MONTHYEARL-2024-184, Radiological Emergency Plan Revision 772024-11-0505 November 2024 Radiological Emergency Plan Revision 77 L-2024-173, Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-31031 October 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles L-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2024-175, Cycle 34 Core Operating Report2024-10-24024 October 2024 Cycle 34 Core Operating Report ML24291A2882024-10-24024 October 2024 Westinghouse Topical Report - Request for Withholding Information from Public Disclosure L-2024-177, Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis2024-10-22022 October 2024 Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis ML24276A2302024-10-16016 October 2024 Westinghouse Topical Report – Request for Withholding Information from Public Disclosure L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes ML24289A2372024-10-15015 October 2024 Transmittal of Revision 1 Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) L-2024-157, Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-0303 October 2024 Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles IR 05000250/20243012024-10-0303 October 2024 NRC Operator License Examination Report 05000250/2024301 and 05000251/2024301 L-2024-147, Submission of Periodic Reports2024-10-0101 October 2024 Submission of Periodic Reports L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24269A1292024-09-24024 September 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis ML24260A2262024-09-18018 September 2024 NRC Examination Results Summary - Examination Reports: 05000250/2024301 and 05000251/2024301 ML24262A2272024-09-18018 September 2024 Transmittal of Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles ML24158A0052024-09-17017 September 2024 Completion of Subsequent License Renewal Site Specific Environmental Review and Modification to Subsequent Renewed Facility Operating Licenses L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24207A0342024-09-13013 September 2024 – Exemption from Certain Requirements of 10 CFR 50.46 for Use of Axiom Fuel Rod Cladding – Letter ML24256A1132024-09-13013 September 2024 Regulatory Audit Summary Related to the Review of Regarding the Updated Spent Fuel Pool Criticality Safety Analysis License Amendment Request IR 05000250/20240052024-08-23023 August 2024 Updated Inspection Plan for Turkey Point Units 3 & 4 - Report 05000250/2024005 and 05000251/2024005 ML24234A0062024-08-22022 August 2024 Project Manager Assignment L-2024-122, Core Operating Limits Report2024-08-12012 August 2024 Core Operating Limits Report L-2024-106, Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-022024-08-12012 August 2024 Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-02 ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-089, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-07-25025 July 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24184B2822024-07-16016 July 2024 – Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal 05000250/LER-2024-002-01, Condition Prohibited by Technical Specifications2024-07-10010 July 2024 Condition Prohibited by Technical Specifications ML24173A1902024-06-28028 June 2024 Withdrawal of an Amendment Request ML24159A2652024-06-26026 June 2024 Correction of Safety Evaluation for Issuance of Amendment Nos. 298 & 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-100, Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project2024-06-19019 June 2024 Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter IR 05000250/20244012024-06-0505 June 2024 – Security Baseline Inspection Report 05000250-2024401, 05000251-2024401 and 07200062-2024401 L-2024-076, Reply to Notice of Violation; NOV 05000250, 05000251/2024010-052024-05-29029 May 2024 Reply to Notice of Violation; NOV 05000250, 05000251/2024010-05 L-2024-082, 2023 Annual Radiological Environmental Operating Report2024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000250/20240012024-05-10010 May 2024 Integrated Inspection Report 05000250/2024001 and 05000251/2024001 ML24135A0942024-05-0909 May 2024 Periodic Update to the Updated Final Safety Analysis Report L-2024-060, 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report2024-05-0909 May 2024 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report ML24127A1862024-05-0909 May 2024 Request for Withholding Information from Public Disclosure ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-073, Cycle 34 Core Operating Limits Report2024-05-0101 May 2024 Cycle 34 Core Operating Limits Report L-2024-072, Cycle 33 Core Operating Limits Report2024-05-0101 May 2024 Cycle 33 Core Operating Limits Report L-2024-048, Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision2024-04-30030 April 2024 Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision L-2024-069, Radiological Emergency Plan Revision 762024-04-22022 April 2024 Radiological Emergency Plan Revision 76 L-2024-066, Sixth 10-Year Inservice Testing Interval Relief Request No. PR-022024-04-17017 April 2024 Sixth 10-Year Inservice Testing Interval Relief Request No. PR-02 2024-09-25
[Table view] Category:Operating Report
