ML18227B078
| ML18227B078 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie, Turkey Point |
| Issue date: | 04/04/1977 |
| From: | Schmidt A Florida Power & Light Co |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| Download: ML18227B078 (21) | |
Text
NIBS FOBM'fJG U.S. NVCLLAflIICGVLATOflYCOMMISSION I2 TOI t
IlIRC DIS I RIDUTION+ofI~NYGQ DOCKET MATERIAL "YS" 'Q~z~
I'l C NVMfILI lION'l1ILY REPORT TO.i Ni Ro CD FROM:
Florida Power
& Light Co'iami, Fla.
A. D. Schmidt DATe of'- DocUMsNT 4/4/77 DATC BCCCIVFD 4/13/77 ETTEB-QOB IGINAL QCOPY QNOTOBIZLD RUNcLAssfFfsn f'BOP IfIP UT F 0 BM NUMBafl OF COPIES BFCEIVED 7
Sr nese BIpTIQN LETTER TRANS THE FOLLOelXNGo I
'@GROT REMOVZ PLANT NA't%:
Turkey Point Units 3 & 4 I
RJL (1-P)
GNCLOSU BL.
MONTHLY REPORT FOR MARCH> 1977 PLANT 6 CONPONENT OPERABXLXTY &
AUAXLABXLXTY, TllXS REPORT TO BE USED XN PREPARXNG GRAY BOOK BY PLANS 6 OPERATXONS ~
(9-P)
ACKNQ~PjQGE I
FOR ACTION/INFORMATION NXPC Jf/~LCvS FOR ACCT ON QEg F T
off'DR tICilO.MT.D BBIINCB CBIB"~T.
X~ST
{L)
INTERNAL O vent>
ISTRI BUTION
.....P,
,.'f.J,C
.IlSXC Ex> LBIINALolSTlllou noN C
NTI<OI NuMIII:R
>qlov~ Qw t'I IIC I OII)I II):; ().)I;)
1 l
P;
~
~
lt 1'e
'\\
P. O. BOX 013100, MIAMI, FL 33101 FLORIDAPOWER & LIGHTCOMPANY,
@8@pggy g(@@
Office of Management Information and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C.
20555 April 4, 1977 I
z zo/z s'/
Gentlemen:
Attached are the March, 1977 Operating Status Reports for Turkey Point Unit Nos.
3 and 4 and St. Lucie Unit. No. l.
Maximum Dependable Capacity (MWe-Net) for St. Lucie Unit No.
1 was revised from 802 MWe-Net to 777 MWe-Net (Estimated).
The revised capacity was calculated using anticipated summer conditions and data obtained when the unit was operating at 100% R.P.
Very truly yours, chmi t Vice President Power Resources VTC/DDC cc:
Mr. Norman C. Moseley Robert Lowenstein, Esquire 8
~+~% ~pi 4'P Cy g7io foV/
PEOPLE... SERVING PEOPLE
\\ ~
k r ~
APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 250 Turkey Point UNIT Unit No.
3 DATE A ril 4 1977 COMPLETED BY V. T. Chilson TEL'EPHONE (305) 552-3769 MONTH
- March, 1977 DAY AVERAGE DAILY POWER LEVEL (Mfe-Net)
DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 6 10 12 13 14 16 684 686 690 685 683 679 677 681 690 688 685 681 679
'674 668 67l 17 19 20 21 22 24 25 26 27 28 29 30 31 NOTE:
672 670 671 669 667 669 673 686 692 690 686 685 678 678 Average daily power level greater than 666 MPfe due to cooler condenser cooling water.
0
\\
APPENDS C
OPERATING DATA REPORT REPORT MONTH March 1977 OPERATING STATUS DOCKET NO.
Turkey Point UNIT Unit No.
3 DATE A ril 4 1977 COMPLETED BY V. T. Chilson TELEPHONE 305 552-37 1.
REPORTING PERIOD:0001,77,03 01 GROSS HOURS IN REPORTING PERIOD:
THROUGH 2400 77 03 3 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt):
2200 88K DEPEND.
CAPACITY (MWe-Net):
666 DESIGN ELECTRICAL RATING (MWe-Net):
693 744.0 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY)
(MWe-Net):
4.
