MONTHYEARL-2024-184, Radiological Emergency Plan Revision 772024-11-0505 November 2024 Radiological Emergency Plan Revision 77 L-2024-173, Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-31031 October 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles L-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2024-175, Cycle 34 Core Operating Report2024-10-24024 October 2024 Cycle 34 Core Operating Report ML24291A2882024-10-24024 October 2024 Westinghouse Topical Report - Request for Withholding Information from Public Disclosure L-2024-177, Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis2024-10-22022 October 2024 Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis ML24276A2302024-10-16016 October 2024 Westinghouse Topical Report – Request for Withholding Information from Public Disclosure L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes ML24289A2372024-10-15015 October 2024 Transmittal of Revision 1 Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) L-2024-157, Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-0303 October 2024 Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles IR 05000250/20243012024-10-0303 October 2024 NRC Operator License Examination Report 05000250/2024301 and 05000251/2024301 L-2024-147, Submission of Periodic Reports2024-10-0101 October 2024 Submission of Periodic Reports L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24269A1292024-09-24024 September 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis ML24260A2262024-09-18018 September 2024 NRC Examination Results Summary - Examination Reports: 05000250/2024301 and 05000251/2024301 ML24262A2272024-09-18018 September 2024 Transmittal of Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles ML24158A0052024-09-17017 September 2024 Completion of Subsequent License Renewal Site Specific Environmental Review and Modification to Subsequent Renewed Facility Operating Licenses L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24207A0342024-09-13013 September 2024 – Exemption from Certain Requirements of 10 CFR 50.46 for Use of Axiom Fuel Rod Cladding – Letter ML24256A1132024-09-13013 September 2024 Regulatory Audit Summary Related to the Review of Regarding the Updated Spent Fuel Pool Criticality Safety Analysis License Amendment Request IR 05000250/20240052024-08-23023 August 2024 Updated Inspection Plan for Turkey Point Units 3 & 4 - Report 05000250/2024005 and 05000251/2024005 ML24234A0062024-08-22022 August 2024 Project Manager Assignment L-2024-122, Core Operating Limits Report2024-08-12012 August 2024 Core Operating Limits Report L-2024-106, Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-022024-08-12012 August 2024 Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-02 ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-089, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-07-25025 July 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24184B2822024-07-16016 July 2024 – Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal 05000250/LER-2024-002-01, Condition Prohibited by Technical Specifications2024-07-10010 July 2024 Condition Prohibited by Technical Specifications ML24173A1902024-06-28028 June 2024 Withdrawal of an Amendment Request ML24159A2652024-06-26026 June 2024 Correction of Safety Evaluation for Issuance of Amendment Nos. 298 & 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-100, Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project2024-06-19019 June 2024 Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter IR 05000250/20244012024-06-0505 June 2024 – Security Baseline Inspection Report 05000250-2024401, 05000251-2024401 and 07200062-2024401 L-2024-076, Reply to Notice of Violation; NOV 05000250, 05000251/2024010-052024-05-29029 May 2024 Reply to Notice of Violation; NOV 05000250, 05000251/2024010-05 L-2024-082, 2023 Annual Radiological Environmental Operating Report2024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000250/20240012024-05-10010 May 2024 Integrated Inspection Report 05000250/2024001 and 05000251/2024001 ML24135A0942024-05-0909 May 2024 Periodic Update to the Updated Final Safety Analysis Report L-2024-060, 