01/07/1977 Letter Operating Status Reports of December 1976
ML18227B081
Person / Time
Site: Saint Lucie, Turkey Point  NextEra Energy icon.png
Issue date: 01/07/1977
From: Schmidt A
Florida Power & Light Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML18227B081 (17)


Text

NRC FORM 195 U.S. NUCLEAR REGULATORY COMMISSION DOCK BER IZ 76) 5 251/335 FILE NUMBER

, NRC DISTRIBUTION FQR rART 50 DOCKET MATERIAL MONTHLY REPORT TO: USNRC FROM: HLORDIA PWR 6 LIGHT CO ~ DATE OF DOCUMENT MIAMI, FLORDIA 1/7/77 A.D. SCHMIDT DATE RECEIVED 1/ g/77 C3LETTE R ONOTORIZED PROP INPUT FORM NUMBER OF COPIES RECEIVED

~QQ R I G N AL I KIUNCLASSIFIE0 OCOPY LETTER TRANS THE POLL(NING: MONTHLY REPORT FOR DECEMBER 1976 PLANT & COMPONENT OPERABILITY &

AVAILABILITY, THIS REPORT TO BE USED IN PREPARING GRAY BOOK BY PLANS &

OPERATIONS'LANT NAME ~ TURKEY PT o g 1 <<3>> 6 4 ACRNOWLEDGED DO NOT REMOVE I

FOR ACTION/INFORMATION MIPC W CYS FOR ACT ON INTERNAL D IST R I BUTION DR BRANCH CHIEF L ZIEMANN /LEAR PARRISH DIGGS EXTERNAL DISTRIBUTION CONTROL NUMBER MIAMI FL.

NRC FORM 156 IZ.76)

r III r I

- f I

~, 9C II II 4 v

P. O. BOX 013100, MIAMI, FL 33101

~ykl /fr

~gegu atOYf r

FLORIDA POWER & LIGHT COMPANY cy yQCXF+

January 7, 1977 gg1QT.>

5

~g'Ah pe Dobe< ~"

Office of Management Information and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen: Ik r i I

Attached are the December', 1976 Operating Status.'Reports for Turkey Point Unit Nos.,'3 and' and St.'ucie Unit No. l.

Very truly yours, A. D. Schmidt Vice President Power Resources VTC/DDC cc: Mr. Norman C. Moseley Jack R. Newman, Esquire PEOPLE... SERVING PEOPLE

<1 gy rz>

I ')

I'I gp ~

L~

l'p P4 y@i j,

APPENDS B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 250 UNIT Turkey Point Unit No. 3 DATE Jan. 6 1977 COMPLETED BY V. T. Chi on TELEPHONE (305) 552-3830 MONTH December, 19 7'6 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (NHe-Net) (Kle-Net) 17 18 3 19 20 21'2 23 25 10 26 27 12 28 13 29 3.4 30 31 16

APPENDIX C OPERATING DATA REPOR~

DOCKET NO ~

Turkey Point Unit No. 3 REPORT MONTH December 1976 Jsn. 6, 1977 COMPLFTED BY V. T. Chilson TELEPHONE OPERATING STATUS 1~ REPORTING PERIOD: 0001 76 12 01 GROSS HOURS IN REPORTING PERIOD: 744.0 THROUGH

2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2200 HAE a DEPEND. CAPACEEE (NNA-Nat):

DESIGN ELECTRICAL RATING (MWe-Net): 693

3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWc-Valet): NONE
4. REASONS FOR RESTRICTION (IP ANY):

