ML18227A414

From kanterella
Jump to navigation Jump to search
Attached July, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1
ML18227A414
Person / Time
Site: Turkey Point  
Issue date: 08/05/1977
From: Schmidt A
Florida Power & Light Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML18227A414 (14)


Text

U.S. NUCLEAR REGULATORY MMISSION NHC;FORM 195 12-76) c

/

NRC DISTRIBUTION FoR PART 50 DOCKET MATERIAL D

KET NUMBE FILE NUMBER M NTHL TO:

NRC ETTE R RIG INAL COPY DESCAIPTION

'I ONOTORIZED

/fan NC LASS I F I E D PAOP INPUT FORM ENCLOSURE FROM:

Florida Power G Light Co.

Miami, FL 33101 A.D. Schmidt DATE OF DOCU NT 8577 DATE R Ec EIVE D 8 12 77 NUMBEA OF COPIES RECEIVED

/ S/q~ro Letter trans the foll:ng:

qQ lIl;QSI Monthly Report for July 1977 Plant 5 Component Operability 8c Availability.

This Report to be used in preparing Gray Book by Planh 8e Operations.

PLANT NAME:

(1-P)

Turkey Point Units 3

G 4; St. Lucie Unit 1 VT'/13/77 (ll-P)

I Cc CYS R

CT N

FOR ACTION/INFORMATION INTERNALDISTRI BUTION nc e

c ss C

e EXTERNAL DISTRIBUTION CONTROL NUMBER e ~

p

'7224003 NAC FOAM 195 I2 7$ 1

P 0 8OX 013100 MIAMI FL 33>0I FLORIDAPOWER Br LIGHT COMPANY August 5, 1977 Office of Management Information and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C.

'0555

/.Rf.g/gp

~ ~ lg77~

r Gentlemen:

Attached are the July, 1977, Operating Status Reports for Turkey Point Unit Nos.

3 and 4 and St. Lucie Unit No. l.

I Very truly yours, i

A. D. Schmidt Vice President Power Resources VTC/DDC cc:

Mr. Norman C. Moseley Robert Lowenstein, Esquire

'722AQ' EOP LE... SERVING P EOP LE

APPEÃ)IZ B AVERAGE DAlLY MiET POVER LEVEL DOCKET NO. 50 250 UNITUnit No.

3 DATEAugust 5, 1977 COMiLETED BYV. T. Chilson TEKEPHOiiE (305)

S52-3769

- MONTH JULY, 1977 DAY AVERAGE DAlLY POMZR LEVEL (KVe-Net)

DAY AVERAGE DAiLY POL'Pr'R LEVEL (MWe-Net)

10 12 13 14 as 16 643 645 645 646 644 646 649 642 641 639 636 639 639 640 640 652 17 18 19 20 21 22 23 25 26 27 28 29 30 31 658 314 292 25 227 467 647 643 640 638 637 643 639

APPENDIX C OPERATLfG DATA REPORT REPORT ifONTH JULY, 1977 Domm HO.

50 - 250 ur ey o nt Unit No.

3 DATF August 5, 1977 CONPLE~M BY V. T. Chilson OP~TI'VG STATUS TcCEPHONE (305) 552-3769 1.

REPORTZifG PERIOD: 0001077 07001 GROSS HOURS I.'i REPORTLfG PERIOD:

TBROUCH 2400 2.

CUKKZLY AUTHORIZE) POWER LEVEL (i%Sit):

2200 NAZ D&KRfD. CAPACITY (Ifie-Net):

666 DESIGN ELECTRXCAL RATE'.fG (444e-Het):

693 744.0 3.

PO~r LEVEL TO fsEIXCH RESTRICT%) (IF A."fY)

('Sie-Net):

4.

RL4SONS FOR RESTRICTION (ZF A!iY):

NONE THIS NONTH YEAR TO DATE CiDPJLAT~iT 5 ~

NfSMiERS OF HOURS REACTOR WAS CRITICAL.....

670.9 4 514.7 32 554.8 6 ~

~r CTOR RESERVE SHUTDOWi HOURS ~ ~ ~ ~

. ~......

~

4.8 4.8 72.2 7 ~

HOURS CLRfERATOR ON LiifE.~.

~ ~..

~ ~......,...

652.6 4 345.0 31 384.1 S.