REASONS FOR RESTRICTION (IF ANY):
NONE 5 ~
NtJMBERS OF HOURS REACTOR WAS CRITICAL...
THIS M088H YEAR TO DATE CUMULATIVE 744.0 1 794.6 29 834.7 6.
REACTOR RESERVE SHUTDOWN HOURS..
~ ~
~ ~..
~.
~. 67. 4 7.
HOURS GENERATOR ON LINE.
8.
UNIT RESERVE SHUTDOWN HOURS...............
744.0 1 666.9 28 706.1 85.0 9.
GROSS THER8JAL ENERGY GENERATED (MWH}......
1 629 974 3 538 470 5~2~}2L 10 GROSS ELECTRICAL ENERGY GENERATED (MWH) 530 368 1 153 360 17 723 811 11 NET ELECTRICAL ENERGY GENERATED (MWH)
~
505 511 1 094 112 16 770 047 12.
REACTOR SERVICE FACTOR.
100.0 83.1
~8.
13.
REACTOR AVA1LABILITYFACTOR...,,,,.....,..
100.0
- 83. 1 78.9 14.
UNIT SERVZCE FACTOR.
100.0 15.
UNIT AVAILABILITYFACTOR..
~...............
100.0 16'UNIT CAPA'CITY FACTOR (Using 08DC)...,
~....
102.0 (1) 77.2 77.2 76.1 75.7 76.0 67.4 17.
UNIT CAPACITY FACTOR (Using Design MWe)...
'98 '
73.1 63.9 18.
UNIT FORCED OUTAGE RATE......
0' 1.5 2.8 19.
SHUTDOWiNS SCHEDULED OVER NEET 6 MONTHS (TYPE> DATE, AND DURATION OF EACH):
20.
ZF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
21.
UNITS IN TEST STATUS (PRIOR TO COiiRCIAL OPERATION):
PORECAST ACHIEVED INITIALCRITICALITY INITIALELECTRICITY COJOJERCIAL OPERATION NOTE:
(1) Unit CaPacity Factor (using MDC) greater than ZOOID due to cooler condenser cooling water.
'.)
REASON A:
EQUIPMENT FAILURE (EXPLAIN)
B:
HAINT. OR TEST C:
REFUELING D:
REGULATORY RESTRICTION E:
OPERATOR TRAINING AND LICENSE EXAHINATION F:
ADMINISTRATIVE C:
OPERATIONAL ERROR (EXPLAIN) ll:, OTllER (PDPIAIN)
APPENDIX D UNIT Sl!UTDOWNS AND POWER REDUCTIONS REPORT HONTN'arch 1977 DOCKET li0.
UNIT NAHE DATE 50 - 250 Turke Point Unit No. 3 A ril 4 1977 TELEPHONE (305) 552-3769 COHPLETED BY V. T. Chilson
- )
METHOD 1:
MANUAL 2:
=.MANUAL SCRAH 3:
AUTOMATIC SCRAH 4:
01llER (EXPLAIN)
NO.
DATE TYPE F:
FORCED S:
SCllEDULED DURATION (BOURS)
REASON (1)
METllOD OF SHUTTING DOWN TllE REACTOR OR REDUCING POWER(2)
CORRECTIVE ACTIONS/COMMENTS NONE
SUMMARY
- Unit No.
3 operated at approximately lOOX R.P. during month.
~ 1
~
APPENDIX B AVERAGE DAILY UNIT POWER LEVEL 4 DOCKET NO. 50 251 Turkey Point UNIT DATEApril 4, 1977 COMPLETED BY V. T. Chilson TEL'EPHONE (305) 552-3769 MONTH
- March, 1977 DAY AVERAGE DAILY POWER LEVEL (MWe-.Net)
686 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 662 17 7'88 690 685 680 677
'73 675 675 18 19 20 21 22 23 24 662 663 319 10 i
12 14 677 676 671 671 665 661 609 26 27 28 29 30 NOTE:
644 677 683 679 672 Average daily power level greater than 666 MWe due to cooler condenser cooling water.
APPENDIX C OPERATING DATA REPORT REPORT MONTH March.
1977 DOCKET NO.
50-251 Turkey Point, UNIT Unit No.