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report2024-05-0909 May 2024 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report ML24127A1862024-05-0909 May 2024 Request for Withholding Information from Public Disclosure ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-073, Cycle 34 Core Operating Limits Report2024-05-0101 May 2024 Cycle 34 Core Operating Limits Report L-2024-072, Cycle 33 Core Operating Limits Report2024-05-0101 May 2024 Cycle 33 Core Operating Limits Report L-2024-048, Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision2024-04-30030 April 2024 Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision L-2024-069, Radiological Emergency Plan Revision 762024-04-22022 April 2024 Radiological Emergency Plan Revision 76 L-2024-066, Sixth 10-Year Inservice Testing Interval Relief Request No. PR-022024-04-17017 April 2024 Sixth 10-Year Inservice Testing Interval Relief Request No. PR-02 2024-09-25
[Table view] Category:Operating Report
MONTHYEARL-2022-039, and Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2022-04-14014 April 2022 and Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2021-097, and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report2021-05-13013 May 2021 and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report L-2021-096, 10 CFR 50.59(d)(2) Summary Report2021-05-11011 May 2021 10 CFR 50.59(d)(2) Summary Report L-2021-018, 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report2021-02-16016 February 2021 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report L-2020-065, Submission of Periodic Reports2020-04-0909 April 2020 Submission of Periodic Reports ML18227A9832018-08-15015 August 2018 Submit First Year Operation Report. L-2008-245, Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/082008-11-10010 November 2008 Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/08 L-2007-053, Annual Radiological Environmental Operating Report2007-05-0404 May 2007 Annual Radiological Environmental Operating Report L-2004-097, Annual Radiological Environmental Operating Report2004-05-11011 May 2004 Annual Radiological Environmental Operating Report ML18227B0771978-03-17017 March 1978 03/17/1978 Letter Operating Summary Reports of February 1978 ML18227A4231978-03-0404 March 1978 Attached February, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0631978-03-0404 March 1978 03/04/1978 Letter Operating Status Reports of February 1978 ML18227A4221978-02-14014 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0641978-02-14014 February 1978 02/14/1978 Letter Operating Status Reports of January 1978 ML18227A4211978-02-0404 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0651978-02-0404 February 1978 02/04/1978 Letter Operating Status Reports of January 1978 ML18227A4201978-01-0707 January 1978 Attached December, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0671978-01-0707 January 1978 01/07/1978 Letter Operating Status Reports of December 1977 ML18227A4191977-12-0303 December 1977 Attached November, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0681977-12-0303 December 1977 12/03/1977 Letter Operating Status Reports of November 1977 ML18227A4171977-11-0505 November 1977 Attached October, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0691977-11-0505 November 1977 11/05/1977 Letter Operating Status Reports of October 1977 ML18227B0701977-10-0505 October 1977 10/05/1977 Letter Operating Status Reports of September 1977 ML18227B0711977-09-0303 September 1977 09/03/1977 Letter Operating Status Reports of August 1977 ML18227A4151977-09-0303 September 1977 Attached August, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0731977-08-0505 August 1977 08/05/1977 Letter Operating Status Reports of July 1977 ML18227A4141977-08-0505 August 1977 Attached July, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0741977-07-0707 July 1977 07/07/1977 Letter Operating Status Reports of June 1977, and a Revised Operating Data Report for May 1997 for Turkey Point Unit 3 ML18227A4131977-07-0707 July 1977 Attached June, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. May, 1977 for Unit 3 Incorrectly Reported for