UNIT IIESERUE S!1UTUUUN "OURS............... 9.

GROSS THEBIfAL ERKRGY CF'KRATED (RfWH)......

1 387 483 9 313 286 10.

GROSS ELECTRICAL KRIERGY CLRKRATED (IGHH). ~.

424 265 2 979 151 I

11.

NET ELECTRICAL ENERGY GENERATED (IffiH).....

401 801 2 828 518 85.0

~61 041 I

19 549 602 I~S04 4

12.

REACTOR SERVECE FACTOR.

90.2 88.7 79.7 13.

REACTOR AVAILABH.XTYFACTOR..

~

~ ~... ~...,..

90.8 88.8 79.9 14 UNIT SERVECE FACTOR

~.

~,

~,

87.7 85.4 76.9 15.

UiNIT AVAILABILITYFACTOR...,.....,....,...

87.7 16'WET CAPACITY PACXOR (Uelng (44DC)..........

81.1 17.

UNIT CAPACITY FACZOR (Using Design 'Sfie)...

18.

UNIT FORCED OUTACE RATE.

~...............

~

12.3 85.4 83.5 80.2 3.2 77.1 68.1 65.4 3.0 19.

SHUTDO'vPifS SCIKDULED OVER 444T 6.fOÃTHS (TYPE, DATE, A4%) DURATXON OF EACH):

Stean Generator Inspection -

August 16 - Septenber 12, 1977 20.

XF SHUTDOffN AT EHD OF ~ORT PERIOD, ESTLfATED DATE OF STARTJP:

214 UNXTS Li TEST STATUS (PRIOR TO CO. fERCEAL OPERATION):

LNZTEAL CRITZCALXZY LIITZALELECTRICITY COMKRCZAL OPERATEO'.f FORECAST ACHZaVED

.)

REASON A:

EQUIPHENT FAILURE (EXPLAIN)

B:

HAINT. OR TEST C:

REFUEI.IHC D:

RECULATORY RESTRICTION E:

l)PERATOR TRAIHINC AND LICENSE EXAHIHATIOH F:

ADHIHISTRATIVE 0:

OPERATIONAL ERROR (EXPLAIN)

H:

OTIIER (EXPLAIN)

APPEHDIX D UNIT SIIUTDOWNS AHD POWER REDUCTIONS REPORT HOHTH JULY'977 PACE 1 OF 2 DOCKET HO.

50 - 250 Turkey Point UNIT NAHE Unit No. 3 DATE Au ust 5

1977 COMPLETED BY V. T. Chilson TELEPIIONE (305) 552-3769

)

HETIIOD 1:

HAHUAL 2:

.HANUAL SCRAM 3:

AUTOHATIC SCRAH 4:

OIIIER (EXPLAIN)

NO.

DATE TYPE F:

FORCED S:

SCIIEDULED DURATION 010URS)

REASOH(1)

. HETIIOD OF SIIUTTINC DOWN TIIE REACTOR OR REDUCINC POWER(2)

CORRECTIVE ACTIONS/COHHENTS 17 77-07-18 10.7 Unit No.

3 Mas manually tripped due to oil leak in generator seal oil system that could not be isolated.

Corrective actions included replacing failed seal oil system filter.

(Non-nuclear system) 18 77-07-19 71.3 Unit No.

3 was removed from service to locate and repair condenser tube leak.

(Non-nuclear system) 19 77-07-22 Load reduction to locate and repair condenser tube leak.

(Non-nuclear system) 20 77-07-23 1.7 Unit No.

3 was tripped by spurious operation of a relay in the reactor protection system.

(Nuclear system)

)

REASOII A:

EI)UIPHEIIT FAILURE (EXPLAIN)

B:

HAINT. OR TEST C:

REFUEI.ING D:

IIECULATORY RESTRICTION E:

Ol'ERATOR TRAIHING AHD LICENSE EXAtlIHATIOH F:

ADIIINISTRATIVE G:

OPERATIONAI. ERROR (EXPLAIH)

H:, OTHER (EXPLAIII)

APPEHDIX D UHIT SIIUTDOIINS AND POWER REDUCTIOtIS DOCKET NO.

50 250 Turkey Point UNIT NhtlC Unit No. 3 DATE Au ust 5, 1977 COHPLETED BY V. T. Chilson TELEPIIOHL'305) 552 - 3769

)

HETHOD 1:

tIAHllhl.

