ML19350A280

From kanterella
Revision as of 01:30, 31 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Feb 1981
ML19350A280
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/06/1981
From: Murray T
TOLEDO EDISON CO.
To: Stello V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML19350A282 List:
References
L81-136, NUDOCS 8103130393
Download: ML19350A280 (1)


Text

.

m C L.I TOiE03

% EDISON March 6, 1981 L81-136 FILE: RR 2 (P-6-81-02) e

\e--

Docket No. 50-346 License No. NPF-3 - p' f I:s.f4 4 AI,1p' g.Ah Mr. Victor Stello, Jr. , Director Office of Inspection and Enforcement 1

V g/8g7[/A

. -}h U. S. Nuclear Regulatory Commission Washington, D. C. 20555 k 4/ N

Dear Mr. Stello:

4 .-

Monthly Operating Report, Februar ,

Davis-Besse Nuclear Power Station Enclosed are ten copies of the Monthly Operating Report for Davis-Besse Nuclear Power Station Ur.it 1 for the month of February,1981.

Yours truly,

[npQWswllk.txt f Terry D. Murray Station Superintendent Davis-Besse Nuclear Power Station TDM/ljk Enclosure cc: Mr. James G. Keppler Regional Director, Region III Encl: 1 Mr. Norman llaller, Director Office of Management Progr a Analysis Encl: 2 Mr. Luis Reyes NRC Resident Inspector Encl: 1 copy EDISON PLAZA 300 MAD: SON AVENUE TOLEDO. CHIO 43552 THE TCLEDO ED! SON CCMPANY Blog;gg Q . ..