ML19320B473

From kanterella
Revision as of 04:59, 1 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Monthly Operating Rept for June 1980
ML19320B473
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/08/1980
From: Murray T
TOLEDO EDISON CO.
To: Stello V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML19320B474 List:
References
L-80-1032, NUDOCS 8007140318
Download: ML19320B473 (1)


Text

O r.- @ rotsoo enEDISDN L80-1032 July 8, 1980 PILE: RR 2 (P-6-80-0C; Docket No. 50-346 License No. NPF-3 Mr. Victor Stello, Jr. , Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr. Stello:

Monthly Operating Report, June, 1980 Davis-Besse Nuclear Power Station Unit 1 Enclosed find ten (10) copies of the Monthly Operating Report for Davis-Besse Nuclear Power Station Unit 1, for the month of June, 1980.

Also enclosed is a 1.st of the monthly values of the unit capacity factors which could not be determined in the past, for November, 1977 through January, 1980.

Yours truly,

%oW Terry D. Murray Station Superintendent Davis-Besse Nuclear Power Station TDM/1jk Enclosures cc: Mr. James G. Keppler Regional Director, Region III Enc 1: 1 Mr. Norman Haller, Director Office of Management Program Analysis Encl: 2 EDISON PLAZA 300 MADISON AVENUE TOLEDO. OHfu 43652 THE TOLEDO EDISON COMPANY 80071403/p p