Continuum Dynamics
From kanterella
Jump to navigation
Jump to search
Continuum Dynamics | |
From | MONTHYEARML15022A6612014-07-310Site: Nine Mile Point
[table view]Start date: 31 July 2014 Title: Stress Re-Evaluation of Nine Mile Point Unit 2 Steam Dryer at 115% CLTP, CDI Report No. 14-08NP, Revision 0, Non-proprietary Version Topic: Finite Element Analysis, Stress corrosion cracking, Earthquake, Liquid penetrant, Flow Induced Vibration, Power Uprate ML15022A6622014-05-310Site: Nine Mile Point Start date: 31 May 2014 Title: Acoustic and Low Frequency Hydrodynamic Loads at 115% CLTP Target Power Level on Nine Mile Point Unit 2 Steam Dryer to 250 Hz Using ACM Rev. 4.1R, C.D.I. Report No. 14-09NP, Revision 1, Non-proprietary Version Topic: Power Uprate ML15023A0312014-04-300Site: Nine Mile Point Start date: 30 April 2014 Title: Computation of Cumulative Usage Factor for the 115% CLTP Power Level at Nine Mile Point Unit 2 with the Inboard RCIC Valve Closed, C.D.I. Technical Note No. 14-04NP, Revision 0, Non-proprietary Version ML15022A6632013-09-270Site: Nine Mile Point Start date: 27 September 2013 Title: CDI Non-Conformance Report No. 0343, Non-proprietary Version Topic: Affidavit ML12313A2042012-10-260Site: Nine Mile Point Start date: 26 October 2012 Title: Attachment 2, Final Steam Dryer Stress Report, Continuum Dynamics, Incorporated Report No. 12-18NP, Attachment 3, Affidavit from CDI Topic: Finite Element Analysis, Liquid penetrant, Flow Induced Vibration, Power Uprate, Affidavit ML12284A1842012-09-300Site: Nine Mile Point Start date: 30 September 2012 Title: Attachment 3, Final EPU Steam Dryer Load Definition CDI Report No. 12-20NP, Acoustic and Low Frequency Hydrodynamic Loads at 115% CLTP Target Power Level on Nine Mile Point, Unit 2 Steam Dryer to 250 Hz Using ACM Rev. 4.1 Topic: Finite Element Analysis, Power Uprate ML12284A1852012-06-300Site: Nine Mile Point Start date: 30 June 2012 Title: Attachment 4, Steam Dryer Limit Curves CDI Technical Note No. 12-13NP, Limit Curves with ACM Rev. 4.1 for the 100% Power Level Basis at Nine Mile Point, Unit 2, Revision 1 Topic: Finite Element Analysis, Power Uprate, Affidavit ML11221A0132011-08-050Site: Nine Mile Point Start date: 5 August 2011 Title: Attachment 3, Continuum Dynamics, Inc Technical Note No. 11-17NP, Limit Curve Analysis with ACM Rev. 4.1 for Power Ascension at Nine Mile Point Unit 2, Revision 1. (Non-Proprietary) Topic: Finite Element Analysis, Power Uprate ML11171A0602011-05-310Site: Nine Mile Point Start date: 31 May 2011 Title: Attachment 3, CDI Report No. 11-04NP, Stress Evaluation of Nine Mile Point Unit 2 Steam Dryer Using ACM Rev. 4.1 Acoustic Loads, Revision 0. (Non-Proprietary), Attachment 4, Affidavit from Continuum Dynamics, Inc Topic: Finite Element Analysis, Liquid penetrant, Flow Induced Vibration, Power Uprate, Affidavit ML1104601602011-01-310Site: Nine Mile Point Start date: 31 January 2011 Title: Attachment 1, CDI Report No. 10-09NP, ACM Rev. 4.1: Methodology to Predict Full Scale Steam Dryer Loads from In-Plant Measurements, Revision 3 Topic: Power Uprate, Affidavit ML1021702952010-07-300Site: Nine Mile Point Start date: 30 July 2010 Title: Attachment 5, Continuum Dynamics, Inc., CDI Report No. 10-12NP, Design and Stress Evaluation of Nine Mile Point Unit 2 Steam Dryer Modifications for EPU Operation Topic: Finite Element