ML19254F009

From kanterella
Revision as of 00:59, 2 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards List of Outstanding Requests for Tech Spec Changes
ML19254F009
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 10/24/1979
From: Warembourg D
PUBLIC SERVICE CO. OF COLORADO
To: Kuzmycz G
Office of Nuclear Reactor Regulation
References
P-79246, NUDOCS 7911050341
Download: ML19254F009 (4)


Text

.

public service company of cene nese 16805 Weld County Road 19 1/2, Platteville, Colorado 80651 October 24, 1979 Fort S t. Vrain Unit No. 1 P-79246 Mr. George Kuzmycz Project >bnager, Special Projects Division of Project Management U. S. Nuclear Regulatory Cormission Washington, D.C. 20555 Docket No. 50-267 S GJECT: Reques ts for Technical Specification Changes

Dear Mr. Kuzmycz:

Attached is the list of outstanding letters and requests for Techni-cal Specification changes. I realize that some items on this list will be included in Amendment 22, but they are included here for com-pleteness.

If I can be of further assistance please contact me.

Very truly yours ,

&Lu Y M Don Warembourg /

s Manager, Nuclear Production DW/alk v

Tty

. 1269 340 79110 W W

FORT ST. VRAIN; PUBLIC SERVICE COMPANY OF COLORADO PLATTEVILLE, COLORADO OUTSTANDING LETTERS / REQUESTS FOR TECHNICAL SPECIFICATION CHANGES AS OF 10-24-79 P

ITEM LETTER PRIORITY NO. _ NUMBER S ECTION DESCRIPTION 3 24 P- 76075 S R N R 1.1 Sampling of non-radioactive e f fluen ts . HOLD: This will be superceded by new Appendix B. -

7 25 P-760 75 S R 5.4.1 Taole 5.4-1, Item 3C, Table 5.4-4, Item 1C.

3 73 P- 7709 7 LCO NR 1.1 Nalco 7320, Solution 1 ppa (temporary change) .

9 78 P- 7715 3 LCO 4. 3.10 Added two new snubbers.

5 91 P-77188 LCO 4. 4.1 Change Table 4.4-3, Items 2a and 2b. Added NOTE (u) and Basis Page 4. 4-12.

2 93 P-7722 8 LCO 4.4.1 Revise format of Table 4.4-1 to include absolute trip values and units.

2 94 P- 7722 8 LCO 4.4.1 Table 4.4-1, Item 8, added ab-solute trip values.

2 95 P-7722 8 LCO 4.4.1 Addeo definition of absolute trip value to LCO, Page 4.4-1, 2 96 P-7722 8 LCO 4.4.1 Table 4.4-1, Item 4, add per-missable bypass conditions per NOTE (h).

2 97 P- 7722 3 LCO 4.4.1 Revise NOTE (t) for Tables 4.4-1 through 4.4-4.

2 98 P- 7722 8 AC 7.1.2 PORC, Item e.

3 100 P-77251 License Revise D(2) Pages 4 and 3.

3 101 P- 77251 Appendix B Delete in entirety.

3 102 P-77251 SR 5.9.1 Delete in entirety.

3 103 P-77251 New Appendix B. New Environmental Technical Spe-cifications.

1269 341

P ITEM LETTER P RIORITY NO. NL'MB ER S ECTION . DESCRIPTION 3 105 P-78008 LCO 4.8.1 Delete LCO, replace with ELCO 2.1.1.

3 106 P-78008 LCO 4. 8.2 Delete LCO, replace with ELCO 2.1.2.

3 107 P-78008 LCO 4.8.3 Delete LCO, replace with ELCO 2.1. 3. -

3 108 P- 78008 S R 5. 8.1 Delete SR, replace with ESR 2.1.1.

3 109 P-78008 SR 5.8.2 Delete SR, replace with ESR 2.1.2.

3 110 P- 78008 LCO 4.6.1 Include UAT and time.

3 111 P-7 S008 AC 7.5.1 Revise Sections b and c.

3 112 P-7800 8 LCO 4.4.1 Re vis e NOTE (d) , s ee I ten 14 3.

3 113 P- 78008 LCO 4.3.10 Delete six MSS snubbers, add 16 VSS.

3 114 P- 78008 License Add Ra 228, 266.

HOLD 115 P-780 58 LCO 4.4.1 Re vis e NOTE (n) .

8 116 P-78062 LC0 4. 3.10 lbdify LCO and Basis.

9 117 P- 78062 LCO 4. 3.10, Add two new snubbers.

Table 4. 3.10-1 133 P-79 001 LC0 4.2.18 De fine times to s tart depres-surization (Supercede Iten 120).

134 P- 79015 AC 7.1 Reorganization - Titles.

135 P-79015 AC 7.2 Reorganization - Titles.

136 P- 79015 AC 7.3 Reorganization - Titles .

141 P-79164 SL 3.1 Specify limits for power to flow ratios less than 2.5 or greater than 1. 7, stipulate applicability.

1269 342

P ITEM LETTER P RIORITY NO. N UMBER S ECTION DESC RIPTION 142 P- 79056 LCO 4.6.l(d) Diesel generator day tank in-ventory from 500 to 325 gal-lons.

143 P-79133 LCO 4.4.1 Revise Note (d) and Item 14 a)

S R 5.4.1 of Table 5.4-1, See Item 112.

144 P-79164 LCO 4.2.17 Bas is Change time f rom one week to 108 hours0.00125 days <br />0.03 hours <br />1.785714e-4 weeks <br />4.1094e-5 months <br />.

145_ P-79170 LCO 4.2.6/ Fire Suppression and Protection SR 5.2.10 to reflect Standard Technical Sp eci fications .

146 P-79170 New SR 5.2.24 Circulating Water Makeup Pump to reflect S tandard Technical Sp eci fications.

147 P-79170 S R 5 .10. 3 Reflect S tandard Technical Spe-cifications.

148 P-79170 LCO 4.10.5/ Fire Suppression and Protection S R 5.10.6 to reflect Standard Technical Sp ecifications .

149 P-79170 LCO 4.10.6/ Fire Suppression and Protection SR 5.10. 7 to reflect Standard Technical Specifications.

150 P-79170 New LCO 4.10.7/ Fire Suppression and Protection New SR 5.10.8 to reflect Standard Technical Spe cifications .

151 P-79170 New LCO 4.10.8/ Fire Suppression and Protection New SR 5.10.9 to reflect S tandard Technical S p eci fications .

152 P-79218 Table 4.3.10-1 Update to reflect current desig-of LCO 4. 3.10 nation of all Class I snubbers.

1269 343

$