NRC FORM 195 U.S. NUCLEAR REGULATORY COMMISSION IZ 76)
, NRC DISTRIBUTION FQR rART 50 DOCKET MATERIAL 251/335 DOCK 5
BER FILE NUMBER MONTHLY REPORT TO:
USNRC FROM:
HLORDIA PWR 6 LIGHT CO ~
MIAMI, FLORDIA A.D. SCHMIDT DATE OF DOCUMENT 1/7/77 DATE RECEIVED 1/ g/77 C3LETTE R
~QQ R IG INAL OCOPY ONOTORIZED KIUNCLASSIFIE0 PROP INPUT FORM NUMBER OF COPIES RECEIVED LETTER TRANS THE POLL(NING:
MONTHLY REPORT FOR DECEMBER 1976 PLANT & COMPONENT OPERABILITY &
AVAILABILITY, THIS REPORT TO BE USED IN PREPARING GRAY BOOK BY PLANS &
OPERATIONS'LANT NAME~
TURKEY PT o g
1 <<3>>
6 4 ACRNOWLEDGED DO NOT REMOVE I
MIPC W
CYS FOR ACT ON FOR ACTION/INFORMATION INTERNALDISTR I BUTION DR BRANCH CHIEF L ZIEMANN /LEAR PARRISH DIGGS EXTERNAL DISTRIBUTION MIAMI FL.
CONTROL NUMBER NRC FORM 156 IZ.76)
r III r
I
- f I
~,
9C II II 4
v
~gegu atOYf cy yQCXF+
gg1QT.> 5 pe ~g'Ah Dobe< ~"
P. O. BOX 013100, MIAMI, FL 33101
~ykl /fr r
FLORIDAPOWER & LIGHTCOMPANY January 7,
1977 Office of Management Information and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Gentlemen:
Ik r
i I
Attached are the December',
1976 Operating Status.'Reports for Turkey Point Unit Nos.,'3 and' and St.'ucie Unit No. l.
Very truly yours, A. D. Schmidt Vice President Power Resources VTC/DDC cc:
Mr. Norman C. Moseley Jack R.
Newman, Esquire PEOPLE... SERVING PEOPLE
rz>
<1 gy I ')
L~
I'I gp ~
l'p P4 y@i j,
APPENDS B
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50 250 UNIT Turkey Point Unit No.
3 DATE Jan.
6 1977 COMPLETED BY V. T. Chi on TELEPHONE (305) 552-3830 MONTH
- December, 19 7'6 DAY AVERAGE DAILY POWER LEVEL (NHe-Net)
DAY AVERAGE DAILY POWER LEVEL (Kle-Net) 17 18 3
19 20 21'2 23 25 10 26 27 12 28 13 3.4 29 30 31 16
APPENDIX C OPERATING DATA REPOR~
REPORT MONTH December 1976 DOCKET NO ~
Turkey Point Unit No.
3 Jsn.
6, 1977 COMPLFTED BY V. T. Chilson OPERATING STATUS TELEPHONE 1 ~
REPORTING PERIOD:
0001 76 12 01 GROSS HOURS IN REPORTING PERIOD:
THROUGH 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2200 HAE a DEPEND.
CAPACEEE (NNA-Nat):
DESIGN ELECTRICAL RATING (MWe-Net):
693 744.0 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY)
(MWc-Valet):
4.
REASONS FOR RESTRICTION (IP ANY):
NONE THIS MONTH YEAR TO DATE CUMULATIVE 5.
NUMBERS OF HOURS REACTOR 'WAS CRITICAL....
0.0 6 760.0 28 040.1 6.
REACTOR RESERVE SHUTDOWN HOURS.........,..
0.0 64.2 67.4 7 ~
HOURS GENERATOR ON LINE
~
~
~
~ ~
0 0 6 669.1 27 039.1 8.
UNIT RESERVE SHUTDOWN HOURS...............
0.0 0.0 85.0 9.
GROSS THERMO ENERGY GENERATED (PAUL) ~.....
10.
GROSS ELECTRICAL ENERGY GENERATED (MWH) ~ ~ ~
11.