2:

)IAIIUAI,SCRAH 3:

AUTOHATIC SCRAH 4:

0)IIER (EXPLAIN)

HO.

DATE TYPE F:

FORCbl)

S:

SCHEDULED DURATIOtl (IIOURS)

PAGE 2 OF 2 REASON(1)

. IIETHOD OF SIIUTTIIIG DOWII THE REACTOR OR REDUCING POltER(2)

CORRECTIVE ACTIOIIS/CO)IHENTS 21 77-07-23 7.6 Unit No.

3 @as tripped when the second of two generator breakers'opened while nanually opening a transmission system breaker during a switching operation.

Corrective actions included repairing a saalfunctioning generator breaker.

(Hon-nuclear systen)

~ ~

SUIIHARY)

Unit Ho.

3 operated at approxinatcly IOOZ R.P. except for load reduction on July 22, 1977, and outages of July lg, 19-22, 22, and 23> 1977.

~

~

g

~

1

APPEIKLX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NG. 50 251 Turkey Point UNIT Unit No.

DATE Au ust 5

1977 COMPLE~ BY V. T. Chilson HONE (305) 552-3769 MONTH Y

DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 17 18 3

19 20 21 6

22 23 24 25 10 26 27 12 28 13 29 30 15 31 16

APPENDL(

C'PERA";XNG DATA REPORT REPORT HONTH JULY, 1977 I

OPERATING STATUS DOCKET NO.

50 - 251 Tur ey Point

. UNIT Unic No.

4 DA~

August 5, 1977 COMPLETED BY V* T. Chilson TELEPHONE (305) 552 3769 1.

REPORTXilG PERIOD: 0001,77 07 01 GROSS HOUPS XN REPORTING PERIOD:

THROUGH 2400 77 2.

CURRENTLY AU HORXEED PQllER LEVEL (AOlc):

2200 6%ZZ DEPEND.

CAPACZTY (RDle-Net):

666 DESIGN ELECTRICAL RATING (Nile-N(Ec):

93 744.0 3.

PO~E LEVEL TO 4HICH RESTRICTED (IF ANY)

(A(Ne-Nec):

4.

~~ONS FOR RESTRXCTION (XF A'lY):

NONE

. THIS HONTH YEAR TO DATAE-ClÃULATXVE 5

~

AZMIESS 87 HOURS REAC OR HAS CRZZZCAL.....~ 2~ ~I 6.

REACTOR RESERVE SHUTDO'lN HOURS ~ ~ ~ ~ ~

~

-0

-0

~138.

7 ~

HOURS GENERATOR ON LINK...................

0 0 2 496.7 23 038.8 8 ~

UNiIT RESERVE SHUTDOMA HOURS. ~..........

~.. 9.

GROSS LLL.'lAL ENERGY GENERATED (.'M!)......

W-5 424 235 48 483 605 18.

CROSS El "CZRZCAL LUEROZ.OLU RII ~" (HHH)... 1 768 385

'~5726 8 8 11.

HE

~CZRZCAL LUSRCZ OEIERAZEO (will).....- 3 615 2~675 2 6

~OIRHRg 12.

REACTOR SERVICE PACTOR......

0.2 49.6 70.2 13.

REACTOR AVAZLABILZTYFACTOR....

14 ~

UANIT-SERVICE FACTOR.

15.lIT AVAILABILITYFACTOR.......

~.

~ ~ ~.. ~..

~

16.

WZT CAPACITY FA~AR (Using QSC)...

~. ~....

17.

UNIT CAPACITY FACTOR (Using Design HNe)...

0.2 49.6 0.0 49.1 0.0 49.1 0.0 49.4 0.0 47.5 70.6 66.7 66.7 64.8 18.

UNXT FORCED OUTAGE RATE.......

~...

~..

~...

0.0 0.0 19 'HUTDOllNS SCHIZlULED OVER NK:P' HONTHS (TYPE, DATE, AND DURATION OF EACH):

20.

ZF SHUTDOQll AT KND OP REPORT PERIOD, KST~AWM DATE OP STA(l~JP:

Au st 3

1977 21.

UNITS XN I"ST STATUS (PRIOR TO COEKRCXAL OPTATION):

IiNITIALCRITXCALZ Y INITIAL ELECTRICITY COi%lKRCLQ. OPERATION FORECAST ACHIZPci)

.)

