MONTHYEARL-2024-184, Radiological Emergency Plan Revision 772024-11-0505 November 2024 Radiological Emergency Plan Revision 77 L-2024-173, Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-31031 October 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles L-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2024-175, Cycle 34 Core Operating Report2024-10-24024 October 2024 Cycle 34 Core Operating Report ML24291A2882024-10-24024 October 2024 Westinghouse Topical Report - Request for Withholding Information from Public Disclosure L-2024-177, Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis2024-10-22022 October 2024 Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis ML24276A2302024-10-16016 October 2024 Westinghouse Topical Report – Request for Withholding Information from Public Disclosure L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes ML24289A2372024-10-15015 October 2024 Transmittal of Revision 1 Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) L-2024-157, Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-0303 October 2024 Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles IR 05000250/20243012024-10-0303 October 2024 NRC Operator License Examination Report 05000250/2024301 and 05000251/2024301 L-2024-147, Submission of Periodic Reports2024-10-0101 October 2024 Submission of Periodic Reports L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24269A1292024-09-24024 September 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis ML24260A2262024-09-18018 September 2024 NRC Examination Results Summary - Examination Reports: 05000250/2024301 and 05000251/2024301 ML24262A2272024-09-18018 September 2024 Transmittal of Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles ML24158A0052024-09-17017 September 2024 Completion of Subsequent License Renewal Site Specific Environmental Review and Modification to Subsequent Renewed Facility Operating Licenses L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24207A0342024-09-13013 September 2024 – Exemption from Certain Requirements of 10 CFR 50.46 for Use of Axiom Fuel Rod Cladding – Letter ML24256A1132024-09-13013 September 2024 Regulatory Audit Summary Related to the Review of Regarding the Updated Spent Fuel Pool Criticality Safety Analysis License Amendment Request IR 05000250/20240052024-08-23023 August 2024 Updated Inspection Plan for Turkey Point Units 3 & 4 - Report 05000250/2024005 and 05000251/2024005 ML24234A0062024-08-22022 August 2024 Project Manager Assignment L-2024-122, Core Operating Limits Report2024-08-12012 August 2024 Core Operating Limits Report L-2024-106, Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-022024-08-12012 August 2024 Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-02 ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-089, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-07-25025 July 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24184B2822024-07-16016 July 2024 – Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal 05000250/LER-2024-002-01, Condition Prohibited by Technical Specifications2024-07-10010 July 2024 Condition Prohibited by Technical Specifications ML24173A1902024-06-28028 June 2024 Withdrawal of an Amendment Request ML24159A2652024-06-26026 June 2024 Correction of Safety Evaluation for Issuance of Amendment Nos. 298 & 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-100, Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project2024-06-19019 June 2024 Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter IR 05000250/20244012024-06-0505 June 2024 – Security Baseline Inspection Report 05000250-2024401, 05000251-2024401 and 07200062-2024401 L-2024-076, Reply to Notice of Violation; NOV 05000250, 05000251/2024010-052024-05-29029 May 2024 Reply to Notice of Violation; NOV 05000250, 05000251/2024010-05 L-2024-082, 2023 Annual Radiological Environmental Operating Report2024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000250/20240012024-05-10010 May 2024 Integrated Inspection Report 05000250/2024001 and 05000251/2024001 ML24135A0942024-05-0909 May 2024 Periodic Update to the Updated Final Safety Analysis Report L-2024-060, 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report2024-05-0909 May 2024 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report ML24127A1862024-05-0909 May 2024 Request for Withholding Information from Public Disclosure ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-073, Cycle 34 Core Operating Limits Report2024-05-0101 May 2024 Cycle 34 Core Operating Limits Report L-2024-072, Cycle 33 Core Operating Limits Report2024-05-0101 May 2024 Cycle 33 Core Operating Limits Report L-2024-048, Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision2024-04-30030 April 2024 Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision L-2024-069, Radiological Emergency Plan Revision 762024-04-22022 April 2024 Radiological Emergency Plan Revision 76 L-2024-066, Sixth 10-Year Inservice Testing Interval Relief Request No. PR-022024-04-17017 April 2024 Sixth 10-Year Inservice Testing Interval Relief Request No. PR-02 2024-09-25
[Table view] Category:Operating Report
