Category:Letter
MONTHYEARML24023A0342024-02-0505 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0038 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000335/20230102024-01-26026 January 2024 NRC Quadrennial Focused Engineering Inspection (FEI) Commercial Grade Dedication Report 05000335/2023010 and 05000389/2023010 L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) IR 05000335/20230042024-01-24024 January 2024 Integrated Inspection Report 05000335/2023004 and 05000389/2023004 ML23320A3062024-01-22022 January 2024 Issuance of Amendment Nos. 298 and 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project ML23341A2102024-01-22022 January 2024 LTR-23-0216-1 - Closure Letter - 2.206 Petition for License Renewal Plant Reactor Pressure Vessel Embrittlement L-2024-007, Inservice Inspection Program Owner'S Activity Report (OAR-1)2024-01-18018 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2024-004, Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years2024-01-18018 January 2024 Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-002, Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2024-01-0808 January 2024 Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-179, Unusual or Important Environmental Event - Turtle Mortality2023-12-14014 December 2023 Unusual or Important Environmental Event - Turtle Mortality L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2023-166, Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report2023-12-0606 December 2023 Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report ML23340A0332023-12-0101 December 2023 FPL to Fws, Comments Submitted by Florida Power and Light on the Species Status Assessment Accompanying the September 20, 2023 Proposed Threatened Species Status with Section 4(d) Rule for the Miami Cave Crayfish L-2023-172, Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule ML23332A1772023-11-28028 November 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, ML23333A0102023-11-27027 November 2023 Attachment B - 11/07/2022 - Waterkeeper Scoping Comments-1 ML23333A0152023-11-27027 November 2023 Attachment G - Arcadis Memo Re FPL Year 4 Raasr Final (June 2, 2023, Appended to Derm letter)-1 L-2023-162, Response to 50.69 2nd Round of Rals2023-11-21021 November 2023 Response to 50.69 2nd Round of Rals L-2023-146, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles2023-11-15015 November 2023 License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles IR 05000250/20230032023-11-0909 November 2023 Integrated Inspection Report 05000250/2023003 and 05000251/2023003 IR 05000335/20230032023-11-0606 November 2023 Integrated Inspection Report 05000335/2023003 and 05000389/2023003 ML23310A1342023-11-0404 November 2023 10 CFR 2.206 Petition - LTR-23-0216-1 Petition Amendment; Turkey Point Subsequent Renewal with Petitioner 11/04/2023 ML24016A2622023-10-25025 October 2023 Subsequent License Renewal Updated List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected Project ML23270B8882023-10-23023 October 2023 Regulatory Audit Summary Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structure, Systems, and Components for Nuclear Power Reactors EPID L-2022-LLA-0182 L-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis2023-10-11011 October 2023 License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23275A1102023-10-0202 October 2023 License Amendment Request Revision 2 for the Technical Specifications Conversion to NUREG-1432, Revision 5 IR 05000250/20230102023-09-29029 September 2023 Biennial Problem Identification and Resolution Inspection Report 05000250/2023010 and 05000251/2023010 L-2023-131, Subsequent License Renewal Application - Second Annual Update2023-09-28028 September 2023 Subsequent License Renewal Application - Second Annual Update ML23234A1922023-09-27027 September 2023 Issuance of Amendment Nos. 297 and 290 Regarding Conversion to Improved Standard Technical Specifications L-2023-136, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-26026 September 2023 Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML23265A5492023-09-22022 September 2023 Transmittal of