U.S, NUCLEAR IIEGULATO Y COMMISSION NAG ARM 195

~P TS)'RC DISTRII3UTIONFon'ART 50 DOCICET MATERIAL DOCKET NUM GER 50-250 FI LE NUMOE R MONTIILY REPORT U.S.

NRC FROM:'lorida Power

& Light Co.

Miami, Florida A. D. Schmidt DATE OF DOCUMENT 7-2-76 DATE RECEIVED

'7-16-76s Is 4 f9LETTER I ElORI GIMBAL

~CDZW

'NOTORIZED KIUNCLASS I F I E D

~

PROP INPUT FORM '

s I

I NUMOER OF COPIES RECEIVED its DESCRIPTION

-LETTER TRANS THE FOLL(MING:-.

c: c4.

I

~

6'i ~

s

~

~ ~'p

'I

~

VIONTHLY, REPORT FOR Ju le, 19/6 PLANT & COMPO¹NT OPERABXLXTY &'s's s

sw Qeus ~

~

AVAILABILITY

~

THXS REPORT TO BE USED XN

~

PREPARING GRAY BOOK BY PLANS & OPERATIONS Turkey Pt.

//3

& 0 il s

S

=-

- =M.IPG-

-CYS FOR AC ON FOR ACTION/INFORMATION

-. INTFRNALDISTRI BUTION C=PDR D

BRANCHCHIEF I EXTCRNALOISTRIOUT.ION CONTRPL NuMIIF.R 7119

~ r."

1 p~,"P( g

/

P.O.

BOX 013100, MIAMI, FLORIDA 33101

+(lg

~

~Sf FLORIDA POWER 8I L'IGHT COMPANY

/

C y 2, 1976

/'@

f I (

~@Pc.

L ~,p".-

Office of Management T.nformatio QKk, ~~'.,+

g and Program Controls CP U.

S. Nuclear Regulatory Commissi Washington, D. C.

20555 Gentlemen:

Attached are the June, 1976 Operating Status Reports for Turkey Point Unit Nos.

3 and 4 and St. Lucie Unit No. 1.

Very truly yours, D. Schmidt Vice President.

Power Resources VTC/PM Attachments cc:

Mr. Norman C. Moseley Jack R.

Newman, Esquire Ig Crj HELPING BUILD FLORIDA

'I

)

1

,J 1

4 P

LI

- 4~

i I 1

APPENDIX C OPERATING DATA REPORT REPORT MONTH June 1976

. DOCKET NO. 50 - 250 UNIT. Turkey Point Unit No.

3'ATF Julv 2, 1976 COMPLETED BY V. T.

Chilson TELEPHONE (305) 552 3830 OPERATXNG STATUS 1.

REPORTING PERIOD: 0001 76 06 01 GROSS HOURS ZN REPORTING PERIOD:

720.0 THROUGH 2400'6'

~

,, 2 ~

CURRENT LEVEL (MWt):

DESIGN ELECTRICAL RATING (MWe-Net 3.

POWER LEVEL'O WfiXCH RESTRXCTED (IF ANY) (MWe-Net): ~0~

4 ~

REASONS FOR RESTRXCTION (ZF ANY):

64.2 67.4 7.

HOURS GENERATOR ON LXNE...........'.......

507.7 3 693.6'4 063.6 6 ~

REACTOR RESERVE SHUTDOWN HOURS ~ ~ ~ ~ ~

~ ~

THIS MONTH YEAR TO DATE'UMULATIVE 5,

NUMBER OF HOURS REACTOR WAS CRITICAL.....

521.6 3 765.9 25 046.0 UNIT RESERVE SHUTDOWN HOURS........

~.

0 85.0

~5'8 ~6 4~66 10 ~

GROSS ELECTRICAL ENERGY GENERATED (MWH)..

345 900 2 541 660 14 556 896 ll.

