Category:Letter
MONTHYEARML24023A0342024-02-0505 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0038 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000335/20230102024-01-26026 January 2024 NRC Quadrennial Focused Engineering Inspection (FEI) Commercial Grade Dedication Report 05000335/2023010 and 05000389/2023010 L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) IR 05000335/20230042024-01-24024 January 2024 Integrated Inspection Report 05000335/2023004 and 05000389/2023004 ML23320A3062024-01-22022 January 2024 Issuance of Amendment Nos. 298 and 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project ML23341A2102024-01-22022 January 2024 LTR-23-0216-1 - Closure Letter - 2.206 Petition for License Renewal Plant Reactor Pressure Vessel Embrittlement L-2024-007, Inservice Inspection Program Owner'S Activity Report (OAR-1)2024-01-18018 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2024-004, Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years2024-01-18018 January 2024 Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-002, Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2024-01-0808 January 2024 Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-179, Unusual or Important Environmental Event - Turtle Mortality2023-12-14014 December 2023 Unusual or Important Environmental Event - Turtle Mortality L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2023-166, Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report2023-12-0606 December 2023 Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report ML23340A0332023-12-0101 December 2023 FPL to Fws, Comments Submitted by Florida Power and Light on the Species Status Assessment Accompanying the September 20, 2023 Proposed Threatened Species Status with Section 4(d) Rule for the Miami Cave Crayfish L-2023-172, Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule ML23332A1772023-11-28028 November 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, ML23333A0102023-11-27027 November 2023 Attachment B - 11/07/2022 - Waterkeeper Scoping Comments-1 ML23333A0152023-11-27027 November 2023 Attachment G - Arcadis Memo Re FPL Year 4 Raasr Final (June 2, 2023, Appended to Derm letter)-1 L-2023-162, Response to 50.69 2nd Round of Rals2023-11-21021 November 2023 Response to 50.69 2nd Round of Rals L-2023-146, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles2023-11-15015 November 2023 License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles IR 05000250/20230032023-11-0909 November 2023 Integrated Inspection Report 05000250/2023003 and 05000251/2023003 IR 05000335/20230032023-11-0606 November 2023 Integrated Inspection Report 05000335/2023003 and 05000389/2023003 ML23310A1342023-11-0404 November 2023 10 CFR 2.206 Petition - LTR-23-0216-1 Petition Amendment; Turkey Point Subsequent Renewal with Petitioner 11/04/2023 ML24016A2622023-10-25025 October 2023 Subsequent License Renewal Updated List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected Project ML23270B8882023-10-23023 October 2023 Regulatory Audit Summary Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structure, Systems, and Components for Nuclear Power Reactors EPID L-2022-LLA-0182 L-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis2023-10-11011 October 2023 License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23275A1102023-10-0202 October 2023 License Amendment Request Revision 2 for the Technical Specifications Conversion to NUREG-1432, Revision 5 IR 05000250/20230102023-09-29029 September 2023 Biennial Problem Identification and Resolution Inspection Report 05000250/2023010 and 05000251/2023010 L-2023-131, Subsequent License Renewal Application - Second Annual Update2023-09-28028 September 2023 Subsequent License Renewal Application - Second Annual Update ML23234A1922023-09-27027 September 2023 Issuance of Amendment Nos. 297 and 290 Regarding Conversion to Improved Standard Technical Specifications L-2023-136, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-26026 September 2023 Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML23265A5492023-09-22022 September 2023 Transmittal of WCAP-18830-P/NP Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles to Support a License Amendment Request from FPL - License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis L-2023-122, Corrections to the 2022 Annual Radiological Environmental Operating Report2023-09-20020 September 2023 Corrections to the 2022 Annual Radiological Environmental Operating Report IR 05000335/20233012023-09-20020 September 2023 NRC Operator License Examination Report 05000335/2023301 and 05000389/2023301 L-2023-127, Correction to the 2022 Annual Radioactive Effluent Release Report2023-09-18018 September 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-113, Correction to the 2020 Annual Radiological Environmental Operating Report2023-09-14014 September 2023 Correction to the 2020 Annual Radiological Environmental Operating Report L-2023-108, Report of 10 CFR 50.59 Plant Changes2023-09-11011 September 2023 Report of 10 CFR 50.59 Plant Changes L-2023-118, Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-11011 September 2023 Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML23243A9552023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application - Tribe- Section 106 Letters ML23243A9522023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9532023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9542023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application L-2023-107, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42023-09-0606 September 2023 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 L-2023-112, Corrections to the 2021 Annual Radioactive Effluent Release Report2023-09-0606 September 2023 Corrections to the 2021 Annual Radioactive Effluent Release Report ML23199A2352023-09-0505 September 2023 Letter to EPA-Turkey Point Nuclear Generating Station, Units 3 and 4 - Notice of Availability of Draft Site-Specific Environmental Impact Statement for Subsequent License Renewal 2024-02-05
[Table view] Category:Operating Report
MONTHYEARL-2023-051, Report of 10 CFR 50.59 Plant Changes2023-04-0404 April 2023 Report of 10 CFR 50.59 Plant Changes L-2022-039, and Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2022-04-14014 April 2022 and Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2022-016, Report of 10 CFR 50.59 Plant Changes2022-02-28028 February 2022 Report of 10 CFR 50.59 Plant Changes L-2021-097, and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report2021-05-13013 May 2021 and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report L-2021-096, 10 CFR 50.59(d)(2) Summary Report2021-05-11011 May 2021 10 CFR 50.59(d)(2) Summary Report L-2021-018, 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report2021-02-16016 February 2021 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report L-2020-065, Submission of Periodic Reports2020-04-0909 April 2020 Submission of Periodic Reports ML18227A9832018-08-15015 August 2018 Submit First Year Operation Report. L-2017-165, Report of 10 CFR 50.59 Plant Changes2017-09-20020 September 2017 Report of 10 CFR 50.59 Plant Changes L-2012-367, Cycle 20 Core Operating Limits Report2012-10-0202 October 2012 Cycle 20 Core Operating Limits Report L-2012-169, Annual Radiological Environmental Operating Report for Calendar Year 20112012-04-24024 April 2012 Annual Radiological Environmental Operating Report for Calendar Year 2011 L-2009-284, Submittal of Report of Changes, Tests & Experiments for Period April 4, 2008 Through June 13, 20092009-12-10010 December 2009 Submittal of Report of Changes, Tests & Experiments for Period April 4, 2008 Through June 13, 2009 L-2008-245, Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/082008-11-10010 November 2008 Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/08 L-2007-053, Annual Radiological Environmental Operating Report2007-05-0404 May 2007 Annual Radiological Environmental Operating Report L-2005-101, Inservice Inspection Program Third Interval - First Period - First Outage (SL2-15) Owner'S Activity Report (OAR-1)2005-05-0202 May 2005 Inservice Inspection Program Third Interval - First Period - First Outage (SL2-15) Owner'S Activity Report (OAR-1) L-2004-097, Annual Radiological Environmental Operating Report2004-05-11011 May 2004 Annual Radiological Environmental Operating