NET ELECTRICAL ENERGY GENERATED (MWH)..... - 1 706 14 417 328 51 729 588 4 555 215 16 570 451 4 320 173 15 675 935 12.
REACTOR SERVICE FACTOR 0.0 t
13.
REACTOR AVAILABILITYFACTOR...............
- 0. 0 77.0 77.7 78.5 78.7 14.
UNIT SERVICE FACTOR.
0.0 15'NIT AVAILABILITYPACTORA
~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ a 0.0 16.
EfZT CAPACITY PACTOR (USing (AADC).........
0 ~ 0 17.
UNIT CAPACITY FACTOR (Using Design We)...
0 0 18.
UNIT FORCED OUTAGE RATE.
0 '
75.9 73.8 71.0 0.1 75.9 66.8 63.3 a
2.9 19 'HUTDOWiNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH) 20.
IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OFSTARTUP:
Jen.
16, 1977 21.
UNITS IN TEST STATUS (PRIOR TO COKKRCZAL OPERATION):
FORECAST ACHIEVED INITIALCRITICALITY IiNITIALELECTRZCITY a
COMMiRCIAL OPERATION
1:
MANUAL 2:
JIANUAL SCRAM 3:
,AUTOMATIC SCRAM 4:
OIIIER (EXPLAIII)
NO.
(1)
REASON A:
EQUIPMEHT FAILURE (EXPLAIN)
B:
MAIHT. OR TEST C:
REFUELINC D:
RECULATORY RESTRICTION E:
OPERATOR TRAINIHG AHD LICENSE EXAMINATION F:
ADMINISTRATIVE G:
OPERATIONAL ERROR (EXPIAIN)
H:
OTHER (EXPLAIN)
(2)
METHOD DATE TYPE F:
FORCED S:
SCHEDULED REPORT MONTH December 1976 DURATION (BOURS)
REASON(1)
METHOD OF SWOTTING DOWN THE REACTOR OR REDUCINC POWER(2)
APPEHDIX D UNIT SHUTDOWNS AN) POWER REDUCTIONS DOCKET NO.
50 - 250 UNIT NAME Turkey Point Unit Ho. 3
'ATE Jan.
6, 1977 COMPLETED BY V. T. Chilson TELEPHONE (3O5)
CORRECTIVE ACTIONS/CMHE'.ITS 21 76-11-14 744.0 Unit No.
3 removed from service for refueling, maintenance, and inspections.
(Continued from previous month)
(Nuclear and Non-nuclear systems)
SIRMARY:
Unit No.
3 removed from service for refueling, maintenance, and inspections.
(Continued from previous month)
APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
UNIT Turkey Point Unit No.
4 Jan.
6, 1977 COMPLETED BY V. T. Chilson TELEPHONE MONTH
- December, 1976 DAY AVERAGE DAILY POWER LEVEL (Mle-Net)
DAY AVERAGE DAILY POWER LEVEL (K<e-Valet) 10 12 17 521
'83 689 687 661 664 696 690 689 684 680.
17 18
,19 20 21 22 23 26 27 29 30 690 697 689 605 683 692 692 693.
695 692 691 693 689 688 15 687 31 690 687 NOTE Average daily power level greater than 666'Ãh due to cooler condenser cooling water.
APPENDIX C OPERATING DATA REPORT ORT MONTH
- December, 1976 DOCKET NO.
50 - 250 UNIT Turke Point Unit No.
DATE Jan.
6 1977 CO'fPLETED BY V. T. Chileon OPERATING STATUS 1.
REPORTING PERIOD:
0001>76>12,01 GROSS HOURS IN REPORTING PERIOD:
THROUGH 2400,76,~12 31 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt):
>AX.DE>E>>. CA>AC>>>
(>>> -N t):
DESIGN ELECTRICAL RATING (MWe-Net):
693 3 ~
POWER LEVEL TO WHICH RESTRICTED (IP ANY)
('fffe-Net)f NONE 4.
REASONS FOR RESTRICTION (ZF ANY):
744.0 THIS MONTH YEAR TO DATE CffMULATIVE 5.
i%uSERS OF HOURS REACTOR 'WAS CRZTZCAL.....
718.2 6 075.9 21 721.8 6.
