Text
~
\\
p~
- REC:
NRC REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
DISTRIBUTIOhl FOR INCOMING MATERIAL QRG:
SCHMIDT A D FL PWR 5 LIGHT DOCDATE: 03/04/78 DATE RCVD: 03/14/78 DOCTYPE:
LETTER NOTARIZED:
NO
SUBJECT:
MONTHLY OPERATING REPORTS FOR THE MONTH OF FEBRUARY.
H COPIES RECEIVED LTR 1
EhlCL 1
PLANT NAME:TURKEY PT ¹3 TURKEY PT ¹3 ST LUCIE ¹1 REVIEWER INITIAL:
XRS DISTRIBUTER INITIAL:P Q DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS MONTHLY OPERATING REPORT FOR GRAY BOOK PREPARATION.
(DISTRIBUTION CODE A003>
FOR ACTION:
INTERNAL:
EXTERNAL:
BR CHIEF SCHWENCER++W/2 ENCL FILE+~W/ENCL u
~ l/2 ENCL LPDR S
MIAMI> FL++W/ENCL TIC++W/ENCL NS IC++W/ENCL BNL<hlATLAB)~~M/ENCL ACRS CAT B++W/0 ENCL NRC PDR++W/ENCL 0 ISTR IBIJTION:
LTR 10 ENCL 10 S I ZE:
1P+3P+6P THE END CONTROL NBR:
7807401'2
1 j
FLORIDAPOWER & LIGHT COiVIPANY March 4, 1978 Office of Management 1nformation and Program Controls U.
S. Nuclear Regulatory Commission Washington, D.
C.
20555 k4 Gentlemen:
Attached are the February, 1978, Operating Status Reports for Turkey Point Unit Nos.
3 and 4 and St. Lucie Unit No. 1.
Very truly yours, Vice President Power Resources VTC/DDC cc:
Mr. James P. O'Reilly Robert Lowenstein, Esquire r80740i42 PEOPLE... SERVING PEOPLE
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50>>
250 Turkey Point UNIT Unit. No.
3 DATE March 4
1978 COMPLETED BY V. T. Chilson MONTH FEBRUARY 197 8 DAY AVERAGE DAILY POWER. LEVEL (i6Ve-Nel:)
DAY AVERAGE DAILY POWER L VEL (MWe-Net) 17 18 127 19 400 20 638 21 680
'2 683 23 24 687 25 686 10 26 686 27 681 28 675 13 14 NOTE:
Average daily power greater than 666 HNe-due to cooler condenser cooling water.
OPERATI1fG DATAREPORT DOCKET NO.
D4YE Ãar.4 1978 CO! iPLETED SY EZ~S11aaa TELEPHONE M~H2.-3824 OPERATING STATUS 760 700 Turkey Point Unit Ho.
3
- g. Reporting period:
Peb 1978
- 3. I.icensed Thermal Power (MWt):
- 4. Namephte Rating (Gross MWe):
- 5. Design Electricai Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):,
- 7. Maximum Dependable Capacity (Net lPIWe):
Unit Ho.
3 operated at, approximately 100K R.P.,
,after the unit was returned to service.following, comple-tion of scheduled refueling, maintenance,
.inspections,and
- tests, ezcept for the outage.
- 8. IfChanges Occur in Capacity'Ratings'(Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, IfAny (Net MWe):
- 10. Reasons For Restrictions, IfAny:
NONE This Month Yr:to-Date Cumuhtive 4
35 569.7 111.1 265.4 34 351.8 85.0 521 921 67 296.113 21 452 87 20 299'19 74.8 7.0 63.8 2.8
- 12. Number Of Hours Reactor Was Critical 343. 8 343.8
- 13. Reactor Reserve Shutdown Hours. 14. Hours Generator On.Line 265.4
- 15. Unit Reserve Shutdown Hours 16. Gross Thecal Energy Generated (MWH)
I T. Gross Electrical Energy Generated (MWH) 168 530
- 18. Net Electricai Energy Generated (MWH) 154 909 152 669
- 19. Unit Service Factor 2D. Unit AvailabilityFactor
- 39. 5
- 2. Unit Capacity Factor (Using DER Net) 33.3 15.6
- 23. Unit Forced Outage Rate 1.4 1.4
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each):
Steam Generator Tube Inspection Program - August 17 September 11, 1978
- 25. IfShut Down At End Of R port Period, Estimated Date of Startup:
- 26. Units ln Test Status (Prior to Commercial Operation):
Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COibliiIERCIALOPERATION
UNITSIIUTDOWNS ANDPOWER REDUCTIONS DOCKET NO.
