ML18227B083
| ML18227B083 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 11/15/1976 |
| From: | Chilson V Florida Power & Light Co |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| Download: ML18227B083 (13) | |
Text
'IPC n II. rye pnP arvvO INTERNALD ISTRI BUTION ELOHIM CH BRANCUSI CllEEF L V
EXTERNALDISTRIBUTION CONTROL NUMBER NAG FOAM 195 (2 76)
- 11621, n" P
NRC FOAM 195 I2 76)
U.S. NUCLEAflAEQULATORY ISS I ON DOCKET NUMBER 50 251.
'idRC DISTRIBUTION FDR PART 50 DOCKET MATERlAL FILE NUMBER TO:
& LIGHT CO.
MIAMI, FLORDIA V.T. CHILSON DATE OF DOCUMENT 11-5-76 DATE RLCEIVED 11-15-76 C3LETTER IBORIGINAL CICOPV QNOTOAIZED l3UNCLASS IF I E D PROP INPUT FORM NUMBER OF COPIES AECEIVED DESCRIPTION LTR.
TRANS THE FOLLOWING ENCLOSU RE CORRECTED CYS.
OF OCTOBER 1976 OPERATING DATA REPORT.......
(
1 SIGNED CY. RECEIVED)
( 7 pages)
PLANT NAME:
TURKEY PT.
8 3
& 4 A.C IiOSOYVYS SAFETY ASSIGNED AD:
BRANCH CHIEF:
PROJECT MANAGER:
LIC~
ASST'
PARRISH FOR ACTION/INFORMATION ASS~I NED AD ~
r PRO
'IAN
~
RE'G FILE NRC PDR I & E 2
OELD GOSSICK & STAFF MIPC CASE HANAUER LES INTERNALD SYSTEMS SAFETY HEINEMAN SCHROEDER ENGINEERING MACCARRY KNIGHT SIIIWEIL PAWLICKI IST RI BUTION BENAROYA IPPOLITO K RKWOO OPERATIN REAC 0 S
SITE ENV 0 ANA PRO CT IIANA EMEN P
COLLINS HOUSTON PETERSON MELTZ HELTEMES SKOVHOLT I.PDR:
MIAMI FL.
TIC:
NOMIC; ASI.B
'EACTOR SAFE'IIY ROSS NOVAK ROSZTOCZY CHECK AT& I SALTZMAN RUTBERG EXTERNAL DISTRIBUTION NAT IAB:
REG, VIE LA PDR CONSUI,TANTS OPERA N
EISENIl SHAO BAER BUTLER RIMES BROOKHAQ~F ULRIKSON ORNI.
QLLI CONTROL NUMBE R 11621 NAC FOAM IOS 2 7II
C t R
~
~
c e
~
~ c
,rg)l
- I Attached are corrected copies of October 1976 Operating Data'Reports for Turkey Point Unit Nos.
3 and 4.
The corrections are:
Add revised refueling dates for Turkey Point Unil. No. 3, Line 19.
Add estimated startup date for Turkey Point Unit No. 4, Line 20.
We regret any inconvenience caused by these omissions.
V. T.
Chilson I;)
~ t" Pl
,l g
/ h$
h hh li' ll h ~ l<'
h I hi I
~ ~Q
~
J H
t>>.
~ n i'"
<tr):,,kg'r I
APPENDIX C OPERATING DATA REPORT REPORT MONTH
- October, 1976 OPERATING STATUS DOCKET Np. 50 UNIT Turkey Point Unit No.
3 DATE Nov. 5, 1976 COMPLETED BY V. T. Chilson TELEPHONE (305) 552 3830 1,
REPORTING PERIOD: 0001,76 10>01 GROSS HOURS IN REPORTING PERIOD:
THROUGH 2400 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt):
MAX DEPEND.
CAPACITY (MWe-Net):
. 666 DESIGN ELECTRICAL RATING (MWe-Net):
693 745.pe 3.
POWER LEVEL Tp WHICH RESTRICTED (IF ANY)
(MWe-Net):
4.
REASONS FOR RESTRICTION (IF ANY):
NONE THIS MONTH YEAR Tp DATE CUMULATIVE 5 ~
NUMBERS OF HOURS REACTOR WAS CRITICAL.....
745.0*
6 446.1 27 726.2 6.
REACTOR RESERVE SHUTDOWNi HOURS..
~......
~..
0.0 64.2 67.4 7.
HOURS GENERATOR ON LINE. ~........,......,,
745.0*
6 355.6 26 725.6 8 ~
UNIT RESERVE SHUTDOWN HOURS............'...
0 ~ 0 0 ~ 0
~
85.0 9 ~
GROSS THERMAL ENERGY GENERATED (MWH) 1 614 694 13 733 282 51 p45 542 10 'ROSS ELECTRICAL ENERGY GENERATED (MWH)...
