ML19329B950

From kanterella
Revision as of 22:14, 31 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Preoperational Environ Monitoring Programs, Semiannual Repts Jul-Dec 1974.
ML19329B950
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/28/1975
From: Roe L
TOLEDO EDISON CO.
To: Muller D
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19329B951 List:
References
NUDOCS 8002110704
Download: ML19329B950 (1)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -__

ENSON Docket No. 50-346 LOWELL E. ROE Mce Pres 4 dent February 28, 1975 6lC$3**"* s j .v ,

_. - ~\

j- *\

~~ . }

S--

Q. O Mr. Daniel R. Muller -,

Assistant Director for Environmental Projects s United States Nuclear Regulatory Commission J. x/;s G Washington, D. C. 20555 N '4-i

Dear Mr. Muller:

Under separate cover, we are transmitting twenty-five (25) copies of our second Semi-Annual Report of our Pre-Operational Environmental Monitoring Programs for the Davis-Besse Nuclear Power Station Unit No.1. This report is for the period July 1,1974 to December 31, 1974.

During this period activities continued t. be directed towards obtaining aquatic, s

radiological, and terrestrial baseline data documenting natural fluctuations in the environment. The data collected for this period are consistant with previous data collected and do not indicate any unusual conditions for western Lake Erie.

Yours very truly, wr aa/l i

1 60G 80021107Qf THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO. CHIO 43652

-