WCAP-18830-P/NP Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles to Support a License Amendment Request from FPL - License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis L-2023-122, Corrections to the 2022 Annual Radiological Environmental Operating Report2023-09-20020 September 2023 Corrections to the 2022 Annual Radiological Environmental Operating Report IR 05000335/20233012023-09-20020 September 2023 NRC Operator License Examination Report 05000335/2023301 and 05000389/2023301 L-2023-127, Correction to the 2022 Annual Radioactive Effluent Release Report2023-09-18018 September 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-113, Correction to the 2020 Annual Radiological Environmental Operating Report2023-09-14014 September 2023 Correction to the 2020 Annual Radiological Environmental Operating Report L-2023-108, Report of 10 CFR 50.59 Plant Changes2023-09-11011 September 2023 Report of 10 CFR 50.59 Plant Changes L-2023-118, Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-11011 September 2023 Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML23243A9552023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application - Tribe- Section 106 Letters ML23243A9522023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9532023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9542023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application L-2023-107, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42023-09-0606 September 2023 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 L-2023-112, Corrections to the 2021 Annual Radioactive Effluent Release Report2023-09-0606 September 2023 Corrections to the 2021 Annual Radioactive Effluent Release Report ML23199A2352023-09-0505 September 2023 Letter to EPA-Turkey Point Nuclear Generating Station, Units 3 and 4 - Notice of Availability of Draft Site-Specific Environmental Impact Statement for Subsequent License Renewal 2024-02-05
[Table view] Category:Operating Report
MONTHYEARL-2023-051, Report of 10 CFR 50.59 Plant Changes2023-04-0404 April 2023 Report of 10 CFR 50.59 Plant Changes L-2022-039, and Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2022-04-14014 April 2022 and Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2022-016, Report of 10 CFR 50.59 Plant Changes2022-02-28028 February 2022 Report of 10 CFR 50.59 Plant Changes L-2021-097, and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report2021-05-13013 May 2021 and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report L-2021-096, 10 CFR 50.59(d)(2) Summary Report2021-05-11011 May 2021 10 CFR 50.59(d)(2) Summary Report L-2021-018, 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report2021-02-16016 February 2021 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report L-2020-065, Submission of Periodic Reports2020-04-0909 April 2020 Submission of Periodic Reports ML18227A9832018-08-15015 August 2018 Submit First Year Operation Report. L-2017-165, Report of 10 CFR 50.59 Plant Changes2017-09-20020 September 2017 Report of 10 CFR 50.59 Plant Changes L-2012-367, Cycle 20 Core Operating Limits Report2012-10-0202 October 2012 Cycle 20 Core Operating Limits Report L-2012-169, Annual Radiological Environmental Operating Report for Calendar Year 20112012-04-24024 April 2012 Annual Radiological Environmental Operating Report for Calendar Year 2011 L-2009-284, Submittal of Report of Changes, Tests & Experiments for Period April 4, 2008 Through June 13, 20092009-12-10010 December 2009 Submittal of Report of Changes, Tests & Experiments for Period April 4, 2008 Through June 13, 2009 L-2008-245, Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/082008-11-10010 November 2008 Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/08 L-2007-053, Annual Radiological Environmental Operating Report2007-05-0404 May 2007 Annual Radiological Environmental Operating Report L-2005-101, Inservice Inspection Program Third Interval - First Period - First Outage (SL2-15) Owner'S Activity Report (OAR-1)2005-05-0202 May 2005 Inservice Inspection Program Third Interval - First Period - First Outage (SL2-15) Owner'S Activity Report (OAR-1) L-2004-097, Annual Radiological Environmental Operating Report2004-05-11011 May 2004 Annual Radiological Environmental Operating Report ML18227B0771978-03-17017 March 1978 03/17/1978 Letter Operating Summary Reports of February 1978 ML18227B0631978-03-0404 March 1978 03/04/1978 Letter Operating Status Reports of February 1978 ML18227A4231978-03-0404 March 1978 Attached February, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0641978-02-14014 February 1978 02/14/1978 Letter Operating Status Reports of January 1978 ML18227A4221978-02-14014 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0651978-02-0404 February 1978 02/04/1978 Letter Operating Status Reports of January 1978 ML18227A4211978-02-0404 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0671978-01-0707 January 1978 01/07/1978 Letter Operating Status Reports of December 1977 ML18227A4201978-01-0707 January 1978 Attached December, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0681977-12-0303 December 1977 12/03/1977 Letter Operating Status Reports of November 1977 ML18227A4191977-12-0303 December 1977 Attached November, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0691977-11-0505 November 1977 11/05/1977 Letter Operating Status Reports of October 1977 ML18227A4171977-11-0505 November 1977 Attached October, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0701977-10-0505 October 1977 10/05/1977 Letter Operating Status Reports of September 1977 ML18227A4151977-09-0303 September 1977 Attached August, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0711977-09-0303 September 1977 09/03/1977 Letter Operating Status Reports of August 1977 ML18227A4141977-08-0505 August 1977 Attached July, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0731977-08-0505 August 1977 08/05/1977 Letter Operating Status Reports of July 1977 ML18227A4131977-07-0707 July 1977 Attached June, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. May, 1977 for Unit 3 Incorrectly Reported for Some Values. Attached Revised May, 1977 Operating Data Report for Unit 3 ML18227B0741977-07-0707 July 1977 07/07/1977 Letter Operating Status Reports of June 1977, and a Revised Operating Data Report for May 1997 for Turkey Point Unit 3 ML18227A4121977-06-0606 June 1977 Attached May, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0751977-06-0606 June 1977 06/06/1977 Letter Operating Status Reports of May 1977 ML18227A4111977-05-0505 May 1977 Attached April, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0761977-05-0505 May 1977 05/05/1977 Letter Operating Status Reports of April 1977 ML18227A4101977-04-0404 April 1977 Attached March, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. Maximum Dependable Capacity (MWe-Net) for St. Lucie No. 1 Was Revised from 802 MWe-Net to 777 MWe-Net (Estimated) ML18227B0781977-04-0404 April 1977 04/04/1977 Letter Operating Status Reports of March 1977 ML18227B0791977-03-0707 March 1977 03/07/1977 Letter Operating Status Reports of February 1977 ML18227A4091977-03-0707 March 1977 Attached February, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0801977-02-0707 February 1977 02/07/1977 Letter Operating Status Reports of January 1977 ML18227B0811977-01-0707 January 1977 01/07/1977 Letter Operating Status Reports of December 1976 ML18227A4081977-01-0707 January 1977 Attached December, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0821976-12-0606 December 1976 12/06/1976 Letter Operating Status Reports of November 1976 ML18227B0831976-11-15015 November 1976 11/15/1976 Letter Corrected Copies of Operating Data Reports for October 1976 ML18227A4061976-11-0808 November 1976 Attached October, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 2023-04-04
[Table view] Category:Monthly