MONTHYEARL-2022-039, and Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2022-04-14014 April 2022 and Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2021-097, and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report2021-05-13013 May 2021 and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report L-2021-096, 10 CFR 50.59(d)(2) Summary Report2021-05-11011 May 2021 10 CFR 50.59(d)(2) Summary Report L-2021-018, 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report2021-02-16016 February 2021 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report L-2020-065, Submission of Periodic Reports2020-04-0909 April 2020 Submission of Periodic Reports ML18227A9832018-08-15015 August 2018 Submit First Year Operation Report. L-2008-245, Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/082008-11-10010 November 2008 Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/08 L-2007-053, Annual Radiological Environmental Operating Report2007-05-0404 May 2007 Annual Radiological Environmental Operating Report L-2004-097, Annual Radiological Environmental Operating Report2004-05-11011 May 2004 Annual Radiological Environmental Operating Report ML18227B0771978-03-17017 March 1978 03/17/1978 Letter Operating Summary Reports of February 1978 ML18227A4231978-03-0404 March 1978 Attached February, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0631978-03-0404 March 1978 03/04/1978 Letter Operating Status Reports of February 1978 ML18227A4221978-02-14014 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0641978-02-14014 February 1978 02/14/1978 Letter Operating Status Reports of January 1978 ML18227A4211978-02-0404 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0651978-02-0404 February 1978 02/04/1978 Letter Operating Status Reports of January 1978 ML18227A4201978-01-0707 January 1978 Attached December, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0671978-01-0707 January 1978 01/07/1978 Letter Operating Status Reports of December 1977 ML18227A4191977-12-0303 December 1977 Attached November, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0681977-12-0303 December 1977 12/03/1977 Letter Operating Status Reports of November 1977 ML18227A4171977-11-0505 November 1977 Attached October, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0691977-11-0505 November 1977 11/05/1977 Letter Operating Status Reports of October 1977 ML18227B0701977-10-0505 October 1977 10/05/1977 Letter Operating Status Reports of September 1977 ML18227B0711977-09-0303 September 1977 09/03/1977 Letter Operating Status Reports of August 1977 ML18227A4151977-09-0303 September 1977 Attached August, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0731977-08-0505 August 1977 08/05/1977 Letter Operating Status Reports of July 1977 ML18227A4141977-08-0505 August 1977 Attached July, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0741977-07-0707 July 1977 07/07/1977 Letter Operating Status Reports of June 1977, and a Revised Operating Data Report for May 1997 for Turkey Point Unit 3 ML18227A4131977-07-0707 July 1977 Attached June, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. May, 1977 for Unit 3 Incorrectly Reported for Some Values. Attached Revised May, 1977 Operating Data Report for Unit 3 ML18227B0751977-06-0606 June 1977 06/06/1977 Letter Operating Status Reports of May 1977 ML18227A4121977-06-0606 June 1977 Attached May, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0761977-05-0505 May 1977 05/05/1977 Letter Operating Status Reports of April 1977 ML18227A4111977-05-0505 May 1977 Attached April, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227A4101977-04-0404 April 1977 Attached March, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. Maximum Dependable Capacity (MWe-Net) for St. Lucie No. 1 Was Revised from 802 MWe-Net to 777 MWe-Net (Estimated) ML18227B0781977-04-0404 April 1977 04/04/1977 Letter Operating Status Reports of March 1977 ML18227B0791977-03-0707 March 1977 03/07/1977 Letter Operating Status Reports of February 1977 ML18227A4091977-03-0707 March 1977 Attached February, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0801977-02-0707 February 1977 02/07/1977 Letter Operating Status Reports of January 1977 ML18227B0811977-01-0707 January 1977 01/07/1977 Letter Operating Status Reports of December 1976 ML18227A4081977-01-0707 January 1977 Attached December, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0821976-12-0606 December 1976 12/06/1976 Letter Operating Status Reports of November 1976 ML18227B0831976-11-15015 November 1976 11/15/1976 Letter Corrected Copies of Operating Data Reports for October 1976 ML18227B0841976-11-0808 November 1976 11/08/1976 Letter Operating Status Reports of October 1976 ML18227A4061976-11-0808 November 1976 Attached October, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227A4071976-11-0505 November 1976 Attached Corrected Copies of October, 1976 Operating Data Reports for Turkey Point Unit Nos. 3 and 4 ML18227A4051976-10-0808 October 1976 Attached September, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0861976-09-0707 September 1976 09/07/1976 Letter Operating Status Reports of August 1976 ML18227A4031976-09-0707 September 1976 Attached August, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0871976-08-0505 August 1976 08/05/1976 Letter Operating Status Reports of July 1976 ML18227A4021976-08-0505 August 1976 Attached July, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. St. Lucie Unit No. 1 Was Previously Reported to Be in Commercial Operation, in Error. Attached Corrected June 1976 for St. Lucie No. 1 2022-04-14
[Table view] |
Text
U.S. NUCLEAR REGULATORY MMISSION D KET NUMBE NHC;FORM 195 12-76) c
/ FILE NUMBER NRC DISTRIBUTION FoR PART 50 DOCKET MATERIAL M NTHL FROM: DATE OF DOCU NT TO:
NRC Florida Power G Light Co. 8577 Miami, FL 33101 DATE R Ec EI V E D A.D. Schmidt 8 12 77 ETTE R ONOTORIZED PAOP INPUT FORM NUMBEA OF COPIES RECEIVED RIG INAL COPY
/fan N C LASS I F I E D / S/q~ro DESCAIPTION ENCLOSURE
'I Letter trans the foll:ng: Monthly Report for July 1977 Plant 5 Component Operability 8c Availability.
