Attached February, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1
ML18227A423
Person / Time
Site: Turkey Point  
Issue date: 03/04/1978
From: Schmidt A
Florida Power & Light Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML18227A423 (16)


Text

~

\\

p~

  • REC:

NRC REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

DISTRIBUTIOhl FOR INCOMING MATERIAL QRG:

SCHMIDT A D FL PWR 5 LIGHT DOCDATE: 03/04/78 DATE RCVD: 03/14/78 DOCTYPE:

LETTER NOTARIZED:

NO

SUBJECT:

MONTHLY OPERATING REPORTS FOR THE MONTH OF FEBRUARY.

H COPIES RECEIVED LTR 1

EhlCL 1

PLANT NAME:TURKEY PT ¹3 TURKEY PT ¹3 ST LUCIE ¹1 REVIEWER INITIAL:

XRS DISTRIBUTER INITIAL:P Q DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS MONTHLY OPERATING REPORT FOR GRAY BOOK PREPARATION.

(DISTRIBUTION CODE A003>

FOR ACTION:

INTERNAL:

EXTERNAL:

BR CHIEF SCHWENCER++W/2 ENCL FILE+~W/ENCL u

~ l/2 ENCL LPDR S

MIAMI> FL++W/ENCL TIC++W/ENCL NS IC++W/ENCL BNL<hlATLAB)~~M/ENCL ACRS CAT B++W/0 ENCL NRC PDR++W/ENCL 0 ISTR IBIJTION:

LTR 10 ENCL 10 S I ZE:

1P+3P+6P THE END CONTROL NBR:

7807401'2

1 j

FLORIDAPOWER & LIGHT COiVIPANY March 4, 1978 Office of Management 1nformation and Program Controls U.

S. Nuclear Regulatory Commission Washington, D.

C.

20555 k4 Gentlemen:

Attached are the February, 1978, Operating Status Reports for Turkey Point Unit Nos.

3 and 4 and St. Lucie Unit No. 1.

Very truly yours, Vice President Power Resources VTC/DDC cc:

Mr. James P. O'Reilly Robert Lowenstein, Esquire r80740i42 PEOPLE... SERVING PEOPLE

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50>>

250 Turkey Point UNIT Unit. No.

3 DATE March 4

1978 COMPLETED BY V. T. Chilson MONTH FEBRUARY 197 8 DAY AVERAGE DAILY POWER. LEVEL (i6Ve-Nel:)

DAY AVERAGE DAILY POWER L VEL (MWe-Net) 17 18 127 19 400 20 638 21 680

'2 683 23 24 687 25 686 10 26 686 27 681 28 675 13 14 NOTE:

Average daily power greater than 666 HNe-due to cooler condenser cooling water.

OPERATI1fG DATAREPORT DOCKET NO.

D4YE Ãar.4 1978 CO! iPLETED SY EZ~S11aaa TELEPHONE M~H2.-3824 OPERATING STATUS 760 700 Turkey Point Unit Ho.

3

g. Reporting period:

Peb 1978

3. I.icensed Thermal Power (MWt):
4. Namephte Rating (Gross MWe):
5. Design Electricai Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):,
7. Maximum Dependable Capacity (Net lPIWe):

Unit Ho.

3 operated at, approximately 100K R.P.,

,after the unit was returned to service.following, comple-tion of scheduled refueling, maintenance,

.inspections,and

tests, ezcept for the outage.
8. IfChanges Occur in Capacity'Ratings'(Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, IfAny (Net MWe):
10. Reasons For Restrictions, IfAny:

NONE This Month Yr:to-Date Cumuhtive 4

35 569.7 111.1 265.4 34 351.8 85.0 521 921 67 296.113 21 452 87 20 299'19 74.8 7.0 63.8 2.8

12. Number Of Hours Reactor Was Critical 343. 8 343.8
13. Reactor Reserve Shutdown Hours. 14. Hours Generator On.Line 265.4
15. Unit Reserve Shutdown Hours 16. Gross Thecal Energy Generated (MWH)

I T. Gross Electrical Energy Generated (MWH) 168 530

18. Net Electricai Energy Generated (MWH) 154 909 152 669
19. Unit Service Factor 2D. Unit AvailabilityFactor
39. 5
2. Unit Capacity Factor (Using DER Net) 33.3 15.6
23. Unit Forced Outage Rate 1.4 1.4
24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each):

Steam Generator Tube Inspection Program - August 17 September 11, 1978

25. IfShut Down At End Of R port Period, Estimated Date of Startup:
26. Units ln Test Status (Prior to Commercial Operation):

Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COibliiIERCIALOPERATION

UNITSIIUTDOWNS ANDPOWER REDUCTIONS DOCKET NO.