MONTHYEARL-2020-065, Submission of Periodic Reports2020-04-0909 April 2020 Submission of Periodic Reports ML18227B0771978-03-17017 March 1978 03/17/1978 Letter Operating Summary Reports of February 1978 ML18227B0631978-03-0404 March 1978 03/04/1978 Letter Operating Status Reports of February 1978 ML18227B0641978-02-14014 February 1978 02/14/1978 Letter Operating Status Reports of January 1978 ML18227B0651978-02-0404 February 1978 02/04/1978 Letter Operating Status Reports of January 1978 ML18227B0671978-01-0707 January 1978 01/07/1978 Letter Operating Status Reports of December 1977 ML18227B0681977-12-0303 December 1977 12/03/1977 Letter Operating Status Reports of November 1977 ML18227B0691977-11-0505 November 1977 11/05/1977 Letter Operating Status Reports of October 1977 ML18227B0701977-10-0505 October 1977 10/05/1977 Letter Operating Status Reports of September 1977 ML18227B0711977-09-0303 September 1977 09/03/1977 Letter Operating Status Reports of August 1977 ML18227B0731977-08-0505 August 1977 08/05/1977 Letter Operating Status Reports of July 1977 ML18227B0741977-07-0707 July 1977 07/07/1977 Letter Operating Status Reports of June 1977, and a Revised Operating Data Report for May 1997 for Turkey Point Unit 3 ML18227B0751977-06-0606 June 1977 06/06/1977 Letter Operating Status Reports of May 1977 ML18227B0761977-05-0505 May 1977 05/05/1977 Letter Operating Status Reports of April 1977 ML18227B0781977-04-0404 April 1977 04/04/1977 Letter Operating Status Reports of March 1977 ML18227B0791977-03-0707 March 1977 03/07/1977 Letter Operating Status Reports of February 1977 ML18227B0801977-02-0707 February 1977 02/07/1977 Letter Operating Status Reports of January 1977 ML18227B0811977-01-0707 January 1977 01/07/1977 Letter Operating Status Reports of December 1976 ML18227B0821976-12-0606 December 1976 12/06/1976 Letter Operating Status Reports of November 1976 ML18227B0831976-11-15015 November 1976 11/15/1976 Letter Corrected Copies of Operating Data Reports for October 1976 ML18227B0841976-11-0808 November 1976 11/08/1976 Letter Operating Status Reports of October 1976 ML18227B0861976-09-0707 September 1976 09/07/1976 Letter Operating Status Reports of August 1976 ML18227B0871976-08-0505 August 1976 08/05/1976 Letter Operating Status Reports of July 1976 ML18227B0881976-07-0202 July 1976 07/02/1976 Letter Operating Status Reports of June 1976 ML18227B0951975-10-0909 October 1975 10/09/1975 Letter Operating Summary Reports of September 1975 ML18227B0961975-09-0909 September 1975 09/09/1975 Letter Operating Summary Reports of August 1975 ML18227B0971975-08-0101 August 1975 08/01/1975 Letter Operating Status Reports of July 1975 ML18227B0981975-07-0303 July 1975 07/03/1975 Letter Operating Status Reports of June 1975 ML18227B0991975-06-0505 June 1975 06/05/1975 Letter Operating Status Reports of May 1975 ML18227B1001975-05-0505 May 1975 05/05/1975 Letter Operating Status Reports of April 1975 ML18227B1011975-04-0404 April 1975 04/04/1975 Letter Operating Status Reports of March 1975 ML18227B1021975-03-0606 March 1975 03/06/1975 Letter Operating Status Reports of February 1975 ML18227B1041975-02-0707 February 1975 02/07/1975 Letter Operating Status Reports of January 1975 ML18227B1031975-02-0707 February 1975 02/07/1975 Letter Operating Status Reports of January 1975 2020-04-09
[Table view] |
Text
NRC FORM 195 U.S. NUCLEAR REGULATORY COMMISSION DOCK BER IZ 76) 5 251/335 FILE NUMBER
, NRC DISTRIBUTION FQR rART 50 DOCKET MATERIAL MONTHLY REPORT TO: USNRC FROM: HLORDIA PWR 6 LIGHT CO ~ DATE OF DOCUMENT MIAMI, FLORDIA 1/7/77 A.D. SCHMIDT DATE RECEIVED 1/ g/77 C3LETTE R ONOTORIZED PROP INPUT FORM NUMBER OF COPIES RECEIVED
~QQ R I G N AL I KIUNCLASSIFIE0 OCOPY LETTER TRANS THE POLL(NING: MONTHLY REPORT FOR DECEMBER 1976 PLANT & COMPONENT OPERABILITY &
AVAILABILITY, THIS REPORT TO BE USED IN PREPARING GRAY BOOK BY PLANS &
OPERATIONS'LANT NAME ~ TURKEY PT o g 1 <<3>> 6 4 ACRNOWLEDGED DO NOT REMOVE I
FOR ACTION/INFORMATION MIPC W CYS FOR ACT ON INTERNAL D IST R I BUTION DR BRANCH CHIEF L ZIEMANN /LEAR PARRISH DIGGS EXTERNAL DISTRIBUTION CONTROL NUMBER MIAMI FL.
NRC FORM 156 IZ.76)
r III r I
- f I
~, 9C II II 4 v
P. O. BOX 013100, MIAMI, FL 33101
~ykl /fr
~gegu atOYf r
FLORIDA POWER & LIGHT COMPANY cy yQCXF+
January 7, 1977 gg1QT.>
5
~g'Ah pe Dobe< ~"
Office of Management Information and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen: Ik r i I
Attached are the December', 1976 Operating Status.'Reports for Turkey Point Unit Nos.,'3 and' and St.'ucie Unit No. l.
