NRC FORM 195 U.S, NUCLEAR REGULATORV CO SSION DOCKET NUMB I2 76I 0-335 25 FILE NUMBE NRC DISTRIBUTION FDR PART 50 DOCKET MATERIAL MONTHLY REPORT TO: F ROM PPL DATE OF DOCUMENT NHC Miami~ Pl. 33103, 0 Nozman C. Noseley DATE RECEIVED I 03-1II-QLEQE R>> QNOTORIZED PROP INPUT FORM NUMBER OF COPIES RECEIVED QORIGINAL Q UN I ED

-, QCOPV C LASS IF

) S) n~Z DESCRIPTION LETTER TRANS THE FOLLOWING: MONTHLY REPORT FOR FEBRUARY) 1977 PLANT & COMPONENT OPERABILITY &

(lan ) AVAILABILITY'HISREPORT TO BE USED PREPARING GRAY BOOK BY PLANS & OPERATIONS' IN (9x as)

PLANT NAME: muaZ POINT UNITS 3 a II

'XIQNOZ amejjy gem ST. LUCIE UNIT g 1 ACKNOWLEDGER .

I FOR ACTION/INFORMATION MIPC CYS FOR AC ON INTERNAL OISTRI BUTION BRANCH CHIEF L EXTERNAL OISTRI BUTION CONTROL NUMBER I ILAIL g2g7f Ogga/

f" QhL~fR TOM GQ QZQ UZI'ONZM

P. O. BOX 013100, MIAMI, FL 33101 FLORIDA POWER & LIGHT COMPANY March 7, 1977 Office Information "

and oZ Management Program Controls

~ 'QQG%~ ~

PeaII>C@'>

U. S. Nuclear Regulatory Commission P@

Washington, D. C. 20555 Gentlemen:

Attached'are the February 1977 Operating Status Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit No.

)

l. ye Very truly yours, A. D. Schmidt ~ t Vice President Power Resources VTC/DDC I

"<<fleam Attachments cc: Mr. Norman C. Moseley '.~(- j Fj)g~

Robert Lowenstein, Esquire

+eg I +

~ 'eg~~p~i~

WPgg a>o~saaWV PEOPLE... SERVING PEOPLE

g8qJjf g@

gggiag88

I

> Ql I sa .e ~

~ l Qll I

~ e I t f QI' ~ 'Ql

~ ~

o I I

~ ~

~

~

~ 0

APPENDZX C OPERATQfG DATA REPORT DO~ iVO.SO - 335 UNITSt. Lucie U i o REPORT MONTH Pebrua 1977 DATEMarch 2 1977 COMPLETED BYV. T. Chilson OPERATING STATUS TELEPHONE(>05) 552-3830 672.0 THROUGH

2. CUDDLY AUTHORIZED PO~R- LEVEL (NWt): 2560 MAR.DEPEND. CAPACITY (MWe-Net): s .)

DESIGN ELECTRICAL RA~0 (MWe-Net): 802

3. PO~ LEVEL TO WHICH RESTRICTED (ZF ANY) (MWe-Net):

4~ REASONS POR RESTRICTION (ZP A',K):

5.

6.

~c i ERS OP HOURS ACTOR WAS REACTOR RESERVE SHUTDOWN HOURS.

CRITICAL....

~ ~ ~ ~ ~ . ~ ~ ~ ~

~

+IS 630.6 MONTH 8.0 YEAR TO DATE 1 362.2 0.0 ~0.

~

CUMULATIVE

~2 7 ~ HOURS GEKRATOR ON"'LINE................... 600.0 1 299.2 1 563.2

'8 "

UNIT 'RESERVE SHUTDOWN HOURS;,...,...,.....

4 0.0: 0.0 0.0

9. GROSS TRERIIAL ENEIICT CATENATED (Nlllll...... ~1S 4
10. GROSS ELECZRZCAL EIIERCT GBIERATSD GIRR) ~ ~ . ~454 6 0 ~TRZOg I 001 060

~40 11.