Some Values. Attached Revised May, 1977 Operating Data Report for Unit 3 ML18227B0751977-06-0606 June 1977 06/06/1977 Letter Operating Status Reports of May 1977 ML18227A4121977-06-0606 June 1977 Attached May, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0761977-05-0505 May 1977 05/05/1977 Letter Operating Status Reports of April 1977 ML18227A4111977-05-0505 May 1977 Attached April, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227A4101977-04-0404 April 1977 Attached March, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. Maximum Dependable Capacity (MWe-Net) for St. Lucie No. 1 Was Revised from 802 MWe-Net to 777 MWe-Net (Estimated) ML18227B0781977-04-0404 April 1977 04/04/1977 Letter Operating Status Reports of March 1977 ML18227B0791977-03-0707 March 1977 03/07/1977 Letter Operating Status Reports of February 1977 ML18227A4091977-03-0707 March 1977 Attached February, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0801977-02-0707 February 1977 02/07/1977 Letter Operating Status Reports of January 1977 ML18227B0811977-01-0707 January 1977 01/07/1977 Letter Operating Status Reports of December 1976 ML18227A4081977-01-0707 January 1977 Attached December, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0821976-12-0606 December 1976 12/06/1976 Letter Operating Status Reports of November 1976 ML18227B0831976-11-15015 November 1976 11/15/1976 Letter Corrected Copies of Operating Data Reports for October 1976 ML18227B0841976-11-0808 November 1976 11/08/1976 Letter Operating Status Reports of October 1976 ML18227A4061976-11-0808 November 1976 Attached October, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227A4071976-11-0505 November 1976 Attached Corrected Copies of October, 1976 Operating Data Reports for Turkey Point Unit Nos. 3 and 4 ML18227A4051976-10-0808 October 1976 Attached September, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0861976-09-0707 September 1976 09/07/1976 Letter Operating Status Reports of August 1976 ML18227A4031976-09-0707 September 1976 Attached August, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0871976-08-0505 August 1976 08/05/1976 Letter Operating Status Reports of July 1976 ML18227A4021976-08-0505 August 1976 Attached July, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. St. Lucie Unit No. 1 Was Previously Reported to Be in Commercial Operation, in Error. Attached Corrected June 1976 for St. Lucie No. 1 2022-04-14
[Table view] |
Text
NRC FORM 195 U.S. NUCLEAR REGULATORY COMMISSION 12 76I FILE NUMBER KRC DISTRIBUTION FQR PART 50 DO CKET MATERIAL MONTHLY RE FROM: DATE OF DOCUMENT.
Florida Power & Light Company 5/5/77 Ne Ro CD Miami, Florida DATE RECEIVED A. D Schmidt 5/l2/77 LETTER ONOTORIZED PROP INPUT FORM NUMBER OF COPIES RECEIVED i%ORIGINAL UNCLASSIFIED OCOPV
( g 1 g rc/pA DESCRIPTION ENCLOSURE Iatter trans the following: Monthly Report for APRIL, 1977 Plant &, Component Operability &, Availability.
+is Report to be used in preparing Gray Book g(l IIII~gIIik by PlanS 8 Operations.
IImm N.III~%
(l-P) (B-P)
PLQPV NAME Turkey Point Units 3 & 4 RJL FOR ACTION/INFORMATION 2- CYS FOB CTI N INTERNAL D IST RI BUTION C D rane e ss EXTERNAL Dl T IBUTION CGNTROL NUMBER 77134OOlg NRC FORM 196 <2 75)
P. O. BOX 013100, MIAMI, FL 33101 FLORIDA POWER & LIGHT COMPANY May 5, 1977 Office of Management Information Qfe and Program Controls gea4~~W U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:
Attached are the April, 1977, Operating Status Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit No. l.
Very truly yours, A. D. Schmidt Vice President Power Resources VTC/DDC cc: Mr. Norman C. Moseley Robert Lowenstein, Esquire 77134OI)gP PEOPLE... SERVING PEOPLE
APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 250 Turkey Point UNIT Unit No. 3 DATE Bay 5, 1977 COMPLETED BY >. T. Chxlson TELEPHONE {305) 552-3769 MONTH A ril 1977 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (NHe-Net) QÃe-Net) 677 17 671 673 18 666 673 667 669 20 665 672 656 21'2 673 341 623 23 603 567 24 683 25 10 680 678 27 12 683 28 13 682 29 308 676 30 666 671 16 668 NOTE: Average daily power greater than 666 MWe due to cooler condenser cooling water.
