Attached February, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1
ML18227A423
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/04/1978
From: Schmidt A
Florida Power & Light Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML18227A423 (16)


Text

~ \ p~

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

DISTRIBUTIOhl FOR INCOMING MATERIAL

  • REC: QRG: SCHMIDT A D DOCDATE: 03/04/78 NRC FL PWR 5 LIGHT DATE RCVD: 03/14/78 DOCTYPE: LETTER NOTARIZED: NO COPIES RECEIVED

SUBJECT:

LTR 1 EhlCL 1 MONTHLY OPERATING REPORTS FOR THE MONTH OF FEBRUARY.

H PLANT NAME:TURKEY PT ¹3 REVIEWER INITIAL: XRS TURKEY PT ¹3 DISTR I BUTER INITIAL:P Q ST LUCIE ¹1 DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS MONTHLY OPERATING REPORT FOR GRAY BOOK PREPARATION.

(DISTRIBUTION CODE A003>

FOR ACTION: BR CHIEF SCHWENCER++W/2 ENCL INTERNAL: FILE+~W/ENCL NRC PDR++W/ENCL u ~ l/2 ENCL EXTERNAL: LPDR S MIAMI> FL++W/ENCL T I C++W/ENCL NS IC++W/ENCL BNL<hlATLAB)~~M/ENCL ACRS CAT B++W/0 ENCL 0 ISTR I BIJT ION: LTR 10 ENCL 10 CONTROL NBR: 7807401'2 S I ZE: 1P+3P+6P THE END

1 j FLORIDA POWER & LIGHT COiVIPANY March 4, 1978 k4 Office of Management 1nformation and Program Controls '

U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:

Attached are the February, 1978, Operating Status Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit No. 1.

Very truly yours, Vice President Power Resources VTC/DDC cc: Mr. James P. O'Reilly Robert Lowenstein, Esquire r80740i42 PEOPLE... SERVING PEOPLE

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50>> 250 Turkey Point UNIT Unit. No. 3 DATE March 4 1978 COMPLETED BY V. T. Chilson MONTH FEBRUARY 197 8 DAY AVERAGE DAILY POWER. LEVEL DAY AVERAGE DAILY POWER L VEL (i6Ve-Ne l:) (MWe-Net) 17 18 127 19 400 20 638 21 680

'2 683 23 24 687 25 686 10 26 686 27 681 28 675 13 14 NOTE: Average daily power greater than 666 HNe-due to cooler condenser cooling water.

OPERATI1fG DATA REPORT DOCKET NO.

D4YE Ãar.4 1978 CO! iPLETED SY EZ~S11aaa TELEPHONE M~H2.-3824 OPERATING STATUS Turkey Point Unit Ho. 3 Unit Ho. 3 operated Peb 1978 at, approximately 100K R.P.,

g. Reporting period: ,after the unit was returned
3. I.icensed Thermal Power (MWt): to service.following, comple-760
4. Namephte Rating (Gross MWe): tion of scheduled refueling,
5. Design Electricai Rating (Net MWe): maintenance, .inspections,and
6. Maximum Dependable Capacity (Gross MWe):, 700 tests, ezcept for the outage.
7. Maximum Dependable Capacity (Net lPIWe):
8. If Changes Occur in Capacity'Ratings'(Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, IfAny (Net MWe): NONE
10. Reasons For Restrictions, If Any:

This Month Yr:to-Date Cumuhtive 4

12. Number Of Hours Reactor Was Critical 343. 8 343.8 35 569.7
13. Reactor Reserve Shutdown Hours . 111.1
14. Hours Generator On. Line 265.4 265.4 34 351.8
15. Unit Reserve Shutdown Hours 85.0
16. Gross Thecal Energy Generated (MWH) 521 921 67 296.113 I T. Gross Electrical Energy Generated (MWH) 168 530 21 452 87
18. Net Electricai Energy Generated (MWH) 154 909 152 669 20 299'19
19. Unit Service Factor 74.8 2D. Unit Availability Factor 39. 5 7 .0
2. Unit Capacity Factor (Using DER Net) 33.3 15.6 63.8
23. Unit Forced Outage Rate 1.4 1.4 2.8
24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each):

Steam Generator Tube Inspection Program - August 17 September 11, 1978

25. If Shut Down At End Of R port Period, Estimated Date of Startup:
26. Units ln Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COibliiIERCIALOPERATION

DOCKET NO.