Report ML18227B0771978-03-17017 March 1978 03/17/1978 Letter Operating Summary Reports of February 1978 ML18227B0631978-03-0404 March 1978 03/04/1978 Letter Operating Status Reports of February 1978 ML18227A4231978-03-0404 March 1978 Attached February, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0641978-02-14014 February 1978 02/14/1978 Letter Operating Status Reports of January 1978 ML18227A4221978-02-14014 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0651978-02-0404 February 1978 02/04/1978 Letter Operating Status Reports of January 1978 ML18227A4211978-02-0404 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0671978-01-0707 January 1978 01/07/1978 Letter Operating Status Reports of December 1977 ML18227A4201978-01-0707 January 1978 Attached December, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0681977-12-0303 December 1977 12/03/1977 Letter Operating Status Reports of November 1977 ML18227A4191977-12-0303 December 1977 Attached November, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0691977-11-0505 November 1977 11/05/1977 Letter Operating Status Reports of October 1977 ML18227A4171977-11-0505 November 1977 Attached October, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0701977-10-0505 October 1977 10/05/1977 Letter Operating Status Reports of September 1977 ML18227A4151977-09-0303 September 1977 Attached August, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0711977-09-0303 September 1977 09/03/1977 Letter Operating Status Reports of August 1977 ML18227A4141977-08-0505 August 1977 Attached July, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0731977-08-0505 August 1977 08/05/1977 Letter Operating Status Reports of July 1977 ML18227A4131977-07-0707 July 1977 Attached June, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. May, 1977 for Unit 3 Incorrectly Reported for Some Values. Attached Revised May, 1977 Operating Data Report for Unit 3 ML18227B0741977-07-0707 July 1977 07/07/1977 Letter Operating Status Reports of June 1977, and a Revised Operating Data Report for May 1997 for Turkey Point Unit 3 ML18227A4121977-06-0606 June 1977 Attached May, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0751977-06-0606 June 1977 06/06/1977 Letter Operating Status Reports of May 1977 ML18227A4111977-05-0505 May 1977 Attached April, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0761977-05-0505 May 1977 05/05/1977 Letter Operating Status Reports of April 1977 ML18227A4101977-04-0404 April 1977 Attached March, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. Maximum Dependable Capacity (MWe-Net) for St. Lucie No. 1 Was Revised from 802 MWe-Net to 777 MWe-Net (Estimated) ML18227B0781977-04-0404 April 1977 04/04/1977 Letter Operating Status Reports of March 1977 ML18227B0791977-03-0707 March 1977 03/07/1977 Letter Operating Status Reports of February 1977 ML18227A4091977-03-0707 March 1977 Attached February, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0801977-02-0707 February 1977 02/07/1977 Letter Operating Status Reports of January 1977 ML18227B0811977-01-0707 January 1977 01/07/1977 Letter Operating Status Reports of December 1976 ML18227A4081977-01-0707 January 1977 Attached December, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0821976-12-0606 December 1976 12/06/1976 Letter Operating Status Reports of November 1976 ML18227B0831976-11-15015 November 1976 11/15/1976 Letter Corrected Copies of Operating Data Reports for October 1976 ML18227A4061976-11-0808 November 1976 Attached October, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 2023-04-04
[Table view] Category:Monthly