This Report to be used in preparing Gray Book by Planh 8e Operations.
qQ lIl;QSI PLANT NAME: (1-P) (ll-P)
VT'/13/77 Turkey Point Units 3 G 4; St. Lucie Unit 1 Cc I
FOR ACTION/INFORMATION CYS R CT N INTERNAL D ISTRI BUTION nc e c ss EXTERNAL DISTRIBUTION CONTROL NUMBER C e e ~
p
'7224003 NAC FOAM 195 I2 7$ 1
P 0 8OX 013100 MIAMI FL 33>0I FLORIDA POWER Br LIGHT COMPANY August 5, 1977 Office of Management Information / .Rf.g/gp and Program Controls ~ ~ lg77~
U. S. Nuclear Regulatory Commission Washington, D. C. '0555 r Gentlemen:
Attached are the July, 1977, Operating Status Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit No. l.
I Very truly yours, A. D. Schmidt Vice President i
Power Resources VTC/DDC cc: Mr. Norman C. Moseley Robert Lowenstein, Esquire
'722AQ' EOP LE... SERVING P EOP LE
APPEÃ)IZ B AVERAGE DAlLY MiET POVER LEVEL DOCKET NO. 50 250 UNITUnit No. 3 DATEAugust 5, 1977 COMiLETED BY V. T. Chil son TEKEPHOiiE (305) S52-3769
- MONTH JULY, 1977 (MWe-Net)
DAY AVERAGE DAlLY POMZR LEVEL DAY AVERAGE DAiLY POL'Pr'R LEVEL (KVe-Net) 643 17 658 645 18 314 645 19 292 646 20 644 21 646 22 25 649 23 227 642 467 641 25 647 10 639 26 643 636 27 640 12 639 28 638 13 639 29 637 14 640 30 643 as 640 31 639 16 652
APPENDIX C OPERATLfG DATA REPORT Domm HO. 50 - 250 ur ey o nt Unit No. 3 REPORT ifONTH JULY, 1977 DATF August 5, 1977 CONPLE~M BY V. T. Chilson TcCEPHONE (305) 552-3769 OP~TI'VG STATUS
- 1. REPORTZifG PERIOD: 0001077 07001 GROSS HOURS I.'i REPORTLfG PERIOD: 744.0 TBROUCH 2400
- 2. CUKKZLY AUTHORIZE) POWER LEVEL (i%Sit): 2200 NAZ D&KRfD. CAPACITY (Ifie-Net): 666 DESIGN ELECTRXCAL RATE'.fG (444e-Het): 693
- 3. PO~r LEVEL TO fsEIXCH RESTRICT%) (IF A."fY) ('Sie-Net): NONE
- 4. RL4SONS FOR RESTRICTION (ZF A!iY):
THIS NONTH YEAR TO DATE CiDPJLAT~iT 5 ~ NfSMiERS OF HOURS REACTOR WAS CRITICAL..... 670.9 4 514.7 32 554.8 6~ ~r CTOR RESERVE SHUTDOWi HOURS ~ ~ ~ ~ . ~ ...... ~ 4.8 4.8 72.2 7 ~ HOURS CLRfERATOR ON LiifE. .