REPORT MONfII FEBRUARY 1978 iVii.
Date Licensee Event Report 8 E~
0 iil cn G gal Eo 0
CJ Cause 4 Corrective Action tu Prevent Recurrence 28 77-11-23 402.9 C
N/A N/A N/A Unit No.
3 was removed from service for. scheduled refueling, main'tenance, and inspections.
(Continued from previous month)
(Nuclear and non-nuclear systems)
CB P&IPXX (B)
Outage was extended to repair mechani cal seal on reactor coolant pumps.
(Nuclear system) 78-02-18 3
7 B
N/A H/A GENERA (A)
Unit was removed from service to balance the generator exciter.
(Non-nuclear system)
I F: Forced S: SeheiluleJ I'f177)
Reason:
A.Iaiuipmenl I'ailurc (Explain)
Ii hlalntenancc or Test C-Rcfuelint; D ltcgula tory Rest rtct ton L'.Operator Training 8c tdecose Lrxaotinalion F.Administrative G-Operational Error (Explain)
II.Other (Explain)
Method:
I -hlaoual 2-Manual Scram.
3-Aulotnalic Seratn.
4-Other (Explain)
Exlubit G - Instructions for Preparation or Data Entry Slteets for Licensee Evcot Report (LL'R) File (NUREG-OI6I )
Exlobit I - Satoe Source
0
AVERAGE DAILY UNIT POWER LEVEL Turkey Point UNIT DATE COMPLETED BY V.
TELEPHONE 305 552-3824 MONTH FEBRUARY, 1978 DAY AVERAGE DAILY PO~,LEVEL
(Ãfe-Net) 666 660 654 651 661 668 671 DAY AVERAGE DAILY POWER LVEL (MWe-Nee) 17 18 19 20 21 22 671 662 659.
24 25 12 13 14 660 659 654 390 27 28 15 16 iHOTE:
Average daily power greater than 666 ice due to cooler condenser cooling water.
o
OPERATIiIG STATUS OPERATING DATA REPORT DOCKET NO. ~i3 DATEM~~8 COMPLETED BY ~ T. Chilson TELEPHONE QOQ Q2-3824 760 700 666 Unit Name Turke Point Vnit No.
4
- February, 1978
- 3. Licensed Thermal Power PiNt):
2200
- 4. Nameolate Rating (Gross hIWe):
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
7; Maximum Dependable Capacity (Net MWe):
Notes Unit No.
4 operated.
at approximately 3.00X R.P.
until the unit vas removed from. service to perform steam generator tube inspec>>
tion and repairs-.
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Re port, Give Reasons:
- 9. Power Level To Which Restricted, IfAny (Net MWe):
- 10. Reasons For Restrictions, IfAny:
11 ~ Hours In Reporting Period 12'. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line
- 15. Unit Reserve Shutdown Hours
'6.
Gross Thermal Energy Generated,{MWH)
- 17. Gross Eiectricai Energy Generated (MWH)
- 18. Net Electrical Energy Generated {MWH)
- 19. Unit Service Factor
- 20. Unit AvailabilityFactor
- 21. Unit Capacity Factor {Using MDC Net)
~A. Unit.Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months {Type. D This Month 672.
0'28.2 Yr:to-Date 1 416.0 Cumulative 39 625.0 327.7
<<0 717 981 226 680 214 826 48.8 48.8
- 48. 0:
46.1, ate. and Duration ol'ach):
71.7 64.1 3.2
'-0-' -"
1.38. 8
>>0- 2 319 238
- 57. 404.906 740 370 18 564 295 74.9 68.6 74.9 68.6 74.
- 25. IfShut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status {Priorto Commercial Operation):
rch 8
1978 Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COilfiiIERCIALOPERATION
UNITSIIUTDOlVNSAND POlUER REDUCTIONS
. RRpRRFMOIFFI<
FRRRUARY 1979 DOCKET NO 50 251 UNjTNAhlF Turke Point Unit No.