IIET IKECZRZCAL ENERGT 0 IERATSO (IGIE)..... 426 256

~~

12. REACTOR SERVICE FACTOR 93-9 96. 2 96.8
13. RPACTOR AVAILABILITYFACTOR............... 93. 9 96.2 '6.8 14 ~ GNZZ SHIOZCE TACTOR ~ ~ ~ . ~ ~ ~ 894
15. IIEET ASAZLASZLZZT TACTOR ....... ~ ~ ~.~ ~ ~ ~ ~ ~ ~ 95 0
16. 'EGT CAPAC~ PA'CZOR (Using OCDC)........,. 81.6 75.8 71.4
17. UNIT CAPACITY PACTOR (Using Design ..We)... 79.1 73. 4 69.2
10. IRIIT SORCEO OGTAC RATE.................. ~0.
19. ShnDOWNS SCHEDIKZ) OVMT- NEZX 6 MONTHS ('AAPEG DATE, AND DURATION OP EACH):
20. ZF SHUTDOWN AT EA) OP ~ORT PKGODG ESTER') DATE OP.STARTUP:
21. UNITS Ql TEST STATUS (PRIOR TO COEKRCZAL OP~TIOÃ): PORECAST ACHIEVED LGTIAL CRITICALITY BGTZAL ELECTRICITY COMMERCIAL OPERATION

APPENDIX D DOCKET NO. 50 - 335 I) REASON h: EQUIPHEHT FAILURE (EXPIAIN)

UNIT SIIUTD(hltlS AND POWER REDUCTIONS UNIT NAHE St. Lucio Unit No. 1 R: HAINT. OR TEST C: REFUELIHC DATE Harch 2 1977 D: REGULATORY RESTRICTION E: OPERATOR TRAIIIIHC AND COHPLETED RY V. T. Chilson LICEtlSE EXAHIHATION Ft ADHIHISTRATIVE TELEPHONE (305) 552-3830 Ct OPERATIOHAI. ERROR (EXPLAIN)

II: OTIIER (EXPIAIN)

.') HETIIOD 1 t HhlilihL HETIIOD OF 2: .HAtlUAL SCRAH TYPE SIIUTXIHC DOWII 3: AUTOHATIC SCRAH F; FORCED DURATION THE REACTOR OR OliiER (EXPLAIN) NO. DATE S: SCHEDULED (IIOURS) REASOtl(l) REDUCIHC POWER(2) CORRECTIVE ACTIONS/COtIHEHTS 77-02-01 12.4 Partial loss of flow test (tripped one reactor coolant pump). Power Ascension Test Program.

77-02-02 20.0 Total loss of flow test (tripped all reactor coolant pumps). Power Ascension Test Program.

77-02-03 4.8 Loss of off-site power supply. Power Ascension Test Program.

77-02-20 13.8 Turbine tripped from approximately 100Z R.P. Power Ascension Test Program.

77-02-21 2.8 Unit tripped on low steam generator level during trans-ient condition while increasing load after the unit was returned to service from the power sscention turbine trip test.

77-02-21 18.2 Cenerator tripped from approximately 100Z R.P. Power Ascension Test Program.

SUHHARY: Power Ascension Test. Program continued during month.

APPENDIX B AVERAGE DAILY UNIT POWER LEV1D DOCKET NO. 50 250 LNIT Turkey Point Unit No. 3 DATE March 2, 1977 COMPLETED BY V. T. Chilson TEL'EPRONE (305) 552-3830 yON~ February 1977 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER L VEL (KVe-Net) (t5le-Net) 685 17 691 685 695 631 19 616 522 20 691 568 21 558 346 22 614 686 23 692 691 698 694 642 10 689 26 550 27 685 686'88 28 683 687 29 13'4 684 15 684 16 688 NOTE: Average daily power greater than 666 Kfe due to cooler condenser cooling water.

APPENDS C OPKtATZHC DATA REPORT DO~ NO 5 UNIT Turks Poi 0~ 3 REPORT MONTH Februe 1977 DATE Merch 2, 1977 COlAPLEAAD BY V. T. Chilson TELEPHONE 30 OPKQTZNC STATUS 2.