MONTHYEARL-2020-065, Submission of Periodic Reports2020-04-0909 April 2020 Submission of Periodic Reports ML18227B0771978-03-17017 March 1978 03/17/1978 Letter Operating Summary Reports of February 1978 ML18227B0631978-03-0404 March 1978 03/04/1978 Letter Operating Status Reports of February 1978 ML18227B0641978-02-14014 February 1978 02/14/1978 Letter Operating Status Reports of January 1978 ML18227B0651978-02-0404 February 1978 02/04/1978 Letter Operating Status Reports of January 1978 ML18227B0671978-01-0707 January 1978 01/07/1978 Letter Operating Status Reports of December 1977 ML18227B0681977-12-0303 December 1977 12/03/1977 Letter Operating Status Reports of November 1977 ML18227B0691977-11-0505 November 1977 11/05/1977 Letter Operating Status Reports of October 1977 ML18227B0701977-10-0505 October 1977 10/05/1977 Letter Operating Status Reports of September 1977 ML18227B0711977-09-0303 September 1977 09/03/1977 Letter Operating Status Reports of August 1977 ML18227B0731977-08-0505 August 1977 08/05/1977 Letter Operating Status Reports of July 1977 ML18227B0741977-07-0707 July 1977 07/07/1977 Letter Operating Status Reports of June 1977, and a Revised Operating Data Report for May 1997 for Turkey Point Unit 3 ML18227B0751977-06-0606 June 1977 06/06/1977 Letter Operating Status Reports of May 1977 ML18227B0761977-05-0505 May 1977 05/05/1977 Letter Operating Status Reports of April 1977 ML18227B0781977-04-0404 April 1977 04/04/1977 Letter Operating Status Reports of March 1977 ML18227B0791977-03-0707 March 1977 03/07/1977 Letter Operating Status Reports of February 1977 ML18227B0801977-02-0707 February 1977 02/07/1977 Letter Operating Status Reports of January 1977 ML18227B0811977-01-0707 January 1977 01/07/1977 Letter Operating Status Reports of December 1976 ML18227B0821976-12-0606 December 1976 12/06/1976 Letter Operating Status Reports of November 1976 ML18227B0831976-11-15015 November 1976 11/15/1976 Letter Corrected Copies of Operating Data Reports for October 1976 ML18227B0841976-11-0808 November 1976 11/08/1976 Letter Operating Status Reports of October 1976 ML18227B0861976-09-0707 September 1976 09/07/1976 Letter Operating Status Reports of August 1976 ML18227B0871976-08-0505 August 1976 08/05/1976 Letter Operating Status Reports of July 1976 ML18227B0881976-07-0202 July 1976 07/02/1976 Letter Operating Status Reports of June 1976 ML18227B0951975-10-0909 October 1975 10/09/1975 Letter Operating Summary Reports of September 1975 ML18227B0961975-09-0909 September 1975 09/09/1975 Letter Operating Summary Reports of August 1975 ML18227B0971975-08-0101 August 1975 08/01/1975 Letter Operating Status Reports of July 1975 ML18227B0981975-07-0303 July 1975 07/03/1975 Letter Operating Status Reports of June 1975 ML18227B0991975-06-0505 June 1975 06/05/1975 Letter Operating Status Reports of May 1975 ML18227B1001975-05-0505 May 1975 05/05/1975 Letter Operating Status Reports of April 1975 ML18227B1011975-04-0404 April 1975 04/04/1975 Letter Operating Status Reports of March 1975 ML18227B1021975-03-0606 March 1975 03/06/1975 Letter Operating Status Reports of February 1975 ML18227B1041975-02-0707 February 1975 02/07/1975 Letter Operating Status Reports of January 1975 ML18227B1031975-02-0707 February 1975 02/07/1975 Letter Operating Status Reports of January 1975 2020-04-09
[Table view] |
Text
NAG ARM 195 U.S, NUCLEAR IIEGULATO Y COMMISSION DOCKET NUM GER
~P TS)'RC FI 50-250 NUM OE R DISTRII3UTION Fon'ART 50 DOCICET MATERIAL LE MONTIILY REPORT U.S. NRC FROM:
'lorida Power & Light Co.
DATE OF DOCUMENT 7-2-76 Miami, Florida DATE RECEIVED A. D. Schmidt
'7-16-76s Is 4 f9LETTER I 'NOTORIZED El OR I GIMBAL PROP INPUT FORM '
s NUMOER OF COPIES RECEIVED KIUNCLASS I F I E D ~
~CDZW I I
DESCRIPTION its -LETTER TRANS THE FOLL(MING:-. VIONTHLY, REPORT FOR Ju le, 19/6 c:
~ ~ 'pc4. I ~
6'i
'I
~
~
s -' ~
PLANT & COMPO¹NT OPERABXLXTY &'s's sw Qeus AVAILABILITY ~ THXS REPORT TO BE USED XN s
~ ~
~
PREPARING GRAY BOOK BY PLANS & OPERATIONS Turkey Pt. //3 & 0 il s S
FOR ACTION/INFORMATION
=- - =M.IPG-
-CYS FOR AC ON
-. INTFRNAL D ISTRI BUTION C=PDR D
- BRANCH CHIEF I EXTCRNAL OISTRIOUT.ION CON TRPL NuMIIF.R 7119
~ r ."
1 p~,"P( g
/
P.O. BOX 013100, MIAMI, FLORIDA 33101 FLORIDA POWER
~ 8I L'IGHT
+(lg
~Sf COMPANY
/
C y 2, 1976
/'@
fI (
~@Pc.
Office of Management T.nformatio and Program Controls U. S. Nuclear Regulatory Commissi QK k, L ~,p".-
~~'.,+
CP g
Washington, D. C. 20555 Gentlemen:
Attached are the June, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit No. 1.
Very truly yours, D. Schmidt Vice President.
Power Resources Ig VTC/PM Attachments Crj cc: Mr. Norman C. Moseley Jack R. Newman, Esquire HELPING BUILD FLORIDA
'I
) 1
,J 1
4 i
I P LI - 4~
1
APPENDIX C OPERATING DATA REPORT
. DOCKET NO. 50 - 250 UNIT. Turkey Point Unit No.