REPORT MONfII FEBRUARY 1978 iVii.

Date Licensee Event Report 8 E~

0 iil cn G gal Eo 0

CJ Cause 4 Corrective Action tu Prevent Recurrence 28 77-11-23 402.9 C

N/A N/A N/A Unit No.

3 was removed from service for. scheduled refueling, main'tenance, and inspections.

(Continued from previous month)

(Nuclear and non-nuclear systems)

CB P&IPXX (B)

Outage was extended to repair mechani cal seal on reactor coolant pumps.

(Nuclear system) 78-02-18 3

7 B

N/A H/A GENERA (A)

Unit was removed from service to balance the generator exciter.

(Non-nuclear system)

I F: Forced S: SeheiluleJ I'f177)

Reason:

A.Iaiuipmenl I'ailurc (Explain)

Ii hlalntenancc or Test C-Rcfuelint; D ltcgula tory Rest rtct ton L'.Operator Training 8c tdecose Lrxaotinalion F.Administrative G-Operational Error (Explain)

II.Other (Explain)

Method:

I -hlaoual 2-Manual Scram.

3-Aulotnalic Seratn.

4-Other (Explain)

Exlubit G - Instructions for Preparation or Data Entry Slteets for Licensee Evcot Report (LL'R) File (NUREG-OI6I )

Exlobit I - Satoe Source

0

AVERAGE DAILY UNIT POWER LEVEL Turkey Point UNIT DATE COMPLETED BY V.

TELEPHONE 305 552-3824 MONTH FEBRUARY, 1978 DAY AVERAGE DAILY PO~,LEVEL

(Ãfe-Net) 666 660 654 651 661 668 671 DAY AVERAGE DAILY POWER LVEL (MWe-Nee) 17 18 19 20 21 22 671 662 659.

24 25 12 13 14 660 659 654 390 27 28 15 16 iHOTE:

Average daily power greater than 666 ice due to cooler condenser cooling water.

o

OPERATIiIG STATUS OPERATING DATA REPORT DOCKET NO. ~i3 DATEM~~8 COMPLETED BY ~ T. Chilson TELEPHONE QOQ Q2-3824 760 700 666 Unit Name Turke Point Vnit No.

4

February, 1978
3. Licensed Thermal Power PiNt):

2200

4. Nameolate Rating (Gross hIWe):
5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):

7; Maximum Dependable Capacity (Net MWe):

Notes Unit No.

4 operated.

at approximately 3.00X R.P.

until the unit vas removed from. service to perform steam generator tube inspec>>

tion and repairs-.

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Re port, Give Reasons:
9. Power Level To Which Restricted, IfAny (Net MWe):
10. Reasons For Restrictions, IfAny:

11 ~ Hours In Reporting Period 12'. Number Of Hours Reactor Was Critical

13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line
15. Unit Reserve Shutdown Hours

'6.

Gross Thermal Energy Generated,{MWH)

17. Gross Eiectricai Energy Generated (MWH)
18. Net Electrical Energy Generated {MWH)
19. Unit Service Factor
20. Unit AvailabilityFactor
21. Unit Capacity Factor {Using MDC Net)

~A. Unit.Capacity Factor (Using DER Net)

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months {Type. D This Month 672.

0'28.2 Yr:to-Date 1 416.0 Cumulative 39 625.0 327.7

<<0 717 981 226 680 214 826 48.8 48.8

48. 0:

46.1, ate. and Duration ol'ach):

71.7 64.1 3.2

'-0-' -"

1.38. 8

>>0- 2 319 238

57. 404.906 740 370 18 564 295 74.9 68.6 74.9 68.6 74.
25. IfShut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status {Priorto Commercial Operation):

rch 8

1978 Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COilfiiIERCIALOPERATION

UNITSIIUTDOlVNSAND POlUER REDUCTIONS

. RRpRRFMOIFFI<

FRRRUARY 1979 DOCKET NO 50 251 UNjTNAhlF Turke Point Unit No.

4 COMPLETED IIY l)atc r<

6jV

~A Licensee Event Rcport rr RA H~

0 o Q

IR OEo CJ Cause &.Corrcctivc Action to Prcvcnt Recurrence 78-02-14 S

344.3 Steam GBner<rttor Inspection Program Report-Feb.

1978 (Transmitted March 1, 19/8 IITEXCH (F)

Unit No.

