ML18227A422
| ML18227A422 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 02/14/1978 |
| From: | Schmidt A Florida Power & Light Co |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| Download: ML18227A422 (6) | |
Text
r REGULATORY INFOR~ION DISTRIBUTION SYSTEM ~DS)
DISTRIBUTION FOR INCOME MATERIAL 50-250
/. "5 REC:
NRC ORG:
SCHMIDT A D
FL PWR cc LIGHT DOCDATE: 02/14/78 DATE RCVD: 02f21/ 78 DOCTYPE:
LETTER NOTARIZED:
NO COPIES RECEIVED SUBiJECT:
LTR 1
ENCL 1
M IOllTHLY OPERATING REPT FOR SUBJECT UNITS 3 8c 4 AND UtlIT 1.
FOR JANlJARYi 1978.
PLANT NAME:TURKEY PT 83 TURKEY PT 43 ST LUCIE Ni REVIEWER INITIAL:
XJM DISTRIBUTER IhlITIAL:
DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS MONTHLY OPERATING REPORT FOR GRAY BOOK PREPARATION.
(DISTRIBUTION CODE A003>
FOR ACTION:
INTERNAL:
EXTERNAL:
BR CHIEF~XAEEE ++W/2 ENCL EG FILE++W/E l L 6
ACTION+4W/2 ENCL LPDR S
MIAMI FL~~W/ENCL 7IC4 +W/ENCL NS IC+4 W/ENCL BNL(NATLAB)4+W/ENCL ACRS CAT B++W/0 ENCL NRC PDR++W/ENCL DISTRIBUTION:
LTR 10 ENCL 10 SIZE:
iP+iP+2P THE END CONTROL NBR:
7805.0005
V FLORIDA POWER 8( LIGHT COMPANY February 14, 1978 Office of Management Xnformation and Program Controls U. S. Nuclear Regulatory Commission Washington, D.
C.
20555 Gentlemen:
Attached are the January, 1978, Operating Summary Repozts-for Turkey-*Point ~Unit:Nos.
3 and.4 -.and St. Lucie Unit No.
I Very truly yours, D. Schmidt Vice President Power Resources VTC/bab cc:
Mr. James P. O'Reilly Robert Lowenstein, Esquire 780530005 PEOPLE... SERVNG.PEOPLE,g!)
e t.CJI84',
St~QLKRY OF OPERATIVLG EXPERIFNCE DOCKET.'NO.
5 0-25 0 Turkey Point UNIT i
978 COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3830 REPORT HONTH Januar 1978
'urkey Point Unit No 3 scheduled, refueling, maintenanceg "and;-'inspections~.continued Najor Safety-related maintenance performed'ur ing the month will be included in a separate Refueling Outage Report to be submitted'fter the unit is returned to service.
ikfARY OF OPERATING EYPERIENCE DOCKET NO.
50-251 Turkey Point UNIT Unit No.
4 DATE Februar 14, 1978 COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3824 REPORT MONTH Januar 19 78 Turkey Point Unit No.
4 operated at approximately 100% R..P.
except for outage of January 25, 1978.
Refer to Unit Shutdowns and Power Reduction Sections of the Operating
.Status-..-'Report ~for':de'tails--of this, outa'ge.,
Major Safety-related Maintenance performed during the month included the corrective actions taken to ensure operability of the flow path from the. Boric Acid Storage Tank to the charging pump suction line.
Refer to Licensee Event Report No.. 251-78-1 for additional details.
L
SUGARY OF OPERATING EXPERIENCE DOCKET NO.
50-335 UNIT St. Lucie Unit No.
1 DATE Februar 14, 1978 COalPLETED BY V. T. Chilson TELEPHONE (305) 552-3824 REPORT i~kONTH J'anua 1978 St
.Lucie Unit No.
1 operat.ed.at approximately 100%
R. P.
except, for outages of January 13, 23 25; 28, 29, and 31, 1978.
Refer to Unit Shutdowns and Power Reduction Section of the Operating Status Report. for additional details of these outages..
/
Major Safety-related-maintenance'erformed during the month included the replacement of a failed, gasket on the pressur-.
izer.manway closure head and the replacement of five (5) pressurizer manway clpsure head retaining studs.
Refer to Licensee Event Report No. 335-78-5 for additional details of the inspection and replacement of the pressurizer manway closure head retaining studs.