NET ELECTRICAL ENERGY GENERATED (MWH),

327 163 2 412 045 13 767 807 12 REACTOR SERVICE FACTOR...........;

4 80.0 13 'EACTOR AVAILABZLXTYFACTOR..

~...........

72.4 87.7 80.2 14.

UNIT SERVXCE FACTOR.....

. ~...........

~ ~

70.5

84. 6 76:8 15 ~

UNIT AVAILABILITYFACTOR- - - - ~

8 6

77 1 16.

UNIT CAPACITY FACTOR (Using MDC).........

68.2 82.9 67.O 17.

UNIT CAPACITY FACTOR (Using Design MWe).. '5.6 79.7

~6 18.

UNIT FORCED OUTAGE RATE....

~...

~.

0.5 0.2 3.3 19 'HUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE~

DATE~ AND DURATION OF EACH):

Refueling, maintenance, and inspections - October 4 through November 14, 2.976

20. 'F SHUTDOWN AT END OF REPORT PERIODS'STXMATED DATE OF'TARTUP:

21 UNXTS IN,TEST STATUS (PRIOR TO COMMERCIAL OPERATION):"

FORECAST ACHIEVED XNITIALCRITICALITY INITIALELECTRICITY COf&fERCIAL OPERATION

P

APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DocKET No.

0 250 UNIT Turkey Point Unit No. 3 July 2, 1976 COMPLETED BY V. T. 'hilson MONTH DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 10 12 13 116 674 669 662 592 669 549 67 672 672 17 18 19 20

~

22 23 24 25 26 27 28 29 30 667 667 661 496 656

~585 657 659 15 16 668 NOTE:

Daily average power'level greater than 666 M'le due to cooler condenser cooling water.

0

REASON A:

EQUIPMENT FAILURE (EXPLAIN)

B:

MAINT. OR TEST J

C:

FZFUELING D:

PZGULATORY RESTRiCTION E:

OPERATOR TRAINING AND LICENSE EXAMINATION

~

F:

ADMINISTRATIVE G:

OPERATIONAL ERROR.(EXPLAIN H:

OTHER (EXPLAIN)

APPENDIX D UNIT SHUTDOWNS AND POWER REDUCTIONS.

PAGE ONE OF T'AO

. DATE July 2, 1976 coMPLFTED BY' T

Chilson TELEPHONE (3 5) 552 3830 DOCKET NO.

50 " 250 UNIT NATE- 'urkey Point Unit No:

3 METHOD l:

MANUAL 2:

MANUAL SCRAM 3:

AUTOMATIC SCRAM 4:

OTHER (EXPLAIN),

NO.

DATE 12 76-05-2 14 76-06-1 13'6-06-0 TYPE F:

FORCED S:

SCHEDULED S

DURATION (HOURS)

-.64.8 13.

REASON(l)

A A

A'ETHOD OF SHUTTING DOWN THE REACTOR OR REDUCING POWER(2) 3 N/A CORRECTIVE ACTIONS COMMENTS Unit No. 3 was removed from service to locate arid repair tube leak in steam generator No. 3A.

There. were no significant quantities of. radioactive materials released as a result of this small leak.

Corrective action was to plug the leaking tube..

(Nuclear System)

Reactor was tripped by momentary actuation of a relay in the reactor protec'tion system.

Corrective action included cleaning associated relay contacts.

(Nuclear System)

Load reduction due to low boron concentration in the boron injection tank.

Corrective action taken was to increase boron concentration in the boron injection tank.

( Nuclear.System) 15 76-06-2 144.9 A'nitNo.

3 was removed from service to locate and repair tube leak in steam generator No. 3C.

There were no significant quantities of radioactive materials released as a result of this. small leak.

Corrective action v:as to plug the'leaking tube.

(Nuclear System)

~,

t A

d

~SO A

EQUIPaKNT A'AILURE (EXPLAIN)

B:

MitTNT.