MONTHYEARL-2022-039, and Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2022-04-14014 April 2022 and Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2021-097, and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report2021-05-13013 May 2021 and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report L-2021-096, 10 CFR 50.59(d)(2) Summary Report2021-05-11011 May 2021 10 CFR 50.59(d)(2) Summary Report L-2021-018, 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report2021-02-16016 February 2021 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report L-2020-065, Submission of Periodic Reports2020-04-0909 April 2020 Submission of Periodic Reports ML18227A9832018-08-15015 August 2018 Submit First Year Operation Report. L-2008-245, Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/082008-11-10010 November 2008 Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/08 L-2007-053, Annual Radiological Environmental Operating Report2007-05-0404 May 2007 Annual Radiological Environmental Operating Report L-2004-097, Annual Radiological Environmental Operating Report2004-05-11011 May 2004 Annual Radiological Environmental Operating Report ML18227B0771978-03-17017 March 1978 03/17/1978 Letter Operating Summary Reports of February 1978 ML18227A4231978-03-0404 March 1978 Attached February, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0631978-03-0404 March 1978 03/04/1978 Letter Operating Status Reports of February 1978 ML18227A4221978-02-14014 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0641978-02-14014 February 1978 02/14/1978 Letter Operating Status Reports of January 1978 ML18227A4211978-02-0404 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0651978-02-0404 February 1978 02/04/1978 Letter Operating Status Reports of January 1978 ML18227A4201978-01-0707 January 1978 Attached December, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0671978-01-0707 January 1978 01/07/1978 Letter Operating Status Reports of December 1977 ML18227A4191977-12-0303 December 1977 Attached November, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0681977-12-0303 December 1977 12/03/1977 Letter Operating Status Reports of November 1977 ML18227A4171977-11-0505 November 1977 Attached October, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0691977-11-0505 November 1977 11/05/1977 Letter Operating Status Reports of October 1977 ML18227B0701977-10-0505 October 1977 10/05/1977 Letter Operating Status Reports of September 1977 ML18227B0711977-09-0303 September 1977 09/03/1977 Letter Operating Status Reports of August 1977 ML18227A4151977-09-0303 September 1977 Attached August, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0731977-08-0505 August 1977 08/05/1977 Letter Operating Status Reports of July 1977 ML18227A4141977-08-0505 August 1977 Attached July, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0741977-07-0707 July 1977 07/07/1977 Letter Operating Status Reports of June 1977, and a Revised Operating Data Report for May 1997 for Turkey Point Unit 3 ML18227A4131977-07-0707 July 1977 Attached June, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. May, 1977 for Unit 3 Incorrectly Reported for Some Values. Attached Revised May, 1977 Operating Data Report for Unit 3 ML18227B0751977-06-0606 June 1977 06/06/1977 Letter Operating Status Reports of May 1977 ML18227A4121977-06-0606 June 1977 Attached May, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0761977-05-0505 May 1977 05/05/1977 Letter Operating Status Reports of April 1977 ML18227A4111977-05-0505 May 1977 Attached April, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227A4101977-04-0404 April 1977 Attached March, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. Maximum Dependable Capacity (MWe-Net) for St. Lucie No. 1 Was Revised from 802 MWe-Net to 777 MWe-Net (Estimated) ML18227B0781977-04-0404 April 1977 04/04/1977 Letter Operating Status Reports of March 1977 ML18227B0791977-03-0707 March 1977 03/07/1977 Letter Operating Status Reports of February 1977 ML18227A4091977-03-0707 March 1977 Attached February, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0801977-02-0707 February 1977 02/07/1977 Letter Operating Status Reports of January 1977 ML18227B0811977-01-0707 January 1977 01/07/1977 Letter Operating Status Reports of December 1976 ML18227A4081977-01-0707 January 1977 Attached December, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0821976-12-0606 December 1976 12/06/1976 Letter Operating Status Reports of November 1976 ML18227B0831976-11-15015 November 1976 11/15/1976 Letter Corrected Copies of Operating Data Reports for October 1976 ML18227B0841976-11-0808 November 1976 11/08/1976 Letter Operating Status Reports of October 1976 ML18227A4061976-11-0808 November 1976 Attached October, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227A4071976-11-0505 November 1976 Attached Corrected Copies of October, 1976 Operating Data Reports for Turkey Point Unit Nos. 3 and 4 ML18227A4051976-10-0808 October 1976 Attached September, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0861976-09-0707 September 1976 09/07/1976 Letter Operating Status Reports of August 1976 ML18227A4031976-09-0707 September 1976 Attached August, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0871976-08-0505 August 1976 08/05/1976 Letter Operating Status Reports of July 1976 ML18227A4021976-08-0505 August 1976 Attached July, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. St. Lucie Unit No. 1 Was Previously Reported to Be in Commercial Operation, in Error. Attached Corrected June 1976 for St. Lucie No. 1 2022-04-14
[Table view] |
Text
~ \ p~
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
DISTRIBUTIOhl FOR INCOMING MATERIAL
- REC: QRG: SCHMIDT A D DOCDATE: 03/04/78 NRC FL PWR 5 LIGHT DATE RCVD: 03/14/78 DOCTYPE: LETTER NOTARIZED: NO COPIES RECEIVED
SUBJECT:
LTR 1 EhlCL 1 MONTHLY OPERATING REPORTS FOR THE MONTH OF FEBRUARY.