THIS MONTH YEAR TO DATE CUMULATIVE

5. NUMBERS OF HOURS REACTOR 'WAS CRITICAL.... 0.0 6 760.0 28 040.1
6. REACTOR RESERVE SHUTDOWN HOURS.........,.. 0.0 64.2 67.4 7 ~ HOURS GENERATOR ON LINE ~ ~ ~ , ~ ~ 0 0 6 669.1 27 039.1
8. UNIT RESERVE SHUTDOWN HOURS............... 0.0 0.0 85.0
9. GROSS THERMO ENERGY GENERATED (PAUL) ~ ..... 14 417 328 51 729 588
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) ~ ~ ~ 4 555 215 16 570 451
11. NET ELECTRICAL ENERGY GENERATED (MWH)..... - 1 706 4 320 173 15 675 935
12. REACTOR SERVICE FACTOR 0.0 77.0 78.5 t
13. REACTOR AVAILABILITYFACTOR............... 0. 0 77.7 78.7
14. UNIT SERVICE FACTOR. 0.0 15 'NIT AVAILABILITY PACTORA ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ a 0.0 75.9 75.9
16. EfZT CAPACITY PACTOR (USing (AADC)......... 0~0 73.8 66.8
17. UNIT CAPACITY FACTOR (Using Design We)... 0 0 71.0 63.3 a
18. UNIT FORCED OUTAGE RATE. . .........., 0' 0.1 2.9 19 'HUTDOWiNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH)
20. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OFSTARTUP: Jen. 16, 1977
21. UNITS IN TEST STATUS (PRIOR TO COKKRCZAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY IiNITIAL ELECTRZCITY a

COMMiRCIAL OPERATION

(1) REASON APPEHDIX D DOCKET NO. 50 - 250 A: EQUIPMEHT FAILURE (EXPLAIN)

B: MAIHT. OR TEST UNIT SHUTDOWNS AN) POWER REDUCTIONS UNIT NAME Turkey Point Unit Ho. 3 C: REFUELINC D: RECULATORY RESTRICTION 'ATE Jan. 6, 1977 E: OPERATOR TRAINIHG AHD LICENSE EXAMINATION COMPLETED BY V. T. Chilson F: ADMINISTRATIVE G: OPERATIONAL ERROR (EXPIAIN) REPORT MONTH December TELEPHONE (3O5) 1976 H: OTHER (EXPLAIN)

(2) METHOD 1: MANUAL METHOD OF 2: JIANUAL SCRAM TYPE SWOTTING DOWN 3: ,AUTOMATIC SCRAM F: FORCED DURATION THE REACTOR OR 4: OIIIER (EXP LAIII) NO. DATE S: SCHEDULED (BOURS) REASON(1) REDUCINC POWER(2) CORRECTIVE ACTIONS/CMHE'.ITS 21 76-11-14 744.0 Unit No. 3 removed from service for refueling, maintenance, and inspections. (Continued from previous month) (Nuclear and Non-nuclear systems)

SIRMARY: Unit No. 3 removed from service for refueling, maintenance, and inspections. (Continued from previous month)

APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

UNIT Turkey Point Unit No. 4 Jan. 6, 1977 COMPLETED BY V. T. Chilson TELEPHONE MONTH December, 1976 (K<e-Valet)

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (Mle-Net) 17 690 18 697 17 ,19 689 521 20 605

'83 21 683 689 22 692 687 23 692 661 693.

664 695 10 696 26 692 690 27 691 12 689 693 684 29 689 680. 30 688 15 687 31 690 687 NOTE Average daily power level greater than 666'Ãh due to cooler condenser cooling water.

APPENDIX C OPERATING DATA REPORT DOCKET NO. 50 - 250 UNIT Turke Point Unit No.

ORT MONTH December, 1976 DATE Jan. 6 1977 CO'fPLETED BY V. T. Chileon OPERATING STATUS

1. REPORTING PERIOD: 0001>76>12,01 GROSS HOURS IN REPORTING PERIOD: 744.0 THROUGH 2400,76,~12 31
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt):

>AX.DE>E>>. CA>AC>>> (>>> -N t):

DESIGN ELECTRICAL RATING (MWe-Net): 693 3 ~ POWER LEVEL TO WHICH RESTRICTED (IP ANY) ('fffe-Net)f NONE

4. REASONS FOR RESTRICTION (ZF ANY):

THIS MONTH YEAR TO DATE CffMULATIVE

5. i%uSERS OF HOURS REACTOR 'WAS CRZTZCAL..... 718.2 6 075.9 21 721.8 HOURS'
6. ~> CTOR RESERVE SHUTDOf6f HOURS. ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 21.7 138.8 7

8.