505 740 4 340 645 16 355 881 11.
NET ELECTRYCAL ENERGY GENERATED (NNE).....
466 673 4 119 351 1~547 1
12 ~
REACTOR SERVICE FACTOR.
~~...........
100.0 88.1 80.9 13.
REACTOR AVAILABILITYFACTOR..
~.......
~....
14.
UNIT SERVICE FACTOR.
100 '
88.9 81 '
100.0 86.8 78.0 15.
UNIT AVAILABILITYFACTOR................,
~
100.0 86.8 78.2 16.
'UNIT CAPACITY FACTOR (Using (MDC).........
96 '
84.5 68.8 17.
UNIT CAPACITY FACTOR (Using Design MWe)...
93 '
81.2 65.2 18.
UNIT FORCED OUTAGE RATE................
~..
0.1 3.0 19.
SHUTDOWANS SCHEDULED OVER NEXT 6 MpiiTHS (TYPE, DATE, AND DURATION OF EACH):
Refueling, maintenance, and insPections November 13 through December 27, 1976 20.
IP SHUTDOWN AT END OF REPORT PERIOD>
ESTIMATED DATE OF STARTUP:
21.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
INITIALCRITICALITY INITIALELECTRICITY CONKRCIAL OPERATION CnenSed lone DST to ESl on Goto>et 31, 1976 1
g()%b, high FORECAST ACHIEVED
~~621.
APPENDIX C OPERATING DATA REPORT I
REPORT MONTH
- October, 1976 OPERATING STATUS
~
DOCKET NO.
UNIT Turkey Point Unit No. 3 DATE Nov. 5, 1976 COMPLFTED 'BY V. T. Chilson TELEPHONE (305) 552-3830 1.
REPORTING PERIOD: 0001,76 10 01 GROSS HOURS IN REPORTING PERIOD:
2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt):
2200 MAX.DEPEND. CAPACITY (MWe-Net):
. 666 DESIGN ELECTRICAL RATING (MWe-Net):
93 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY)
(MWe-Net):
NONE 4.
REASONS FOR RESTRICTION (IF A'.Hl):
745.0+
THIS MONTH YEAR TO DATE CUMULATIVE 5.
NULLBERS OF HOURS REACTOR WAS CRITICAL.....
745.0+
6 446.1 27 726.2 6.
REACTOR RESERVE SHUTDOWN HOURS............
0.0 64.2 67.4 7.
HOURS GENERATOR ON LINE 745.0+
6 355.6 26 725.6 8 ~
UNIT RESERVE SHUTDOWN HOURS..........,
~,,
0.0 0 '
85,0 9.
GROSS THERMAL ENERGY GENERATED (MWH)......
1 614 694 13 733 282 51, 045 542 10.
GROSS ELECTRICAL ENERGY GENERATED (MWH)...
505 740 4 340 645 16 355 881 11.
IIEE ELECEREC4L EEERGII GLIEEREED LIIIIE). ~
~. ~
488 673 4 119 331 1~947 I
12.
REACTOR SERVICE FACTOR.
100.0 88.1 80.9 13.
REACTOR AVAILABILITYFACTOR.......
~....,..
100.0 88.9 81.1 14'NIT SERVICE FACTOR.
15.
UNIT AVAILABILITYFACTOR.................
100.0 100.0 86.8 86.8 78.0 78 '
16 ~
UNIT CAPACITY FACTOR (Using (MDC) ~.
~ ~ ~.
84.5 68.8 17.
UNIT CAPACITY FACTOR (Using Design MWe)...
93 '
81.2 65.2 18'NIT FORCED OUTAGE RATE.
0.0 0.1 3.0 19 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPED DATE 9 A4%) DURATION OF EACH)
Refueling, maintenance, and insPections - November 13 through December 27, 1976 20.
IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
21.
UNITS IN TEST STATUS (PRIOR TO COMMERCZAL OPERATION):
INITIALCRITICALITY INITIALELECTRICITY CORKRCIAL OPERATION FORECAST ACHIEVED NOTE:
+ Changed from DST to EST on October 31, 1976
4
APPENDIX C OPERATING DATA REPORT REPORT MONTH
- October, 1976 OPERATING STATUS DOCKET NO. 50 - 250 UNIT Turkey Point Unit No.
3 DATE Nov. 5, 1976 COMPLETED By V. T. Chilson TELEPHONE (305) 552-3830 1.
REPORTING PERIOD: 0001,76 10 Ol GROSS HOURS IN REPORTING PERIOD:
2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt):
MAX.DEPEND. CAPACITY (MWe-Net):
. 666 DESIGN ELECTRICAL RATING (MWe-Net):
693 745.0*
3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY)
(MWe-Net):
4.
