MONTHYEARL-2024-184, Radiological Emergency Plan Revision 772024-11-0505 November 2024 Radiological Emergency Plan Revision 77 L-2024-173, Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-31031 October 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles L-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2024-175, Cycle 34 Core Operating Report2024-10-24024 October 2024 Cycle 34 Core Operating Report ML24291A2882024-10-24024 October 2024 Westinghouse Topical Report - Request for Withholding Information from Public Disclosure L-2024-177, Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis2024-10-22022 October 2024 Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis ML24276A2302024-10-16016 October 2024 Westinghouse Topical Report – Request for Withholding Information from Public Disclosure L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes ML24289A2372024-10-15015 October 2024 Transmittal of Revision 1 Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) L-2024-157, Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-0303 October 2024 Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles IR 05000250/20243012024-10-0303 October 2024 NRC Operator License Examination Report 05000250/2024301 and 05000251/2024301 L-2024-147, Submission of Periodic Reports2024-10-0101 October 2024 Submission of Periodic Reports L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24269A1292024-09-24024 September 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis ML24260A2262024-09-18018 September 2024 NRC Examination Results Summary - Examination Reports: 05000250/2024301 and 05000251/2024301 ML24262A2272024-09-18018 September 2024 Transmittal of Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles ML24158A0052024-09-17017 September 2024 Completion of Subsequent License Renewal Site Specific Environmental Review and Modification to Subsequent Renewed Facility Operating Licenses L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24207A0342024-09-13013 September 2024 – Exemption from Certain Requirements of 10 CFR 50.46 for Use of Axiom Fuel Rod Cladding – Letter ML24256A1132024-09-13013 September 2024 Regulatory Audit Summary Related to the Review of Regarding the Updated Spent Fuel Pool Criticality Safety Analysis License Amendment Request IR 05000250/20240052024-08-23023 August 2024 Updated Inspection Plan for Turkey Point Units 3 & 4 - Report 05000250/2024005 and 05000251/2024005 ML24234A0062024-08-22022 August 2024 Project Manager Assignment L-2024-106, Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-022024-08-12012 August 2024 Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-02 L-2024-122, Core Operating Limits Report2024-08-12012 August 2024 Core Operating Limits Report ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-089, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-07-25025 July 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24184B2822024-07-16016 July 2024 – Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan 05000250/LER-2024-002-01, Condition Prohibited by Technical Specifications2024-07-10010 July 2024 Condition Prohibited by Technical Specifications L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal ML24173A1902024-06-28028 June 2024 Withdrawal of an Amendment Request ML24159A2652024-06-26026 June 2024 Correction of Safety Evaluation for Issuance of Amendment Nos. 298 & 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-100, Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project2024-06-19019 June 2024 Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter IR 05000250/20244012024-06-0505 June 2024 – Security Baseline Inspection Report 05000250-2024401, 05000251-2024401 and 07200062-2024401 L-2024-076, Reply to Notice of Violation; NOV 05000250, 05000251/2024010-052024-05-29029 May 2024 Reply to Notice of Violation; NOV 05000250, 05000251/2024010-05 L-2024-082, 2023 Annual Radiological Environmental Operating Report2024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000250/20240012024-05-10010 May 2024 Integrated Inspection Report 05000250/2024001 and 05000251/2024001 ML24135A0942024-05-0909 May 2024 Periodic Update to the Updated Final Safety Analysis Report ML24127A1862024-05-0909 May 2024 Request for Withholding Information from Public Disclosure L-2024-060, 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report2024-05-0909 