Forwards Suppl to 790801 Response to IE Bulletin 79-19, Seismic Analysis for As-Built Safety-Related Piping Sys. Includes Rept of Actions Taken in Response to Bulletin, W/Revisions & Suppls Through 790907
ML19254E306
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 09/28/1979
From: William Cahill
CONSOLIDATED EDISON CO. OF NEW YORK, INC.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 7910310436
Download: ML19254E306 (2)


Text

.4 -

  • William J. Cahill. Jr.

vice President 72 Consol. dated Edisoe. Company of Ne., York. Inc.

4 trwng Placa, New York. N Y 10003 Telechone (212) 460-3819 Septaber 28, 1979 Ret Indian Point (mit No. 2 Docket No. 50-247 Mr. Boyce H. Grier, Director Office of Inspection and Enforc ment Region I U. S. Nuclear Reg tlatory Cmmission 631 Park Avenue King of Prussia, Pa. 19406

Dear Mr. Grier:

Attachment A to this letter provides a report of actions taken in response to IE Bulletin No. 79-14 including revisions and supplenents thereto through Septenter 7, 1979. This report supplements our response oE August 1, 1979.

As discussed with representatives of Pagion I by telephone on Septerrber 4, 1979, correcting nonconformances generally represented a shorter critical path outage effort than re-analysis of the effect of the nonconformance.

Accordingly, all inspections and corrections of nonconformances inside con-tainment were completed prior to taking the reactor critical following the recent refueling / maintenance outage. All inspections and corrections of nonconformance outside contalment were cmpleted prior to taking the reactor above nminal zero power physics test levels (less than 5% reactor power) .

Concurrent inspections by Region I personnel assisted in identifying areas needing strengthening and added to increased overall effectiveness of our inspection efforts.

Should you or your staff have any questions recarding this report or our Bulletin '9-14 Program, we m uld be pleased to discuss th e at your convenience.

Very truly yours,

//  ;;

/

//j

,l/

// * .x

/ ( l, s . .

William J. Cahill, Jr.

Vice President 1N3 357 7 910 310 f.3 (f

cc: Mr. Victor Stello, Jr., Director Office of Inspection and Enforcemnt U.S. Nuclear Regulatory Ccmnission Washington, D.C. 20555 Mr. Darrell G. Eisenhut, Acting Director Division of Operating Reactors U.S. Nuclear Regulatory Ccmnission Washington, D.C. 20555 Mr. T. Rebelowski, Resident Inspector U.S. Nuclear Regulatory Ccmnission P. O. Box 38 Buchanan, N.Y. 10511 1243 358

.