ML18227B078

From kanterella
Jump to navigation Jump to search
Letter Operating Status Reports of March 1977
ML18227B078
Person / Time
Site: Saint Lucie, Turkey Point  
Issue date: 04/04/1977
From: Schmidt A
Florida Power & Light Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML18227B078 (21)


Text

NIBS FOBM'fJG U.S. NVCLLAflIICGVLATOflYCOMMISSION I2 TOI t

IlIRC DIS I RIDUTION+ofI~NYGQ DOCKET MATERIAL "YS" 'Q~z~

I'l C NVMfILI lION'l1ILY REPORT TO.i Ni Ro CD FROM:

Florida Power

& Light Co'iami, Fla.

A. D. Schmidt DATe of'- DocUMsNT 4/4/77 DATC BCCCIVFD 4/13/77 ETTEB-QOB IGINAL QCOPY QNOTOBIZLD RUNcLAssfFfsn f'BOP IfIP UT F 0 BM NUMBafl OF COPIES BFCEIVED 7

Sr nese BIpTIQN LETTER TRANS THE FOLLOelXNGo I

'@GROT REMOVZ PLANT NA't%:

Turkey Point Units 3 & 4 I

RJL (1-P)

GNCLOSU BL.

MONTHLY REPORT FOR MARCH> 1977 PLANT 6 CONPONENT OPERABXLXTY &

AUAXLABXLXTY, TllXS REPORT TO BE USED XN PREPARXNG GRAY BOOK BY PLANS 6 OPERATXONS ~

(9-P)

ACKNQ~PjQGE I

FOR ACTION/INFORMATION NXPC Jf/~LCvS FOR ACCT ON QEg F T

off'DR tICilO.MT.D BBIINCB CBIB"~T.

X~ST

{L)

INTERNAL O vent>

ISTRI BUTION

.....P,

,.'f.J,C

.IlSXC Ex> LBIINALolSTlllou noN C

NTI<OI NuMIII:R

>qlov~ Qw t'I IIC I OII)I II):; ().)I;)

1 l

P;

~

~

lt 1'e

'\\

P. O. BOX 013100, MIAMI, FL 33101 FLORIDAPOWER & LIGHTCOMPANY,

@8@pggy g(@@

Office of Management Information and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C.

20555 April 4, 1977 I

z zo/z s'/

Gentlemen:

Attached are the March, 1977 Operating Status Reports for Turkey Point Unit Nos.

3 and 4 and St. Lucie Unit. No. l.

Maximum Dependable Capacity (MWe-Net) for St. Lucie Unit No.

1 was revised from 802 MWe-Net to 777 MWe-Net (Estimated).

The revised capacity was calculated using anticipated summer conditions and data obtained when the unit was operating at 100% R.P.

Very truly yours, chmi t Vice President Power Resources VTC/DDC cc:

Mr. Norman C. Moseley Robert Lowenstein, Esquire 8

~+~% ~pi 4'P Cy g7io foV/

PEOPLE... SERVING PEOPLE

\\ ~

k r ~

APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 250 Turkey Point UNIT Unit No.

3 DATE A ril 4 1977 COMPLETED BY V. T. Chilson TEL'EPHONE (305) 552-3769 MONTH

March, 1977 DAY AVERAGE DAILY POWER LEVEL (Mfe-Net)

DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 6 10 12 13 14 16 684 686 690 685 683 679 677 681 690 688 685 681 679

'674 668 67l 17 19 20 21 22 24 25 26 27 28 29 30 31 NOTE:

672 670 671 669 667 669 673 686 692 690 686 685 678 678 Average daily power level greater than 666 MPfe due to cooler condenser cooling water.

0

\\

APPENDS C

OPERATING DATA REPORT REPORT MONTH March 1977 OPERATING STATUS DOCKET NO.

Turkey Point UNIT Unit No.

3 DATE A ril 4 1977 COMPLETED BY V. T. Chilson TELEPHONE 305 552-37 1.

REPORTING PERIOD:0001,77,03 01 GROSS HOURS IN REPORTING PERIOD:

THROUGH 2400 77 03 3 2.

CURRENTLY AUTHORIZED POWER LEVEL (MWt):

2200 88K DEPEND.

CAPACITY (MWe-Net):

666 DESIGN ELECTRICAL RATING (MWe-Net):

693 744.0 3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY)

(MWe-Net):

4.