4 was removed from service to perform steam generator tube inspection and repair leaks.

(Nucleal system)

F:

For<.'cll S: Scl>eduied Reason:

A.Eriuipment Failure (Explain)

II.htalntenance ur Test C-Refueling I) Regulatory Itcstriction E Operator Training &, Liccnsc Lxamination F-Administrative C Operational L'rrur (Explain)

I I-Other (Explain) hlethod:

I-Manual

- 2.Mapual Scram.

3-Autumatic Scram.

4~tiler (Explatn)

Exhibit G - Instructions for Prcparattun of Data

= Entry Sheets I'or Licensee Event Report (LER) File (NUREG.

OI6 I )

Exhibit I - Sanle Source

AVER'AGE DAILY UNIT POWER LEVEL DOCKET NO.

50 335 St. Lucie UNIT Unit No.

1 DATE March 4

1978 COMPLETED'Y V. T. Chi 3.son qoyZZ FEBRUARY >

1978 DAY AVERAGE DAILY POWER. LEVEL.

(MVe-Net)

DAY AVERAGE DAILY POWER L-VEL QNe-Net) 728 743 738 772 787.

781 17 18 19 20 21 7

3 77

'8 10 12 13 795 748 547 793 795 797 795 794 23 25 27 28 79 78 770 785 791 795 15 792

.791 NOTE:

Average daily power greater than 777 MWe due to cooler condenser cooling water.

OPERATING DATAREPORT OPERATING STATUS I. Unit Name:

St. Lucie Unit Ho.

1 g'. Reporting period:

Februa 1978

3. I.icensed Thermal Power (MWt):

2560

4. Namephte Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):'22 777 DOCKET NO.

DATE ~Klr.4 78 COMPLETED BY ~~hilson TELEPHONE ~Q ~-3824 Notes -'nit Ho.

1 operated at approxitaately 100/ R.P.

except for load reduction of Feb. 8-9, 1978.

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

,'. Power Level To Which Restricted, IfAny (Net MWe):

10. Reasons For Restrictions, IfAny'ONE This Month Yr:to-Date Cumulative 672. 0 1 416.0 1 339.5 1 325.4 519 654 100.0 93.6 91.1
11. Hours In Reporting Period
12. Number OfHours Reactor Was Critical
13. Reactor Reserve Shutdown Hours
14. Hours Generator On Line 672. 0
15. Unit Reserve Shutdown pours ~ ww"
18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor 93.6
20. Unit AvailabilityFactor
21. Unit Capacity Factor (Using MDC iNet) 99.5

~". Unit Capacity Factor (Using DER Net)

BIL3

23. Unit Forced Outage Rate

QJL

24. Shutdowns Scheduled Over Next 6 iblonths (Type. Date, and Duration of Each):

Refuelin maintenance and ins ections - Aoril 1 - June 10 1978

'44 9

101.5 9 007.-2 23..

~

4 86.3 86.3 ZS. IfShut Down At End Of Report Period. Estimated Date of Startup:

26. Units fn Test Status (Prior to Commercial Operation):

H/A Forecast Achieved IiVITIAL CRIT ICA LITY INITIAL ELECTRICITY COAINIERCIALOPERATION Ii>/77)

0

UNITSIIUTDOWNS ANDPOWER REDUCTIONS REPORT MON'fll PE8RU RY COMPLETED IIY No. l No.

Date r

c '>

0

~Oh g Licenscc Event Report rr CQ 4l 4l Vl u) Ct 6~Vl o 0 Q

CI EQ O

Cause &Corrective Action to Prcvcnt Recurrence 78-02-08 S

N/A HII Pl&IPXX (II)

Load r'eduction to clean steam gener-ator feedwater pump suction strainers.

(Non-nuclear system)

I F: I',orred S: Scheduled Reason:

A.Equipment Failure (Explain)

II-hlaintcnance or Test C-Refueiint,'

Regulatory Restriction E Operator Training & License Examination F.Administrative C-Operational L'rrof(L'xplaln)

I I Other (Explain)

Method:

h(anual 2.Manual Scram.

3-Automatic Scram.

4.Other (Explain)

Exhibit C - Instructions I'or Pret)aration of Data Entry Slrects for Licensee Event Report (LER) File (NURL'C.

OI6 I )

5 Exhibit I ~ Satnc Source

~ r v