02/13/2008-Summary of Meeting with Nuclear Management Company to Discuss Pre-Application Issues Related to a Future Extended Power Uprate Amendment Application
ML080450168
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 02/21/2008
From: Tam P
NRC/NRR/ADRO/DORL/LPLIII-1
To:
Shared Package
ML080510058 List:
References
TAC MD5531
Download: ML080450168 (5)


Text

February 21, 2008 LICENSEE: Nuclear Management Company (NMC)

FACILITY: Monticello Nuclear Generating Plant

SUBJECT:

SUMMARY

OF THE FEBRUARY 13, 2008, MEETING WITH THE LICENSEE TO DISCUSS PRE-APPLICATION ISSUES RELATED TO A FUTURE EXTENDED POWER UPRATE AMENDMENT APPLICATION (TAC NO. MD5531)

On February 13, 2008, the Nuclear Regulatory Commission (NRC) staff held a Category 1 public meeting with representatives of Nuclear Management Company (NMC) at Westinghouse offices located at 12300 Twinbrook Parkway, Rockville, Maryland. This was the third of such meetings; the previous ones were held on June 5 and October 3, 2007 (see meeting summaries at Accession Nos. ML071710328 and ML072840499). The purpose of this meeting was to specifically discuss the licensee=s proposed approach to demonstrate steam dryer structural integrity at extended power uprate (EPU) conditions in preparation for a future amendment to approve EPU. A list of attendees is provided as Enclosure 1. The licensee=s handout material has been docketed and is publicly available at Accession No. ML080450480.

The licensees presentation, depicting its approach to demonstrate steam dryer structural integrity, was outlined by the handout material. The NRC staff discussed with the licensee various aspects of the approach but did not raise any significant technical concerns.

A portion of the meeting was closed to the public to discuss information proprietary to the licensee and its contractor Continuum Dynamics Incorporated (CDI). To assist in this discussion, NMC personnel provided a handout containing proprietary information. NMC personnel collected all copies at the end of this portion of the meeting; thus, the handout is not docketed as part of this meeting summary.

Before the meeting adjourned, members of the public were given the opportunity to communicate with the NRC staff both verbally and through the use of public meeting feedback forms. No comment or feedback was received at this time.

Please direct any inquiries to Mr. Peter Tam, NRC Project Manager for Monticello, at 301-415-1451, or pst@nrc.gov Sincerely,

/RA/

Peter S. Tam, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-263

Enclosure:

List of Attendees cc w/encl: See next page

Please direct any inquiries to Mr. Peter Tam, NRC Project Manager for Monticello, at 301-415-1451, or pst@nrc.gov Sincerely,

/RA/

Peter S. Tam, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-263

Enclosure:

List of Attendees cc w/encl: See next page DISTRIBUTION:

PUBLIC LPL3-1 r/f RidsNrrDorlLpl3-1 RidsNrrPMPTam RidsNrrLATHarris RidsOgcRp RidsAcrsAcnw&mMailCenter TBloomer, EDO RidsRgn3Mailcenter TAlexion, NRR JO=Driscoll, NRR KManoly, NRR CBasavaraju, NRR HCruz, NRR TLiu, NRR MChawla, NRR Package: ML080510058 Summary Accession No.: ML080450168 Meeting Notice Accession No.: ML080040201 Licensee=s Handout Accession No.: ML080450480 OFFICE LPL3-1/PM LPL3-1/LA EMCB/BC LPL3-1/BC(A)

NAME PTam THarris* KManoly PMilano DATE 2/19/08 2/21/08 2/19/08 2/21/08

  • Concurred by e-mail OFFICIAL RECORD COPY

MEETING BETWEEN NUCLEAR REGULATORY COMMISSION (NRC) AND NUCLEAR MANAGEMENT COMPANY (NMC)

LIST OF ATTENDEES MONTICELLO NUCLEAR GENERATING PLANT EXTENDED POWER UPRATE (EPU)

FEBRUARY 13, 2008 Name Organization Kenneth Albrecht NMC Tom Alexion NRC/NRR/Generic Communication & Power Uprate Branch (Lead Project Manager for EPU)

Alan Bilanin CDI (Continuum Dynamics Incorporated)

Alexander Boschitsch CDI Mahesh (Mac) Chawla NRC/NRR/Plant Licensing Branch III-1 Chakrapani (Pani) Basaravaju) NRC/NRR/Mechanical & Civil Engineering Branch George Inch Constellation Joe Ferrante NMC Michael Jonzen AREVA Lynne Gunderson NMC Ed Hartwig TVA (Browns Ferry)

Kamal Manoly NRC/NRR/Mechanical and Civil Engineering Branch Gary Pavis Constellation David Potter NMC Peter Tam NRC/NRR/Plant Licensing Branch III-1 Edward Weinkam NMC Allen Williams NMC

Monticello Nuclear Generating Plant cc:

Commissioner Peter M. Glass Minnesota Department of Commerce Assistant General Counsel 85 7th Place East, Suite 500 Xcel Energy Services, Inc. St. Paul, MN 55101-2198 414 Nicollet Mall Minneapolis, MN 55401 Manager - Environmental Protection Division Minnesota Attorney General=s Office U.S. Nuclear Regulatory Commission 445 Minnesota St., Suite 900 Resident Inspector's Office St. Paul, MN 55101-2127 2807 W. County Road 75 Monticello, MN 55362 Nuclear Asset Manager Xcel Energy, Inc.

Manager, Nuclear Safety Assessment 414 Nicollet Mall, R.S. 8 Monticello Nuclear Generating Plant Minneapolis, MN 55401 Nuclear Management Company, LLC 2807 West County Road 75 Dennis L. Koehl Monticello, MN 55362-9637 Chief Nuclear Officer Nuclear Management Company, LLC Commissioner 700 First Street Minnesota Pollution Control Agency Hudson, WI 54016 520 Lafayette Road St. Paul, MN 55155-4194 Commissioner Minnesota Department of Health 717 Delaware Street, S. E.

Minneapolis, MN 55440 Douglas M. Gruber, Auditor/Treasurer Wright County Government Center 10 NW Second Street Buffalo, MN 55313