Julv 2, 1976 3'ATF REPORT MONTH June 1976 COMPLETED BY V. T. Chilson (305) 552 3830 TELEPHONE OPERATXNG STATUS
- 1. REPORTING PERIOD: 0001 76 06 01 GROSS HOURS ZN REPORTING PERIOD: 720.0 THROUGH 2400'6' ~
LEVEL (MWt):
,, 2~ CURRENT DESIGN ELECTRICAL RATING (MWe-Net
- 3. POWER LEVEL'O WfiXCH RESTRXCTED (IF ANY) (MWe-Net): ~0~
4~ REASONS FOR RESTRXCTION (ZF ANY):
THIS MONTH YEAR TO DATE'UMULATIVE 5,
6~
7.
NUMBER OF HOURS REACTOR WAS REACTOR RESERVE SHUTDOWN HOURS GENERATOR ON HOURS CRITICAL.....
~ ~ ~ ~ ~
LXNE...........'.......
~ ~
521.6 507.7 3
3 765.9 64.2 693.6 '4 25 046.0 67.4 063.6 10 ~
UNIT RESERVE GROSS SHUTDOWN HOURS ELECTRICAL ENERGY GENERATED (MWH) ..
~ .
~5'8 345 900
~6 0 2 541 660 4~66 85.0 14 556 896 ll. NET ELECTRICAL ENERGY GENERATED (MWH), . 327 163 2 412 045 13 767 807 12 REACTOR SERVICE FACTOR...........; 4 80.0 13 'EACTOR AVAILABZLXTYFACTOR.. ~ ........... : 72.4 87.7 80.2
- 14. UNIT SERVXCE FACTOR..... . ~ . .......... ~ ~ 70.5 84. 6 76:8 15 ~ UNIT AVAILABILITYFACTOR- - - - ~ 8 6 77 1
- 16. UNIT CAPACITY FACTOR (Using MDC)......... 68.2 82.9 67.O
- 17. UNIT CAPACITY FACTOR (Using Design MWe).. '5.6 79.7 ~6
- 18. UNIT FORCED OUTAGE RATE.. .. ~ ... .~. . 0.5 0.2 3.3 19 'HUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE~ DATE~ AND DURATION OF EACH):
Refueling, maintenance, and inspections - October 4 through November 14, 2.976
- 20. 'F SHUTDOWN AT END OF REPORT PERIODS'STXMATED DATE OF'TARTUP:
21 UNXTS IN,TEST STATUS (PRIOR TO COMMERCIAL OPERATION):" FORECAST ACHIEVED XNITIAL CRITICALITY INITIAL ELECTRICITY COf&fERCIAL OPERATION
P APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DocKET No. 0 250 UNIT Turkey Point Unit No. 3 July 2, 1976 COMPLETED BY V. T. 'hilson MONTH DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 17 667 18 667 116 19 661 20 674
~ 22 669 23 662 24 592 25 10 669 26 496 549 27 656 12 67 28 ~
585 13 672 29 657 672 30 659 15 16 668 NOTE: Daily average power'level .
greater than 666 M'le due to cooler condenser cooling water.
0 APPENDIX D DOCKET NO. 50 " 250 REASON UNIT SHUTDOWNS AND POWER REDUCTIONS . UNIT NATE- 'urkey Point Unit No: 3 A: EQUIPMENT FAILURE (EXPLAIN)
B: MAINT. OR TEST . J
. DATE July 2, 1976 C: FZFUELING D: PZGULATORY RESTRiCTION coMPLF TED BY' T Chilson E: OPERATOR TRAINING AND LICENSE EXAMINATION ~
' TELEPHONE (3 5) 552 3830 F: ADMINISTRATIVE G: OPERATIONAL ERROR.(EXPLAIN H: OTHER (EXPLAIN)
PAGE ONE OF T'AO METHOD OF l: MANUAL TYPE SHUTTING DOWN 2: MANUAL SCRAM F: FORCED DURATION THE REACTOR OR 3: AUTOMATIC SCRAM NO. DATE S: SCHEDULED (HOURS) REASON(l) REDUCING POWER(2) CORRECTIVE ACTIONS COMMENTS 4: OTHER (EXPLAIN),
12 76-05-2 S -
.64.8 A'ETHOD A Unit No. 3 was removed from service to locate arid repair tube leak in steam generator No. 3A. There. were no significant quantities of. radioactive materials released as a result of this small leak. Corrective action was to plug the leaking tube.. (Nuclear System) 13'6-06-0 13 A 3 Reactor was tripped by momentary actuation of a relay in the reactor protec'tion system. Corrective action included cleaning associated relay contacts. (Nuclear System)
A'nit 14 76-06-1 . N/A Load reduction due to low boron concentration in the boron injection tank. Corrective action taken was to increase boron concentration in the boron injection tank.