H PLANT NAME:TURKEY PT ¹3 REVIEWER INITIAL: XRS TURKEY PT ¹3 DISTR I BUTER INITIAL:P Q ST LUCIE ¹1 DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS MONTHLY OPERATING REPORT FOR GRAY BOOK PREPARATION.
(DISTRIBUTION CODE A003>
FOR ACTION: BR CHIEF SCHWENCER++W/2 ENCL INTERNAL: FILE+~W/ENCL NRC PDR++W/ENCL u ~ l/2 ENCL EXTERNAL: LPDR S MIAMI> FL++W/ENCL T I C++W/ENCL NS IC++W/ENCL BNL<hlATLAB)~~M/ENCL ACRS CAT B++W/0 ENCL 0 ISTR I BIJT ION: LTR 10 ENCL 10 CONTROL NBR: 7807401'2 S I ZE: 1P+3P+6P THE END
1 j FLORIDA POWER & LIGHT COiVIPANY March 4, 1978 k4 Office of Management 1nformation and Program Controls '
U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:
Attached are the February, 1978, Operating Status Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit No. 1.
Very truly yours, Vice President Power Resources VTC/DDC cc: Mr. James P. O'Reilly Robert Lowenstein, Esquire r80740i42 PEOPLE... SERVING PEOPLE
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50>> 250 Turkey Point UNIT Unit. No. 3 DATE March 4 1978 COMPLETED BY V. T. Chilson MONTH FEBRUARY 197 8 DAY AVERAGE DAILY POWER. LEVEL DAY AVERAGE DAILY POWER L VEL (i6Ve-Ne l:) (MWe-Net) 17 18 127 19 400 20 638 21 680
'2 683 23 24 687 25 686 10 26 686 27 681 28 675 13 14 NOTE: Average daily power greater than 666 HNe-due to cooler condenser cooling water.
OPERATI1fG DATA REPORT DOCKET NO.
D4YE Ãar.4 1978 CO! iPLETED SY EZ~S11aaa TELEPHONE M~H2.-3824 OPERATING STATUS Turkey Point Unit Ho. 3 Unit Ho. 3 operated Peb 1978 at, approximately 100K R.P.,
- g. Reporting period: ,after the unit was returned
- 3. I.icensed Thermal Power (MWt): to service.following, comple-760
- 4. Namephte Rating (Gross MWe): tion of scheduled refueling,
- 5. Design Electricai Rating (Net MWe): maintenance, .inspections,and
- 6. Maximum Dependable Capacity (Gross MWe):, 700 tests, ezcept for the outage.
- 7. Maximum Dependable Capacity (Net lPIWe):
- 8. If Changes Occur in Capacity'Ratings'(Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, IfAny (Net MWe): NONE
- 10. Reasons For Restrictions, If Any:
This Month Yr:to-Date Cumuhtive 4
- 12. Number Of Hours Reactor Was Critical 343. 8 343.8 35 569.7
- 13. Reactor Reserve Shutdown Hours . 111.1
- 14. Hours Generator On. Line 265.4 265.4 34 351.8
- 15. Unit Reserve Shutdown Hours 85.0
- 16. Gross Thecal Energy Generated (MWH) 521 921 67 296.113 I T. Gross Electrical Energy Generated (MWH) 168 530 21 452 87
- 18. Net Electricai Energy Generated (MWH) 154 909 152 669 20 299'19
- 19. Unit Service Factor 74.8 2D. Unit Availability Factor 39. 5 7 .0
- 2. Unit Capacity Factor (Using DER Net) 33.3 15.6 63.8
- 23. Unit Forced Outage Rate 1.4 1.4 2.8
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each):
Steam Generator Tube Inspection Program - August 17 September 11, 1978
- 25. If Shut Down At End Of R port Period, Estimated Date of Startup:
- 26. Units ln Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COibliiIERCIALOPERATION
DOCKET NO.