OR TEST l

C:

J"':FUELING D:

REGULATORY RESTRICTXON E:

OPERATOR TRAINING AND LICENSE EXrgMINATXON F:

ADMINISTRATIVE G:

OPERATZOl'AL ERROR (EXPLAIN)

H:

OTHER (EXPLAIN)

~

APl3ENLQX u

,UNIT.SHUTDONNS AND POi'TER REDUCTXONS REPORT MONTH June 1 76.

PAGE TRIO OF 'BIO I

UNIT NAME'urkey Point Unit No.

3 DitTE July 2, 1976 COMPLETED. BY V. T.

Chilson TELEPHONE 305) 552 38 0 lK'HOD 1:

MANUAL 2:

vZsNUAL SCRAM 3:

AUTO!DTXC. SCRAM 4:

OTHER (EXPLAIN)

NO.

16 DATE 6-06-28 TYPE P:

FORCED S

SCHEDULFD

'URATION (HOURS) 1.3 REASON (1)

METHOD OP SHUTTING DOKN THE REACTOR OR REDUCING PO'HER(2)

CORRECTIVE ACTIONS/COMMENTS Reactor was tripped during the performance of power range nuclear instrumentation. system test when a second power range channel was removed 'from service, in error.

(Nuclear System)

Unit No.

3 was returned'to service on June 3, 1976 following completion of repairs to steam generator No. 3A.

Unit operated at approximately 100 g R.P. during month except for load reduction on June 11, 1976, outage of june 20 -'26, 1976, and outage of "June 28, 1976.

a

I

APPENDIX C OPEPATING DATA REPORT

~

~

DOCKET NO.

50 251 REPORT MONTH June 1976 UNIT Turne Point Unit No. 4 DATE July 2, 1976 COMPLETED BY V. T.

Chilson TELEPHONE

( 305) 552 3830 OPERATING STATUS 1.

REPORTING PERIOD:QQO1 76 Q6 01 GROSS HOURS, IN REPORTING PERIOD:

72Q.O THROUGH

2400, 76, 06, 30 2.

CURRENTL i

LEVEL (lÃt) - 2 209 MAX. DEPEND.

CAPACITY (YiWe-Net):

3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net):

NONE 4

REASONS FOR RESTRICTION (XF ANY):

THIS MONTH YEAR TO DATE 'CUMULATIVE 4

6 ~

REACTOR RESERVE SHUTDOWN HOURS

~

~ '. ~::; ~

~ 7.

HOURS GENERATOR ON LINE.;..

~.

~ ~. 8 UNIT RESERVE SHUTDOWN HOURS..........,'0- :6 9

5~6r 3.P.

GROSS ELECTRXCAL ENERGY GENERATED (MWH)..

172 100 1 833 701 NET ELECTRICAL ENERGY GENERATED (MWH) ~ ~

117.1 17 431.8 1 '66>>84 11 812 778 ll 194 915 12.

REACTOR SERVICE FACTOR...........;

'r 13.

REACTOR AVAILABILITYFACTOR.

~......

~ ~ ~

~ ~ ~

66.0

. 66.1 66.1 74.0 74.5 14.

15.

16.

UNXT SERVICE FACTOR....;.....'...

\\

UNIT AVAILABILITYFACTOR.

UNXT CAPACITY FACTOR (Using MDC)...

48.3 48 3 32.8 62.2 62.2 59.7 69..6 69.6 68.0 17.

UNIT CAPACITY FACTOR (Using Design MWe)..

31 5

18.

UNIT FORCED OUTAGE RATE.

~ -----..-.'.

28.8 57.4 6.8 64.5 19 'HUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE~ AND DURATION OF NONE EACH):

2P..'F SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

21.

UNITS ZN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):,

FORECAST ACHIEVED ZNXTXAL CRITICALITY XNITXALELECTRXCXTY COMMERCIAL OPERATION I

r

APPENDIX B AVERAGE DAXLY UNIT POWER LEVEL r

~)

DOCZET NO.