( Nuclear .System) 15 76-06-2 144.9 No. 3 was removed from service to locate and repair tube leak in steam generator No. 3C. There were no significant quantities of radioactive materials released as a result of this. small leak. Corrective action v:as to plug the'leaking tube. (Nuclear System)
~, t A d
, . ~
APl3ENLQX u I
~SO ,UNIT.SHUTDONNS AND POi'TER REDUCTXONS UNIT NAME'urkey Point Unit No. 3 A EQUIPaKNT A'AILURE (EXPLAIN)
B: MitTNT. OR TEST l DitTE July 2, 1976 C: J"':FUELING D: REGULATORY RESTRICTXON COMPLETED. BY V. T. Chilson E: OPERATOR TRAINING AND LICENSE EXrgMINATXON TELEPHONE 305) 552 38 0 F: ADMINISTRATIVE REPORT MONTH June 1 76.
G: OPERATZOl'AL ERROR (EXPLAIN)
H: OTHER (EXPLAIN) PAGE TRIO OF 'BIO l K'HOD METHOD OP 1: MANUAL TYPE SHUTTING DOKN 2: vZsNUAL SCRAM P: FORCED 'URATION THE REACTOR OR 3: AUTO!DTXC. SCRAM NO. DATE S SCHEDULFD (HOURS) REASON (1) REDUCING PO'HER(2) CORRECTIVE ACTIONS/COMMENTS 4: OTHER (EXPLAIN) 16 6-06-28 1.3 Reactor was tripped during the performance of power range nuclear instrumentation. system test when a second power range channel was removed 'from service, in error.
(Nuclear System)
Unit No. 3 was returned'to service on June 3, 1976 following completion of repairs to steam generator No. 3A.
Unit operated at approximately 100 g R.P. during month except for load reduction on June 11, 1976, outage of june 20 -'26, 1976, and outage of "June 28, 1976.
a
I APPENDIX C OPEPATING DATA REPORT
~ ~ DOCKET NO. 50 251 UNIT Turne Point Unit No. 4 REPORT MONTH June 1976 DATE July 2, 1976 COMPLETED BY V. T. Chilson TELEPHONE ( 305) 552 3830 OPERATING STATUS
- 1. REPORTING PERIOD:QQO1 76 Q6 01 GROSS HOURS, IN REPORTING PERIOD: 72Q.O 2400, 76, 06, 30 2.
THROUGH CURRENTL i MAX. DEPEND. CAPACITY (YiWe-Net):
LEVEL (lÃt) - 2 209
- 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): NONE 4 REASONS FOR RESTRICTION (XF ANY):
THIS MONTH YEAR TO DATE 'CUMULATIVE 4
6~ REACTOR RESERVE SHUTDOWN HOURS ~ ~
'. ~::; ~ ~
117.1
... 17 431.8 7.
8 HOURS GENERATOR ON UNIT RESERVE SHUTDOWN LINE.;.. .
HOURS...
. ~
. ~ ~ .
'0- 1
- 6 9 5~6r '66>>84 3.P. GROSS ELECTRXCAL ENERGY GENERATED (MWH) .. 172 100 1 833 701 11 812 778 NET ELECTRICAL ENERGY GENERATED (MWH) ~ ~
ll 194 915
- 12. REACTOR SERVICE FACTOR...........; . 66.1 74.0
'r
- 13. REACTOR AVAILABILITYFACTOR. ~ ...... ~ ~ ~ ~ ~ ~
66.0 66.1 74.5
- 14. UNXT SERVICE FACTOR....;.....'...