~ ~ ~ .. ~ ~ ......,... 652.6 4 345.0 31 384.1 S. UNIT IIESERUE S!1UTUUUN "OURS............... 85.0
- 9. GROSS THEBIfAL ERKRGY CF'KRATED (RfWH)...... 1 387 483 9 313 286 ~61 041 I
- 10. GROSS ELECTRICAL KRIERGY CLRKRATED (IGHH). ~ . 424 265 2 979 151 19 549 602 I
- 11. NET ELECTRICAL ENERGY GENERATED (IffiH)..... 401 801 2 828 518 I~S04 4
- 12. REACTOR SERVECE FACTOR. 90.2 88.7 79.7
- 13. REACTOR AVAILABH.XTYFACTOR.. ~ ~ ~... ~..., .. 90.8 88.8 79.9 14 UNIT SERVECE FACTOR . ~ . . ~ , ~ , , 87.7 85.4 76.9
- 15. UiNIT AVAILABILITY FACTOR...,.....,....,... 87.7 85.4 77.1 16 'WET CAPACITY PACXOR (Uelng (44DC).......... 81.1 83.5 68.1
- 17. UNIT CAPACITY FACZOR (Using Design 'Sfie)... 80.2 65.4
- 18. UNIT FORCED OUTACE RATE. ~ ............... ~ 12.3 3.2 3.0
- 19. SHUTDO'vPifS SCIKDULED OVER 444T 6 .fOÃTHS (TYPE, DATE, A4%) DURATXON OF EACH):
Stean Generator Inspection - August 16 - Septenber 12, 1977
- 20. XF SHUTDOffN AT EHD OF ~ORT PERIOD, ESTLfATED DATE OF STARTJP:
214 UNXTS Li TEST STATUS (PRIOR TO CO. fERCEAL OPERATION): FORECAST ACHZaVED LNZTEAL CRITZCALXZY LIITZAL ELECTRICITY COMKRCZAL OPERATEO'.f
.) REASON APPEHDIX D DOCKET HO. 50 - 250 A: EQUIPHENT FAILURE (EXPLAIN) Turkey Point B: HAINT. OR TEST UNIT SIIUTDOWNS AHD POWER REDUCTIONS UNIT NAHE Unit No. 3 C: REFUEI.IHC D: RECULATORY RESTRICTION DATE Au ust 5 1977 E: l)PERATOR TRAIHINC AND LICENSE EXAHIHATIOH COMPLETED BY V. T. Chilson F: ADHIHISTRATIVE 0: TELEPIIONE (305) 552- 3769 OPERATIONAL ERROR (EXPLAIN) REPORT HOHTH JULY'977 H: OTIIER (EXPLAIN)
PACE 1 OF 2
) HETIIOD 1: HAHUAL . HETIIOD OF 2: .HANUAL SCRAM TYPE SIIUTTINC DOWN 3: AUTOHATIC SCRAH F: FORCED DURATION TIIE REACTOR OR 4: OIIIER (EXPLAIN) NO. DATE S: SCIIEDULED 010URS) REASOH(1) REDUCINC POWER(2) CORRECTIVE ACTIONS/COHHENTS 17 77-07-18 10.7 Unit No. 3 Mas manually tripped due to oil leak in generator seal oil system that could not be isolated.