UNyT Turkey Point Unit No. 4 DATE

'OMPLETED BY V. T.

Chilson TELEPHONE 2-MONTH June 1976 DAY AVERAGE DAlLY POWER LEVEL (NWe-Net)

DAY AVERAGE DAILY POWER LEVEL (Mfe-Net)

~17 18 10 12 13 14 15 16 298 280 50 19 20 21 22 23 24 26 27 28 29 30 NOTE:,

210 222 225" 192 488 679 67g-681 671 666 663

.662

, Daily average..power level greater than 666 MNe due to cooler condenser cooling water.

a

I

'I r "i I

Il

Fv G:

H:

REASON A:

EQUIPMENT FAILURE (EXPLAIN)

B:

K'tINT. OR TEST C:

REFUELING D:

REGULATORY RESTRXCTXON E:

OPERATOR TRAINING AND LICENSE EXAMXNATION ADMI¹STRATIVE OPERATIONAL ERROR (EXPLAT i OTHER (EXPLAIN)

/

APPENDIX D UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH tune 1976 DOCKET NO.

50 251 UNIT NAME Turkey Point Unit hfo.

4

~ DATE July 2, 1976 COMPLETED-BY V TELEPHONE

( 305 )

552 3830

<<)

METHOD l-'ANUAL i

2:

MANUAL SCXN 3:

AUTO??ATXC SCRAM 4

OTHER {EXPLAIN)

NO.

10 12

-13 14 DATE 6-04-18 6-06-10 6-06-12 6-06-17 6-06-22 TYPE F:

FORCED S:

SCHEDULED F

DURATION (HOURS) 232.0 2,4

88. 4 46.6 3.0 REASON(l)

C (142.0)

B ( 90.0;)

A*

A A

METHOD OF SHUTTING DOWN THE REACTOR OR REDUCING POWER(2) 3

'ORRECTIVE ACTIONS/COMMENTS Unit No. 4 was removed from service for qcheduled refueling, maintenance, and inspections.

(Nuclear and Non-Nuclear Systems)

Reactor tripped on high steam flow coincident with low Tavg.

Corrective action was te return the steam flow measuring instrumentation to an operable condition.

Unit No. 4 was'removed from service to locate and correct cause of low boron concentration in the boron injection tank.

Corrective action included repairing boron injection tank inlet valves.

(Nuclear System)

Unit No. 4 was removed from service to locate and repair condenser tube leaks.

(Non-Nuclear System)

Reactor was tripped on steam generator No. 4A low level coincident with steam flow greater than feedwater flow.

during transient condition caused by momentary drop in turbine control oil system pressure.

(Non-Nuclear System) su'nmnx:. Unit No. d vas returned to service on June 10, 1976 follovving completion of scheduled outage for refueling, maintenance, and inspections.

-The unit operated at approximately 100 g R.p. from June 23, 1976 through end of month after.'completion of repairs to condenser and boron injection tank inlet valves.

0 1

il

~

+ 'll

~ 1 f 7'p~

H

'C

APPENDIX C OPERATING DATA REPORT REPORT MONTH June 1976 DOCZZT NO. 50.- 335 UNIT St. Lucie Unit No. 1 DATE July 2, 1976 COMPLETED BY V. T.

Ohilson TELEPHONE (305) 552 - 3830 OPERATING STATUS 1 v REPORTING PERIOD 2359r 76m 06p 28 GROSS HOURS IN REPORTING PERIOD ~

4, 6,~

2 CURRENTL LEVEL (MWt): 2 560 MAx. DEPEND. cAPAcITY (Mwe-Net):

02 Estimated)-

DESIGN ELECTRXCAL RATING (MWe-Net):

02 3.

