Attached February, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1
ML18227A409
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/07/1977
From: Schmidt A
Florida Power & Light Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML18227A409 (14)


Text

NRC FORM 195 I2 76I U.S, NUCLEAR REGULATORV CO SSION NRC DISTRIBUTION FDR PART 50 DOCKET MATERIAL DOCKET NUMB 0-335 25 NHC TO:

QLEQER>>

QORIGINAL QCOPV I

QNOTORIZED Q UN C LASS IF I E D PROP INPUT FORM F ROM PPL Miami~ Pl.

33103, Nozman C. Noseley FILE NUMBE MONTHLY REPORT DATE OF DOCUMENT 0 DATE RECEIVED 03-1II-NUMBER OF COPIES RECEIVED

)

S) n~Z DESCRIPTION LETTER TRANS THE FOLLOWING:

(lan

)

MONTHLY REPORT FOR FEBRUARY) 1977 PLANT & COMPONENT OPERABILITY &

AVAILABILITY'HISREPORT TO BE USED IN PREPARING GRAY BOOK BY PLANS & OPERATIONS' (9x as)

PLANT NAME:

muaZ POINT UNITS 3 a II gem ST.

LUCIE UNIT g 1

'XIQNOZamejjy MIPC CYS FOR AC ON FOR ACTION/INFORMATION ACKNOWLEDGER I

INTERNALOISTRI BUTION BRANCH CHIEF L I ILAIL EXTERNAL OISTRI BUTION CONTROL NUMBER g2g7fOgga/

f" QhL~fR TOMGQ QZQ UZI'ONZM

P. O. BOX 013100, MIAMI, FL 33101 FLORIDAPOWER & LIGHTCOMPANY March 7, 1977 Office oZ Management Information

~ 'QQG%~

~

and Program Controls PeaII>C@'>

U.

S. Nuclear Regulatory Commission P@

Washington, D. C.

20555 Gentlemen:

Attached'are the February 1977 Operating Status Reports for Turkey Point Unit Nos.

3 and 4 and St. Lucie Unit No. l.

)

ye Very truly yours, A. D. Schmidt Vice President Power Resources

~

t VTC/DDC Attachments cc:

Mr. Norman C. Moseley Robert Lowenstein, Esquire I

'.~(-j Fj)g~

+eg~ 'eg~~p~i~

I +

"<<fleam a>o~saaWV WPgg PEOPLE... SERVING PEOPLE

g8qJjf g@

gggiag88

> Ql I

I sa

.e

~

~ l Qll I

~

e I t f

QI'

~ 'Ql

~

~

o I I

~

~

~

~

~

0

APPENDZX C OPERATQfG DATA REPORT REPORT MONTH Pebrua 1977 DO~ iVO.SO - 335 UNITSt. Lucie U i o

DATEMarch 2 1977 OPERATING STATUS COMPLETED BYV. T. Chilson TELEPHONE(>05) 552-3830 THROUGH 2.

CUDDLY AUTHORIZED PO~R-LEVEL (NWt):

2560 MAR.DEPEND. CAPACITY (MWe-Net):

s.)

DESIGN ELECTRICAL RA~0 (MWe-Net):

802 3.

PO~

LEVEL TO WHICH RESTRICTED (ZF ANY)

(MWe-Net):

4 ~

REASONS POR RESTRICTION (ZP A',K):

672.0

+IS MONTH YEAR TO DATE CUMULATIVE 5.

~c i ERS OP HOURS ACTOR WAS CRITICAL.... ~

630.6 1 362.2

~2~

6.

REACTOR RESERVE SHUTDOWN HOURS.

~ ~ ~ ~ ~. ~ ~ ~ ~.

8.0 7 ~

HOURS GEKRATOR ON"'LINE...................

600.0 0.0 1 299.2

~0.

1 563.2

'8

" UNIT 'RESERVE SHUTDOWN HOURS;,...,...,.....

0.0:

0.0 0.0 4

9.

GROSS TRERIIAL ENEIICT CATENATED (Nlllll...... ~1S 4

10.

GROSS ELECZRZCAL EIIERCT GBIERATSD GIRR) ~

~.

~454 6 0

~TRZOg I 001 060 11.

IIET IKECZRZCAL ENERGT 0 IERATSO (IGIE).....

426 256

~40 12.

REACTOR SERVICE FACTOR.......

93-9

96. 2 96.8 13.

RPACTOR AVAILABILITYFACTOR...............