May 2024 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-073, Cycle 34 Core Operating Limits Report2024-05-0101 May 2024 Cycle 34 Core Operating Limits Report L-2024-072, Cycle 33 Core Operating Limits Report2024-05-0101 May 2024 Cycle 33 Core Operating Limits Report L-2024-048, Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision2024-04-30030 April 2024 Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision L-2024-069, Radiological Emergency Plan Revision 762024-04-22022 April 2024 Radiological Emergency Plan Revision 76 L-2024-066, Sixth 10-Year Inservice Testing Interval Relief Request No. PR-022024-04-17017 April 2024 Sixth 10-Year Inservice Testing Interval Relief Request No. PR-02 2024-09-25
[Table view] Category:Operating Report
MONTHYEARL-2022-039, And Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2022-04-14014 April 2022 And Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2021-097, and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report2021-05-13013 May 2021 and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report L-2021-096, 10 CFR 50.59(d)(2) Summary Report2021-05-11011 May 2021 10 CFR 50.59(d)(2) Summary Report L-2021-018, 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report2021-02-16016 February 2021 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report L-2020-065, Submission of Periodic Reports2020-04-0909 April 2020 Submission of Periodic Reports ML18227A9832018-08-15015 August 2018 Submit First Year Operation Report. L-2008-245, Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/082008-11-10010 November 2008 Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/08 L-2007-053, Annual Radiological Environmental Operating Report2007-05-0404 May 2007 Annual Radiological Environmental Operating Report L-2004-097, Annual Radiological Environmental Operating Report2004-05-11011 May 2004 Annual Radiological Environmental Operating Report ML18227B0771978-03-17017 March 1978 03/17/1978 Letter Operating Summary Reports of February 1978 ML18227A4231978-03-0404 March 1978 Attached February, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0631978-03-0404 March 1978 03/04/1978 Letter Operating Status Reports of February 1978 ML18227A4221978-02-14014 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0641978-02-14014 February 1978 02/14/1978 Letter Operating Status Reports of January 1978 ML18227A4211978-02-0404 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0651978-02-0404 February 1978 02/04/1978 Letter Operating Status Reports of January 1978 ML18227A4201978-01-0707 January 1978 Attached December, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0671978-01-0707 January 1978 01/07/1978 Letter Operating Status Reports of December 1977 ML18227A4191977-12-0303 December 1977 Attached November, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0681977-12-0303 December 1977 12/03/1977 Letter Operating Status Reports of November 1977 ML18227A4171977-11-0505 November 1977 Attached October, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0691977-11-0505 November 1977 11/05/1977 Letter Operating Status Reports of October 1977 ML18227B0701977-10-0505 October 1977 10/05/1977 Letter Operating Status Reports of September 1977 ML18227B0711977-09-0303 September 1977 09/03/1977 Letter Operating Status Reports of August 1977 ML18227A4151977-09-0303 September 1977 Attached August, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0731977-08-0505 August 1977 08/05/1977 Letter Operating Status Reports of July 1977 ML18227A4141977-08-0505 August 1977 Attached July, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0741977-07-0707 July 1977 07/07/1977 Letter Operating Status Reports of June 1977, and a Revised Operating Data Report for May 1997 for Turkey Point Unit 3 ML18227A4131977-07-0707 July 1977 Attached June, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. May, 1977 for Unit 3 Incorrectly Reported for Some Values. Attached Revised May, 1977 Operating Data Report for Unit 3 ML18227B0751977-06-0606 June 1977 06/06/1977 Letter Operating Status Reports of May 1977 ML18227A4121977-06-0606 June 1977 Attached May, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0761977-05-0505 May 1977 05/05/1977 Letter Operating Status Reports of April 1977 ML18227A4111977-05-0505 May 1977 Attached April, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227A4101977-04-0404 April 1977 Attached March, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. Maximum Dependable Capacity (MWe-Net) for St. Lucie No. 1 Was Revised from 802 MWe-Net to 777 MWe-Net (Estimated) ML18227B0781977-04-0404 April 1977 04/04/1977 Letter Operating Status Reports of March 1977 ML18227B0791977-03-0707 March 1977 03/07/1977 Letter Operating Status Reports of February 1977 ML18227A4091977-03-0707 March 1977 Attached February, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0801977-02-0707 February 1977 02/07/1977 Letter Operating Status Reports of January 1977 ML18227B0811977-01-0707 January 1977 01/07/1977 Letter Operating Status Reports of December 1976 ML18227A4081977-01-0707 January 1977 Attached December, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0821976-12-0606 December 1976 12/06/1976 Letter Operating Status Reports of November 1976 ML18227B0831976-11-15015 November 1976 11/15/1976 Letter Corrected Copies of Operating Data Reports for October 1976 ML18227B0841976-11-0808 November 1976 11/08/1976 Letter Operating Status Reports of October 1976 ML18227A4061976-11-0808 November 1976 Attached October, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227A4071976-11-0505 November 1976 Attached Corrected Copies of October, 1976 Operating Data Reports for Turkey Point Unit Nos. 3 and 4 ML18227A4051976-10-0808 October 1976 Attached September, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0861976-09-0707 September 1976 09/07/1976 Letter Operating Status Reports of August 1976 ML18227A4031976-09-0707 September 1976 Attached August, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0871976-08-0505 August 1976 08/05/1976 Letter Operating Status Reports of July 1976 ML18227A4021976-08-0505 August 1976 Attached July, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. St. Lucie Unit No. 1 Was Previously Reported to Be in Commercial Operation, in Error. Attached Corrected June 1976 for St. Lucie No. 1 2022-04-14
[Table view] |
Text
NRC FORM 195 U.S, NUCLEAR REGULATORV CO SSION DOCKET NUMB I2 76I 0-335 25 FILE NUMBE NRC DISTRIBUTION FDR PART 50 DOCKET MATERIAL MONTHLY REPORT TO: F ROM PPL DATE OF DOCUMENT NHC Miami~ Pl. 33103, 0 Nozman C. Noseley DATE RECEIVED I 03-1II-QLEQE R>> QNOTORIZED PROP INPUT FORM NUMBER OF COPIES RECEIVED QORIGINAL Q UN I ED
-, QCOPV C LASS IF
) S) n~Z DESCRIPTION LETTER TRANS THE FOLLOWING: MONTHLY REPORT FOR FEBRUARY) 1977 PLANT & COMPONENT OPERABILITY &
(lan ) AVAILABILITY'HISREPORT TO BE USED PREPARING GRAY BOOK BY PLANS & OPERATIONS' IN (9x as)
PLANT NAME: muaZ POINT UNITS 3 a II
'XIQNOZ amejjy gem ST. LUCIE UNIT g 1 ACKNOWLEDGER .
I FOR ACTION/INFORMATION MIPC CYS FOR AC ON INTERNAL OISTRI BUTION BRANCH CHIEF L EXTERNAL OISTRI BUTION CONTROL NUMBER I ILAIL g2g7f Ogga/
f" QhL~fR TOM GQ QZQ UZI'ONZM
P. O. BOX 013100, MIAMI, FL 33101 FLORIDA POWER & LIGHT COMPANY March 7, 1977 Office Information "
and oZ Management Program Controls
~ 'QQG%~ ~
PeaII>C@'>
U. S. Nuclear Regulatory Commission P@
Washington, D. C. 20555 Gentlemen:
Attached'are the February 1977 Operating Status Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit No.
)
- l. ye Very truly yours, A. D. Schmidt ~ t Vice President Power Resources VTC/DDC I
"<<fleam Attachments cc: Mr. Norman C. Moseley '.~(- j Fj)g~
Robert Lowenstein, Esquire
+eg I +
~ 'eg~~p~i~
WPgg a>o~saaWV PEOPLE... SERVING PEOPLE
g8qJjf g@
gggiag88
I
> Ql I sa .e ~
~ l Qll I
~ e I t f QI' ~ 'Ql
~ ~
o I I
~ ~
~
~
~ 0
APPENDZX C OPERATQfG DATA REPORT DO~ iVO.SO - 335 UNITSt. Lucie U i o REPORT MONTH Pebrua 1977 DATEMarch 2 1977 COMPLETED BYV. T. Chilson OPERATING STATUS TELEPHONE(>05) 552-3830 672.0 THROUGH
- 2. CUDDLY AUTHORIZED PO~R- LEVEL (NWt): 2560 MAR.DEPEND. CAPACITY (MWe-Net): s .)
DESIGN ELECTRICAL RA~0 (MWe-Net): 802
- 3. PO~ LEVEL TO WHICH RESTRICTED (ZF ANY) (MWe-Net):
4~ REASONS POR RESTRICTION (ZP A',K):
5.
6.
~c i ERS OP HOURS ACTOR WAS REACTOR RESERVE SHUTDOWN HOURS.
CRITICAL....
~ ~ ~ ~ ~ . ~ ~ ~ ~
~
+IS 630.6 MONTH 8.0 YEAR TO DATE 1 362.2 0.0 ~0.
~
CUMULATIVE
~2 7 ~ HOURS GEKRATOR ON"'LINE................... 600.0 1 299.2 1 563.2
'8 "
UNIT 'RESERVE SHUTDOWN HOURS;,...,...,.....
4 0.0: 0.0 0.0
- 9. GROSS TRERIIAL ENEIICT CATENATED (Nlllll...... ~1S 4
- 10. GROSS ELECZRZCAL EIIERCT GBIERATSD GIRR) ~ ~ . ~454 6 0 ~TRZOg I 001 060
~40 11.