POWER LEVEL TO WHICH RESTRICTED (ZF ANY) (MWe-Net):

722 4 ~

REASONS POR RESTRICTION (IF ANY):

"Temporary 90% restriction pending reactor coolant flow analysis" e

THXS MONTH YEAR TO DATE

'8.0 48.0 CUMULATIVE 48.0 6 ~

REACTOR RESERVE SHUTDOWN HOURS. ~ ~

7 ~

HOURS GENERATOR ON LINE.

48-0 UNIT RESERVE SHUTDOWN HOURS.

. ~

~

~ ~ ~

~

-'0-9 ~

GROSS THERMAL ENERGY GENERATED (KM)..

~

97 690 10 GROSS ELECTRICAL ENERGY GENERATED (MWH) 11.

NET ELECTRXCAL ENERGY GENERATED (If')

12.

REACTOR SERVXCE PACTOR.

-.o.-

. '00.0 13 REACTOR AVAILABILITYFACTOR

~ ~.

. ~

. ~

14.

UNIT SERVICE FACTOR...................

100.0 15 UNIT AVAX~ILZTYFACTOR.....'............

100.0 16.

UNXT CAPACITY FACTOR (Using MDC).........

17.

UNIT CAPACITY FACTOR (Using Design MWe)..

18 UNXT FORCED OUTAGE RATE........

~. 48.0 97 690 28 170 26 099 100.0 100.0 100. 0 100.0 67.8 67.8 48.0 97 690 28, 170 26 099 100.0 100.0 100.0 100.0 67.8.

67.8 19.

SHUTDOWNS SCHEDULED OVER NEXT,6 MONTHS (TYPE, DATE, AND DURATION OF NONE EACH):

20.; IP SHUTDOWN AT END OP REPORT PERZOD,.ESTIMATED DATE OF STARTUP:

21, UNZTS ZN TEST STATUS (PRXOR TO COMMERCIAL OPERATXON):,

FORECAST ACHIEVED INITIALCRXTXCALITY INITIALELECTRXCXTY COMMERCIAL OPERATION April 22, 1976

~Ma 7,

1976 June 28, 1976

~

~

el

APPENDIX B WVZRAGE DAILY UNIT POWER LEVEL DOCKET NO UNIT St. Lucie Unit No.

1 DATE COMPLETED BY TELEPHONE(

05 552-3830

~~MONTH

.'.~~JAY QVERAGE DAILY POWER LEVEL

-'4M'-Net)

DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 17 18 19 20 21

.22 8

3.0

- 12 24 25

'27 28 29 30 541 5 6

'Z6 (1) NOTE:

.St. Lucie Unit No. 1 was placebo in c'ommerical'peration at 11:59 p.m.

June 28, 1976.

?

C L

APPENDIX D 4

~

DOCKET NO.

50-5 REASON

~

~

A:

EQUIPMENT FAXLURE. (EXPLAIN)

B:

MAINT. OR TEST

.C:

REFUELING D:

FXGULATORY RESTRICTION

.E:

OPERATOR TRAINING AND LICENSE EXAMINATION ADMINISTRATIVE OPERATIONAL ERROR (EXPLA OTHER (EXPLAIN)

' 'NIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH

~ DATE Sul 2 l 6.

COl 1PLETED. BYV. T.

Chilson TELEPHONE 552 8

UNIT NAPPE St. Lucie Unit No. 1 METHOD 1:

YWlUAL 2:

MANUAL SCRAM 3:

AUTOMATXC SCRAM 4:

OTHER {EXPLAIN)

NO.

TYPE Ft FORCED S!

SCHEDULED DURATION (HOURS)

REASON (1)

METHOD OF SHUTTING DOWN THE REACTOR OR REDUCING POWER(2)

CORRECTIVE ACTIONS COMMENTS NONE St. Lucia Unit, Uo.

1 vaa placed in commerical operation on June 28, 1976 at 11:59 p;m.

SUMMARY

Unit operated at approximately 80 0 R.P, through end of month.

g4 0

I T

'i I t p l H

1 U

IU