4 DATE April 4 1977 COMPLETED BY V. T. Chilson OPERATING STATUS TELEPHONE 1,
REPORTING PERIOD: 0001,77903,01 GROSS HOURS ZN REPORTING PERIOD:
THROUGH 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt):
2200 KXX.DEPEND. CAPACITY (MWe-Valet):
666 DES1GN ELECTRICAL RATING (MWe-Net):
693 3.
POWER LEVEL TO WHICH RESTRICTED (IP ANY)
("Ke-Net):
NONE 4.
REASONS FOR RESTRICTION (ZF ANY):
744.0 THIS MONTH YEAR TO DATE CUAAATZVE 5.
IIUUEERS OS EOURS ItEACTOR IIAS CRZTZCAZ.. ~..
597.3
~IA 6 ~
REACTOR RESERVE SHUTDOWN HOURS..
~ ~ ~
~ ~. ~ ~ ~
~
0 138.8 T.
HOURS GENERATOR ON LINE.. ~,,........,.....
591.3 1 764.2 22 306.2 8.
UNIT RESERVE SHUTDOWN HOURS............... 9 ~
GROSS THER%8 ENERGY GENERATED (MWH)..... ~
1 280 629 3 830 353 46 889 723 10.
GROSS ELECTRICAL ENERGY GENERATED
(~i
)...
414 125 1 251 665 15 209 348 11.
ifET ELECTRICAL ENERGY GEANERATED (iSHH)....
~
393 600 1 190 501 12.
REACTOR SERVICE FACTOR.....
~.
82.6 74.4 13.
REACTOR AVAILABILITYFACTOR..
~............
82.6 74.8 14'NIT SERVZCE FACTOR....
79 '
81.7 70.6 15.
UNIT AVAILABILITYFACTOR..................
79.5 81.7 70.6 16.
'UNIT CAPACITY FACTOR (Using (MDC)... ~....
~.
79 '
82.8 69.2 17.
UNIT CAPACITY FACTOR (Using Design AMWe)...
76.3 79,5 65.8 18.
UNIT FORCED OUTAGE RATE..............
~.....
0.0 3.3 19.
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Refueling, rzaintenances and inspections - April 25 through June ll, 1977.
20.
IF SHUTDOWNi AT END OF REPORT PERIOD, ESTBtkTED DATE OF STARTUP:
21.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INZTIAL CRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION
i)
REASON A:
EQUIPMENT FAILURE (EXPLAIH)
B:
MAIHT. OR TEST C:
REFUELING D:
REGULATORY RESTRICTION E:
OPERATOR TicAIHING AND LICENSE EXAMINATION F:
ADMINISTRATIVE G:
OPERATIONAL ERROR (EXPLAIN)
H:
OTHER (F3(PLAIN)
I)
METHOD 1:
MANUAL 2:
MANUAL SCRAM 3:
OTHER (EXPLAIH)
NO.
DATE TYPE F:
FORCED S:
SCHEDULED REPORT MONTH March, 1977 DURATION (HOURS)
REASON(l)
METHOD OF SHUTTING DOWN THE REACTOR OR REDUCING POWER(2)
APPENDIX D UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50 - 251 DATE April 4, 1977 COMPLETED BY V
T. Chilson TELEPHONE (305) 552-3769 CORRECTIVE ACTIONS/CMMENTS UNIT NAME Turks Point Unit No.
4 77-03-20 152.7 Unit No.
4 was removed from service to repair steam.
generator No. 4C tube leak.
Corrective actions included plugging one leaking tube.
One additional tube was plugged.
(Nuclear System)
SUMMARY
- Unit No.
4 operated at approximately 100X R.P. except for outage of March 20 - 26, 1977.
1
APPENDIX B AVERAGE DAILY MIT POWER LEVEL DOCKET NO.
50 335 St. Lucie UHIT Unit No.
1 DATE A ril 4 1977 COMPLETED BY U. T.. Chilson TEL'EPHONE (305) 552-3769 MONTH Ma h
DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 10 12 13 16 732 788 787:
741 488 784 783 791 725 767 621 161 371
- 375, 375 371 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 NOTE:
358 390 642
- 729, 780 786 789 793 794 733 789 778 797 760 786 Average daily power level greater than 777 Kfe due to cooler condenser cooling water.