IIET IKECZRZCAL ENERGT 0 IERATSO (IGIE)..... 426 256
~~
- 12. REACTOR SERVICE FACTOR 93-9 96. 2 96.8
- 13. RPACTOR AVAILABILITYFACTOR............... 93. 9 96.2 '6.8 14 ~ GNZZ SHIOZCE TACTOR ~ ~ ~ . ~ ~ ~ 894
- 15. IIEET ASAZLASZLZZT TACTOR ....... ~ ~ ~.~ ~ ~ ~ ~ ~ ~ 95 0
- 16. 'EGT CAPAC~ PA'CZOR (Using OCDC)........,. 81.6 75.8 71.4
- 17. UNIT CAPACITY PACTOR (Using Design ..We)... 79.1 73. 4 69.2
- 10. IRIIT SORCEO OGTAC RATE.................. ~0.
- 19. ShnDOWNS SCHEDIKZ) OVMT- NEZX 6 MONTHS ('AAPEG DATE, AND DURATION OP EACH):
- 20. ZF SHUTDOWN AT EA) OP ~ORT PKGODG ESTER') DATE OP.STARTUP:
- 21. UNITS Ql TEST STATUS (PRIOR TO COEKRCZAL OP~TIOÃ): PORECAST ACHIEVED LGTIAL CRITICALITY BGTZAL ELECTRICITY COMMERCIAL OPERATION
APPENDIX D DOCKET NO. 50 - 335 I) REASON h: EQUIPHEHT FAILURE (EXPIAIN)
UNIT SIIUTD(hltlS AND POWER REDUCTIONS UNIT NAHE St. Lucio Unit No. 1 R: HAINT. OR TEST C: REFUELIHC DATE Harch 2 1977 D: REGULATORY RESTRICTION E: OPERATOR TRAIIIIHC AND COHPLETED RY V. T. Chilson LICEtlSE EXAHIHATION Ft ADHIHISTRATIVE TELEPHONE (305) 552-3830 Ct OPERATIOHAI. ERROR (EXPLAIN)
II: OTIIER (EXPIAIN)
.') HETIIOD 1 t HhlilihL HETIIOD OF 2: .HAtlUAL SCRAH TYPE SIIUTXIHC DOWII 3: AUTOHATIC SCRAH F; FORCED DURATION THE REACTOR OR OliiER (EXPLAIN) NO. DATE S: SCHEDULED (IIOURS) REASOtl(l) REDUCIHC POWER(2) CORRECTIVE ACTIONS/COtIHEHTS 77-02-01 12.4 Partial loss of flow test (tripped one reactor coolant pump). Power Ascension Test Program.
77-02-02 20.0 Total loss of flow test (tripped all reactor coolant pumps). Power Ascension Test Program.
77-02-03 4.8 Loss of off-site power supply. Power Ascension Test Program.
77-02-20 13.8 Turbine tripped from approximately 100Z R.P. Power Ascension Test Program.
77-02-21 2.8 Unit tripped on low steam generator level during trans-ient condition while increasing load after the unit was returned to service from the power sscention turbine trip test.
77-02-21 18.2 Cenerator tripped from approximately 100Z R.P. Power Ascension Test Program.
SUHHARY: Power Ascension Test. Program continued during month.
APPENDIX B AVERAGE DAILY UNIT POWER LEV1D DOCKET NO. 50 250 LNIT Turkey Point Unit No. 3 DATE March 2, 1977 COMPLETED BY V. T. Chilson TEL'EPRONE (305) 552-3830 yON~ February 1977 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER L VEL (KVe-Net) (t5le-Net) 685 17 691 685 695 631 19 616 522 20 691 568 21 558 346 22 614 686 23 692 691 698 694 642 10 689 26 550 27 685 686'88 28 683 687 29 13'4 684 15 684 16 688 NOTE: Average daily power greater than 666 Kfe due to cooler condenser cooling water.
APPENDS C OPKtATZHC DATA REPORT DO~ NO 5 UNIT Turks Poi 0~ 3 REPORT MONTH Februe 1977 DATE Merch 2, 1977 COlAPLEAAD BY V. T. Chilson TELEPHONE 30 OPKQTZNC STATUS 2.
THROUGH 4 CCRRRRTLV AVZRORZZEO MAX.DEPE%. CAPACZTY POVS LEVEL (We-AHeC):
(RCC);~ 666
- 3. POUER LEVEL TO WHICH RESTRICTED (IP AHY) (Wie-Hec) c
- 4. REASONS FOR RESTRICTION (IF AHY):
THIS MOAAH YKEAR TO DATE CUAAATZVE
- 5. ~ii ERS OF HOURS ACTOR 'JAS CRZTICAL. ~ ~ ~ ~ 662.0 ~1 6~ REACTOR REScERVE SHUTDOWN EOURS........... ~ 0.0 0. 0
- 7. HOURS GERKRATOR ON LLRlE. ~ ~.... ~......,... ~ 656.0 923 0 ~27 962.