THROUGH 4 CCRRRRTLV AVZRORZZEO MAX.DEPE%. CAPACZTY POVS LEVEL (We-AHeC):

(RCC);~ 666

3. POUER LEVEL TO WHICH RESTRICTED (IP AHY) (Wie-Hec) c
4. REASONS FOR RESTRICTION (IF AHY):

THIS MOAAH YKEAR TO DATE CUAAATZVE

5. ~ii ERS OF HOURS ACTOR 'JAS CRZTICAL. ~ ~ ~ ~ 662.0 ~1 6~ REACTOR REScERVE SHUTDOWN EOURS........... ~ 0.0 0. 0
7. HOURS GERKRATOR ON LLRlE. ~ ~.... ~......,... ~ 656.0 923 0 ~27 962.
8. UNIT RESERVE SHUTDOVif HOURS. ~............. 0.0 0.0 . ~6.0 9, CROSS THEEARLEAL EilExlGY GENERATED @AH)...... 1 395 687 1 908 496 53 638 084
10. CROSS "LECTRZCAL LVERCX CLVESATEO (RAVI)... 457 227 622 992 ~ll 44 11 ~ HET ELECTRICAL EiitCY GENERATED (WAH)..... 435 126 588 601 16 264 586
12. REACTOR SERVICE FACTOR 98.5 74.2 78.3
13. REACTOR AVAZLA)IZLITIPACTOR ............... 96.5 ZAA 14 UNIT SERVZCE FACTOR.
15. IRIZT AVAZZARZLZZT PACTOR. ~ .. ~ ~ ~...." ~ ~ ~ ~ ~ 97.6
16. ORZT CAPA'CZZX .ACIOR (04406 OIDC)... ~ ~" ~ ~ ~7.2
17. UNIT CAPACZ cAC1'OR (Usta8 Desi'We)... 93.4 60.0 ~6.2 18 ~ UHIT FORCED OUTAGE RATE. ~ ~ >> ~ ~ ~ ~ ~ ~ ~ ~ ~ 2.4 2.6
19. SHUTDOWNS SCHEDULE) OVER ~i 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
20. IF SHUTDOWi AT EHD OP REPORT PERIOD, ESTDfATZ) DATE OF.STARTUP:
21. UNITS Qf TEST'TATUS (PRIOR TO COlOKRCIAL OPERATION): FORECAST ACHIEVED QfZTZAL CRITICALITY IAAZTIAL ELECTRICITY COMKRCZAL OPERATION

APPENDIX D DOCKET NO. 50 - 250 I) REASON h: EQUIPMENT PAILURE (EXPLAIN)

UNIT SHUTDOWNS AND POllER REDUCTIOHS UNIT NAME Turkey Point Unit Ho. 3 g: MAINT. OR TEST C: REPUELINC DATE Harch 2, 1977 D: RECULATORY RESTRICTIOH E: OPERATOR TRAIHIHC AND COMPLETED gY V. T. Chilson LICE!lSE EXAHINATIOH F: ADMINISTRATIVE TEI.EPNOHE (305) 552-3830 C: OPERATIONAL ERROR (EXPLAIN) REPORT HONTH Pebruar 1977 H: OTHER (EXPLAIN)

!) HETlND 1:- MANUAL METHOD OP 2: .MAHUAI. SCRAM TYPE SNUTTIHC DOWN 3: AU'ÃlSTIC SCRAH P; PORCED DURATION THE REACTOR OR 4: Ol IIER (EXPLAIH) HO. DATE S: SCHEDULED (flOURS) REASON(1) REDUCINC POWER(2) CORRECTIVE ACTIONS/COtlMEHTS 6 77-02-03 Load reduction to locate and repair condenser tube leak.

(Hon-nuclear system) 7 77-02-05 12. 3 Unit Ho. 3 was removed from service to repair oil leak I on reactor coolant pump No. 3A. (Nuclear system) s 77-02-06 1.0 N Reactor tripped by nuclear instrumentation system while increasing load after the unit was returned to service.

(Huclear system) 9 77-02-21 2.7 Reactor trip caused by loss of second of two rod control system power supplies. (Nuclear system) 10 77-02-25 Load reduction to locate and repair condenser tube leak.

(Non-nuclear system)

SQDlhRY: Unit No. 3 operated at approximately 100X R.P. except for load reductions on Pebruary 3 and 25, 1977, and outages on Pebruary 5, 6 and 21, 1977.

APPENDIX B 0

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 251 Turkey Point Unit No. 4 March 2, 1977 COMPLETED BY V. T. Chilson TELE?HONE (305) 552-3830 MONTH Februar 1977 (LLWe-Net)

DAY AVERAGE DAILY POWER LZTfH. DAY AVERAGE DAILY POWaal L VEL (Kfe-Net) 680 17 693 686 18 693 3 687 19 688 680 20 , 685.