\
48.3 62.2 69..6
- 15. UNIT AVAILABILITYFACTOR. 48 3 62.2 69.6
- 16. UNXT CAPACITY FACTOR (Using MDC)... 32.8 59.7 68.0
- 17. UNIT CAPACITY FACTOR (Using Design MWe).. 31 5 57.4 64.5
- 18. UNIT FORCED OUTAGE RATE. ~ -----..- .'. 28.8 6.8 19 'HUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE~ AND DURATION OF EACH):
NONE 2P..'F SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 21. UNITS ZN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):, FORECAST ACHIEVED ZNXTXAL CRITICALITY XNITXAL ELECTRXCXTY COMMERCIAL OPERATION I r
APPENDIX B AVERAGE DAXLY UNIT POWER LEVEL DOCZET NO.
UNyT Turkey Point Unit No. 4 DATE r ~ )
'OMPLETED BY V. T. Chilson TELEPHONE 2-MONTH June 1976 DAY AVERAGE DAlLY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (NWe-Net) (Mfe-Net)
~
17 18 19 210 20 222 21 225" 22 192 23 488 679 24 67g-10 26 681 a
298 27 671 12 280 28 666 13 29 663 14 30 .662 15 16 50 NOTE:, , Daily average..power level greater than 666 MNe due to cooler condenser cooling water.
I
'I r "i I
Il
APPENDIX D DOCKET NO. 50 251 REASON A: EQUIPMENT FAILURE (EXPLAIN)
UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Turkey Point Unit hfo. 4 B: K'tINT. OR TEST C: REFUELING
~ DATE July 2, 1976 D: REGULATORY RESTRXCTXON E: OPERATOR TRAINING AND COMPLETED-BY V LICENSE EXAMXNATION Fv ADMI¹STRATIVE TELEPHONE ( 305 ) 552 3830 G: OPERATIONAL ERROR (EXPLAT i REPORT MONTH tune 1976 H: OTHER (EXPLAIN) /
<<)
l2:-'AN METHOD UAL i TYPE METHOD OF SHUTTING DOWN MANUAL SCXN F: FORCED DURATION THE REACTOR OR 3: AUTO??ATXC SCRAM NO. DATE S: SCHEDULED (HOURS) REASON(l) REDUCING POWER(2) 4 OTHER {EXPLAIN)
ACTIONS/COMMENTS 10 6-04-18 232.0 C (142.0)
B ( 90.0;)
'ORRECTIVEUnit No. 4 was removed maintenance, and from service for inspections. (Nuclear qcheduled refueling, and Non-Nuclear Systems) 6-06-10 2,4 Reactor tripped on high steam flow coincident with low Tavg.
Corrective action was te return the steam flow measuring instrumentation to an operable condition.
12 6-06-12 F 88. 4 A* Unit No. 4 was'removed from service to locate and correct cause of low boron concentration in the boron injection tank.
Corrective action included repairing boron injection tank inlet valves. (Nuclear System)
-13 6-06-17 46.6 A Unit No. 4 was removed from service to locate and repair condenser tube leaks. (Non-Nuclear System) 14 6-06-22 3.0 A 3 Reactor was tripped on steam generator No. 4A low level coincident with steam flow greater than feedwater flow.
during transient condition caused by momentary drop in turbine control oil system pressure. (Non-Nuclear System) su'nmnx:. Unit No. d vas returned to service on June 10, 1976 follovving completion of scheduled outage for refueling, maintenance, and inspections. -The unit operated at approximately 100 g R.p. from June 23, 1976 through end of month after.'completion of repairs to condenser and boron injection tank inlet valves.