- 8. UNIT RESERVE SHUTDOVif HOURS. ~............. 0.0 0.0 . ~6.0 9, CROSS THEEARLEAL EilExlGY GENERATED @AH)...... 1 395 687 1 908 496 53 638 084
- 10. CROSS "LECTRZCAL LVERCX CLVESATEO (RAVI)... 457 227 622 992 ~ll 44 11 ~ HET ELECTRICAL EiitCY GENERATED (WAH)..... 435 126 588 601 16 264 586
- 12. REACTOR SERVICE FACTOR 98.5 74.2 78.3
- 13. REACTOR AVAZLA)IZLITIPACTOR ............... 96.5 ZAA 14 UNIT SERVZCE FACTOR.
- 15. IRIZT AVAZZARZLZZT PACTOR. ~ .. ~ ~ ~...." ~ ~ ~ ~ ~ 97.6
- 16. ORZT CAPA'CZZX .ACIOR (04406 OIDC)... ~ ~" ~ ~ ~7.2
- 17. UNIT CAPACZ cAC1'OR (Usta8 Desi'We)... 93.4 60.0 ~6.2 18 ~ UHIT FORCED OUTAGE RATE. ~ ~ >> ~ ~ ~ ~ ~ ~ ~ ~ ~ 2.4 2.6
- 19. SHUTDOWNS SCHEDULE) OVER ~i 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
- 20. IF SHUTDOWi AT EHD OP REPORT PERIOD, ESTDfATZ) DATE OF.STARTUP:
- 21. UNITS Qf TEST'TATUS (PRIOR TO COlOKRCIAL OPERATION): FORECAST ACHIEVED QfZTZAL CRITICALITY IAAZTIAL ELECTRICITY COMKRCZAL OPERATION
APPENDIX D DOCKET NO. 50 - 250 I) REASON h: EQUIPMENT PAILURE (EXPLAIN)
UNIT SHUTDOWNS AND POllER REDUCTIOHS UNIT NAME Turkey Point Unit Ho. 3 g: MAINT. OR TEST C: REPUELINC DATE Harch 2, 1977 D: RECULATORY RESTRICTIOH E: OPERATOR TRAIHIHC AND COMPLETED gY V. T. Chilson LICE!lSE EXAHINATIOH F: ADMINISTRATIVE TEI.EPNOHE (305) 552-3830 C: OPERATIONAL ERROR (EXPLAIN) REPORT HONTH Pebruar 1977 H: OTHER (EXPLAIN)
!) HETlND 1:- MANUAL METHOD OP 2: .MAHUAI. SCRAM TYPE SNUTTIHC DOWN 3: AU'ÃlSTIC SCRAH P; PORCED DURATION THE REACTOR OR 4: Ol IIER (EXPLAIH) HO. DATE S: SCHEDULED (flOURS) REASON(1) REDUCINC POWER(2) CORRECTIVE ACTIONS/COtlMEHTS 6 77-02-03 Load reduction to locate and repair condenser tube leak.
(Hon-nuclear system) 7 77-02-05 12. 3 Unit Ho. 3 was removed from service to repair oil leak I on reactor coolant pump No. 3A. (Nuclear system) s 77-02-06 1.0 N Reactor tripped by nuclear instrumentation system while increasing load after the unit was returned to service.
(Huclear system) 9 77-02-21 2.7 Reactor trip caused by loss of second of two rod control system power supplies. (Nuclear system) 10 77-02-25 Load reduction to locate and repair condenser tube leak.
(Non-nuclear system)
SQDlhRY: Unit No. 3 operated at approximately 100X R.P. except for load reductions on Pebruary 3 and 25, 1977, and outages on Pebruary 5, 6 and 21, 1977.
APPENDIX B 0
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 251 Turkey Point Unit No. 4 March 2, 1977 COMPLETED BY V. T. Chilson TELE?HONE (305) 552-3830 MONTH Februar 1977 (LLWe-Net)
DAY AVERAGE DAILY POWER LZTfH. DAY AVERAGE DAILY POWaal L VEL (Kfe-Net) 680 17 693 686 18 693 3 687 19 688 680 20 , 685.