REASONS FOR RESTRICTION (IF ANY):

NONE 5 ~

NtJMBERS OF HOURS REACTOR WAS CRITICAL...

THIS M088H YEAR TO DATE CUMULATIVE 744.0 1 794.6 29 834.7 6.

REACTOR RESERVE SHUTDOWN HOURS..

~ ~

~ ~..

~.

~. 67. 4 7.

HOURS GENERATOR ON LINE.

8.

UNIT RESERVE SHUTDOWN HOURS...............

744.0 1 666.9 28 706.1 85.0 9.

GROSS THER8JAL ENERGY GENERATED (MWH}......

1 629 974 3 538 470 5~2~}2L 10 GROSS ELECTRICAL ENERGY GENERATED (MWH) 530 368 1 153 360 17 723 811 11 NET ELECTRICAL ENERGY GENERATED (MWH)

~

505 511 1 094 112 16 770 047 12.

REACTOR SERVICE FACTOR.

100.0 83.1

~8.

13.

REACTOR AVA1LABILITYFACTOR...,,,,.....,..

100.0

83. 1 78.9 14.

UNIT SERVZCE FACTOR.

100.0 15.

UNIT AVAILABILITYFACTOR..

~...............

100.0 16'UNIT CAPA'CITY FACTOR (Using 08DC)...,

~....

102.0 (1) 77.2 77.2 76.1 75.7 76.0 67.4 17.

UNIT CAPACITY FACTOR (Using Design MWe)...

'98 '

73.1 63.9 18.

UNIT FORCED OUTAGE RATE......

0' 1.5 2.8 19.

SHUTDOWiNS SCHEDULED OVER NEET 6 MONTHS (TYPE> DATE, AND DURATION OF EACH):

20.

ZF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

21.

UNITS IN TEST STATUS (PRIOR TO COiiRCIAL OPERATION):

PORECAST ACHIEVED INITIALCRITICALITY INITIALELECTRICITY COJOJERCIAL OPERATION NOTE:

(1) Unit CaPacity Factor (using MDC) greater than ZOOID due to cooler condenser cooling water.

'.)

REASON A:

EQUIPMENT FAILURE (EXPLAIN)

B:

HAINT. OR TEST C:

REFUELING D:

REGULATORY RESTRICTION E:

OPERATOR TRAINING AND LICENSE EXAHINATION F:

ADMINISTRATIVE C:

OPERATIONAL ERROR (EXPLAIN) ll:, OTllER (PDPIAIN)

APPENDIX D UNIT Sl!UTDOWNS AND POWER REDUCTIONS REPORT HONTN'arch 1977 DOCKET li0.

UNIT NAHE DATE 50 - 250 Turke Point Unit No. 3 A ril 4 1977 TELEPHONE (305) 552-3769 COHPLETED BY V. T. Chilson

)

METHOD 1:

MANUAL 2:

=.MANUAL SCRAH 3:

AUTOMATIC SCRAH 4:

01llER (EXPLAIN)

NO.

DATE TYPE F:

FORCED S:

SCllEDULED DURATION (BOURS)

REASON (1)

METllOD OF SHUTTING DOWN TllE REACTOR OR REDUCING POWER(2)

CORRECTIVE ACTIONS/COMMENTS NONE

SUMMARY

Unit No.

3 operated at approximately lOOX R.P. during month.

~ 1

~

APPENDIX B AVERAGE DAILY UNIT POWER LEVEL 4 DOCKET NO. 50 251 Turkey Point UNIT DATEApril 4, 1977 COMPLETED BY V. T. Chilson TEL'EPHONE (305) 552-3769 MONTH

March, 1977 DAY AVERAGE DAILY POWER LEVEL (MWe-.Net)

686 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 662 17 7'88 690 685 680 677

'73 675 675 18 19 20 21 22 23 24 662 663 319 10 i

12 14 677 676 671 671 665 661 609 26 27 28 29 30 NOTE:

644 677 683 679 672 Average daily power level greater than 666 MWe due to cooler condenser cooling water.

APPENDIX C OPERATING DATA REPORT REPORT MONTH March.

1977 DOCKET NO.

50-251 Turkey Point, UNIT Unit No.