~>
CTOR RESERVE SHUTDOf6f HOURS.
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
21.7 138.8 7
HOURS GENERATOR ON LINE.........,,,,....,.
670.1 5 828.4 20 542.0 8.
UNIT RESERVE SHUTDOWiN HOURS'
~..
~ ~....
~..
0.0
'.0 0.0 9.
GROSS THERfLQ ENERGY GENERATED (MWH).....: I 453 037 ll 103 004 41 751 640 10.
GROSS ELECTRICAL EffERGY GENERATED (MWH)...
479 100 3 978 606 13 957 688 ll,ifET ELECTRICAL ENERGY GEVERATED (MffH) ~...
455 3 771 836 13 230 466 12.
REACTOR SERVICE FACTOR.
4 13.
REACTOR AVAILABILITYFACTOR...... ~.....
96.5 99.4 69.2 69.5 73.8 74.2 14'NIT SERVICE FACTOR...
~
~.
~..
~....
~
90.1-
- 66. 4 69.8 15.
UNIT AVAILABILITYFACTOR..................
90.1 66.4 69.8 16'UNIT CAPACITY PACTOR (Using (MDC)... ~......
64.5 68.2 17.
UNIT CAPACITY FACTOR (Using Design ffWe)...
62.0 64.8 18.
UNIT FORCED OUTAGE RATE............,......
0 ~ 5 3 ~ 7 3.6 19.
SHUTDOWiNS SCHEDULED OVER NEXT 6 MONTHS (TYPE> DATE, AND DURATION OF EACH):
repair steam generator tube leek - Jan.
6, 1977 through Jan.
12, 1977.
'eEueling, maintenance and inspections - April 4, 1977 throu h May 22, 1977.
20.'F SHUTDOWN AT END OF ffEPORT PERIOD, ESTIMATED DATE OF STARTSPf 21.
UNITS IN TEST STATUS (PRIOR TO COf0fERCIAL OPERATION):
INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION FORECAST ACHIEVED
4
~
(1)
REASON A:
EQUIPMENT FAILURE (EXPLAIN)
B:
MAINT. OR TEST C:
REFUELING D:
REGULATORY RESTRICTION E-OPERATOR TRAINING AND LICENSE EXAHINATION F:
ADMINISTRATIVE G:
OPERATIONAL ERROR (EXPLAIN)
N:
OTHER (EXPLAIN)
(2)
METHOD APPEHDIX D WHIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH December 1976 DATE Jan.
6 1977 COHPLETED BY V. T. Chilson TELEPHONE (305) 552-3830 DOCKET NO. '0 - 251 UNIT NAME Turke Point Unit No.
4 1:
MAliUAL 2:
.MANUAL SCRAM 3:
AUTOHATIC SCRAM 4:
OIHER (EXPLAIN)
NO.
DATE TYPE F:
FORCED S:
SCHEDULED DURATION (HOURS)
REASON (1)
METHOD OF SHUTTING DOWN THE REACTOR OR REDUCING POWER(2)
CORRECTIVE ACTIONS/CQDiENTS 28 76-10-28 69.4 Unit No.
4 was removed from service for steam gener-ator tube inspection program.
(Continued from previous month)
(Nuclear system) 29 76-12-04 3.2 Unit No.
4 tripped on steam generator No.
4 A high level during a transient condition caused by the loss of a vital instrument bus power supply.
(Nuclear system) 30 76-12-20 1.3 Unit No.
4 tripped during a transient condition caused by the failure of a component in nuclear instrumen-tation system channel N-41.
(Nuclear system)
SUMMARY
Unit No.
4 was returned to service on December 3, 1976 following completion of steam generator tube inspection program.
Unit operated at IOOX R.P. during month except for outages on Dec. 4, 1976 and Dec. 20, 1976.
APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 335 UNIT St. Lucie Unit No.
1 DATE Jan.
6, 1977 COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3830 i~mONTH Dec embe DAY AVERAGE DAILY POEM LEVEL (K<e-Net)
DAY AVERAGE DAlLY POWER LEVEL (MNe-Net) 3 18 19 20 21 370 377 10 12 13 14 23 24 25 26 27 28 29 30 376 374 380 374 371 378 376 373 374 16
APPENDIX C OPERATING DATA REPORT REpORT MOL~ Decenber.