Corrective actions included replacing failed seal oil system filter. (Non-nuclear system) 18 77-07-19 71.3 Unit No. 3 was removed from service to locate and repair condenser tube leak. (Non-nuclear system) 19 77-07-22 Load reduction to locate and repair condenser tube leak. (Non-nuclear system) 20 77-07-23 1.7 Unit No. 3 was tripped by spurious operation of a relay in the reactor protection system. (Nuclear system)
REASOII APPEHDIX D DOCKET NO. 50 250
)
A: EI)UIPHEIIT FAILURE (EXPLAIN) Turkey Point B: HAINT. OR TEST UHIT SIIUTDOIINS AND POWER REDUCTIOtIS UNIT NhtlC Unit No. 3 C: REFUEI.ING D: IIECULATORY RESTRICTION DATE Au ust 5, 1977 E: Ol'ERATOR TRAIHING AHD LICENSE EXAtlIHATIOH COHPLETED BY V. T. Chilson F: ADIIINISTRATIVE -
G: OPERATIONAI. ERROR (EXPLAIH) TELEPIIOHL'305) 552 3769 H:, OTHER (EXPLAIII)
PAGE 2 OF 2
) HETHOD 1: tIAHllhl. . IIETHOD OF 2: )IAIIUAI, SCRAH TYPE SIIUTTIIIG DOWII 3: AUTOHATIC SCRAH F: FORCbl) DU RATIOtl THE REACTOR OR 4: 0)IIER (EXPLAIN) HO. DATE S: SCHEDULED (IIOURS) REASON(1) REDUCING POltER(2) CORRECTIVE ACTIOIIS/CO)IHENTS 21 77-07-23 7.6 Unit No. 3 @as tripped when the second of two generator breakers'opened while nanually opening a transmission system breaker during a switching operation. Corrective actions included repairing a saalfunctioning generator breaker. (Hon-nuclear systen)
~
~
SUIIHARY) Unit Ho. 3 operated at approxinatcly IOOZ R.P. except for load reduction on July 22, 1977, and outages of July lg, 19-22, 22, and 23> 1977.
~
~
g ~
1
APPEIKLX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NG. 50 251 Turkey Point UNIT Unit No.
DATE Au ust 5 1977 COMPLE~ BY V. T. Chilson HONE (305) 552-3769 MONTH (MWe-Net)
Y DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 17 18 3 19 20 21 6 22 23 24 25 10 26 27 12 28 13 29 30 15 31 16
APPENDL(
DATA REPORT C'PERA";XNG DOCKET NO. 50 - 251 Tur ey Point
. UNIT Unic No. 4 REPORT HONTH JULY, 1977 DA~ August 5, 1977 I
COMPLETED BY V* T. Chilson TELEPHONE (305) 552 3769 OPERATING STATUS
- 1. REPORTXilG PERIOD: 0001,77 07 01 GROSS HOUPS XN REPORTING PERIOD: 744.0 THROUGH 2400 77
- 2. CURRENTLY AU HORXEED PQllER LEVEL (AOlc): 2200 6%ZZ DEPEND. CAPACZTY (RDle-Net): 666 DESIGN ELECTRICAL RATING (Nile-N(Ec): 93
- 3. PO~E LEVEL TO 4HICH RESTRICTED (IF ANY) (A(Ne-Nec): NONE 4.
5 6.
7
~
~
~~ONS FOR RESTRXCTION (XF AZMIESS 87 HOURS REAC OR HAS REACTOR RESERVE SHUTDO'lN HOURS HOURS GENERATOR ON A'lY):
CRZZZCAL.....
~ ~ ~ ~ ~ ~
LINK...................
~ 2~
. THIS HONTH
-0 0 0 2 YEAR TO
-0 496.7 DATAE- ClÃULATXVE
~I
~138.
23 038.8 8 ~ UNiIT RESERVE SHUTDOMA HOURS. ~.......... ~ .. 9. GROSS LLL.'lAL ENERGY GENERATED (.'M!)...... W- 5 424 235 48 483 605
- 18. CROSS El "CZRZCAL LUEROZ.OLU RII ~" (HHH)... 1 768 385 '~5726 8 8
- 11. HE ~CZRZCAL LUSRCZ OEIERAZEO (will).....- 3 615 .
2~675 2 6 ~OIRHRg
- 12. REACTOR SERVICE PACTOR...... 0.2 49.6 70.2
- 13. REACTOR AVAZLABILZTYFACTOR.... 0.2 49.6 70.6 14 ~ UANIT-SERVICE FACTOR. 0.0 49.1 66.7 15 .lIT AVAILABILITYFACTOR....... ~ . ~ ~ ~ .. ..
~ ~ 0.0 49.1 66.7
- 16. WZT CAPACITY FA~AR (Using QSC) ... ~ . ~.... 0.0 49.4 64.8
- 17. UNIT CAPACITY FACTOR (Using Design HNe)... 0.0 47.5
- 18. UNXT FORCED OUTAGE RATE. ...... ... .. ...