93. 9 96.2

'6.8 14 ~

GNZZ SHIOZCE TACTOR

~

~

~

~

~

~

894 15.

IIEET ASAZLASZLZZT TACTOR.......

~

~ ~.~ ~ ~

~

~ ~ ~~~

95 0 16.

'EGT CAPAC~ PA'CZOR (Using OCDC)........,.

81.6 75.8 71.4 17.

UNIT CAPACITY PACTOR (Using Design..We)...

79.1

73. 4 69.2 10.

IRIIT SORCEO OGTAC RATE.................. ~0.

19.

ShnDOWNS SCHEDIKZ) OVMT-NEZX 6 MONTHS

('AAPEG DATE, AND DURATION OP EACH):

20.

ZF SHUTDOWN AT EA) OP ~ORT PKGODG ESTER')

DATE OP.STARTUP:

21.

UNITS Ql TEST STATUS (PRIOR TO COEKRCZAL OP~TIOÃ):

LGTIAL CRITICALITY BGTZAL ELECTRICITY COMMERCIAL OPERATION PORECAST ACHIEVED

I)

REASON h:

EQUIPHEHT FAILURE (EXPIAIN)

R:

HAINT. OR TEST C:

REFUELIHC D:

REGULATORY RESTRICTION E:

OPERATOR TRAIIIIHC AND LICEtlSE EXAHIHATION Ft ADHIHISTRATIVE Ct OPERATIOHAI. ERROR (EXPLAIN)

II:

OTIIER (EXPIAIN)

APPENDIX D UNIT SIIUTD(hltlS AND POWER REDUCTIONS DOCKET NO.

50 - 335 UNIT NAHE St. Lucio Unit No.

1 DATE Harch 2

1977 COHPLETED RY V. T. Chilson TELEPHONE (305) 552-3830

.')

HETIIOD 1 t HhlilihL 2:

.HAtlUAL SCRAH 3:

AUTOHATIC SCRAH OliiER (EXPLAIN)

NO.

DATE TYPE F;

FORCED S:

SCHEDULED DURATION (IIOURS)

REASOtl(l)

HETIIOD OF SIIUTXIHC DOWII THE REACTOR OR REDUCIHC POWER(2)

CORRECTIVE ACTIONS/COtIHEHTS 77-02-01 77-02-02 77-02-03 77-02-20 12.4 20.0 4.8 13.8 Partial loss of flow test (tripped one reactor coolant pump).

Power Ascension Test Program.

Total loss of flow test (tripped all reactor coolant pumps).

Power Ascension Test Program.

Loss of off-site power supply.

Power Ascension Test Program.

Turbine tripped from approximately 100Z R.P.

Power Ascension Test Program.

77-02-21 77-02-21 2.8 18.2 Unit tripped on low steam generator level during trans-ient condition while increasing load after the unit was returned to service from the power sscention turbine trip test.

Cenerator tripped from approximately 100Z R.P.

Power Ascension Test Program.

SUHHARY:

Power Ascension Test. Program continued during month.

APPENDIX B AVERAGE DAILY UNIT POWER LEV1D DOCKET NO.

50 250 LNIT Turkey Point Unit No.

3 DATE March 2, 1977 COMPLETED BY V. T. Chilson TEL'EPRONE (305) 552-3830 yON~

February 1977 DAY AVERAGE DAILY POWER LEVEL (KVe-Net)

DAY AVERAGE DAILY POWER L VEL (t5le-Net) 10 13'4 15 16 685 685 631 522 568 346 686 691 694 689 686'88 687 684 684 688 17 19 20 21 22 23 26 27 28 29 NOTE:

691 695 616 691 558 614 692 698 642 550 685 683 Average daily power greater than 666 Kfe due to cooler condenser cooling water.

APPENDS C

OPKtATZHC DATA REPORT REPORT MONTH Februe 1977 DO~ NO 5

UNIT Turks Poi DATE Merch 2, 1977 0 ~ 3 OPKQTZNC STATUS COlAPLEAAD BY V. T. Chilson TELEPHONE 30 THROUGH 4

2.

CCRRRRTLV AVZRORZZEO POVS LEVEL (RCC);~

MAX.DEPE%. CAPACZTY (We-AHeC):

666 3.

POUER LEVEL TO WHICH RESTRICTED (IP AHY)

(Wie-Hec) c 4.

REASONS FOR RESTRICTION (IF AHY):

THIS MOAAH YKEAR TO DATE CUAAATZVE 5.