1976 DOCKET NO. 50 335 UNIT St. Lucia Unit No.
1 DATE Jan.
6, 1977 COMPLETED BY V. T. Chilson OPERATING STATUS TELEPHONE (305) 552-3830 1.
REPORTING PERIOD: 0001,76,12,21 GROSS HOURS IN REPORTING PERIOD:
264.0 THROUGH 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt):
2560 DESIGN ELECTRICAL RATING (MWe-Net):
802 3.
POWER LEVEL TO WHICH RESTRICTED (ZF ANY)
("JWe-LRJet):
722 4.
REASONS FOR RESTRICTION (ZF ALJY):
"Tenporary 90X restriction pending reactor coolant flow analysis" THIS MONTH YEAR TO DATE CUMULATIVE 5
NUMBERS OF HOURS REACTOR WAS CRITICAL 264.0 264.0 264.0 6.
REACTOR RESERVE SHUTDOWN HOURS..
~..
~ ~...
O. 0 7.
HOURS ORMHRSUOR OS LRMS...........
264.0 8.
UNIT RESERVE SHUTDOWN HOURS...............
0.0 0.0 12.
REACTOR SERVICE FACTOR.............,...,..
100.0 100.0 13 REACTOR AVAILABZLITYFACTOR............,..
100.0 100.0 14.
UNIT SERVICE FACTORS
~
100.0 100 ~ 0
~ 9.
GROSS THERMAL RJERGY GENERATED (MWH)...,..
~
347 603 347 603 10.
GROSS ELECTRICS ENERGY GERJERATED
{LRJWH)...
108 270 108 270 ll.
NET ELECTRICAL ENERGY GENERATED (MWH).....
98 975 98 975 347 603 108 270 98 975 100.0 100.0 100.0 15.
UNIT AVAILABILITYFACTOR..................
100.0 100.0 100.0 16.
UNIT CAPACITY FACTOR (Using
{HPC)........
~.
46 ~ I 17.
UNIT CAPACITY FACTOR (Using Design MWe)...
46.7 46.7
- 46. 7 46.7 46.7 18.
UNIT FORCED OUTAGE RATE...............
~ ~..
0.0 0.0 0.0 19.
SHUTDOWNS SCHEDULED OVER NEXT 6 MOLLHS (TYPE, DATE, AND DURATION OF EACH):
20.
IF SHUTDOWLN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
21.
UNITS IN TEST STATUS (PRIOR TO COiJMERCIAL OPERATION):
INITIALCRITICALITY INITIALELECTRICITY CO"DJERCIAL OPERATION FORECAST ACHIEVED April 22, 1976
~M7 1976
~O.
2 1976
(I)
REASON A:
EqUIPMENT FAILURE (EXPLAIN)
B:
HAINT. OR TEST C:
REFUEl ING D:
REGULATORY RESTRICTION E:
OPERATOR TRAINING AND LICENSE EXAMINATION F:
ADMINISTRATIVE G:
OPERATIONAL ERROR (EXPLAIN)
II:
OTHER (EXPLAIN) hPPENDIX D UNIT SllUTDOWNS AND POWER RFDUCTIONS REPORT HONT)1 December 1976 DATE Jan.
6, 1977 COMPLETED EY V. T. Chilson TELEPHONE (305) 552-3830 DOCRET NO.
50 - 335 UNIT NAME St. Lucio Unit No. I (2)
METHOD I:
MANUAL 2:
MANUAL SCRAM 3:
AUTOHATIC SCRAM 4:
OTHER (EXPLAIN)
NO.
DATE TYPE F:
FORCED S:
SCHEDULED DURATION (BOURS)
REASON(1)
METHOD OF SBUTTING DOWN THE REACTOR OR REDUCING POWER(2)
CORRECTIVE ACTIONS/COtlMENTS NONE
SUMMARY
Unit No.
1 was placed in commercial operation on December 21, 1976, at 12:Ol a.m.
Unit operated at approximately 50X R.P.
through end of month.
0 J
4