ML19312A187

From kanterella
Revision as of 10:20, 1 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Revised Pages to Chapter 1 of Initial Startup Rept, as Revised by Suppl 5 for Period 790406-0705
ML19312A187
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/08/1979
From: Jeffery Grant
TOLEDO EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19259C707 List:
References
1-882, NUDOCS 7908140602
Download: ML19312A187 (1)


Text

p u

~

TDLEDO EDISDN August 8, 1979 JAMES S. GRANT v c. am. ..

5

  • Serial No. 1-82 ,l]',,{',

Docket No. 50-346 License No. NPF-3 -

Mr. James G. Keppler Regional Director, Region III Office of Inspection and Enforcement U. S. Nuclear Regulatory Con: mission 799 Roosevelt Road Glen Ellyn, Illinois 60137 Dect Mr. Keppler:

Attached are revised pages of Chapter 1 as revised by Supplement 5 of the Lavis-Besse Unit 1 Initial Startup Report.

This report, which covers the period from April 6,1979 through July 5,1979, is being submitted in accordance with Technical Specification 6.9.1 of Appendix A to the Davis-Besse Nuclear Power Station Operating License and the Regulatory Guide 1.16, Section C.l.a.

Very truly yours,

/ &

JSG/ljk At achment cc: Dr. Ernst Volgenau, Director Office of Inspection and Enforcement Encl: 25 copies Mr. William G. Mcdonald, Director Office of Management Information and Program Control Encl: 2 copies

'G d8UM d j Si l 79 il 4 0[8 I THE TCLEDO EDISCN COMPANY ECISCN F-JZA 3C0 MADISCN AVENUE TOLECO. CHIO 43652 o