0 NRC P'ORM,195 U.S. NUCLEAR REGULATORV COMMISSI N
I2.76)
NRC DISTRIBUTION FQR PART 50 DOCKET MATERIAL DOCKET NUMBER FILE NUMBER MONTHLY 8
TO:
No Ro Co
~ER
~IGINAL
, Ocopv 0 NOTOR I2 E D ASSIFIED PROP INPUT FORM FROM:
Florida Power 8c Light Company Miami~ Florida Ai Di Schmidt DATE OF DOCUMENT 12/03/77 DATE RECEIVED 12/12/77 NUMBER OF COPIES RECEIVED DESCRIPTION Letter trans the following:
ENCLOSURE Month~ Heport for November 1977 Plant 8c Component Operability 8 Availability.
This Report to be used in preparing Gray Book.
by Pland h Operations.
PLANT KQK: Turkey Point Units 3 6' St, Lucie Unit No, 1
RJL 12/13/77 FOR ACTION/INFORMATION S z C
N INTERNALD ISTRIBUTION
+rane e
EXTERNALDISTRIBUTION CONTROL NUMBER 77~4700 NRC FORM IBS I2.78)
FLORIOA POWER 8( LIGHTCOMPANY December 3,
1977 Office of Management information and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Gentlemen:
Attached are the November, 1977, Operating Status Reports for Turkey Point Unit Nos.
3 and 4 and St. Lucie Unit No. l.
Very truly yours, A. D. Schmidt Vice President Power Resources VTC/DDC cc:
Mr. James P. O'Reilly Robert Lowenstein, Esquire PEOPLE... SERVING PEOPLE
0 APPENDIX B AVERAGE DAILY UNIT POWER LEVEL e
DOCKET NO. 50 250 Turkey Point UNITUnit No.
3 DATE Dec.
3 1977 COMPLETED BYV. T. Chilson TELEPHONE (305) 552-3824 MONTH NOVEMBER 1977 DAY AVERAGE DAILY POWER.LEVEL (MWe-Net)
DAY AVERAGE DAILY POWER LEVEL PÃe-Net) 3 635 633 630 628 628 630 632 615 17 18 19 20 21 22'3 634 628 568 556 557 552 518 10 12 13
'4 15 16 264 258 305 423 655 652 643 643 25 26 27 28 29 30
OPERATfNG DATAREPORT OPERATING STATUS DOCKET NO.
DATE,~~977 COhIPLETED BY 3LT~hilson TFLEPHONE /3';~-3824 Notes I. Umt Name:
Turkey Point. Unit No.
3
- 2. Reportihg period:
November 1977
- 3. Licensed Thermal Power (hIWt):
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
'6. Maximum Dependable Capacity (Gross MWe):
dab e a acit et MWe:
666
- 7. MaxtmumDepen I
C p y(N
)
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted, IfAny (Net hIWe):
- 10. Reasons For Restrictions, IfAny.
NONE This Month Yr:to.Date
~
g Cumulative 2
552.7 7 185.8 43.7 0
"04 2.2 4 713 894 327 083 308 409 4'72 380
- 76. 7 87.9 76-7 87.9
~
83.8 64.3 6.8'
.5 2.4 Date, and Duration of Each):.
LJUL
- 12. Number OfHours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 15. Unit Reserve Shutdown FJours
'-"'"tw"">"
- 17. Gross Electrical Energy Generated (hIWH)
.18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor
- 20. Unit AvailabilityFactor
- 21. Unit Capacity Factor (Using MDC Net)
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 months (Type, 4'5 225.9
~
l.llew 1:
85.0 21 284 345 20 148 '315 7.7. 9
.78.1
.69. 9':
.5'.8
- 25. IfShut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Jan.