~ii ERS OF HOURS ACTOR 'JAS CRZTICAL. ~ ~ ~ ~

662.0

~1 6 ~

REACTOR REScERVE SHUTDOWN EOURS...........

~

0.0

0. 0 7.

HOURS GERKRATOR ON LLRlE. ~ ~.... ~......,...

~

656.0 923 0

~27 962.

8.

UNIT RESERVE SHUTDOVif HOURS. ~.............

0.0 0.0

. ~6.0 9,

CROSS THEEARLEAL EilExlGY GENERATED @AH)......

1 395 687 1 908 496 53 638 084 10.

CROSS "LECTRZCAL LVERCX CLVESATEO (RAVI)...

457 227 622 992

~ll 44 11 ~

HET ELECTRICAL EiitCY GENERATED (WAH).....

435 126 588 601 16 264 586 12.

REACTOR SERVICE FACTOR 98.5 74.2 78.3 13.

REACTOR AVAZLA)IZLITIPACTOR...............

96.5 ZAA 14 UNIT SERVZCE FACTOR.

15.

IRIZT AVAZZARZLZZT PACTOR.

~..

~ ~ ~...."

~ ~ ~

~ ~

97.6 16.

ORZT CAPA'CZZX.ACIOR (04406 OIDC)... ~ ~" ~ ~ ~7.2 17.

UNIT CAPACZ cAC1'OR (Usta8 Desi'We)...

93.4 60.0

~6.2 18 ~

UHIT FORCED OUTAGE RATE. ~ ~

>> ~

~

~ ~ ~

~ ~ ~ ~

2.4 2.6 19.

SHUTDOWNS SCHEDULE) OVER

~i 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

20.

IF SHUTDOWi AT EHD OP REPORT PERIOD, ESTDfATZ) DATE OF.STARTUP:

21.

UNITS Qf TEST'TATUS (PRIOR TO COlOKRCIAL OPERATION):

FORECAST ACHIEVED QfZTZAL CRITICALITY IAAZTIALELECTRICITY COMKRCZAL OPERATION

I)

REASON h:

EQUIPMENT PAILURE (EXPLAIN) g:

MAINT. OR TEST C:

REPUELINC D:

RECULATORY RESTRICTIOH E:

OPERATOR TRAIHIHC AND LICE!lSE EXAHINATIOH F:

ADMINISTRATIVE C:

OPERATIONAL ERROR (EXPLAIN)

H:

OTHER (EXPLAIN)

APPENDIX D UNIT SHUTDOWNS AND POllER REDUCTIOHS REPORT HONTH Pebruar 1977 DOCKET NO.

50 - 250 UNIT NAME Turkey Point Unit Ho.

3 DATE Harch 2, 1977 COMPLETED gY V. T. Chilson TEI.EPNOHE (305) 552-3830

!)

HETlND 1:-

MANUAL 2:

.MAHUAI. SCRAM 3:

AU'ÃlSTIC SCRAH 4:

Ol IIER (EXPLAIH)

HO.

DATE 6

77-02-03 TYPE P;

PORCED S:

SCHEDULED DURATION (flOURS) REASON(1)

METHOD OP SNUTTIHC DOWN THE REACTOR OR REDUCINC POWER(2)

CORRECTIVE ACTIONS/COtlMEHTS Load reduction to locate and repair condenser tube leak.

(Hon-nuclear system) 7 77-02-05

12. 3 Unit Ho.

3 was removed from service to repair oil leak I

on reactor coolant pump No. 3A.

(Nuclear system) s 77-02-06 1.0 N

Reactor tripped by nuclear instrumentation system while increasing load after the unit was returned to service.

(Huclear system) 9 77-02-21 2.7 Reactor trip caused by loss of second of two rod control system power supplies.

(Nuclear system) 10 77-02-25 Load reduction to locate and repair condenser tube leak.

(Non-nuclear system)

SQDlhRY:

Unit No.

3 operated at approximately 100X R.P. except for load reductions on Pebruary 3 and 25, 1977, and outages on Pebruary 5, 6 and 21, 1977.

APPENDIX B AVERAGE DAILY UNIT POWER LEVEL 0

DOCKET NO.

50 - 251 Turkey Point Unit No.

4 March 2, 1977 COMPLETED BY V. T. Chilson TELE?HONE (305) 552-3830 MONTH Februar 1977 DAY AVERAGE DAILY POWER LZTfH.

(Kfe-Net)

DAY AVERAGE DAILY POWaal L VEL (LLWe-Net)

3 10 12 13 14 15 16 680 686 687 680 681 683 681 683 682 686 689 691 686 687 689 689 17 18 19 20 21 22 23 24 25 26 27 28 NOTE:

693 693 688

, 685.

