ML19309H142

From kanterella
Revision as of 15:53, 28 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 80-032/03L-0
ML19309H142
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 05/02/1980
From: Murray T
TOLEDO EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19309H143 List:
References
L80-558, NUDOCS 8005080506
Download: ML19309H142 (1)


Text

.

o 8 005080 So G fr.

-

C - 1 TDLEDO t EDISON .

May 2, 1980 L80-558 FILE: RR 2 (NP-33-80-38)

Docket No. 50-346 License No. NPF-3 Mr. James G. Keppler Regional Director, Region III Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 799 Roosevelt Road .

Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

Reportable Occurrence 80-032 Davis-Besse Nuclear Power Station Unit 1 Date of Occurrence: April 6, 1980 Enclosed are three copics of Licensee Event Report 80-032 with a supplemental in-formation sheet which is being submitted in accordance with Technical Specification 6.9 to provide 30 day written notification of the subject occurrence.

Yours truly, J imD -

Terry D. Murray Station Superintendent Davis-Besse Nuc1 car Power Station TDM/1jk Enclosure cc: Mr. Victor Stello, Jr., Director Office of Inspection and Enforcement Encl: 30 copies Mr. Norman Haller, Director Office of Management Program Analysis Encl: 3 copies

.

THE TOLEDO EOISON COMPANY - EDISON PLAZA 300 MAOISON AVENUE TOLEOO. CHIO 43652

>

,

..