B:

MAINT. OR TEST C:

REFUELINC D:

RECULATORY RESTRICTION E:

OPERATOR TRAINING AND LICENSE EXAMINATION F:

ADHINISTRATIVE C:

OPERATIONAL ERROR (EXPLAIN)

H:

OTIIER (EXPLAIN)

APPENDIX D UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50 - 335 UNIT NAHE St. Lucie Unit No.

1 DATE June 3, 1977 COMPLETED BY V. T. Cbilson TELEPHONE (305) 552 3769

!)

METiiOD 1:

HANUAL 2:

~MANUAL SCRAM 3:

AUTOHATIC SCRAM OTHER (EXPLAIN)

NO.

DATE TYPE F:

FORCED S:

SCHEDULED DURATION (BOURS)

REASON(l)

HETHOD OF SHUTTINC DOWN T)lg REACTOR OR REDUCING POWER(2)

CORRECTIVE ACTIONS/CRDiENTS 15 77-05-10 16 77-05-16 63.5 11.6 Unit was removed from service to repair a leek located inside the containment building that could not be isolated.

(Nuclear System)

Unit was removed from service due to transient condition on the transmission system.

(Non-nuclear System) 17 77-05-27 18 77-05-31 5.6 8.2 Unit was tripped during a transient condition by the steam generator level protection system.

(Nuclear System Unit was tripped by actuation of the Loss of Field Relay.

Corrective actions included replacement-of generator exciter conponcnts.

(Nonnuclear System)

SUMMARY

Unit was operated at an avera'ge reactor power level of 95 X R.P. during month except for outages on May 10, May 16, Hsy 27, snd May 31, 1977.