4 COMPLETED IIY l)atc r<
6jV
~A Licensee Event Rcport rr RA H~
0 o Q
IR OEo CJ Cause &.Corrcctivc Action to Prcvcnt Recurrence 78-02-14 S
344.3 Steam GBner<rttor Inspection Program Report-Feb.
1978 (Transmitted March 1, 19/8 IITEXCH (F)
Unit No.
4 was removed from service to perform steam generator tube inspection and repair leaks.
(Nucleal system)
F:
For<.'cll S: Scl>eduied Reason:
A.Eriuipment Failure (Explain)
II.htalntenance ur Test C-Refueling I) Regulatory Itcstriction E Operator Training &, Liccnsc Lxamination F-Administrative C Operational L'rrur (Explain)
I I-Other (Explain) hlethod:
I-Manual
- 2.Mapual Scram.
3-Autumatic Scram.
4~tiler (Explatn)
Exhibit G - Instructions for Prcparattun of Data
= Entry Sheets I'or Licensee Event Report (LER) File (NUREG.
OI6 I )
Exhibit I - Sanle Source
AVER'AGE DAILY UNIT POWER LEVEL DOCKET NO.
50 335 St. Lucie UNIT Unit No.
1 DATE March 4
1978 COMPLETED'Y V. T. Chi 3.son qoyZZ FEBRUARY >
1978 DAY AVERAGE DAILY POWER. LEVEL.
(MVe-Net)
DAY AVERAGE DAILY POWER L-VEL QNe-Net) 728 743 738 772 787.
781 17 18 19 20 21 7
3 77
'8 10 12 13 795 748 547 793 795 797 795 794 23 25 27 28 79 78 770 785 791 795 15 792
.791 NOTE:
Average daily power greater than 777 MWe due to cooler condenser cooling water.
OPERATING DATAREPORT OPERATING STATUS I. Unit Name:
St. Lucie Unit Ho.
1 g'. Reporting period:
Februa 1978
- 3. I.icensed Thermal Power (MWt):
2560
- 4. Namephte Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):'22 777 DOCKET NO.
DATE ~Klr.4 78 COMPLETED BY ~~hilson TELEPHONE ~Q ~-3824 Notes -'nit Ho.
1 operated at approxitaately 100/ R.P.
except for load reduction of Feb. 8-9, 1978.
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
,'. Power Level To Which Restricted, IfAny (Net MWe):
- 10. Reasons For Restrictions, IfAny'ONE This Month Yr:to-Date Cumulative 672. 0 1 416.0 1 339.5 1 325.4 519 654 100.0 93.6 91.1
- 11. Hours In Reporting Period
- 12. Number OfHours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On Line 672. 0
- 15. Unit Reserve Shutdown pours ~ ww"
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor 93.6
- 20. Unit AvailabilityFactor
- 21. Unit Capacity Factor (Using MDC iNet) 99.5
~". Unit Capacity Factor (Using DER Net)
BIL3
- 23. Unit Forced Outage Rate
QJL
- 24. Shutdowns Scheduled Over Next 6 iblonths (Type. Date, and Duration of Each):
Refuelin maintenance and ins ections - Aoril 1 - June 10 1978
'44 9
101.5 9 007.-2 23..
~
4 86.3 86.3 ZS. IfShut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units fn Test Status (Prior to Commercial Operation):
H/A Forecast Achieved IiVITIAL CRIT ICA LITY INITIAL ELECTRICITY COAINIERCIALOPERATION Ii>/77)
0
UNITSIIUTDOWNS ANDPOWER REDUCTIONS REPORT MON'fll PE8RU RY COMPLETED IIY No. l No.
Date r
c '>
0
~Oh g Licenscc Event Report rr CQ 4l 4l Vl u) Ct 6~Vl o 0 Q
CI EQ O
Cause &Corrective Action to Prcvcnt Recurrence 78-02-08 S
N/A HII Pl&IPXX (II)
Load r'eduction to clean steam gener-ator feedwater pump suction strainers.
(Non-nuclear system)
I F: I',orred S: Scheduled Reason:
A.Equipment Failure (Explain)
II-hlaintcnance or Test C-Refueiint,'
Regulatory Restriction E Operator Training & License Examination F.Administrative C-Operational L'rrof(L'xplaln)
I I Other (Explain)
Method:
h(anual 2.Manual Scram.
3-Automatic Scram.
4.Other (Explain)