Forwards Category I Inservice Insp & Testing Program Submittals Re Helium Circulator & Secondary Coolant Sys
ML19309B106
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 03/31/1980
From: Justin Fuller
PUBLIC SERVICE CO. OF COLORADO
To: John Miller
Office of Nuclear Reactor Regulation
Shared Package
ML19309B107 List:
References
P-80064, TAC-65991, NUDOCS 8004030130
Download: ML19309B106 (3)


Text

-

s a public service company of Oscade 12015 East 46th Avenue, Suite 440; Denver, CO 80239 March 31, 1980 Fort St. Vrain Unit No. 1 P-80064 fir. James Miller Chief, Special Projects Branch Division of Project Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Docket No. 50-267

Subject:

Fort St. Vrain Inservice Inspection & Testing

Reference:

1)PSC Letter, J.K. Fuller to S. A. Varga, P-79289 Dated November 30, 1979 2)NRC Summary of Meeting Held August 20, 1979, G-79189 Dated October 20, 1979 Gentl emen:

Enclosed for your review are the Helium Circulator and Secondary Coolant System submittals, which make up the remainder of the Category I inservice inspection and testing program submittals for the Fort St. Vrain High Temperature Gas-Cooled Reactor. These submittals contain draft modifications to the FSV Technical Specification Surveillance Requirements, along with an evaluation of the proposed requirements, as in the previous submittals.

Enclosures (1) and (3) contain the draft revisions of the FSV Technical Specification Surveillance Requirements for the Helium Circulators and Secondary Coolant System, respectively, which include the following sections:

03n l 30

.

  • Mr. James Miller .

March 31,1980 Page 2 Enclosure (1)

SR 5.2.17 - Helium Circulator Pelton Wheels, Surveillanca SR 5.2.18 - Helium Circulators, Surveillance SR 5.2.19 - IACM Diesel-Driven Pumps, Surveillance SR 5.2.27 - Helium Shutoff Valves, Surveillance Enclosure (3)

SR 5.3.1 - Steam / Water Dump System, Surveillance SR 5.3.2 - Main and Hot Reheat Steam Stop Check Valves, Surveillance SR 5.3.3 - Bypass and Pressure Relief Valves, Surveillance SR 5.3.4 - Safe Shutdown Cooling Valves, Surveillance SR 5.3.9 - Safety Valves, Surveillance SR 5.3.10- Secondary Coolant System Instrumentation, Surveillance The revised portions are identified by vertical lines on the right-hand-side of the pages.

Enclosures (2) and (4) contain an evaluation of the additional or modified surveillance requirements which are the result of PSC's review of the current surveillance requirements for the Fort St. Vrain Helium Circulators and Secondary Coolant System. The systematic approach used to develop these requirements is explained further in the first pages of the review.

These four enclosures complete PSC's review of the surveillance requirements for Category I systems and equipment. PSC is proceeding to review the inservice inspection and testing surveillance requirements for the Category II systems and equipment identified in Reference 1. Prior to establishing a schedule for completion of the Category II review, PSC requests that the flRC complete its review of the Category I submittals and provide PSC with comments on the adequacy and acceptability of the approach being utilized by PSC to establish detailed inservice inspection and testing program requirements.

Also attached (Enclosure (5) is the information requested by the flRC at a meeting held on August 20,1979 (see Reference 2) concerning Fort St. l Vrain equipment built to ASME codes, and concerning inspections and tests being performed that are not currently included in the Fort St.

Vrain Technical Specifications.

I l

1

'

._

i

. .

1 Mr. James tHiler I

'

tiarch 31, 1980 Page 3 Please direct any questions you may have concerning these submittals to tir. Mark A. Joseph, (303) 571-6671.

Very truly yours,

/7 I J. K. Fuller, Vice President Engineering and Planning

, ,