APPRiDIX C OP~TDiC DATA RZPORT DOCKET NO. 50 - 250 Turkey Point UNIT Unit No. 3 REPORT NONTH April 1977 DATE Na 5. 1977 CO%'LTD BY V. T. Chilson OPERATING STA,CS TZLZPHONE (305) 552-3769 9
~ ~ ~OR '~C PERIOD: 0001977904901 GROSS HOURS ZN RZPORTZtG PERIOD: 719.0e THROUGH 240 7 CURRY-. Y *L NOR m ?Ot cR ~VZL (MWt): 2200 M.DEPEND. CAPACITY (NWe-Net): 666 DKSLGN ELECTRICAL RATLlG (NWe Net): 693
- 3. POtEER L~c, TO Vc5ZCH RvZSTRX~ (I: A:SY) (NWe<<Net): NONE
- 4. RZASONS FOR RZSTRIC XGN (I A!V):
THIS NONTH YEAR .0 DAA= CSJMJLATXVK 5 ~ ÃRBERS 0. EQ"RS MAC QR EAS C'4 2 CAC..... 594.2 29982I
- 6. RECTOR RZSKRVE S~a ~ OWN HOURS 0 0-HOURS CBPcRATOR ON LLfE................... 579.6 2 246.5 ~2
- 8. UNIT RESKVS'K SETDOWN HOURS.. ~ . ~ ~ ~ . ~ ~ .~.~. ~8. 0
- 9. GROSS ESERM~ B~c-GY G=KRATKD (NWH)...., ~ 1 244 675 4 783 145 56 512 733
- 10. CROSS K'"CTR M. DRGY G>cERATKD (NtEH)... 401 220 1 554 580 18 125 031 NET K ~GAL hWGY G~c ZD (WH). ~ ~ ~ . 380 593 1 474 705 17 150 690
- 12. RKAC.OR SERVICE FACTOR. . . . .... 82.6 83.0 78.8 14.
)5 264
)7.
REAC OR AVAZLABILZY LN UNZT SEESVZCE IDGT CAPACI UNZ CAPAC .Y FAC OR.
AVAIEMILZ ..
FACMR FAC"AOR
-.ACTOR ~,
FAC:OR.....
(Using,'K)C)
(Using Design NWe)...
~ .....,...
82.6 80.6 80.6
- 79. 5 76.4 83.0 78.0
- 78. 0 76.9 73.9
~62 79.0 75.8 76.1 S ZNiIT FORCE OL lACE RATE ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 1.7 1.5 2.8
- 19. SHCTDOWNS S~~tA'LKD OVEt NEXT 6 NONTHS (TYPES DAT=S AV) DURATION OF EACH) c Steam Generator Inspection - JuLy 10 - Aug. 6, 1977
- 25. 'IP SHUTDOWN AT BG) OF iQPORT P~vODS EST~TG) DAT OF STARTUP:
'2 2 MJITS XN TEST STAAJS (PR OR TO CON(ERCZAL OPTATION): FORECAST L'EiM. CRZTZCALZY ZNITZAL ELEC RIC ~A COMKRCM. OPERATION NOTE:
- Change to Daylight Saving Tine
APPENDIX D POCKET NO. 50 - 250 I) REASOH A: Ki)UI PHENT FAILURE (EXPLAIN)
B: HAIHI'. OR TEST IINIT SIIUTDOWNS AND POMFR REIRICTIONS UNIT NAHE Turks Point Unit No. 3 I'.: RFFIIEI.INC D: RECUIATORY RESTRTCTION DATE Hay 5, 1977 F.: Ol'KkATOR TkhllilNC AND COHPI.ETED DY V. T. Cbllson I. I CKNS 8 EXAH I NATI OH F: ADHIHISTRATIVE C: OPKRATIOtihl. FIIROR (KXPIAIH) REPORT HONTII~A ril 1977 TEI.KPHOIIE (305) 552-3769 II: OTIIER (KXI'ITIN)
.') HETIIOD I: IIANIIAI. HETI(OD OF 2: HANIIAI. SCRAH TYPF. SIIUTTING DOMN 3: AUTIRIATIC Si:RAII F: FORCED DURATION TIIE REACTOR OR ll'<Iiiii (KXPIAIN) NO. l)ATE S: SCIIKDUI.KD (IIOIIRS) RFASON(1) REDIICIHC I'OMER(2) CORRKCT1VE ACTIONS/COflHENTS 77-04-07 Load reduction to perform periodic test of turbine main steam stop, reheat stop, and reheat intercept valves. (Non-nuclear system) 12 77-04-22 9.8 Unit No. 3 uas removed from service to repair stem packing leak on drain valve located inside contain-ment. (Nuclear system) 13 77-04-24 129.6 B linlt No. 3 vss removed from service for maintenance.