UNIT SIIUTDOWNS AND POWER REDUCTIONS REPORT MON fII FEBRUARY 1978 Licensee 0E~iil gal Cause 4 Corrective iVii. Date Event Action tu Report 8 cn G Eo 0 Prevent Recurrence CJ 28 77-11-23 402.9 C N/A N/A N/A Unit No. 3 was removed from service for. scheduled refueling, main'tenance, and inspections. (Continued from previous month) (Nuclear and non-nuclear systems)

CB P&IPXX Outage was extended to repair mechani (B) cal seal on reactor coolant pumps.

(Nuclear system) 78-02-18 3 7 . B N/A H/A GENERA Unit was removed from service to (A) balance the generator exciter. (Non-nuclear system)

I F: Forced Reason: Method: Exlubit G - Instructions S: SeheiluleJ A.Iaiuipmenl I'ailurc (Explain) I -hlaoual for Preparation or Data Ii hlalntenancc or Test 2-Manual Scram. Entry Slteets for Licensee C-Rcfuelint; 3-Aulotnalic Seratn. Evcot Report (LL'R) File (NUREG-D ltcgula tory Rest r tct ton 4-Other (Explain) OI6I )

L'.Operator Training 8c tdecose Lrxaotinalion F.Administrative G-Operational Error (Explain) Exlobit I - Satoe Source I'f177) II.Other (Explain)

0 AVERAGE DAILY UNIT POWER LEVEL Turkey Point UNIT DATE COMPLETED BY V.

TELEPHONE 305 552-3824 MONTH FEBRUARY, 1978 DAY AVERAGE DAILY PO~,LEVEL DAY AVERAGE DAILY POWER LVEL

(Ãfe-Ne t) (MWe-Nee) 666 17 660 18 654 19 651 20 661 21 668 22 671 671 24 662 25 659.

660 27 12 659 28 13 654 14 390 15 16 iHOTE: Average daily power greater than 666 ice due to cooler condenser cooling water.

o OPERATING DATA REPORT DOCKET NO.

DATE

~i3 M~~8 COMPLETED BY ~ T. Chilson TELEPHONE QOQ Q2-3824 OPERATIi IG STATUS Unit Name Turke Point February, 1978 Vn it No . 4 Notes Unit No. 4 operated.

at approximately 3.00X R.P.

3. Licensed Thermal Power PiNt): 2200 until the unit vas removed 760 from. service to perform
4. Nameolate Rating (Gross hIWe): steam generator tube inspec>>
5. Design Electrical Rating (Net MWe):

700 tion and repairs-.

6. Maximum Dependable Capacity (Gross MWe):

7; Maximum Dependable Capacity (Net MWe): 666

8. If Changes Occur in Capacity Ratings (I tems Number 3 Through 7) Since Last Re port, Give Reasons:
9. Power Level To Which Restricted, IfAny (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Yr:to-Date Cumulative 11 ~ Hours In Reporting Period 672. 1 416.0 39 625.0 0'28.

12'. Number Of Hours Reactor Was Critical 2

13. Reactor Reserve Shutdown Hours

'-0-' -" 1.38. 8

14. Hours Generator On-Line 327.7
15. Unit Reserve Shutdown Hours <<0 >>0- '6.

Gross Thermal Energy Generated,{MWH) 717 981 2 319 238 57. 404 .906

17. Gross Eiectricai Energy Generated (MWH) 226 680 740 370 18 564 295
18. Net Electrical Energy Generated {MWH) 214 826
19. Unit Service Factor 48.8 74.9 . 68.6
20. Unit Availability Factor 48.8 74.9 68.6
21. Unit Capacity Factor {Using MDC Net) 48. 0: 74.

~A. Unit. Capacity Factor (Using DER Net) 46.1, 71.7 64.1

23. Unit Forced Outage Rate 3.2
24. Shutdowns Scheduled Over Next 6 Months {Type. D ate. and Duration ol'ach):
25. If Shut Down At End Of Report Period. Estimated Date of Startup: rch 8 1978
26. Units In Test Status {Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COilfiiIERCIALOPERATION

DOCKET NO 50 251 UNITSIIUTDOlVNS AND POlUER REDUCTIONS UNjTNAhlF Turke Point Unit No. 4 COMPLETED IIY RRpRRFMOIFFI< FRRRUARY 1979 r<

Licensee H~ Cause &. Corrcctivc 6 ~A RA 0 oIR l)atc j Event Q Action to V

Rcport rr O Eo Prcvcnt Recurrence CJ 78-02-14 S 344.3 Steam IITEXCH Unit No. 4 was removed from service GBner<rttor (F) to perform steam generator tube Inspection inspection and repair leaks. (Nucleal Program system)

Report-Feb. 1978 (Transmitted March 1, 19/8 F: For<.'cll Reason: hlethod: Exhibit G - Instructions S: Scl>eduied A.Eriuipment Failure (Explain) I-Manual for Prcparattun of Data II.htalntenance ur Test -

2.Mapual Scram. =

Entry Sheets I'or Licensee C-Refueling 3-Autumatic Scram. Event Report (LER) File (NUREG.