16, 1978 Fo'recast Achieved IN IT!AL CRITICALITY INITIALELECTRICITY COhIMERCIALOPERATION
(~/77)
0 4
(I)
RFASOH A
EQUI)'EN'Y FAII.URE (EXPLAIN) U: HAIHT. OR TEST C: REI'l}EI,IHG D: REGUIATORY RFVTRICTION L': OPERATOR TRAIHI}lGAND I.ICF}ISR EXA}II}IATIO}l I': ADHINIST}IATIVE 0: OPFBATIOHAI. ERROR (EXPIJLIN) H: OTHL'R (I'.XPIAIN) APPENDIX D ll}IITSHUTDO}}HS AND POWER REDUCTIONS DOCKET HO. 50 - 250 Turkey Point DATE De. 17 TELEPHONE 305 552-3824 COHI'I.EYED DY V. T. Chi}son (2) HITIIOD I: }IAHUAL 2: HAHUAL SCRAH 3: AU'1Y}}IATICSCRAH 4: OTHER (EXPIAIN) TYPE P! PORCED S: SCHEDULED DURATION (I}OURS) REASON(l) . HETROD OP SHUTTING DOWN THE REACTOR OR REDUCI}lG POWER(2) CORRECTIVE ACTIO}IS/CO}IHEHTS 26 77-11-08 Load was reduced to locate and repair condenser tube leak. (Non-nuclear system) 27 77-11-19 Load was reduced to approximately 902 R.P. for ex-tended operation of core cycle IV. (Nuclear System) 28 77-11-23 167.8 Unit Ho. 3 was removed from service for scheduled rcfucling, maintenanc'e, and inspections. (Nuclear and non-nuclear systems) SU}l}IARY: Unit No. 3 operated at approximately 1002 R.P. until thc unit was removed from service on Nov. 23, 1977, for scheduled refueling, maintenance, and inspections, except for load reductions of Nov. 8-12 and Nov. 19-23, 1977.
0 APBENQIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50 251 Turkey Point UNIT DATE COMPLETED BY V. T. Chi1son TELEPHONE (305) 552-3824 MONTH NOVEMBER 1977 DAY AVERAGE DAILY POWER LEVEL (Mle-Net) DAY AVERAGE DAILY POWER LEVEL (>Ãe-Net) 17 674 18 665 19 672 20 676 21 677 22 676 10 23 24 25 26 673 676 684 685 12 13 '4 15 627 677 679 682 676 27 28 29 30 NOTE: 687 688 683 642 Average daily power greater than 666 MWe due to cooler condenser cooling water.
OPERATING STATUS OPERATING DATAREPORT e DOCKET NO. DATE Dee. 3 1977 COMPLETED BY ~pheon TELEPHONE ~~~-3824 Notes Turkey Point Unit No. 4
- 2. Reporting Period:
- November, 1977
- 3. Licensed Thermal Power (MWt):
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net hIWe)
- 7. hfaximum De endable Ca acit et MWe:
p y(N )
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, IfAny (Net hIWe):
- 10. Reasons For Restrictions, IfAny:
NONE This iMonth Yr:to-Date I umulative
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Genuator On-Line
- 15. Unit Reserve Shutdown pours
- 16. Gross Thermal Energy Generated (MWH)
~ ~ - "( ~
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor
- 20. Unit AvailabilityFactor
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type, 462.3 456.4 '97 179 305 473 63.
4'3.4 ' 4 861.6 10 493 084 60;6 60.6. 138.8 '5 403 7 53 552 454 67.8 67.8 63.7 59.9
- . 66.3 61.2.
0.4 Date, and Duration of Each):- 57.5 2.3 63.3 3.3 5 015.6 26 737.3
- 25. IfShut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION (Ll/I7 )
(1) REASON A: E<jUIPHENT FAILURE (EXPLAIII) )I: HAItiT. OR TEST 0: REFUEI.ING D: REGULATORY RESTRICTIOtl E: OPERATOR TRIAINI!IG AND I.ICENSE EXAI'IINATIOtl F: AIDIINISTRATIVE OPLPRATIONAL ERROR (EXPLAIN) II: OTIIER (EXPLAIN) APPEIIDIX'D UNIT SIIUTDOWIIS AND POWER REDUCTIONS REPOR1 IIOIITII NOPEIIBER 1977 DOCKET NO. llNIT NAHE DATE 50 251 Turkey Point Dec I 7 TELEPNOtlg 05 5 2-3824 COHPLETED DY V. T. Chilson (2) IIETIIOD HAIIUAL HAtiUAI. SCRAH
- I:
AUTOHATIC SCRAH OPHER (EXPLAIN) NO. DATE TYPL Fl FORCED Sl SCIIEDULED DURATION (IIOURS) REASON(l) . HETNOD OF SIIUTTING DOWN TNE REACTOR OR REDUCING POWER(2) CORRECTIVE ACTIOIIS/COIIHENTS 16 77-10-28 261.5 Unit was removed from service to locate and repair tube leak in stcam generator No. 4E. Corrective actions included plugging one leaking tube. (Con-tinued from previous month) (Nuclear system) Outage was extended to repair a failed mechanical'eal on a reactor coolant pump. (Nuclear system) ~ 17 77"11-11 2.0 Unit tripped by steam generator No. 4C level pro-tection system uhcn feedwater isolation valve failed to open as required. Corrective actions included repairing faulty auto-manual disengaging system on valve motor. (Non-nuclear system) SUILEIARY: Unit No. 4 operated at approximately 100X R.P. after the unit vas returned to service on November 11, 1977.
APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 335 St. Lucie UNIT Unit No. 1 DATE Dec.. 3, 1977 COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3824 MONTH NOVEMBER, 1977 DAY AVERAGE DAILY POWER.LEVEL (K<e-Net) 84 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 723 3 10 11 12 13 14 668 721 785 775 781 772 783 779 .760 789 781 795 795 794 18 19 20 21 22 23 24 25 26 27 28 29 30 626 751 779 746 537 786 773 792 794 797 794 772 793 16 794 NOTE: Average daily power greater than 777 MWe due to cooler condenser cool'ng water.
r ~ OPERATING STATUS OPERATING DATAREPORT DOCKET NO. " DATE. 2@a '~977 COMPLETED BY Z T~hi3.son TELEPHONE ~L$52-3824 i Umt Name St. Lucie Unit No. I
- 2. Reporting Period: ~axstnbex., &9Z7
- 3. Licensed Thermal Power (MIVt):
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
22 Notes Ma@mum p p y (N )
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, IfAny (Net MWe):
- 10. Reasons For Restrictions, IfAny:
NONE This Month Yr.-to-Date ~ a Cumulative 8'80;0 101.9 6 '8'.'2 '5 660 203 83.4 83.4 11.2 ll. Hours In Reporting Period 720.0 016.0
- 13. Reactor Reserve Shutdown Hours '
='01;5
- 16. Gross Thermal Energy Generated(MWH)'P
--. "m
- 19. Unit Service Factor
~ 99.5
- 20. Unit AvailabilityFactor
. 83.9
- 21. Unit Capacity Factor (Using MDC Net) 97 ~ 5
- 23. Unit Forced Outage Rate 0.6
- 10. 8
~M. Shutdowns Scheduled Over Next 6 Months (Type, Date.and Duration of Each): ~ Refuelin maintenance. and insnections - March 15 June 6 9 8.
- 25. IfShut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units ln Test Status (Prior to Commercial Operation):
Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION to/77)
(1) REASON EqUII'MI:HT FhlI.URE (EXI'VIN) II: IIAIHT. OR TEST REFUEI.IIIG D: REOUIATORY RESTRICTION I'.: OPL'RATOR TRA(HING h'HD I.'ICFHSE EXAIIIHATIUH I': hlkilNlS NATIVE U: OPFRATiONAL ERROR (I!XPIAIH) H: OTHER (EXPIATN) APPFdIDIX D UNIT SHUTDOIDIS AHD POWER REDUCTIONS RFPORT MONTH NOVEMEER, 1977 DOCKET HO. 50 - 335 St. Lucic UH1T NAME U DATE COMPLETED DY TELEPIIOHE (2) IN!TIE)D NAHUAI. MANUAL SCRAM
- I
AUTOIIATIC SCRAII -'s. OTIIER (EXI'MIH) HO. DATF. TYPE FI FORCED S: SCIIEDULED DURATION (HOURS) REASON(1) , METHOD OF SHUTTIHC DOWN TIIE REACTOR OR REDUCING POllER(2) CORRECTIVE ACTIONS/COIDIENTS 77-11-17 Load was reduced to clean stcam generator feedwatcr pump suction strainers. (Non-nuclear system) 35 77-11-22 3.9 Unit tripped during a transient condition caused by the loss of a steam generator feedwater pump. Thc pump tripped when a relay in tbe steam generator fcedwatcr pump flow protection was inadvertently actuated. (Non-nuclear System)
SUMMARY
Unit operated at approximately 100X R.P. except for load reduction of Nov. 17 and outage of Nov. 22, 1977.
~ 'Q}}