, ~
APPENDS C
OPERATXNG DATA REPORT REPORT MONTH
- March, 1977 DOCKET NO.
50 335 St. Lucie UNIT DATE A q 4
COMPLETED BY V. T.
OPERATING STATUS GROSS HOURS IN REPORTING PERIOD:
744.0 THROUGH 2400 77 03 31 2.
CURRENTLY AUTHORIZED POWER LEVEL (Alt):
2560 MAX.DEPEND. CAPACITY (MWe-Net):
. 777 (Est.)
DESIGN ELECTRICAL RATXilG (MWe-iNet):
802 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY)
(MWe<<Net):
NONE 4.
REASONS FOR RESTRXCTIOil (XP ANY):
THIS MO?aH YEAR TO DATE CUMULATIVE 5.
NUMBERS OF HOURS REACTOR WAS CRITICAL.....
744 0 2 106 '
6.
REACTOR RESERVE SHUTDOWN HOURS..
~ ~ ~ ~ ~ ~
~ ~.
2 370 2
7 ~
HOURS GENERATOR ON LIVRE.. ~....
8.
UNIT RESERVE SHUTDOWN HOURS.
~ ~... ~... ~....
736.4 2 035.6 2 299.6 9.
GROSS THERMAL ENERGY GENERATED (MWH).....,
1 592 703 4 299 297 4 646 900 10 GROSS ELECTRICAL ENERGY GENERATED (MWH)...
519 150 1 411 960 11.
NET ELECTRICAL EiNERGY GENERATED (MWH).....
487 915 1 321 922 12.
REACTOR SERVICE FACTOR.
100.0 97.5 13 ~
REACTOR AVAILABILITYPACTOR............,..
100.0 97.5 14.
UNIT SERVICE FACTOR..................
99.0 94.2 15.
UNIT AVAZLABILITYFACTOR..............,...
99.0 94.2 1 520 230 1 420 927 97.8 97.8 94.9 94.9 16.
UNIT CAPACITY 'FACXOR (Using (MDC)........
84 '
- 78. 8 75.4 17.
UNIT CAPACITY FACTOR (Using Design MWe)...
76.3 73.1 18.
UNIT FORCED OUTAGE RATE..
1.0 2.7 2.4 19.
SHUTDOWNS SCHEDULED OVER NEXT 6 MOTHS (TYPE, DATE, A%) DURATION OF EACH):
20.
IF SHUTDOWiN AT END OF REPORT PERIOD, ESTZMATED DATE OF,STARTUP:
\\
21.
UNITS IN TEST STATUS (PRIOR TO COaDlERCZAL OPERATION):
XNZTZAL CRITICALITY XilZTZAL ELECTRICZXT COl0lERCZAL OPERATION FORECAST ACHIEVED
l)
REASON A-EqUIPMENT FAILURE (EXPLAIN)
B:
MAINT. OR TEST C:
REFUELING D:
REGULATORY RESTRICTION E:
OPERATOR TRAINlNG AND LICENSE EXAMINATION F:
ADMINISTRATIVE C:
OPERATIONAL ERROR (EXPLAIN)
H-OTHER (EXPLAIN)
APPENDIX D UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH March 1977 DOCKET NO, 50 - 335 DATE April 4, 1977 COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3769 UNIT NAME St. Lucia Unit No. 1
!)
METHOD 1:
MANUAL 2:
.MANUAL SCRAM 3:
OTHER (EXPLAIN)
NO.
DATE TYPE F:
FORCED S:
SCHEDULED DURATION (BOURS)
REASON(l)
METHOD OF SHUTTING DOWN THE REACTOR OR REDUCING POWER(2)
CORRECTIVE ACTIONS/CRMENTS C'
~
9 77-03-05 10 77-03-11 11 77-03-12 7.6 4 Load reduction to clean condensate pump suction.
strainers.
(Non-nuclear system) l Unit was removed from service to replace gasket~
on containment escape hatch.
(Nuclear system)-
Unit was operated at approximately 50X. R.P. to perform load swing tests.
Power Ascension Test Program.
SlDMARY:
Power Ascension Test Program continued during month.
0
~
~
REcEiyzo oocu~icvr PROCESSNG gaily