UNIT SIIUTDOWNS AND POWER REDUCTIONS REPORT MON fII FEBRUARY 1978 Licensee 0E~iil gal Cause 4 Corrective iVii. Date Event Action tu Report 8 cn G Eo 0 Prevent Recurrence CJ 28 77-11-23 402.9 C N/A N/A N/A Unit No. 3 was removed from service for. scheduled refueling, main'tenance, and inspections. (Continued from previous month) (Nuclear and non-nuclear systems)
CB P&IPXX Outage was extended to repair mechani (B) cal seal on reactor coolant pumps.
(Nuclear system) 78-02-18 3 7 . B N/A H/A GENERA Unit was removed from service to (A) balance the generator exciter. (Non-nuclear system)
I F: Forced Reason: Method: Exlubit G - Instructions S: SeheiluleJ A.Iaiuipmenl I'ailurc (Explain) I -hlaoual for Preparation or Data Ii hlalntenancc or Test 2-Manual Scram. Entry Slteets for Licensee C-Rcfuelint; 3-Aulotnalic Seratn. Evcot Report (LL'R) File (NUREG-D ltcgula tory Rest r tct ton 4-Other (Explain) OI6I )
L'.Operator Training 8c tdecose Lrxaotinalion F.Administrative G-Operational Error (Explain) Exlobit I - Satoe Source I'f177) II.Other (Explain)
0 AVERAGE DAILY UNIT POWER LEVEL Turkey Point UNIT DATE COMPLETED BY V.
TELEPHONE 305 552-3824 MONTH FEBRUARY, 1978 DAY AVERAGE DAILY PO~,LEVEL DAY AVERAGE DAILY POWER LVEL
(Ãfe-Ne t) (MWe-Nee) 666 17 660 18 654 19 651 20 661 21 668 22 671 671 24 662 25 659.
660 27 12 659 28 13 654 14 390 15 16 iHOTE: Average daily power greater than 666 ice due to cooler condenser cooling water.
o OPERATING DATA REPORT DOCKET NO.
DATE
~i3 M~~8 COMPLETED BY ~ T. Chilson TELEPHONE QOQ Q2-3824 OPERATIi IG STATUS Unit Name Turke Point February, 1978 Vn it No . 4 Notes Unit No. 4 operated.
at approximately 3.00X R.P.
- 3. Licensed Thermal Power PiNt): 2200 until the unit vas removed 760 from. service to perform
- 4. Nameolate Rating (Gross hIWe): steam generator tube inspec>>
- 5. Design Electrical Rating (Net MWe):
700 tion and repairs-.
- 6. Maximum Dependable Capacity (Gross MWe):
7; Maximum Dependable Capacity (Net MWe): 666
- 8. If Changes Occur in Capacity Ratings (I tems Number 3 Through 7) Since Last Re port, Give Reasons:
- 9. Power Level To Which Restricted, IfAny (Net MWe):
- 10. Reasons For Restrictions, If Any:
This Month Yr:to-Date Cumulative 11 ~ Hours In Reporting Period 672. 1 416.0 39 625.0 0'28.
12'. Number Of Hours Reactor Was Critical 2
- 13. Reactor Reserve Shutdown Hours
'-0-' -" 1.38. 8
- 14. Hours Generator On-Line 327.7
- 15. Unit Reserve Shutdown Hours <<0 >>0- '6.
Gross Thermal Energy Generated,{MWH) 717 981 2 319 238 57. 404 .906
- 17. Gross Eiectricai Energy Generated (MWH) 226 680 740 370 18 564 295
- 18. Net Electrical Energy Generated {MWH) 214 826
- 19. Unit Service Factor 48.8 74.9 . 68.6
- 20. Unit Availability Factor 48.8 74.9 68.6
- 21. Unit Capacity Factor {Using MDC Net) 48. 0: 74.
~A. Unit. Capacity Factor (Using DER Net) 46.1, 71.7 64.1
- 23. Unit Forced Outage Rate 3.2
- 24. Shutdowns Scheduled Over Next 6 Months {Type. D ate. and Duration ol'ach):
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: rch 8 1978
- 26. Units In Test Status {Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COilfiiIERCIALOPERATION
DOCKET NO 50 251 UNITSIIUTDOlVNS AND POlUER REDUCTIONS UNjTNAhlF Turke Point Unit No. 4 COMPLETED IIY RRpRRFMOIFFI< FRRRUARY 1979 r<
Licensee H~ Cause &. Corrcctivc 6 ~A RA 0 oIR l)atc j Event Q Action to V
Rcport rr O Eo Prcvcnt Recurrence CJ 78-02-14 S 344.3 Steam IITEXCH Unit No. 4 was removed from service GBner<rttor (F) to perform steam generator tube Inspection inspection and repair leaks. (Nucleal Program system)
Report-Feb. 1978 (Transmitted March 1, 19/8 F: For<.'cll Reason: hlethod: Exhibit G - Instructions S: Scl>eduied A.Eriuipment Failure (Explain) I-Manual for Prcparattun of Data II.htalntenance ur Test -
2.Mapual Scram. =
Entry Sheets I'or Licensee C-Refueling 3-Autumatic Scram. Event Report (LER) File (NUREG.