4 DATE April 4 1977 COMPLETED BY V. T. Chilson OPERATING STATUS TELEPHONE 1,

REPORTING PERIOD: 0001,77903,01 GROSS HOURS ZN REPORTING PERIOD:

THROUGH 2.

CURRENTLY AUTHORIZED POWER LEVEL (MWt):

2200 KXX.DEPEND. CAPACITY (MWe-Valet):

666 DES1GN ELECTRICAL RATING (MWe-Net):

693 3.

POWER LEVEL TO WHICH RESTRICTED (IP ANY)

("Ke-Net):

NONE 4.

REASONS FOR RESTRICTION (ZF ANY):

744.0 THIS MONTH YEAR TO DATE CUAAATZVE 5.

IIUUEERS OS EOURS ItEACTOR IIAS CRZTZCAZ.. ~..

597.3

~IA 6 ~

REACTOR RESERVE SHUTDOWN HOURS..

~ ~ ~

~ ~. ~ ~ ~

~

0 138.8 T.

HOURS GENERATOR ON LINE.. ~,,........,.....

591.3 1 764.2 22 306.2 8.

UNIT RESERVE SHUTDOWN HOURS............... 9 ~

GROSS THER%8 ENERGY GENERATED (MWH)..... ~

1 280 629 3 830 353 46 889 723 10.

GROSS ELECTRICAL ENERGY GENERATED

(~i

)...

414 125 1 251 665 15 209 348 11.

ifET ELECTRICAL ENERGY GEANERATED (iSHH)....

~

393 600 1 190 501 12.

REACTOR SERVICE FACTOR.....

~.

82.6 74.4 13.

REACTOR AVAILABILITYFACTOR..

~............

82.6 74.8 14'NIT SERVZCE FACTOR....

79 '

81.7 70.6 15.

UNIT AVAILABILITYFACTOR..................

79.5 81.7 70.6 16.

'UNIT CAPACITY FACTOR (Using (MDC)... ~....

~.

79 '

82.8 69.2 17.

UNIT CAPACITY FACTOR (Using Design AMWe)...

76.3 79,5 65.8 18.

UNIT FORCED OUTAGE RATE..............

~.....

0.0 3.3 19.

SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Refueling, rzaintenances and inspections - April 25 through June ll, 1977.

20.

IF SHUTDOWNi AT END OF REPORT PERIOD, ESTBtkTED DATE OF STARTUP:

21.

UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INZTIAL CRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

i)

REASON A:

EQUIPMENT FAILURE (EXPLAIH)

B:

MAIHT. OR TEST C:

REFUELING D:

REGULATORY RESTRICTION E:

OPERATOR TicAIHING AND LICENSE EXAMINATION F:

ADMINISTRATIVE G:

OPERATIONAL ERROR (EXPLAIN)

H:

OTHER (F3(PLAIN)

I)

METHOD 1:

MANUAL 2:

MANUAL SCRAM 3:

AUTOMATIC SCRAM 4:

OTHER (EXPLAIH)

NO.

DATE TYPE F:

FORCED S:

SCHEDULED REPORT MONTH March, 1977 DURATION (HOURS)

REASON(l)

METHOD OF SHUTTING DOWN THE REACTOR OR REDUCING POWER(2)

APPENDIX D UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50 - 251 DATE April 4, 1977 COMPLETED BY V

T. Chilson TELEPHONE (305) 552-3769 CORRECTIVE ACTIONS/CMMENTS UNIT NAME Turks Point Unit No.

4 77-03-20 152.7 Unit No.

4 was removed from service to repair steam.

generator No. 4C tube leak.

Corrective actions included plugging one leaking tube.

One additional tube was plugged.

(Nuclear System)

SUMMARY

Unit No.

4 operated at approximately 100X R.P. except for outage of March 20 - 26, 1977.

1

APPENDIX B AVERAGE DAILY MIT POWER LEVEL DOCKET NO.

50 335 St. Lucie UHIT Unit No.

1 DATE A ril 4 1977 COMPLETED BY U. T.. Chilson TEL'EPHONE (305) 552-3769 MONTH Ma h

DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 10 12 13 16 732 788 787:

741 488 784 783 791 725 767 621 161 371

375, 375 371 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 NOTE:

358 390 642

729, 780 786 789 793 794 733 789 778 797 760 786 Average daily power level greater than 777 Kfe due to cooler condenser cooling water.