Analysis, Flow Induced Vibration, Power Uprate, Affidavit ML1019504972010-07-090Site: Nine Mile Point Start date: 9 July 2010 Title: Attachment 1, CDI Report No. 10-11NP, Stress Assessment of Nine Mile Point Unit 2 Steam Dryer Using the Acoustic Circuit Model Rev. 4.1, Rev. 0, Cover Through Chapter 5 Topic: Finite Element Analysis, Liquid penetrant, Power Uprate ML1019504982010-07-090Site: Nine Mile Point Start date: 9 July 2010 Title: Attachment 1, CDI Report No. 10-11NP, Stress Assessment of Nine Mile Point Unit 2 Steam Dryer Using the Acoustic Circuit Model Rev. 4.1, Rev. 0, Chapter 6 Through End Topic: Power Uprate ML1019004482010-06-300Site: Nine Mile Point Start date: 30 June 2010 Title: C.D.I. Report No. 10-09NP, ACM Rev. 4.1: Methodology to Predict Full Scale Steam Dryer Loads from In-Plant Measurements, Rev. 1 (Non-Proprietary) Topic: Power Uprate ML1019004492010-06-300Site: Nine Mile Point Start date: 30 June 2010 Title: C.D.I. Report No. 10-10NP, Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Nine Mile Point Unit 2 Steam Dryer to 250 Hz Using ACM Rev. 4.1, Rev. 1 Topic: Finite Element Analysis, Power Uprate ML1001900732009-12-310Site: Nine Mile Point Start date: 31 December 2009 Title: C.D.I. Technical Note No. 09-17NP, Limit Curve Analysis with ACM Rev. 4 for Power Ascension at Nine Mile Point, Unit 2, Revision 0 Topic: Finite Element Analysis, Power Uprate ML1001900742009-12-310Site: Nine Mile Point Start date: 31 December 2009 Title: C.D.I. Report No. 08-08NP, Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Nine Mile Point Unit 2 Steam Dryer to 250 Hz, Revision 3 Topic: Finite Element Analysis, Power Uprate ML1001900752009-12-310Site: Nine Mile Point Start date: 31 December 2009 Title: CDI Report No. 09-26NP, Stress Assessment of Nine Mile Point, Unit 2 Steam Dryer at CLTP and EPU Conditions, Cover to Page 62, Revision 1 Topic: Finite Element Analysis, Liquid penetrant, Power Uprate ML1001900762009-12-310Site: Nine Mile Point Start date: 31 December 2009 Title: CDI Report No. 09-26NP, Stress Assessment of Nine Mile Point, Unit 2 Steam Dryer at CLTP and EPU Conditions, Page 63 Through 130, Revision 1 Topic: Power Uprate ML0932002692009-10-310Site: Browns Ferry Start date: 31 October 2009 Title: CDI Report No. 09-13NP, Rev. 1, Stress Assessment of Browns Ferry Nuclear Unit 2 Steam Dryer with Steam Dam, Outer Hood and Tie-Bar Reinforcements, Cover Page - Page 62 Topic: Finite Element Analysis, Liquid penetrant, Power Uprate ML0932002702009-10-310Site: Browns Ferry Start date: 31 October 2009 Title: CDI Report No. 09-13NP, Rev. 1, Stress Assessment of Browns Ferry Nuclear Unit 2 Steam Dryer with Steam Dam, Outer Hood and Tie-Bar Reinforcements, Page 62 Through 119 Topic: Power Uprate, Affidavit ML0924403732009-08-310Site: Browns Ferry Start date: 31 August 2009 Title: CDI Report No. 09-24NP, Rev. 0, Stress Assessment of Browns Ferry Nuclear Unit 1 Steam Dryer to 110% OLTP Power Level, Cover Through Chapter 4 (Non-proprietary Version) Topic: Finite Element Analysis, Liquid penetrant, Power Uprate ML0924403742009-08-310Site: Browns Ferry Start date: 31 August 2009 Title: CDI Report No. 09-24NP, Rev. 0, Stress Assessment of Browns Ferry Nuclear Unit 1 Steam Dryer to 110% OLTP Power Level, Chapter 5 Through End (Non-proprietary Version) Topic: Power Uprate ML0924403752009-08-310Site: Browns Ferry Start date: 31 August 2009 Title: C.D.I. Report No. 09-22NP, Rev. 0, Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level to 110% OLTP Power Level on Browns Ferry Nuclear Unit 1 Steam Dryer to 250 Hz (Non-proprietary Version) Topic: Finite Element Analysis, Power Uprate, Affidavit ML0924604952009-08-310Site: Browns Ferry Start date: 31 August 2009 Title: CDI Report No. 09-23NP, Rev. 0, Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level to 120% OLTP Power Level on Browns Ferry Nuclear Unit 1 Steam Dryer to 250 Hz, Enclosure 6 Topic: Power Uprate ML0924604962009-08-310Site: Browns Ferry Start date: 31 August 2009 Title: CDI Technical Note No. 09-12NP, Rev. 0, Limit Curve Analysis with ACM Rev. 4 for Power Ascension to 120% OLTP at Browns Ferry Nuclear Unit 1, Enclosure 7 Topic: Finite Element Analysis, Power Uprate, Affidavit ML0924605002009-08-310Site: Browns Ferry Start date: 31 August 2009 Title: CDI Report No. 09-25NP, Rev. 0, Stress Assessment of Browns Ferry Nuclear, Unit 1 Steam Dryer to 120% OLTP Power Level, Enclosure 5 Topic: Finite Element Analysis, Liquid penetrant, Power Uprate ML0924605532009-08-280Site: Nine Mile Point Start date: 28 August 2009 Title: Attachment 3 - CDI Report 08-08NP, Revision 2, (Non-Proprietary) Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Nine Mile Point, Unit 2 Steam Dryer to 250 Hz Topic: Finite Element Analysis, Power Uprate ML0924605952009-08-280Site: Nine Mile Point Start date: 28 August 2009 Title: Attachment 2 - CDI Report 09-26NP, Revision 0, (Non-Proprietary) Stress Assessment of Nine Mile Point, Unit 2 Steam Dryer at CLTP and EPU Conditions, Part 1 of 2 Topic: Finite Element Analysis, Liquid penetrant, Power Uprate ML0924605962009-08-280Site: Nine Mile Point Start date: 28 August 2009 Title: Attachment 2 - CDI Report 09-26NP, Revision 0, (Non-Proprietary) Stress Assessment of Nine Mile Point, Unit 2 Steam Dryer at CLTP and EPU Conditions, Part 2 of 2 Topic: Power Uprate ML0923903232009-08-100Site: Monticello Start date: 10 August 2009 Title: Enclosure 2 - Continuum Dynamics Affidavit Topic: Affidavit L-MT-09-043, Enclosure 2, NSPM Draft Response L-MT-09-043 to Mechanical and Civil Engineering Branch RAIs - Steam Dryer Proprietary Information2009-07-090Site: Monticello Start date: 9 July 2009 Title: Enclosure 2, NSPM Draft Response L-MT-09-043 to Mechanical and Civil Engineering Branch RAIs - Steam Dryer Proprietary Information Topic: Affidavit ML0920202292009-06-300Site: Browns Ferry Start date: 30 June 2009 Title: CDI Report No. 09-13NP, Rev. 0, Stress Assessment of Browns Ferry Nuclear Unit 2 Steam Dryer with Steam Dam, Outer Hood and Tie-Bar Reinforcements, Introduction Through Page 62, Enclosure 4 Topic: Finite Element Analysis, Liquid penetrant, Power Uprate ML0920202312009-06-300Site: Browns Ferry Start date: 30 June 2009 Title: CDI Report No. 09-13NP, Rev. 0, Stress Assessment of Browns Ferry Nuclear Unit 2 Steam Dryer with Steam Dam, Outer Hood and Tie-Bar Reinforcements, Page 63 Through 128, Enclosure 4 Topic: Power Uprate ML0920202242009-05-310Site: Browns Ferry Start date: 31 May 2009 Title: CDI Technical Note No. 08-13NP, Rev. 1, Limit Curve Analysis with ACM Rev. 4 for Power Ascension at Browns Ferry Nuclear Unit 2, Enclosure 6 Topic: Finite Element Analysis, Power Uprate, Affidavit ML0916101102009-05-270Site: Nine Mile Point Start date: 27 May 2009 Title: CDI Report No. 08-24NP, Rev. 1, Stress Assessments of Nine Mile Point, Unit 2 Steam Dryer, Attachment 13.7, Introduction Through Page 77 Topic: Finite Element Analysis, Liquid penetrant, Power Uprate ML0916101112009-05-270Site: Nine Mile Point Start date: 27 May 2009 Title: CDI Report No. 08-24NP, Rev. 1, Stress Assessments of Nine Mile Point, Unit 2 Steam Dryer, Attachment 13.7, Page 78 Through 129 Topic: Power Uprate ML0920202232009-04-300Site: Browns Ferry Start date: 30 April 2009 Title: CDI Report No. 08-05NP, Rev. 4, Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Browns Ferry Nuclear Unit 2 Steam Dryer to 250 Hz, Enclosure 5 Topic: Power Uprate ML0907606322009-03-310Site: Browns Ferry Start date: 31 March 2009 Title: CDI Technical Note No. 07-30NP, Limit Curve Analysis with ACM Rev. 4 for Power Ascension at Browns Ferry Nuclear Unit 1, Revision 2 (Non-proprietary Version) Topic: Finite Element Analysis, Power Uprate, Affidavit ML0910002922009-03-310Site: Browns Ferry Start date: 31 March 2009 Title: CDI Technical Note No. 07-30NP, Limit Curve Analysis with ACM Rev. 4 for Power Ascension at Browns Ferry Nuclear Unit 1, Revision 3 Topic: Finite Element Analysis, Power Uprate ML0910002932009-03-310Site: Browns Ferry Start date: 31 March 2009 Title: CDI Report No. 08-04P, Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Browns Ferry Nuclear Unit 1 Steam Dryer to 250 Hz, Revision 4 Topic: Power Uprate, Affidavit ML0907606312009-02-280Site: Browns Ferry Start date: 28 February 2009 Title: CDI Report No. 08-04P, Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Browns Ferry Nuclear Unit 1 Steam Dryer to 250 Hz, Revision 3 (Non-proprietary Version) Topic: Power Uprate ML0916101122009-01-310Site: Nine Mile Point Start date: 31 January 2009 Title: CDI Report No. 08-08NP, Rev. 1, Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Nine Mile Point, Unit 2 Steam Dryer to 250 Hz, Attachment 13.8 Topic: Finite Element Analysis, Power Uprate ML0832501152008-11-300Site: Browns Ferry Start date: 30 November 2008 Title: CDI Report No. 08-20NP, Stress Assessment of Browns Ferry Nuclear Unit 2 Steam Dryer with Outer Hood and Tie-Bar Reinforcements Revision 0, Cover Page - Page 38 Topic: Finite Element Analysis, Liquid penetrant, Power Uprate ML0832501162008-11-300Site: Browns Ferry Start date: 30 November 2008 Title: CDI Report No. 08-20NP, Stress Assessment of Browns Ferry Nuclear Unit 2 Steam Dryer with Outer Hood and Tie-Bar Reinforcements Revision 0, Page 39 - End Topic: Power Uprate, Affidavit ML0834600222008-11-300Site: Browns Ferry Start date: 30 November 2008 Title: Enclosure 2 - Browns Ferry, Units 1, 2, & 3 - Technical Specifications Changes TS-418 and TS-431 - Extended Power Uprate - CDI Report 07-11NP, Revision 1, Dynamics of BWR Steam Dryer Components, Non-Proprietary Version Topic: Finite Element Analysis, Power Uprate, Affidavit ML0831008282008-10-310Site: Hope Creek Start date: 31 October 2008 Title: Attachment 5 - Limit Curves with ACM Rev. 4 for 115% Power Level Basis at Hope Creek, Unit 1, C.D.I. Technical Note No. 08-22NP, Revision 0 Topic: Finite Element Analysis, Power Uprate LR-N08-0224, Attachment 5 - Limit Curves with ACM Rev. 4 for 115% Power Level Basis at Hope Creek, Unit 1, C.D.I. Technical Note No. 08-22NP, Revision 02008-10-310Site: Hope Creek Start date: 31 October 2008 Title: Attachment 5 - Limit Curves with ACM Rev. 4 for 115% Power Level Basis at Hope Creek, Unit 1, C.D.I. Technical Note No. 08-22NP, Revision 0 Topic: Finite Element Analysis, Power Uprate LR-N08-0224, Attachment 6 - Hope Creek Final Stress Assessment of Hope Creek, Unit 1 Steam Dryer at 115% CLTP Conditions, C.D.I. Report No. 08-21NP, Revision 12008-10-310Site: Hope Creek Start date: 31 October 2008 Title: Attachment 6 - Hope Creek Final Stress Assessment of Hope Creek, Unit 1 Steam Dryer at 115% CLTP Conditions, C.D.I. Report No. 08-21NP, Revision 1 Topic: Finite Element Analysis, Liquid penetrant, Power Uprate ML0832500842008-10-310Site: Browns Ferry Start date: 31 October 2008 Title: CDI Report No. 08-05NP, Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Browns Ferry Nuclear Unit 2 Steam Dryer to 250 Hz, Revision 3. Topic: Power Uprate 2014-07-31 |
To | MONTHYEARML0916101072009-03-270Site: Nine Mile Point
[table view]Start date: 27 March 2009 Title: SIA Report No. 0801273.401, Rev. 1, Flaw Evaluation and Vibration Assessment of the Nine Mile Point, Unit 2 Steam Dryer for Extended Power Uprate Operating Conditions, Attachment 13.5 Topic: Finite Element Analysis, Power Uprate ML0703201762007-02-080Site: Susquehanna Start date: 8 February 2007 Title: PPL Susquehanna, LLC - Request for Withholding of Proprietary Information from Public Disclosure for Susquehanna Steam Electric Station, Units 1 and 2 Topic: Power Uprate, Affidavit ML0625505512006-09-150Site: Browns Ferry Start date: 15 September 2006 Title: Proprietary Letter, Request for Withholding Information from Public Disclosure - CDI Proprietary Responses Report 05-28P and 06-11P Topic: Power Uprate, Affidavit ML0507701992006-09-050Site: Dresden, Quad Cities Start date: 5 September 2006 Title: Withholding from Public Disclosure, C.D.I. Proprietary Report No. 04-09P, Rev. 5 and Presentation Entitled, Methodology to Determine Unsteady Pressure Loading on Components in Reactor Steam Domes, Dated January 25, 2005 Topic: Affidavit ML0615301212006-08-170Site: Dresden, Quad Cities Start date: 17 August 2006 Title: Continuum Dynamics, Inc. Request for Withholding Information from Public Disclosure, Bilanin Letter Topic: Affidavit ML0621301282006-08-080Site: Browns Ferry Start date: 8 August 2006 Title: RAI, Extended Power Uprate Request for Withholding Information from Public Disclosure (CDI Report No. 05-28P) Topic: Power Uprate, Affidavit ML0525603432005-10-240Site: Vermont Yankee Start date: 24 October 2005 Title: Vermont Yankee Nuclear Power Station - Request for Withholding Information from Public Disclosure Topic: Affidavit ML0518200102005-07-180Site: Dresden, Quad Cities Start date: 18 July 2005 Title: Continuum Dynamics, Inc., Request for Withholding Information from Public Disclosure Topic: Affidavit ML0509402302005-04-130Site: Vermont Yankee Start date: 13 April 2005 Title: Vermont Yankee Nuclear Power Station, Withholding from Public Disclosure, C.D.I. (Continuum Dynamics, Inc.) Report No. 04-09P, Revision 6, Dated March 2005 (Attachment 3 to Entergy Letter Bvy 05-034) TAC MC0761 Topic: Affidavit ML0431303182004-12-010Site: Vermont Yankee Start date: 1 December 2004 Title: Request for Withholding Information from Public Disclosure, Vermont Yankee Topic: Power Uprate, Affidavit 2009-03-27 |