~ ~ ~ 0.0 0.0 19 'HUTDOllNS SCHIZlULED OVER NK:P' HONTHS (TYPE, DATE, AND DURATION OF EACH):
- 20. ZF SHUTDOQll AT KND OP REPORT PERIOD, KST~AWM DATE OP STA(l~JP: Au st 3 1977
- 21. UNITS XN I"ST STATUS (PRIOR TO COEKRCXAL OPTATION): FORECAST ACHIZPci)
IiNITIAL CRITXCALZ Y INITIAL ELECTRICITY COi%lKRCLQ. OPERATION
.) REASOII APPENDIX D DOCKET NO. 50 - 251 h: E"<UIPIIENT FAII.URE (EXP Lhltl)
Turkey Point D: Hhitt'T. OR TEST UtIIT SIIUTD(httIS AHU POHER REDUCTIONS UtIIT NAHF. Unit No. 4 C: REFUEI.IHG nt REOULATORY RESTRICTION DATE August 5, 1977 E: OPFRATOR TRAINING AND l.ICEHSE EXAHIHATIOH COtIPLETED DY V. T. Chilson F: ADIIINISTRATIVE TELEPUOIIE (305) 552-3769 G: OPERATIONAL ERROR (EXPLAIN) REPORT tIOtml JULY 1977 Il: OTII FR (EXP IXIII)
) HETIIOD 1: tlhHUAI. . HETHOD OF 2: tlhNUAI. SCRAH TYPE SIIUTTIHC DOMH 3: AUTOtlhTIC SCRAH F: FORCED DURATION THE REACTOR OR 4: OIIIER (EXPLAIH) NO. DATE S: SCIIEDULED (NOUNS) REASON(1) REDUCIHC POWER(2) CORRECTIVE ACTIONS/CO..IHEHTS 77-05-09 7414. 0 Unit llo. 4 uas removed from service for refueling, maintenance, and inspections. {Continued from previous month) (Nuclear and non-nuclear systems)
SUIIHARY- Unit Ho. 4 was out of service for entire month for refueling, maintenance, and inspect'ions.
APPENDIX B AVERAGE DAILY UNXT POWER LEVEL DOCKET NO. 50 -'35 St. Lucie PilIT Unit No. 1 DATE August. 5, 1977 COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3769 MONTH JULY 1977 DAY AVERAGE DAILY POWER LEVEL DAY AVKULGE DAILY POWER L"VEL (Kfe-Net) (MWe-Net) 769 17 779 774 18 779 779 19 780 752 20 783 454 783 773 22 783 780 23 778 270 778 778 25 741 10 600 26 772 524 27 763 12 698 ,28 773 13 481 29 631
'73 30 229 15 722 768 16 758 NOTE Average daily power greater than 777 ice due to cooler condenser cooling water. /
t
APPENDS C OPERATZ'.lG DATA R~~ORT DOCKET NO. 50 - 335 t ~ ncie Unit No. 1 REPORT HONZH JULY9 1977 DATE Angst 5, 1977 CONPLETED BY V. T. ChiIson TELEPHONE (305) 552 3769 OPERATX4NG STATUS
- 1. REPORTING PERIOD: 0001077907901 GROSS HOURS Zil REPORTI.lG PERIOD: 744.0 OUGH 2400 77 0 2~ CURR2'9fTLY Al42THORZZED P09~q LEVEL (989gt) . 2560 DESIGN ELECTRICAL RATING (HWe-Net): '802
- 3. POWaR LEVEL TO 'riHZCH RESTRICic9 (XF AilY) (94Ãe-Het): NONE REASONS FOR RESTRICTION {IF <Vr):
THIS 4HONTH YEAR TO DATE CUNULATZVE
- 5. NU44BERS OF HOURS BM~CTOR WAS CRITICAL...,, 735 ~ 3 4 344.4 ~4 HOURS............ 8.7 ~0
~...
- 6. REACTOR RESERVE ShODOWN 101. 8
- 7. HOURS Gc~RATOR ON LLlE.. ~... ~ 689.4 4 137.9 4 401 9 8- UNZT RESERVE SHUTDOWN HOURS. ~ ~ - ~ ~ ~ ~ ~ ~ ~ ~ ~ . ~ -0 9. GROSS THERl8~ ENERGY G~ci 2 TlU) (HllH) ~..... 1 705 667
- 10. GROSS ELECTRICAL ENERGY Gc lERATED (944H)...