I) Regulatory Itcstriction 4~tiler (Explatn) OI6 I )
E Operator Training &, Liccnsc Lxamination F-Administrative C Operational L'rrur (Explain) Exhibit I - Sanle Source I I-Other (Explain)
AVER'AGE DAILY UNIT POWER LEVEL DOCKET NO. 50 335 St. Lucie UNIT Unit No. 1 DATE March 4 1978 COMPLETED'Y V. T. Chi 3.son qoyZZ FEBRUARY (MVe-Net)> 1978 DAY AVERAGE DAILY POWER. LEVEL. DAY AVERAGE DAILY POWER L-VEL QNe-Net) 728 17 7 3 743 18 77
'8 738 19 772 20 787. 21 781 795 23 79 748 78 547 25 770 10 793 .
785 795 27 791 12 797 28 795 13 795 794 15 792
.791 NOTE: Average daily power greater than 777 MWe due to cooler condenser cooling water.
OPERATING DATA REPORT DOCKET NO.
DATE ~Klr.4 78 COMPLETED BY ~~hilson TELEPHONE ~Q ~-3824 OPERATING STATUS I. Unit Name: St. Lucie Unit Ho. 1 Notes -'nit Ho. 1 operated Februa 1978 at approxitaately 100/ R.P.
g'. Reporting period: except for load reduction I.icensed Thermal Power (MWt): 2560
- 3. of Feb. 8-9, 1978.
4.
5.
6.
7.
8.
Namephte Rating (Gross MWe):
Design Electrical Rating (Net MWe):
Maximum Dependable Capacity (Gross MWe):
Maximum Dependable Capacity (Net MWe):
'22 777 If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
, '. Any'ONE Power Level To Which Restricted,
- 10. Reasons For Restrictions, If If Any (Net MWe):
This Month Yr:to-Date Cumulative .
- 11. Hours In Reporting Period 672. 0 1 416.0 '44
- 12. Number Of Hours Reactor Was Critical 1 339.5 9
- 13. Reactor Reserve Shutdown Hours 101.5
- 14. Hours Generator On Line 672. 0 1 325.4 9 007.-2
- 15. Unit Reserve Shutdown pours
~ w 23.. ~ 4 w" >
- 18. Net Electrical Energy Generated (MWH) 519 654 100.0 93.6 86.3
- 19. Unit Service Factor
- 20. Unit Availability Factor 93.6 86.3
- 21. Unit Capacity Factor (Using MDC iNet) 99.5 91.1
~". Unit Capacity Factor (Using DER Net) BIL3
- 23. Unit Forced Outage Rate QJL
- 24. Shutdowns Scheduled Over Next 6 iblonths (Type. Date, and Duration of Each):
Refuelin maintenance and ins ections - Aoril 1 - June 10 1978 ZS. If Shut Down At End Of Report Period. Estimated Date of Startup: H/A
- 26. Units fn Test Status (Prior to Commercial Operation): Forecast Achieved IiVITIAL CRIT ICA LITY INITIAL ELECTRICITY COAINIERCIALOPERATION Ii>/77)
0 UNIT SIIUTDOWNS AND POWER REDUCTIONS No. l COMPLETED IIY REPORT MON'fll PE8RU RY r
6~Vl c '> Licenscc CQ 4l 4l o 0CI Cause & Corrective Date 0 Event Vl Q Action to No. EQ Report rr u) Ct O Prcvcnt Recurrence
~Oh g 78-02-08 S N/A HII Pl&IPXX Load r'eduction to clean steam gener-(II) ator feedwater pump suction strainers.
(Non-nuclear system)
I F: I',orred Reason: ' Method: Exhibit C - Instructions .
S: Scheduled A.Equipment Failure (Explain) h(anual I'or Pret)aration of Data II-hlaintcnance or Test 2.Manual Scram. Entry Slrects for Licensee C-Refueiint,' 3-Automatic Scram. Event Report (LER) File (NURL'C.
Regulatory Restriction 4.Other (Explain) OI6 I )
E Operator Training & License Examination F.Administrative 5 C-Operational L'rrof (L'xplaln) Exhibit I ~ Satnc Source I I Other (Explain)