REASONS FOR RESTRICTION (IF AVI):
NONE 5*
NUMBERS OF HOURS REACTOR WAS CRITICAL...
6.
REACTOR RESERVE SHUTDOWN HOURS.
~ ~ ~ - ~.
THIS MONTH YEAR TO DATE CUMULATIVE 745.0*
6 446.1 27 726.2 0.0 64.2 '
67.4 7.
HOURS GENERATOR ON LINE,, ~
745.0*
. 6 355.6 26 725.6 8.
UNZT RESERVE SHUTDOWN HOURS.........,.....
0.0 0.0 85.0 9.
GROSS THERMAL ENERGY GENERATED (MWH)......
1 614 694 13 733 282 51 045 542 10.
GROSS ELECTRICAL ENERGY GENERATED (MWH)...
505 740 4 340 645 16 355 881 11.
IIEY ELEC1'RECRL ENERGY GLVE!IEYEG (NIN).....
466 673 4 119 351 3~5475 1
12.
REACTOR SERVICE FACTOR......
100.0
- 88. 1 80.9 13.
REACTOR AVAILABILITYFACTOR..............,
100.0 88 '
81.1 14 UNIT SERVICE FACTOR..
100.0 86.8 78.0 15.
UNIT AVAILABILITYFACTOR....,...,....,,...
100.0 86.8 78 '
16*
UNIT CAPACITY FACTOR (Using (MDC).........
17.
UNIT CAPACITY FACTOR (Using Design MWe)...
18'NIT FORCED OUTAGE RATE 96.9 84.5 68.8 93.1 81.2 65.2 0.0 0.1 3.0 19.
SHUTDOWNS SCHEDULED OVER NEXT 6 M044HS (TYPE, DATE, AND DURATION OF EACH):
Refueling, maintenance, and"inspections November 13 through December 27, 1976 20.
IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE-OF STARTUP:
21.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION FORECAST ACHZEVED NOTE:
~ Changed from DST to EST on October 31, 1976
~
~
~:
APPENDIX C OPERATING DATA REPORT REPORT MONTH October 1976 OPERATING STATUS DOCKET NO. 50 - 251 UNITTurke Point Unit No.
4 DATENov. 5, 1976 COMPLETED BY V ~ T. Chilson TELEPHONE (305) 552-3830 1.
REPORTING PERIOD: 0001.76 10 01 GROSS HOURS IN REPORTING PERIOD:
THROUGH 240 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt):
2200 MAX.DEPEND. CAPACITY (MtJe-Net):
3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY)
(MWe-Net):
4.
REASONS FOR RESTRICTION (IF ANY):
NON THIS MONTH YEAR TO DATE CUMULATIVE 5
RIM!ERE 09 EOIIRS REACTOR NAS CRITECAL.....
536.2 5 357.6 2~200 6.
REACTOR RESERVE SHUTDOWNi HOURS............
0.0 117.1 7.
HOURS GENERATOR ON LINE.....
527.7 5 159.3 20 434.0 8.
UNIT RESERVE SHUTDOWN HOURS.
~ ~ ~.. ~........
0.0 0.0 9.
GROSS THERMAL ENERGY GENERATED (MWH)......
1 134 444
, 10 957 697 41 606 333 10.
GROSS ELECTRICAL ENERGY GENERIITED (ISIS)...
365 550
~3499 ll.
NET ELECTRICAL ENERCY CEEERATED (ISIS).....
346 662 3 317 972 1~2776 12.
REACTOR SERVICE FACTOR.
13.
REACTOR AVAILABILITYFACTOR..
~...........
72.0 72 '
73 '
75.5 14.
UNIT SERVICE FACTOR.
70.8 70.5 73.0 15.
UNIT AVAILABILITYFACTOR..................
70'8 70.5 73.0 16'UNIT CAPACITY FACTOR (Using (MDC)..........
69 '
68.1 69.3 17.
UNIT CAPACITY FACTOR (Using Design MWe)...
67 '
65.4 18.
UNIT FORCED OUTAGE RATE.
1.0 4.1 3.6 19.
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
20.
IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
Nov.
2 21.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
INITIALCRITICALITY INITIALELECTRICITY COlOJERCIAL OPERATION
\\
NOTE:
- Changed DST to EST on October 31, 1976 (1) Corrected-to-date FORECAST ACHIEVED
h APPENDIX C OPERATING DATA REPORT REPORT MONTH October 1976 OPERATING STATUS DOCKET NO ~ 50 - 251 UNITTurke Point Unit No.