HOURS GENERATOR ON UNIT RESERVE LINE.........,,,,....,.

SHUTDOWiN . ..

~ ~ ~ .... ..

~

670.1 0.0 '.0 5 828.4 20 542.0 0.0

9. GROSS THERfLQ ENERGY GENERATED (MWH).....: I 453 037 ll 103 004 41 751 640
10. GROSS ELECTRICAL EffERGY GENERATED (MWH)... 479 100 3 978 606 13 957 688 ll, ifET ELECTRICAL ENERGY GEVERATED (MffH) ~... 455 3 771 836 13 230 466
12. REACTOR SERVICE FACTOR. 96.5 69.2 73.8 4
13. REACTOR AVAILABILITYFACTOR...... ~..... 99.4 69.5 74.2 14 'NIT SERVICE FACTOR... ~ ~ . ~ .. .... . . .

~ ~ 90.1- 66. 4 69.8

15. UNIT AVAILABILITYFACTOR.................. 90.1 66.4 69.8 16 'UNIT CAPACITY PACTOR (Using (MDC)... ...... ~ 64.5 68.2
17. UNIT CAPACITY FACTOR (Using Design ffWe)... 62.0 64.8
18. UNIT FORCED OUTAGE RATE............,...... 0~5 3~ 7 3.6
19. SHUTDOWiNS SCHEDULED OVER NEXT 6 MONTHS (TYPE> DATE, AND DURATION OF EACH):

repair steam generator tube leek - Jan. 6, 1977 through Jan. 12, 1977.

maintenance and inspections - April 4, 1977 throu h May 22, 1977.

20.'F

'eEueling, SHUTDOWN AT END OF ffEPORT PERIOD, ESTIMATED DATE OF STARTSPf

21. UNITS IN TEST STATUS (PRIOR TO COf0fERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

4 ~

(1) REASON APPEHDIX D DOCKET NO. '0 - 251 A: EQUIPMENT FAILURE (EXPLAIN)

B: MAINT. OR TEST WHIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Turke Point Unit No. 4 C: REFUELING D: REGULATORY RESTRICTION DATE Jan. 6 1977 E- OPERATOR TRAINING AND LICENSE EXAHINATION COHPLETED BY V. T. Chilson F: ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN) REPORT MONTH December 1976 TELEPHONE (305) 552-3830 N: OTHER (EXPLAIN)

(2) METHOD 1: MAliUAL METHOD OF 2: .MANUAL SCRAM TYPE SHUTTING DOWN 3: AUTOHATIC SCRAM F: FORCED DURATION THE REACTOR OR 4: OIHER (EXPLAIN) NO. DATE S: SCHEDULED (HOURS) REASON (1) REDUCING POWER(2) CORRECTIVE ACTIONS/CQDiENTS 28 76-10-28 69.4 Unit No. 4 was removed from service for steam gener-ator tube inspection program. (Continued from previous month) (Nuclear system) 29 76-12-04 3.2 Unit No. 4 tripped on steam generator No. 4 A high level during a transient condition caused by the loss of a vital instrument bus power supply. (Nuclear system) 30 76-12-20 1.3 Unit No. 4 tripped during a transient condition caused by the failure of a component in nuclear instrumen-tation system channel N-41. (Nuclear system)

SUMMARY

Unit No. 4 was returned to service on December 3, 1976 following completion of steam generator tube inspection program.

Unit operated at IOOX R.P. during month except for outages on Dec. 4, 1976 and Dec. 20, 1976.

APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 335 UNIT St. Lucie Unit No. 1 DATE Jan. 6, 1977 COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3830 i~mONTH Dec embe DAY AVERAGE DAILY POEM LEVEL DAY AVERAGE DAlLY POWER LEVEL (K<e-Net) (MNe-Net) 18 3 19 20 21 370 377 23 376 24 374 25 380 10 26 374 27 371 12 28 378 13 29 376 14 30 373 374 16

APPENDIX C OPERATING DATA REPORT DOCKET NO. 50 335 UNIT St. Lucia Unit No. 1 REpORT MOL~ Decenber. 1976 DATE Jan. 6, 1977 COMPLETED BY V. T. Chilson OPERATING STATUS TELEPHONE (305) 552-3830

1. REPORTING PERIOD: 0001,76,12,21 GROSS HOURS IN REPORTING PERIOD: 264.0 THROUGH
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2560 DESIGN ELECTRICAL RATING (MWe-Net): 802
3. POWER LEVEL TO WHICH RESTRICTED (ZF ANY) ("JWe-LRJet): 722
4. REASONS FOR RESTRICTION (ZF ALJY):

"Tenporary 90X restriction pending reactor coolant flow analysis" THIS MONTH YEAR TO DATE CUMULATIVE 5 NUMBERS OF HOURS REACTOR WAS CRITICAL 264.0 264.0 264.0

6. REACTOR RESERVE SHUTDOWN HOURS.. ~ .. ...

~ ~ O. 0

7. HOURS ORMHRSUOR OS LRMS....... .... 264.0
8. UNIT RESERVE SHUTDOWN HOURS............... 0.0 0.0

~

9. GROSS THERMAL RJERGY GENERATED (MWH)..., .. ~ 347 603 347 603 347 603
10. GROSS ELECTRICS ENERGY GERJERATED {LRJWH)... 108 270 108 270 108 270 ll. NET ELECTRICAL ENERGY GENERATED (MWH)..... 98 975 98 975 98 975
12. REACTOR SERVICE FACTOR.............,...,.. 100.0 100.0 100.0 13 REACTOR AVAILABZLITYFACTOR............,.. 100.0 100.0 100.0
14. UNIT SERVICE FACTORS ~ 100.0 100 ~ 0 100.0
15. UNIT AVAILABILITYFACTOR.................. 100.0 100.0 100.0
16. UNIT CAPACITY FACTOR (Using {HPC) ........ ~ . 46 ~ I 46.7 46.7
17. UNIT CAPACITY FACTOR (Using Design MWe)... 46.7 46. 7 46.7
18. UNIT FORCED OUTAGE RATE............... ~ ~ .. 0.0 0.0 0.0
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MOLLHS (TYPE, DATE, AND DURATION OF EACH):
20. IF SHUTDOWLN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
21. UNITS IN TEST STATUS (PRIOR TO COiJMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY April 22, 1976 INITIAL ELECTRICITY ~M7 1976 CO"DJERCIAL OPERATION ~O. 2 1976

(I) REASON hPPENDIX D DOCRET NO. 50 - 335 A: EqUIPMENT FAILURE (EXPLAIN)

B: HAINT. OR TEST UNIT SllUTDOWNS AND POWER RFDUCTIONS UNIT NAME St. Lucio Unit No. I C: REFUEl ING D: REGULATORY RESTRICTION DATE Jan. 6, 1977 E: OPERATOR TRAINING AND LICENSE EXAMINATION COMPLETED EY V. T. Chilson F: ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN) REPORT HONT)1 December 1976 TELEPHONE (305) 552-3830 II: OTHER (EXPLAIN)

(2) METHOD I: MANUAL METHOD OF 2: MANUAL SCRAM TYPE SBUTTING DOWN 3: AUTOHATIC SCRAM F: FORCED DURATION THE REACTOR OR 4: OTHER (EXPLAIN) NO. DATE S: SCHEDULED (BOURS) REASON(1) REDUCING POWER(2) CORRECTIVE ACTIONS/COtlMENTS NONE

SUMMARY

Unit No. 1 was placed in commercial operation on December 21, 1976, at 12:Ol a.m. Unit operated at approximately 50X R.P. through end of month.