(Nuclear and Non-nuclear system)
SIIHHARYt Unit No. 3 operated st approximately 100X R.P. except for load reduction on April 7, 1977, snd outages on April 22, and April 24 to 29, 1977.
APPEG)IX C OPERATIC DATA REPORT DOCKET NO. 50 - 251 Turkey Point T Unit No. 4 REPORT HONZH April 1977 DATE May 5, 1977 CQ.JP~ BY V. T. Chilson OPERAT NG STATUS TELEPHONE (305) 552-3769 ABORTING,PHGOD:0001,77,04,01 CROSS HOURS & REPORTER PERIOD: 719.0*
THROUGH 2400 77 04
- 2. CURRY<"'4I MTHORI~ ?OVER I~cL (66it): 2200 NAX.DEPEND. CAPAC TY (RJMe-Net): 666 DESIGN ELECTRZCAL RATZfG (NJe-Net): 693
- 3. POJU~ UMBEL TO J"EJZCH RESTRI~~ (IF ANY) (Sie-Net): NONE
~
- 4. ~AEONS FOR RESTRICT ON (IF ANY)-
THIS NONTH YEAR TO DATE CRRJLATIVE S. RL RIESS OS RGURS IIEACOR UAS ,CREEICAL..... ~6. ~cE 24-11JLZ
- 6. REACTOR 3 3 'IUE SRUEOOIIR ROUSE ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ . ~ ~SCIL 7 ~ HOURS Gc>ERAAOR ON LINEA ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
611.0 2 375.2 22 917.2
- 8. UNI RESERVE SHUTDOWi HOURS. ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ . 9 GROSS SIKE AL IDGE G IERAEEO OUIRI ~1334 0 ~4~4 61~
~CY G~TED 433 400 1 685 065 15 642 748 10 GROSS ELEC~CAL (NJZ>..
- 11. NET HSCTRZCAL c~~{CY Cc~&TED (NJ'H)..... 412 373 1 602 874 14 833 340
- 12. REACTOR SERVICE FACTOR 85 0 83.2 74. 6 13 ~ REACTOR AVAILABZLITi Y~ FA~R ~ ~ ~ ~ ~ ~ ~ ~ ~ ~, ~ ~ ~ 83.2 75.0 14 ~ UNIT SERVICE FACTOR. 85.0 82.5 70. 9
- 15. UNIT AVAILABILITY FA~R,.......,..., .. ~ . 85.0 82.5 70.9
- 16. K{IT CAPACI Y FAC OR (Using (.'GDC)... ~ . 86.1 83. 6 69.5
- 17. UNIT CA?ACZTY FACTOR (Using Design MJie) ~ ~ . 82.8 80.3 66.2
- 18. UNIT FORCED OUTAGE RAT ~ .4 ~ ~ . ~ ..... ....~ ~ 3-2 19 'HUTDOJJÃS SCHEDL'LED OVER NEE 6 NO~M (TYPE, DA , AhD DURATION OF EACH)
Refueling, maintenance9 and inspections - .ay 9 " July 9, 1977
- 20. IF SHUTDOWN AT Cia) OP REPORT PHLIODR EST&DYED DATE OF STAR'LLP. Na39 4 1977 21 ~ UNITS IN TEST STATUS (PRIOR TO CNMZCIAL OPERATION): FORECAST ACHIEVED L!ITIALCRITICAL TY LJZTIAL ELECTRICITY CO.'QKRCIAL OPERAT ON NOTE:
- Change to Daylight Saving Time
APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 251 Turkey Point UNIT Unit No. 4 DATE Ma 5, 1977 COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3769 MONTH April 1977 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY PO~ LEVEL (Kle-Net ) (MWe-Net) 671 17 680 670 18 682 673 19 678 673 20 675 674 675 21'2 673 672 683 23 671 682 24 641 682 25 671 10 684 26 282 691 27 12 692 28 13 687 29 14 679 30 15 682 676 NOTE: Average daily power greater than 666 MWe due to cooler condenser cooling water.