- 11. NET ELECTRICAL ENERGY GESF'lATED (iSHH)...,. 518 560 2 823 148 2~92
- 12. ACTOR SERVICE FACTOR. 98.8 85.4 86.1
- 13. REACTOR AVAZLABILZTY FACTOR......,........ 100. 0 87.4 14 'Ni XT SERVICE FACTOR. 92. 7 81.3 15 ~ UNIT AVAILABILITYFACTOR...,.....,,....... 92.7 81. 3
- 16. lD{IT CAPACZT FACTOR (Using,(NDC) ........ 89 ' 71.4 70.3
- 17. UNIT CAPACITY FACTOR {Using Design HWe)... 86.9 69.2 18 'NXT FORCED OUTAGE RATE. . ~ ~ ~ ~ ~ ~ ~ ~ 1.6 16.8 16.0 19 ~ SHUTDOWN48 SCHEDULED OVER NEET 6 HONTHS ('JJPE 9 DAT 9 AND DURATXON OF EACH)
Warzanty Inspection - Septet2ber 26 to October 10, 1977. 'zelininary
- 20. iF SHUTDOWNi AT RQ OF REPORT PERIOD> ESTZQTED DATE OF STARTUP:
21 ~ UNITS Dl T.ST STATUS (PRIOR TO CO48rr'lCZAL OPMATIO4Q: FORECAST ACHIEVED ZiXTZAL CRXTICALITY INITIAL ELECTRICIT CO4 lERCL4L OPERATION
.) REASON APPENDIX D DOCKET NO. 50 - 335 h: EQUIPHF&f FAILURE (EXPLAIN) St. Lucio D: NAINT. OR TEST UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT HANE Unit No.
C: REFUELllt0 D: REGULATORY RESTRICTION DATE Au ust 5 197 E: OPERATOR TRAIHIHC AHD I.ICENSE EXAHIHATIOH COllPLETED DY V. T. Chilson F: AlkllNISTRATIVE G: OPERATIOHhl. ERROR (EXPLAIN) TELEPHONE 305 552-3769 H: OTHER (EXPLAIN)
PAGE 1 OF 2
') IIETIBD I: MANUAL . NETilOD OF 2: HANUAf. SCRAH TYPE SIIUTTINC DOWN 3: AUTOHATIC SCRAN F: FORCED DURATION TIIE REACTOR OR 4: OIIIER (EXPLAIN) NO. DATE S: SCHEDULED (I10URS) REASON(1) REDUCIHC POWER(2) CORRECTIVE ACTIONS/COHNENTS 26 77-07-04 8.1 Unit was removed from service to repair packing leak on pressurizer spray valve. (Nuclear system) 27 77-07-08 11.0 Unit was removed from service to repair failed pres-surizer spray valves. (Nuclear system) 28 77-07-10 10. 1 Unit was removed from service for maintenance of pres-surizer spray vplve. (Nuclear system)
.) RFJlSON APPENDIX D DOCKET HO. 50 - 335 h: EqUIPMENT Fhll.URP. (EXPIAIN) St. Lucie 8: MAIHT. OR TEST UNIT SHUTDOWNS AND POWER REDUCTIONS WHIT HAIIE Unit No. 1 C: REFUL'l.l NC D: REGULATORY RESTRICTIOH DATE August 5, 1977 E: 01'ERATOR TRAININC AND I.ICFNSE EXAMINATION COHPLETED BY V. T. Chilson F: ADMINISTRATIVE C: OPERATIONAl. ERROR (EXPLAIN) TELEPllOHE 305 552-3769 Il: OTHER (EXPLAIN)
PACE 2 OF 2
) METIIOD I: IIANUhl. . METllOD OF 2: .MANUhl, SCRAM TYPE SIIUTTINC DOWN 3: AUTOHATIC SCRAM F: FORCED DURATION TNE REACTOR OR 4: OIIIER (EXPLAIN) NO. DATE S: SCHEDULED (lIOURS) REASON(1) REDUCINC POWER(2) CORRECTIVE ACTIONS/COMMENTS 29 77-07-12 8.1 Unit was removed from service to install the repaired alternate pressurizer spray valve. (Nuclear system) 30 77-07-29 17. 2 Unit uas removed from service to install modified pressurizer spray valve assembly. (Nuclear system)
SUMllhRY: Unit operated at approximately IOOX R.P. except for outages of July 4-5, 8, 10-11, 12-13, and 29-30, 1977.