681 21 687 683 22 691 681 23 688 683 24 684 682 25 682 10 686 26 686 689 27 680 12 691 28 676 13 686 14 687 15 689 16 689 NOTE: Average daily power greater than 666'Ne due to cooler condenser cooling water.
APP~MDIX C OPENING DATA REPORT DOCKET NO. 50 251 ULLXT Turke Point Unit No. 4 REPORT ifONTH Februa 1977 DATEMarch 2, 1977 CONPLEM) SY V T. Chilson TEXZ.HONE (305) 552-3830 OPERATING STATUS 2.
THROUGH 4 CORRERTLT AIITRORTTED TOIIEII LEVEL iMZ DEPERlD. CAPACITY (LAMe-?let):
CARI):)~ 666 DESIGN ELECTRICAL RA~0 (Ãfe-Net): 693 3* POWER LEVEL TO WHICH RESTRICTED (ZF ANY) ~i e-Net): NONE A
4V REASONS FOR RESTRICTION (X: A'lY):
5.
6.
NUAABERS OF HOURS REACTOR WAS RECTOR RESERVE SHUTDOWiN HOURS. ~ .
CRITICAL.. .
~ ~ ~......
~ ~
~~
THIS HO'AAH 0.0 YEAR TO DATE 1 186.1 0.0 ClMULATIVE 22 907.9 138.8
- 7. HOURS CElERATOR ON LINE ..............,... 672.0 1 172.9 21 715.0
- 8. UNIT RESERVE SHUTDOWiN POURS...... ~........ 0.0 0.0 0,0
- 9. CROSS THERRMAL BIQLGY GVIETlATED (RUlH).. ... ~ 1 470 916 2 549 724 45 609 094
- 10. GROSS ELECTRICAL EMEIIGT G IESATTD (EIIR)... AS3 023 ~S37 IO ~47 1321;L ll. LLT ELECTRICAL EfELCY 0~EYED (LLB)..... 460 636 796 901 14 027 367
- 12. REACTOR SERVICE FACTOR ....... ... . . 100 0 '3.7 '4.2
- 13. REACTOR AVAILABILITYFAC OR,...,.......,.. 100.0 , 83.7 ~
74.7
- 14. UiNZT SERVICE FACTOR. ~ ... . .,. . .. . 100.0 82. 9 70.4
- 15. UNIT AVAILABILITYFACTOR. ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ - ~ ~ ~ ~ 7 100.0 82.9 70.4
- 16. WXT CAPA'CXTY 'FACTOR (Udlag (LlDC).. " ~ .~ .. 84.5 69.0
- 17. UNZT CAPACITY FACTOR (Usiag Design NWe)... 98.9 81. 2 65.6
- 18. Pi(IT FORCED OUTACE RATE .... .. . . . . 0.0 0.0 3.5
- 19. SHUTDOWiNS SCHEDULED OVER NEKX 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
ReEueliag, maintenance, and inspections April 25 through June ll, 1977
- 20. XF SHUTDOWLN AT EID OF ReT)ORT PERIOD, ESTZC(ATE) DATE OF.STARTUP:
- 21. ULLZTS ZN TEST STATUS (PRIOR TO CO)OKRCXAL OPETlATZON):
LGTXAL CRZTICALXTY LllTXALELECTRICITY COiQlERCLQ, OPERATION (1) NOTE: Unit Capacity Factor (MDC) greater than 100K due to cooler condenser cooling water.
APPEllDIX D DOCKET NO. 50 - 251
.) REASON EqUIPMEllT PAILURE (EXl LAIN) 8: MAINT. OR TEST UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Turks Point Unit No. 4 C: REFUELINC DATE March 2, 1977 D: RECULATORY RESTRICTION E: 'PERATOR TRAINING AND COMPLETED RY V. T. Chilean LICENSE EXAMINATION P: ADllINISTRATIVE G: OPERATIONA1. ERROR (EXPLAIN)
TELEPIIOHE (305 552-3830 ll: 0'fUER (EXPLAIH)
) l!ETIIOD 1: IIANUAL METHOD OP 2: ;MANUAl. SCRAM TYPE SllUTTINC DOWN 3: AUTOMATIC SCRAM P: PORCED DURATION TNE REACTOR OR 4: OTllER (EXPLAIN) HO. S: SCHEDULED (HOURS) REASON(l) REDUCINC POWER(2) CORRECTIVE ACTIONS/COMMENTS HONE SUIIMARY: Unit No. 4 operated at approximately 100X R.P. during month.