APPENDIX 0 DOCKET NO. 50 - 251 I) REASI)N A: EliUII'HENT FAT I.URE (EXP IAIN)
B: IIAINT. OR TEST UN1T SUUTIRIWNS AND POWER REDUCTIONS UNIT NAHE Turke Point Unit No. 4 C: REFUEI.INC DATE Ha 5 1977 n: REI:UIWTORY RESTRrCT1ON E: Ol KkhTOR TRAININC AND COHI'I.ETED BY V. T. Chilson I.ICENSE EXAHINATION F: Ale! IN I STRAT I VE TEI.EI'IIONE (305) 552-3769 Ol'ERATIONAI ERROR (EXPIhIN)
~ RPPIIIIY lll)HTII~Arll1977 II: I)Till R (KXI'IAI N)
!) HYTIIOD I: HANUAI, HETIIOD OF 2: HANUAI. SCRAH TYPE SIIUTTINC DOWN 3: AUTOHATIC SCRAH F: FORCED DURATION TIIE REACTOR OR 4: 03IIER (EXI'I.A1N) NO. DATE S: SC!!EDUCED (!!OURS) RCASON(1) REDUC)NC POWER(2) CORRECT1VE ACTIONS/COHHENTS 77-04-26 108.0 Unit No. 4 was removed from service to repair steam generator No. 4C tube leak. Corrective actions included plugging three leaking tubes. Additional tubes vere plugged as a preventative measure.
(Nuclear system)
SUHHARY: Unit No. 4 operated at approximately 1002 R.P. except for outage of April 26 to Hay 4, 1977.
APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
St. Lucie UNIT Unit No. 1 DATE Ma 5, 1977 COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3769 MONTH A ril 1977 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY PO~r. LEVEL (MWe-Net) (MWe-Net) 755 17 773 18 181 19 20 21'2 23 24 25 10 26 188 27 12 786 28 794 29 150 14 776 30 242 509 NOTE: Average daily power greater than 777 MNe due to cooler condenser cooling water.
APP DW C OPERATZNG DATA REPORT DOCKET NO. 50 - 335 St. Lucia UAAI Unit No. 1 REPORT HONTH Aotsl 1977 DATE Mav 5 1977 C0%'~ BY V. T. Chi1son OPERA~0 TELEPHONE (305) 552-3769 STA US R~ORTING PERIOD: 0001.77 04 01 GROSS HOURS Ll ABORTING P~vOD: 719.0+
THROUGH 2400 77 04
- 2. CUR~VY AUTHORIZE PO~ LEVR. (NWt): 2560 NAX DEPDlD. CAPACITY (NWe-Net): 777 (Est.)
DESIGN - eC RICAL RA ING (NWe-Net): 802
- 3. POWER LEI'EL .0 WHICH RESTRI~J (XF ANY) (Mle-Net): NONE 4 ~ MASONS FOR RESTRICTION (I: A'ST):
THIS HOisTH YEAR TO DATE CUMlLATIVE S. RIRRRRS OS COORS RSACSOR RAS CRL.RCAL..... 2OI.A ~2 ~
~ZLJi
- 6. RZACTOR RZSERV SHU'JJOWN HOURS........... ~
7 ~ HO?ARS GRKRA OR ON LLlEA 181.8 2 217.4 2 481.4
- 8. l.'NIT RESERVE SH..DOlsN HOURS...............