REASOII h:

E"<UIPIIENT FAII.URE (EXPLhltl)

D:

Hhitt'T.

OR TEST C:

REFUEI.IHG nt REOULATORY RESTRICTION E:

OPFRATOR TRAINING AND l.ICEHSE EXAHIHATIOH F:

ADIIINISTRATIVE G:

OPERATIONAL ERROR (EXPLAIN)

Il:

OTII FR (EXP IXIII)

APPENDIX D UtIIT SIIUTD(httIS AHU POHER REDUCTIONS REPORT tIOtml JULY 1977 DOCKET NO.

50 - 251 Turkey Point UtIIT NAHF.

Unit No.

4 DATE August 5, 1977 COtIPLETED DY V. T. Chilson TELEPUOIIE (305) 552-3769

)

HETIIOD 1:

tlhHUAI.

2:

tlhNUAI. SCRAH 3:

AUTOtlhTIC SCRAH 4:

OIIIER (EXPLAIH)

NO.

DATE TYPE F:

FORCED S:

SCIIEDULED DURATION (NOUNS)

REASON(1)

. HETHOD OF SIIUTTIHC DOMH THE REACTOR OR REDUCIHC POWER(2)

CORRECTIVE ACTIONS/CO..IHEHTS 77-05-09 7414. 0 Unit llo. 4 uas removed from service for refueling, maintenance, and inspections.

{Continued from previous month)

(Nuclear and non-nuclear systems)

SUIIHARY-Unit Ho. 4 was out of service for entire month for refueling, maintenance, and inspect'ions.

APPENDIX B AVERAGE DAILY UNXT POWER LEVEL DOCKET NO.

50 -'35 St. Lucie PilIT Unit No.

1 DATE August. 5, 1977 COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3769 MONTH JULY 1977 DAY AVERAGE DAILY POWER LEVEL (Kfe-Net)

DAY AVKULGE DAILY POWER L"VEL (MWe-Net) 10 12 13 15 16 769 774 779 752 454 773 780 270 778 600 524 698 481

'73 722 758 17 18 19 20 22 23 25 26 27

,28 29 30 NOTE 779 779 780 783 783 783 778 778 741 772 763 773 631 229 768 Average daily power greater than 777 ice due to cooler condenser cooling water.

/

t

APPENDS C

OPERATZ'.lG DATA R~~ORT DOCKET NO.

50 - 335 t ~

ncie Unit No.

1 REPORT HONZH JULY9 1977 OPERATX4NG STATUS DATE Angst 5, 1977 CONPLETED BY V. T. ChiIson TELEPHONE (305) 552 3769 1.

REPORTING PERIOD:

0001077907901 GROSS HOURS Zil REPORTI.lG PERIOD:

OUGH 2400 77 0 2 ~

CURR2'9fTLY Al42THORZZED P09~q LEVEL (989gt).

2560 DESIGN ELECTRICAL RATING (HWe-Net):

'802 3.

POWaR LEVEL TO 'riHZCH RESTRICic9 (XF AilY)

(94Ãe-Het):

NONE REASONS FOR RESTRICTION {IF <Vr):

744.0 THIS 4HONTH YEAR TO DATE CUNULATZVE 5.

NU44BERS OF HOURS BM~CTOR WAS CRITICAL...,,

735 ~ 3 4 344.4

~4 6.

REACTOR RESERVE ShODOWN HOURS............

8.7 101. 8

~0 7.

HOURS Gc~RATOR ON LLlE..~...

~~...

689.4 4 137.9 8-UNZT RESERVE SHUTDOWN HOURS.

~ ~ - ~ ~ ~ ~ ~ ~ ~ ~ ~.

~

-0 9.

GROSS THERl8~ ENERGY G~ci 2

TlU) (HllH)~.....

1 705 667 10.

GROSS ELECTRICAL ENERGY Gc lERATED (944H)...

11.

NET ELECTRICAL ENERGY GESF'lATED (iSHH)...,.

518 560 2 823 148 12.

ACTOR SERVICE FACTOR.

98.8 85.4 4 401 9

2~92 86.1 13.

REACTOR AVAZLABILZTYFACTOR......,........

100. 0 87.4 14'Ni XT SERVICE FACTOR.