, ~

APPENDS C

OPERATXNG DATA REPORT REPORT MONTH

March, 1977 DOCKET NO.

50 335 St. Lucie UNIT DATE A q 4

COMPLETED BY V. T.

OPERATING STATUS GROSS HOURS IN REPORTING PERIOD:

744.0 THROUGH 2400 77 03 31 2.

CURRENTLY AUTHORIZED POWER LEVEL (Alt):

2560 MAX.DEPEND. CAPACITY (MWe-Net):

. 777 (Est.)

DESIGN ELECTRICAL RATXilG (MWe-iNet):

802 3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY)

(MWe<<Net):

NONE 4.

REASONS FOR RESTRXCTIOil (XP ANY):

THIS MO?aH YEAR TO DATE CUMULATIVE 5.

NUMBERS OF HOURS REACTOR WAS CRITICAL.....

744 0 2 106 '

6.

REACTOR RESERVE SHUTDOWN HOURS..

~ ~ ~ ~ ~ ~

~ ~.

2 370 2

7 ~

HOURS GENERATOR ON LIVRE.. ~....

8.

UNIT RESERVE SHUTDOWN HOURS.

~ ~... ~... ~....

736.4 2 035.6 2 299.6 9.

GROSS THERMAL ENERGY GENERATED (MWH).....,

1 592 703 4 299 297 4 646 900 10 GROSS ELECTRICAL ENERGY GENERATED (MWH)...

519 150 1 411 960 11.

NET ELECTRICAL EiNERGY GENERATED (MWH).....

487 915 1 321 922 12.

REACTOR SERVICE FACTOR.

100.0 97.5 13 ~

REACTOR AVAILABILITYPACTOR............,..

100.0 97.5 14.

UNIT SERVICE FACTOR..................

99.0 94.2 15.

UNIT AVAZLABILITYFACTOR..............,...

99.0 94.2 1 520 230 1 420 927 97.8 97.8 94.9 94.9 16.

UNIT CAPACITY 'FACXOR (Using (MDC)........

84 '

78. 8 75.4 17.

UNIT CAPACITY FACTOR (Using Design MWe)...

76.3 73.1 18.

UNIT FORCED OUTAGE RATE..

1.0 2.7 2.4 19.

SHUTDOWNS SCHEDULED OVER NEXT 6 MOTHS (TYPE, DATE, A%) DURATION OF EACH):

20.

IF SHUTDOWiN AT END OF REPORT PERIOD, ESTZMATED DATE OF,STARTUP:

\\

21.

UNITS IN TEST STATUS (PRIOR TO COaDlERCZAL OPERATION):

XNZTZAL CRITICALITY XilZTZAL ELECTRICZXT COl0lERCZAL OPERATION FORECAST ACHIEVED

l)

REASON A-EqUIPMENT FAILURE (EXPLAIN)

B:

MAINT. OR TEST C:

REFUELING D:

REGULATORY RESTRICTION E:

OPERATOR TRAINlNG AND LICENSE EXAMINATION F:

ADMINISTRATIVE C:

OPERATIONAL ERROR (EXPLAIN)

H-OTHER (EXPLAIN)

APPENDIX D UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH March 1977 DOCKET NO, 50 - 335 DATE April 4, 1977 COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3769 UNIT NAME St. Lucia Unit No. 1

!)

METHOD 1:

MANUAL 2:

.MANUAL SCRAM 3:

AUTOMATIC SCRAM 4:

OTHER (EXPLAIN)

NO.

DATE TYPE F:

FORCED S:

SCHEDULED DURATION (BOURS)

REASON(l)

METHOD OF SHUTTING DOWN THE REACTOR OR REDUCING POWER(2)

CORRECTIVE ACTIONS/CRMENTS C'

~

9 77-03-05 10 77-03-11 11 77-03-12 7.6 4 Load reduction to clean condensate pump suction.

strainers.

(Non-nuclear system) l Unit was removed from service to replace gasket~

on containment escape hatch.

(Nuclear system)-

Unit was operated at approximately 50X. R.P. to perform load swing tests.

Power Ascension Test Program.

SlDMARY:

Power Ascension Test Program continued during month.

0

~

~

REcEiyzo oocu~icvr PROCESSNG gaily