681 21 687 683 22 691 681 23 688 683 24 684 682 25 682 10 686 26 686 689 27 680 12 691 28 676 13 686 14 687 15 689 16 689 NOTE: Average daily power greater than 666'Ne due to cooler condenser cooling water.

APP~MDIX C OPENING DATA REPORT DOCKET NO. 50 251 ULLXT Turke Point Unit No. 4 REPORT ifONTH Februa 1977 DATEMarch 2, 1977 CONPLEM) SY V T. Chilson TEXZ.HONE (305) 552-3830 OPERATING STATUS 2.

THROUGH 4 CORRERTLT AIITRORTTED TOIIEII LEVEL iMZ DEPERlD. CAPACITY (LAMe-?let):

CARI):)~ 666 DESIGN ELECTRICAL RA~0 (Ãfe-Net): 693 3* POWER LEVEL TO WHICH RESTRICTED (ZF ANY) ~i e-Net): NONE A

4V REASONS FOR RESTRICTION (X: A'lY):

5.

6.

NUAABERS OF HOURS REACTOR WAS RECTOR RESERVE SHUTDOWiN HOURS. ~ .

CRITICAL.. .

~ ~ ~......

~ ~

~~

THIS HO'AAH 0.0 YEAR TO DATE 1 186.1 0.0 ClMULATIVE 22 907.9 138.8

7. HOURS CElERATOR ON LINE ..............,... 672.0 1 172.9 21 715.0
8. UNIT RESERVE SHUTDOWiN POURS...... ~........ 0.0 0.0 0,0
9. CROSS THERRMAL BIQLGY GVIETlATED (RUlH).. ... ~ 1 470 916 2 549 724 45 609 094
10. GROSS ELECTRICAL EMEIIGT G IESATTD (EIIR)... AS3 023 ~S37 IO ~47 1321;L ll. LLT ELECTRICAL EfELCY 0~EYED (LLB)..... 460 636 796 901 14 027 367
12. REACTOR SERVICE FACTOR ....... ... . . 100 0 '3.7 '4.2
13. REACTOR AVAILABILITYFAC OR,...,.......,.. 100.0 , 83.7 ~

74.7

14. UiNZT SERVICE FACTOR. ~ ... . .,. . .. . 100.0 82. 9 70.4
15. UNIT AVAILABILITYFACTOR. ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ - ~ ~ ~ ~ 7 100.0 82.9 70.4
16. WXT CAPA'CXTY 'FACTOR (Udlag (LlDC).. " ~ .~ .. 84.5 69.0
17. UNZT CAPACITY FACTOR (Usiag Design NWe)... 98.9 81. 2 65.6
18. Pi(IT FORCED OUTACE RATE .... .. . . . . 0.0 0.0 3.5
19. SHUTDOWiNS SCHEDULED OVER NEKX 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

ReEueliag, maintenance, and inspections April 25 through June ll, 1977

20. XF SHUTDOWLN AT EID OF ReT)ORT PERIOD, ESTZC(ATE) DATE OF.STARTUP:
21. ULLZTS ZN TEST STATUS (PRIOR TO CO)OKRCXAL OPETlATZON):

LGTXAL CRZTICALXTY LllTXALELECTRICITY COiQlERCLQ, OPERATION (1) NOTE: Unit Capacity Factor (MDC) greater than 100K due to cooler condenser cooling water.

APPEllDIX D DOCKET NO. 50 - 251

.) REASON EqUIPMEllT PAILURE (EXl LAIN) 8: MAINT. OR TEST UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Turks Point Unit No. 4 C: REFUELINC DATE March 2, 1977 D: RECULATORY RESTRICTION E: 'PERATOR TRAINING AND COMPLETED RY V. T. Chilean LICENSE EXAMINATION P: ADllINISTRATIVE G: OPERATIONA1. ERROR (EXPLAIN)

TELEPIIOHE (305 552-3830 ll: 0'fUER (EXPLAIH)

) l!ETIIOD 1: IIANUAL METHOD OP 2: ;MANUAl. SCRAM TYPE SllUTTINC DOWN 3: AUTOMATIC SCRAM P: PORCED DURATION TNE REACTOR OR 4: OTllER (EXPLAIN) HO. S: SCHEDULED (HOURS) REASON(l) REDUCINC POWER(2) CORRECTIVE ACTIONS/COMMENTS HONE SUIIMARY: Unit No. 4 operated at approximately 100X R.P. during month.