4 DATENov. 5>> 1976 COMPLETED BYE T. Chilson TELEPHONE(305) 552-3830 1,
REPORTING PERIOD: 0001976 10 01 GROSS HOURS IN REPORTING PERIOD:
THROUGH 240 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt):
MAX DEPEND.
CAPACITY (MWe-Net):
3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY)
(MWe-Net):
NON 4 ~
REASONS FOR RESTRICTION (IF AVC):
THIS MONTH YEAR TO DATE CUMULATIVE 5.
NUMBERS OF HOURS REACTOR WAS CRITICAL.....
536 2
5 357.6 2~1 OO 6.
REACTOR RESERVE SHUTDOWN HOURS............
0.0 117. I 7.
HOURS GENERATOR ON LINE.........,.. ~......
527.7 5 159.3 20 434.0 8.
UNIT RESERVE SHUTDOWN HOURS........
~..
~.
0.0 0.0 0.0 9.
GROSS THERMAL ENERGY GENERATED (MWH)......
1 134 444 10 'ROSS ELECTRICAL ENERGY GENERATED (MWH) ~..
365 550 11 NET ELECTRICAL ENERGY GENERATED (MWH).....
346 662 10 957 697 41 606 333 349943 1;~83
/
3 317 972 1~2 77i~
12.
REACTOR SERVICE FACTOR 72.6 13 REACTOR AVAILABILITYFACTOR...
72.0 73 ~ 2 75.5 14.
UNIT SERVICE FACTOR.
9 15.
UNIT AVAILABILITYFACTOR...........
~.....
- 70. 8 70.5 73.0 70.8 70.5 73.0 16'ZT CAPACITY FACTOR (Using (MDC).........
69 '
68.1 69.3 17.
UNIT CAPACITY FAClOR (Using Design MWe). ~.
67 '
65.4 18'NIT FORCED OUTAGE RATE...................
4.1 3.6 19.
SHUTDOWNS SCHEDULED OVER NEXT 6 MO~S (TYPE, DATE, AND DURATION OF EACH):
20.
IF SHUTDOWN AT END OF REPORT PERIOD>
ESTIMATED DATE OP STARTUP:
Nov.
21.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION FORECAST ACHIEVED NOTE:
- Changed DST to EST on October 31, 1976 (1) Corrected-to-date
APPENDIX C OPERATING DATA REPORT REPORT MOHTH October 1976 OPERATING STATUS DOCKET NO. 50 - 251 UNITTurke Point Unit No.
4 DATENov. 5, 1976 COMPLETED BYV T. Chilson TELEPHONE(305) 552-3830 1.
REPORTING PERIOD: 0001 76 10 01 GROSS HOURS IN REPORTING PERIOD:
THROUGH 2400 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt):
2200 MAX.DEPEND. CAPACITY (MWe-Net):
3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY)
(MWe-Net):
4.
REASONS FOR RESTRICTION (IF ANY):
NONE THIS MONTH YEAR TO DATE CUMULATIVE NIINSERS 09 NOIIRS REACTOR NAS CRLTICAL 536.2 5 357.6 2~100 6 ~
REACTOR RESERVE SHUTDOWAN HOURS ~
~ ~ ~ ~ ~
~
~ ~ ~ ~ ~
0 '
0.0 117.1 7.
HOURS GENERATOR ON LINE..
527.7 5 159.3 20 434.0 8.
UNIT RESERVE SHUTDOWN HOURS,............
~.
00 00 9.
GROSS THERMAL ENERGY GENERATED (MWH)......
1 134 444 10 957 697 41 606 333 10.
CROSS ELECIRECAL RIIEROY OENEIIATED (NWII) ~
~ ~
365 55D
~3499
~ZL583 11, NET ELECTRICAL ENERCY CENERATND (NWN)....,
366 662 3 317 972 2~27 6
12.
REACTOR SERVICE FACTOR.
72.0 13.
REACTOR AVAILABILITYFACTOR ~
~
~.
~. ~........
73.2 75 '
14-UNIT SERVICE FACTOR.
70.8 70.5 73.0 15.
UNIT AVAILABILITYFACTOR.....
~...
~........
70.5 73.0 16.
UNIT CAPACITY TACTOR (Using (MDC)...... ~...
69 '
17.
UNIT CAPACITY FACIOR (Using Design MWe)...
67 1
68.1 65.6 69.3 18.
UNIT FORCED OUTAGE RATE ~........
1.0 4.1 3.6 19.
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
20.
IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
Nov.
21.
UNITS IN TEST STATUS (PR OR TO COMMERCIAL OPERATION):
INITIALCRITICALITY INITIALELECTRICITY COKKRCIAL OPERATION PORECAST ACHIEVED NOTE:
" Changed DST to EST on October 31, 1976 (1) Corrected-to-date