Very truly yours, A. D. Schmidt Vice President Power Resources VTC/DDC cc: Mr. Norman C. Moseley Jack R. Newman, Esquire PEOPLE... SERVING PEOPLE
<1 gy rz>
I ')
I'I gp ~
L~
l'p P4 y@i j,
APPENDS B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 250 UNIT Turkey Point Unit No. 3 DATE Jan. 6 1977 COMPLETED BY V. T. Chi on TELEPHONE (305) 552-3830 MONTH December, 19 7'6 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (NHe-Net) (Kle-Net) 17 18 3 19 20 21'2 23 25 10 26 27 12 28 13 29 3.4 30 31 16
APPENDIX C OPERATING DATA REPOR~
DOCKET NO ~
Turkey Point Unit No. 3 REPORT MONTH December 1976 Jsn. 6, 1977 COMPLFTED BY V. T. Chilson TELEPHONE OPERATING STATUS 1~ REPORTING PERIOD: 0001 76 12 01 GROSS HOURS IN REPORTING PERIOD: 744.0 THROUGH
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2200 HAE a DEPEND. CAPACEEE (NNA-Nat):
DESIGN ELECTRICAL RATING (MWe-Net): 693
- 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWc-Valet): NONE
- 4. REASONS FOR RESTRICTION (IP ANY):
THIS MONTH YEAR TO DATE CUMULATIVE
- 5. NUMBERS OF HOURS REACTOR 'WAS CRITICAL.... 0.0 6 760.0 28 040.1
- 6. REACTOR RESERVE SHUTDOWN HOURS.........,.. 0.0 64.2 67.4 7 ~ HOURS GENERATOR ON LINE ~ ~ ~ , ~ ~ 0 0 6 669.1 27 039.1
- 8. UNIT RESERVE SHUTDOWN HOURS............... 0.0 0.0 85.0
- 9. GROSS THERMO ENERGY GENERATED (PAUL) ~ ..... 14 417 328 51 729 588
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) ~ ~ ~ 4 555 215 16 570 451
- 11. NET ELECTRICAL ENERGY GENERATED (MWH)..... - 1 706 4 320 173 15 675 935
- 12. REACTOR SERVICE FACTOR 0.0 77.0 78.5 t
- 13. REACTOR AVAILABILITYFACTOR............... 0. 0 77.7 78.7
- 14. UNIT SERVICE FACTOR. 0.0 15 'NIT AVAILABILITY PACTORA ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ a 0.0 75.9 75.9
- 16. EfZT CAPACITY PACTOR (USing (AADC)......... 0~0 73.8 66.8
- 17. UNIT CAPACITY FACTOR (Using Design We)... 0 0 71.0 63.3 a
- 18. UNIT FORCED OUTAGE RATE. . .........., 0' 0.1 2.9 19 'HUTDOWiNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH)
- 20. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OFSTARTUP: Jen. 16, 1977
- 21. UNITS IN TEST STATUS (PRIOR TO COKKRCZAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY IiNITIAL ELECTRZCITY a
COMMiRCIAL OPERATION
(1) REASON APPEHDIX D DOCKET NO. 50 - 250 A: EQUIPMEHT FAILURE (EXPLAIN)
B: MAIHT. OR TEST UNIT SHUTDOWNS AN) POWER REDUCTIONS UNIT NAME Turkey Point Unit Ho. 3 C: REFUELINC D: RECULATORY RESTRICTION 'ATE Jan. 6, 1977 E: OPERATOR TRAINIHG AHD LICENSE EXAMINATION COMPLETED BY V. T. Chilson F: ADMINISTRATIVE G: OPERATIONAL ERROR (EXPIAIN) REPORT MONTH December TELEPHONE (3O5) 1976 H: OTHER (EXPLAIN)
(2) METHOD 1: MANUAL METHOD OF 2: JIANUAL SCRAM TYPE SWOTTING DOWN 3: ,AUTOMATIC SCRAM F: FORCED DURATION THE REACTOR OR 4: OIIIER (EXP LAIII) NO. DATE S: SCHEDULED (BOURS) REASON(1) REDUCINC POWER(2) CORRECTIVE ACTIONS/CMHE'.ITS 21 76-11-14 744.0 Unit No. 3 removed from service for refueling, maintenance, and inspections. (Continued from previous month) (Nuclear and Non-nuclear systems)
SIRMARY: Unit No. 3 removed from service for refueling, maintenance, and inspections. (Continued from previous month)
APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
UNIT Turkey Point Unit No. 4 Jan. 6, 1977 COMPLETED BY V. T. Chilson TELEPHONE MONTH December, 1976 (K<e-Valet)
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (Mle-Net) 17 690 18 697 17 ,19 689 521 20 605
'83 21 683 689 22 692 687 23 692 661 693.
664 695 10 696 26 692 690 27 691 12 689 693 684 29 689 680. 30 688 15 687 31 690 687 NOTE Average daily power level greater than 666'Ãh due to cooler condenser cooling water.
APPENDIX C OPERATING DATA REPORT DOCKET NO. 50 - 250 UNIT Turke Point Unit No.