687 691 688 684 682 686 680 676 Average daily power greater than 666'Ne due to cooler condenser cooling water.

APP~MDIX C OPENING DATA REPORT REPORT ifONTH Februa 1977 OPERATING STATUS DOCKET NO. 50 251 ULLXTTurke Point Unit No. 4 DATEMarch 2, 1977 CONPLEM) SY V T. Chilson TEXZ.HONE (305) 552-3830 THROUGH 4

2.

CORRERTLT AIITRORTTED TOIIEII LEVEL CARI):)~

iMZ DEPERlD.

CAPACITY (LAMe-?let):

666 DESIGN ELECTRICAL RA~0 (Ãfe-Net):

693 3*

POWER LEVEL TO WHICH RESTRICTED (ZF ANY)

~i e-Net):

NONE A

4V REASONS FOR RESTRICTION (X: A'lY):

THIS HO'AAH YEAR TO DATE ClMULATIVE 5.

NUAABERS OF HOURS REACTOR WAS CRITICAL.. ~. ~ ~~

1 186.1 22 907.9 6.

RECTOR RESERVE SHUTDOWiN HOURS. ~. ~ ~ ~......

0.0 0.0 138.8 7.

HOURS CElERATOR ON LINE..............,...

672.0 1 172.9 21 715.0 8.

UNIT RESERVE SHUTDOWiN POURS...... ~........

0.0 0.0 0,0 9.

CROSS THERRMAL BIQLGY GVIETlATED (RUlH).. ~...

1 470 916 2 549 724 45 609 094 10.

GROSS ELECTRICAL EMEIIGT G IESATTD (EIIR)...

AS3 023

~S37 IO

~47 1321;L ll.

LLT ELECTRICAL EfELCY 0~EYED (LLB).....

460 636 796 901 14 027 367 12.

REACTOR SERVICE FACTOR..........

100 0 '3.7

'4.2 13.

REACTOR AVAILABILITYFAC OR,...,.......,..

100.0

, 83.7

~

74.7 14.

UiNZT SERVICE FACTOR.

~

100.0

82. 9 70.4 15.

UNIT AVAILABILITYFACTOR. ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

- ~ ~ ~ ~ 7 16.

WXT CAPA'CXTY 'FACTOR (Udlag (LlDC).." ~. ~..

100.0 82.9 84.5 70.4 69.0 17.

UNZT CAPACITY FACTOR (Usiag Design NWe)...

98.9

81. 2 65.6 18.

Pi(IT FORCED OUTACE RATE....

0.0 0.0 3.5 19.

SHUTDOWiNS SCHEDULED OVER NEKX 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

ReEueliag, maintenance, and inspections April 25 through June ll, 1977 20.

XF SHUTDOWLN AT EID OF ReT)ORT PERIOD, ESTZC(ATE) DATE OF.STARTUP:

21.

ULLZTS ZN TEST STATUS (PRIOR TO CO)OKRCXAL OPETlATZON):

LGTXAL CRZTICALXTY LllTXALELECTRICITY COiQlERCLQ, OPERATION (1)

NOTE:

Unit Capacity Factor (MDC) greater than 100K due to cooler condenser cooling water.

.)

REASON EqUIPMEllT PAILURE (EXl LAIN) 8:

MAINT. OR TEST C:

REFUELINC D:

RECULATORY RESTRICTION E: 'PERATOR TRAINING AND LICENSE EXAMINATION P:

ADllINISTRATIVE G:

OPERATIONA1. ERROR (EXPLAIN) ll:

0'fUER (EXPLAIH)

APPEllDIX D UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50 - 251 UNIT NAME Turks Point Unit No. 4 DATE March 2, 1977 COMPLETED RY V. T. Chilean TELEPIIOHE (305 552-3830

)

l!ETIIOD 1:

IIANUAL 2:

MANUAl. SCRAM 3

AUTOMATIC SCRAM 4:

OTllER (EXPLAIN)

HO.

TYPE P:

PORCED S:

SCHEDULED DURATION (HOURS)

REASON(l)

METHOD OP SllUTTINC DOWN TNE REACTOR OR REDUCINC POWER(2)

CORRECTIVE ACTIONS/COMMENTS HONE SUIIMARY:

Unit No.

4 operated at approximately 100X R.P. during month.