I) Regulatory Itcstriction 4~tiler (Explatn) OI6 I )

E Operator Training &, Liccnsc Lxamination F-Administrative C Operational L'rrur (Explain) Exhibit I - Sanle Source I I-Other (Explain)

AVER'AGE DAILY UNIT POWER LEVEL DOCKET NO. 50 335 St. Lucie UNIT Unit No. 1 DATE March 4 1978 COMPLETED'Y V. T. Chi 3.son qoyZZ FEBRUARY (MVe-Net)> 1978 DAY AVERAGE DAILY POWER. LEVEL. DAY AVERAGE DAILY POWER L-VEL QNe-Net) 728 17 7 3 743 18 77

'8 738 19 772 20 787. 21 781 795 23 79 748 78 547 25 770 10 793 .

785 795 27 791 12 797 28 795 13 795 794 15 792

.791 NOTE: Average daily power greater than 777 MWe due to cooler condenser cooling water.

OPERATING DATA REPORT DOCKET NO.

DATE ~Klr.4 78 COMPLETED BY ~~hilson TELEPHONE ~Q ~-3824 OPERATING STATUS I. Unit Name: St. Lucie Unit Ho. 1 Notes -'nit Ho. 1 operated Februa 1978 at approxitaately 100/ R.P.

g'. Reporting period: except for load reduction I.icensed Thermal Power (MWt): 2560

3. of Feb. 8-9, 1978.

4.

5.

6.

7.

8.

Namephte Rating (Gross MWe):

Design Electrical Rating (Net MWe):

Maximum Dependable Capacity (Gross MWe):

Maximum Dependable Capacity (Net MWe):

'22 777 If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

, '. Any'ONE Power Level To Which Restricted,

10. Reasons For Restrictions, If If Any (Net MWe):

This Month Yr:to-Date Cumulative .

11. Hours In Reporting Period 672. 0 1 416.0 '44
12. Number Of Hours Reactor Was Critical 1 339.5 9
13. Reactor Reserve Shutdown Hours 101.5
14. Hours Generator On Line 672. 0 1 325.4 9 007.-2
15. Unit Reserve Shutdown pours

~ w 23.. ~ 4 w" >

18. Net Electrical Energy Generated (MWH) 519 654 100.0 93.6 86.3
19. Unit Service Factor
20. Unit Availability Factor 93.6 86.3
21. Unit Capacity Factor (Using MDC iNet) 99.5 91.1

~". Unit Capacity Factor (Using DER Net) BIL3

23. Unit Forced Outage Rate QJL
24. Shutdowns Scheduled Over Next 6 iblonths (Type. Date, and Duration of Each):

Refuelin maintenance and ins ections - Aoril 1 - June 10 1978 ZS. If Shut Down At End Of Report Period. Estimated Date of Startup: H/A

26. Units fn Test Status (Prior to Commercial Operation): Forecast Achieved IiVITIAL CRIT ICA LITY INITIAL ELECTRICITY COAINIERCIALOPERATION Ii>/77)

0 UNIT SIIUTDOWNS AND POWER REDUCTIONS No. l COMPLETED IIY REPORT MON'fll PE8RU RY r

6~Vl c '> Licenscc CQ 4l 4l o 0CI Cause & Corrective Date 0 Event Vl Q Action to No. EQ Report rr u) Ct O Prcvcnt Recurrence

~Oh g 78-02-08 S N/A HII Pl&IPXX Load r'eduction to clean steam gener-(II) ator feedwater pump suction strainers.

(Non-nuclear system)

I F: I',orred Reason: ' Method: Exhibit C - Instructions .

S: Scheduled A.Equipment Failure (Explain) h(anual I'or Pret)aration of Data II-hlaintcnance or Test 2.Manual Scram. Entry Slrects for Licensee C-Refueiint,' 3-Automatic Scram. Event Report (LER) File (NURL'C.

Regulatory Restriction 4.Other (Explain) OI6 I )

E Operator Training & License Examination F.Administrative 5 C-Operational L'rrof (L'xplaln) Exhibit I ~ Satnc Source I I Other (Explain)

~ r v