92. 7 81.3 15 ~

UNIT AVAILABILITYFACTOR...,.....,,.......

92.7

81. 3 16.

lD{IT CAPACZT FACTOR (Using,(NDC)........

89 '

71.4 70.3 17.

UNIT CAPACITY FACTOR {Using Design HWe)...

86.9 69.2 18 'NXT FORCED OUTAGE RATE.

~ ~ ~ ~ ~ ~ ~ ~

1.6 16.8 16.0 19 ~

SHUTDOWN48 SCHEDULED OVER NEET 6 HONTHS

('JJPE 9

DAT 9

AND DURATXON OF EACH)

'zelininary Warzanty Inspection - Septet2ber 26 to October 10, 1977.

20.

iF SHUTDOWNi AT RQ OF REPORT PERIOD> ESTZQTED DATE OF STARTUP:

21 ~

UNITS Dl T.ST STATUS (PRIOR TO CO48rr'lCZAL OPMATIO4Q:

ZiXTZAL CRXTICALITY INITIALELECTRICIT CO4 lERCL4L OPERATION FORECAST ACHIEVED

.)

REASON h:

EQUIPHF&f FAILURE (EXPLAIN)

D:

NAINT. OR TEST C:

REFUELllt0 D:

REGULATORY RESTRICTION E:

OPERATOR TRAIHIHC AHD I.ICENSE EXAHIHATIOH F:

AlkllNISTRATIVE G:

OPERATIOHhl. ERROR (EXPLAIN)

H:

OTHER (EXPLAIN)

APPENDIX D UNIT SHUTDOWNS AND POWER REDUCTIONS PAGE 1 OF 2 DOCKET NO.

50 - 335 UNIT HANE St. Lucio Unit No.

DATE Au ust 5 197 TELEPHONE 305 552-3769 COllPLETED DY V. T. Chilson

')

IIETIBD I:

MANUAL 2:

HANUAf. SCRAH 3:

AUTOHATIC SCRAN 4:

OIIIER (EXPLAIN)

NO.

DATE TYPE F:

FORCED S:

SCHEDULED DURATION (I10URS)

REASON(1)

. NETilOD OF SIIUTTINC DOWN TIIE REACTOR OR REDUCIHC POWER(2)

CORRECTIVE ACTIONS/COHNENTS 26 77-07-04 8.1 Unit was removed from service to repair packing leak on pressurizer spray valve.

(Nuclear system) 27 77-07-08 11.0 Unit was removed from service to repair failed pres-surizer spray valves.

(Nuclear system) 28 77-07-10

10. 1 Unit was removed from service for maintenance of pres-surizer spray vplve.

(Nuclear system)

.)

RFJlSON h:

EqUIPMENT Fhll.URP. (EXPIAIN) 8:

MAIHT. OR TEST C:

REFUL'l.lNC D:

REGULATORY RESTRICTIOH E:

01'ERATOR TRAININC AND I.ICFNSE EXAMINATION F:

ADMINISTRATIVE C:

OPERATIONAl. ERROR (EXPLAIN)

Il:

OTHER (EXPLAIN)

APPENDIX D UNIT SHUTDOWNS AND POWER REDUCTIONS PACE 2 OF 2 DOCKET HO.

WHIT HAIIE 50 - 335 St. Lucie Unit No. 1 DATE August 5, 1977 TELEPllOHE 305 552-3769 COHPLETED BY V. T. Chilson

)

METIIOD I:

IIANUhl.

2:

.MANUhl, SCRAM 3:

AUTOHATIC SCRAM 4:

OIIIER (EXPLAIN)

NO.

DATE TYPE F:

FORCED S:

SCHEDULED DURATION (lIOURS)

REASON(1)

. METllOD OF SIIUTTINC DOWN TNE REACTOR OR REDUCINC POWER(2)

CORRECTIVE ACTIONS/COMMENTS 29 77-07-12 8.1 Unit was removed from service to install the repaired alternate pressurizer spray valve.

(Nuclear system) 30 77-07-29

17. 2 Unit uas removed from service to install modified pressurizer spray valve assembly.

(Nuclear system)

SUMllhRY:

Unit operated at approximately IOOX R.P. except for outages of July 4-5, 8, 10-11, 12-13, and 29-30, 1977.

<" I 1(