ORT MONTH December, 1976 DATE Jan. 6 1977 CO'fPLETED BY V. T. Chileon OPERATING STATUS
- 1. REPORTING PERIOD: 0001>76>12,01 GROSS HOURS IN REPORTING PERIOD: 744.0 THROUGH 2400,76,~12 31
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt):
>AX.DE>E>>. CA>AC>>> (>>> -N t):
DESIGN ELECTRICAL RATING (MWe-Net): 693 3 ~ POWER LEVEL TO WHICH RESTRICTED (IP ANY) ('fffe-Net)f NONE
- 4. REASONS FOR RESTRICTION (ZF ANY):
THIS MONTH YEAR TO DATE CffMULATIVE
- 5. i%uSERS OF HOURS REACTOR 'WAS CRZTZCAL..... 718.2 6 075.9 21 721.8 HOURS'
- 6. ~> CTOR RESERVE SHUTDOf6f HOURS. ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 21.7 138.8 7
8.
HOURS GENERATOR ON UNIT RESERVE LINE.........,,,,....,.
SHUTDOWiN . ..
~ ~ ~ .... ..
~
670.1 0.0 '.0 5 828.4 20 542.0 0.0
- 9. GROSS THERfLQ ENERGY GENERATED (MWH).....: I 453 037 ll 103 004 41 751 640
- 10. GROSS ELECTRICAL EffERGY GENERATED (MWH)... 479 100 3 978 606 13 957 688 ll, ifET ELECTRICAL ENERGY GEVERATED (MffH) ~... 455 3 771 836 13 230 466
- 12. REACTOR SERVICE FACTOR. 96.5 69.2 73.8 4
- 13. REACTOR AVAILABILITYFACTOR...... ~..... 99.4 69.5 74.2 14 'NIT SERVICE FACTOR... ~ ~ . ~ .. .... . . .
~ ~ 90.1- 66. 4 69.8
- 15. UNIT AVAILABILITYFACTOR.................. 90.1 66.4 69.8 16 'UNIT CAPACITY PACTOR (Using (MDC)... ...... ~ 64.5 68.2
- 17. UNIT CAPACITY FACTOR (Using Design ffWe)... 62.0 64.8
- 18. UNIT FORCED OUTAGE RATE............,...... 0~5 3~ 7 3.6
- 19. SHUTDOWiNS SCHEDULED OVER NEXT 6 MONTHS (TYPE> DATE, AND DURATION OF EACH):
repair steam generator tube leek - Jan. 6, 1977 through Jan. 12, 1977.
maintenance and inspections - April 4, 1977 throu h May 22, 1977.
20.'F
'eEueling, SHUTDOWN AT END OF ffEPORT PERIOD, ESTIMATED DATE OF STARTSPf
- 21. UNITS IN TEST STATUS (PRIOR TO COf0fERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
4 ~
(1) REASON APPEHDIX D DOCKET NO. '0 - 251 A: EQUIPMENT FAILURE (EXPLAIN)
B: MAINT. OR TEST WHIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Turke Point Unit No. 4 C: REFUELING D: REGULATORY RESTRICTION DATE Jan. 6 1977 E- OPERATOR TRAINING AND LICENSE EXAHINATION COHPLETED BY V. T. Chilson F: ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN) REPORT MONTH December 1976 TELEPHONE (305) 552-3830 N: OTHER (EXPLAIN)
(2) METHOD 1: MAliUAL METHOD OF 2: .MANUAL SCRAM TYPE SHUTTING DOWN 3: AUTOHATIC SCRAM F: FORCED DURATION THE REACTOR OR 4: OIHER (EXPLAIN) NO. DATE S: SCHEDULED (HOURS) REASON (1) REDUCING POWER(2) CORRECTIVE ACTIONS/CQDiENTS 28 76-10-28 69.4 Unit No. 4 was removed from service for steam gener-ator tube inspection program. (Continued from previous month) (Nuclear system) 29 76-12-04 3.2 Unit No. 4 tripped on steam generator No. 4 A high level during a transient condition caused by the loss of a vital instrument bus power supply. (Nuclear system) 30 76-12-20 1.3 Unit No. 4 tripped during a transient condition caused by the failure of a component in nuclear instrumen-tation system channel N-41. (Nuclear system)
SUMMARY
- Unit No. 4 was returned to service on December 3, 1976 following completion of steam generator tube inspection program.
Unit operated at IOOX R.P. during month except for outages on Dec. 4, 1976 and Dec. 20, 1976.
APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 335 UNIT St. Lucie Unit No. 1 DATE Jan. 6, 1977 COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3830 i~mONTH Dec embe DAY AVERAGE DAILY POEM LEVEL DAY AVERAGE DAlLY POWER LEVEL (K<e-Net) (MNe-Net) 18 3 19 20 21 370 377 23 376 24 374 25 380 10 26 374 27 371 12 28 378 13 29 376 14 30 373 374 16
APPENDIX C OPERATING DATA REPORT DOCKET NO. 50 335 UNIT St. Lucia Unit No. 1 REpORT MOL~ Decenber. 1976 DATE Jan. 6, 1977 COMPLETED BY V. T. Chilson OPERATING STATUS TELEPHONE (305) 552-3830
- 1. REPORTING PERIOD: 0001,76,12,21 GROSS HOURS IN REPORTING PERIOD: 264.0 THROUGH
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2560 DESIGN ELECTRICAL RATING (MWe-Net): 802
- 3. POWER LEVEL TO WHICH RESTRICTED (ZF ANY) ("JWe-LRJet): 722
- 4. REASONS FOR RESTRICTION (ZF ALJY):
"Tenporary 90X restriction pending reactor coolant flow analysis" THIS MONTH YEAR TO DATE CUMULATIVE 5 NUMBERS OF HOURS REACTOR WAS CRITICAL 264.0 264.0 264.0
- 6. REACTOR RESERVE SHUTDOWN HOURS.. ~ .. ...
~ ~ O. 0
- 7. HOURS ORMHRSUOR OS LRMS....... .... 264.0
- 8. UNIT RESERVE SHUTDOWN HOURS............... 0.0 0.0
~
- 9. GROSS THERMAL RJERGY GENERATED (MWH)..., .. ~ 347 603 347 603 347 603
- 10. GROSS ELECTRICS ENERGY GERJERATED {LRJWH)... 108 270 108 270 108 270 ll. NET ELECTRICAL ENERGY GENERATED (MWH)..... 98 975 98 975 98 975
- 12. REACTOR SERVICE FACTOR.............,...,.. 100.0 100.0 100.0 13 REACTOR AVAILABZLITYFACTOR............,.. 100.0 100.0 100.0
- 14. UNIT SERVICE FACTORS ~ 100.0 100 ~ 0 100.0
- 15. UNIT AVAILABILITYFACTOR.................. 100.0 100.0 100.0
- 16. UNIT CAPACITY FACTOR (Using {HPC) ........ ~ . 46 ~ I 46.7 46.7
- 17. UNIT CAPACITY FACTOR (Using Design MWe)... 46.7 46. 7 46.7
- 18. UNIT FORCED OUTAGE RATE............... ~ ~ .. 0.0 0.0 0.0
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MOLLHS (TYPE, DATE, AND DURATION OF EACH):
- 20. IF SHUTDOWLN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 21. UNITS IN TEST STATUS (PRIOR TO COiJMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY April 22, 1976 INITIAL ELECTRICITY ~M7 1976 CO"DJERCIAL OPERATION ~O. 2 1976
(I) REASON hPPENDIX D DOCRET NO. 50 - 335 A: EqUIPMENT FAILURE (EXPLAIN)
B: HAINT. OR TEST UNIT SllUTDOWNS AND POWER RFDUCTIONS UNIT NAME St. Lucio Unit No. I C: REFUEl ING D: REGULATORY RESTRICTION DATE Jan. 6, 1977 E: OPERATOR TRAINING AND LICENSE EXAMINATION COMPLETED EY V. T. Chilson F: ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN) REPORT HONT)1 December 1976 TELEPHONE (305) 552-3830 II: OTHER (EXPLAIN)
(2) METHOD I: MANUAL METHOD OF 2: MANUAL SCRAM TYPE SBUTTING DOWN 3: AUTOHATIC SCRAM F: FORCED DURATION THE REACTOR OR 4: OTHER (EXPLAIN) NO. DATE S: SCHEDULED (BOURS) REASON(1) REDUCING POWER(2) CORRECTIVE ACTIONS/COtlMENTS NONE
SUMMARY
- Unit No. 1 was placed in commercial operation on December 21, 1976, at 12:Ol a.m. Unit operated at approximately 50X R.P. through end of month.