0 1
il
~
+ 'll ~1 f 7'p~ H 'C
APPENDIX C OPERATING DATA REPORT DOCZZT NO. 50.- 335 UNIT St. Lucie Unit No. 1 REPORT MONTH June 1976 DATE July 2, 1976 COMPLETED BY V. T. Ohilson TELEPHONE (305) 552 - 3830 OPERATING STATUS 1v 2
REPORTING PERIOD CURRENTL 4, 6,~2359r 76m 06p MAx. DEPEND. cAPAcITY (Mwe-Net):
DESIGN ELECTRXCAL RATING (MWe-Net):
28 GROSS LEVEL (MWt): 2 560 HOURS 02 02 IN REPORTING PERIOD ~
Estimated)-
48.0
- 3. POWER LEVEL TO WHICH RESTRICTED (ZF ANY) (MWe-Net): 722 4~ REASONS POR RESTRICTION (IF ANY):
"Temporary 90% restriction pending reactor coolant flow analysis" e
THXS MONTH YEAR TO DATE CUMULATIVE
'8.0 48.0 6~ REACTOR RESERVE SHUTDOWN HOURS. ~ ~
7~ HOURS GENERATOR ON LINE. . . .... 48-0 48.0 48.0 UNIT RESERVE SHUTDOWN HOURS. . ~ ~ ~ ~ ~ ~
-'0- 9~ GROSS THERMAL ENERGY GENERATED (KM) .. ~ 97 690 97 690 97 690 10 GROSS ELECTRICAL ENERGY GENERATED (MWH) 28 170 28, 170 (If') 26 099 26 099 11.
12.
13 NET ELECTRXCAL ENERGY GENERATED REACTOR SERVXCE PACTOR.
REACTOR AVAILABILITYFACTOR
-.o.-
~ ~ .
. '00.0. ~ .~
100.0 100.0 100.0 100.0
- 14. UNIT SERVICE FACTOR................... .. 100.0 100. 0 100.0 15 UNIT AVAX~ILZTYFACTOR.....'............ 100.0 100.0 100.0
- 16. UNXT CAPACITY FACTOR (Using MDC)......... 67.8 67.8.
- 17. UNIT CAPACITY FACTOR (Using Design MWe).. 67.8 67.8 18 UNXT FORCED OUTAGE RATE . ....... . ... ~ . 19. SHUTDOWNS SCHEDULED OVER NEXT,6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
NONE 20.; IP SHUTDOWN AT END OP REPORT PERZOD,.ESTIMATED DATE OF STARTUP:
21, UNZTS ZN TEST STATUS (PRXOR TO COMMERCIAL OPERATXON):, FORECAST ACHIEVED INITIAL CRXTXCALITY April 22, 1976 INITIALELECTRXCXTY ~Ma 7, 1976 COMMERCIAL OPERATION June 28, 1976
~ ~
el
APPENDIX B WVZRAGE DAILY UNIT POWER LEVEL DOCKET NO UNIT St. Lucie Unit No. 1 DATE COMPLETED BY TELEPHONE( 05 552-3830
~~MONTH
.'.~~JAY QVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL
-'4M'-Net) (MWe-Net) 17 18 19 20 21
.22 8 24 25 3.0
'27
- 12 28 29 541 30 5 6
'Z6 (1) NOTE: .St. Lucie Unit No. 1 was placebo in at 11:59 p.m.
c'ommerical'peration June 28, 1976.
?
C L
'NIT 4 ~
APPENDIX D DOCKET NO. 50- 5 REASON ~ ~ SHUTDOWNS AND POWER REDUCTIONS UNIT NAPPE St. Lucie Unit No. 1 A: EQUIPMENT FAXLURE. (EXPLAIN)
B:
.C:
MAINT. OR TEST REFUELING
~ DATE Sul 2 l 6.
D: FXGULATORY RESTRICTION COl 1PLETED . BYV. T. Chilson
.E: OPERATOR TRAINING AND LICENSE EXAMINATION TELEPHONE 552 8 ADMINISTRATIVE REPORT MONTH OPERATIONAL ERROR (EXPLA OTHER (EXPLAIN) '
METHOD METHOD OF 1: YWlUAL TYPE SHUTTING DOWN 2: MANUAL SCRAM Ft FORCED DURATION THE REACTOR OR 3: AUTOMATXC SCRAM NO. S! SCHEDULED (HOURS) REASON (1) REDUCING POWER(2) CORRECTIVE ACTIONS COMMENTS 4: OTHER {EXPLAIN)
NONE
SUMMARY
St. Lucia Unit, Uo. 1 vaa placed in commerical operation on June 28, 1976 at 11:59 p;m.
Unit operated at approximately 80 0 R.P, through end of month.