9~ GROSS ANNAL HKRGY GENERATED (?lWH)...... 407 185 4 706 482 5 054 085.
- 10. GROSS ELEC RXCAL ~GY GElERA ZD (?URH)... 133 040 1 545 000 1 653 270 1 AAE J G ~J. ICAL RiGLGY GENERATED (N?RH) . ~ . ~ ~ 118 624 1 440 576 1 539 551 12.
13.
14 15.
16 ~
~vC.OR SERVICE UNIT
?D(IT CAPACI~J FAC OR.
REACJJ)R AVAILABXL'XTY UNIT SERVICE FAC OR FACTOR...........
~ ~ ~
AVAI~ILXTYFACTOR... ~...
PACER (Ushzg
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~ ~........
(?lDC) ..........
~ .~.
~
'7.0 28.8
- 28. 8 25 ~ 3 21.2 80.3 80.3 77.0 64.4 82.0
- 82. 0 79 '
79.0 63.0
'7 ~ UNX CAPACITY FACTOR (Using Design NWe)... 20.6 62.4 61.1 18 ~ UNXJ FORCED OUTAGE RATEA ~ ~ ~ ~ s ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 74.7 21.1 19. 3 19A SHUTDOWilS SCLSZDULZO OVER NEX 6 NONTHS (TYPE, DATE, AND DURATION OF EACH):
- 29. XF SHU,DOWN AT EG) OF REPORT PERXOD, ESTDfATZD DATE OF STAR~i
- 21. UNITS EN TZS. STATUS (PRIOR TO COMKRC~ OPERATION): FORECAST ACHI VED XNI IAL CRITICALITY INITIALELZ~XCITY CO. KRCIAL OPERATION NOTE:
- Change to Daylight Saving Tine
(I) REASON APPENDIX D DOCKET HO. 50 - 335 A: El)UIPHFAIT FAIIAIRE (EXPLAIN)
B: IIAINT. OR TEST UNIT SIIUTDOWHS AND POWER REDUCTIONS WHIT NAHE St. Lucie Unit No. I C: RFFUELIHC 0: <<EOUIATORY RESTRICTION DATE HQ 5 1977 E: OPL'RATOR TEA ININO AND LICENSE EXAMINATION COHPLETED BY V. T. Chilson F: AININIS'I'RATIVE 0: OPE<<ATIOHAL ERROR (EXPIWIH) TEI.EPNOHE (305) 552-3769 II: OTII FR (EXP ITIN)
(2) METHOD 1: HANUAI. HETIIOD OF 2: MANUAL SCRAH TYPE SIIUTTIHC DOWN 3: AUTOMATIC SCRAH PI FORCED DURATION TIIE REACTOR OR 4: OlllEil (EXPLAIN) HO. DATE S: SCHEDULED (IIOURS) REASON(1) REDUCING POWER(2) CORRECTIVE ACTIONS/COtDIFNTS 12 77-04-03 200.0 Unit was manually tripped uhcn a fire occurred In l.hc area of the general. or main lead box. Corrective actions Included repairing hydrogen leak and modifying generator main lead box. Outage uas extended to perform other maintenance uork. (Non-nuclear system) 13 77-04-15 332.5 Unit uas manually tripped due to loss of containment instrument air vhich resulted In loss of component cooling uater to equipment located inside containment.
Corrective actions included replacing the instrument air compressor discharge check valves and providing 77-04-30 4.6 sn automatic redundant instrument (Nuclear System) sir supply.
Unit uas tripped during transient condition caused by malfunction of heater drain pump control system.
(Hon-nuclear system) t Unit operated at approximately 99X R.P. except for unit outsges on April 3 to ll, April 15 to 29, and April 30, 1977.