Letter Sequence Meeting |
---|
TAC:MD5531, Clarify Application of Setpoint Methodology for LSSS Functions (Open) |
|
MONTHYEARML0713506492007-05-16016 May 2007 Notice of Meeting with Monticello to Discuss a Future Application for an Extended Power Uprate Amendment Project stage: Meeting ML0715806062007-06-0505 June 2007 Handout for Pre-application Meeting for Monticello Extended Power Uprate Project stage: Meeting ML0715806272007-06-19019 June 2007 Summary of June 5, 2007, Meeting with the Licensee to Discuss Pre-Application Issues Related to a Future Extended Power Uprate Amendment Application Project stage: Meeting ML0725602242007-09-14014 September 2007 Notice of Forthcoming Meeting with Monticello Nuclear Generating Plant Regarding Steam Dryers in Extended Power Uprate Conditions Project stage: Meeting ML0727705082007-10-0303 October 2007 10/3/07 Meeting Handout, Steam Dryer Evaluation Approach for Monticello Extended Power Uprate (Epu). Project stage: Meeting ML0727805992007-10-19019 October 2007 Summary of 10/3/07 Meeting Between NRC and Monticello Personnel a Future Extended Power Uprate Amendment Project stage: Meeting ML0800402012008-01-0707 January 2008 Notice of Meeting with Nuclear Management Company to Discuss Issues for a Future Extended Power Uprate Amendment at Monticello Nuclear Generating Plant Project stage: Meeting ML0804504802008-02-13013 February 2008 2/13/08 Meeting Handout Project stage: Meeting ML0804501682008-02-21021 February 2008 Summary of Meeting with Nuclear Management Company to Discuss Pre-Application Issues Related to a Future Extended Power Uprate Amendment Application Project stage: Meeting ML0810101932008-03-31031 March 2008 Monticello, License Amendment Request: Extended Power Uprate Project stage: Other ML0810101992008-03-31031 March 2008 Identification of Risk Implications Due to Extended Power Uprate at Monticello Project stage: Other ML0810101982008-03-31031 March 2008 Dryer Dynamic Stress Evaluation (Non-Proprietary Version of Enclosure 11) Project stage: Other ML0810101972008-03-31031 March 2008 Piping Flow Induced Vibration Monitoring Program Project stage: Other L-MT-08-018, Extended Power Uprate Startup Test Plan2008-03-31031 March 2008 Extended Power Uprate Startup Test Plan Project stage: Other ML0810101952008-03-31031 March 2008 NEDO-33322, Revision 1, Safety Analysis Report for Monticello Constant Pressure Power Uprate. Project stage: Other ML0810101942008-03-31031 March 2008 Monticello, MNGP Extended Power Uprate Environmental Assessment Project stage: Other 2007-06-05
[Table View] |
|
---|
Category:Meeting Agenda
MONTHYEARPMNS20240066, Cultural Resource Surveys2024-01-19019 January 2024 Cultural Resource Surveys PMNS20231228, Section 106 Consultation Discussion for the Monticello Nuclear Generating Plant Subsequent License Renewal Application2023-11-0101 November 2023 Section 106 Consultation Discussion for the Monticello Nuclear Generating Plant Subsequent License Renewal Application PMNS20231085, SLRA - Public Meeting to Discuss Condensate Backwash Receiving Tank Fatigue Evaluation2023-10-0202 October 2023 SLRA - Public Meeting to Discuss Condensate Backwash Receiving Tank Fatigue Evaluation PMNS20231010, Notice of Meeting with Northern States Power Company, a Minnesota Corporation, Doing Business as Xcel Energy2023-09-0808 September 2023 Notice of Meeting with Northern States Power Company, a Minnesota Corporation, Doing Business as Xcel Energy PMNS20230790, Notice of Meeting with Northern States Power Company, Doing Business as Xcel Energy2023-06-29029 June 2023 Notice of Meeting with Northern States Power Company, Doing Business as Xcel Energy PMNS20230237, Environmental Scoping Meeting Related to the Monticello Nuclear Generating Plant Subsequent License Renewal Application2023-03-28028 March 2023 Environmental Scoping Meeting Related to the Monticello Nuclear Generating Plant Subsequent License Renewal Application PMNS20230213, Environmental Scoping Meeting Related to the Monticello Nuclear Generating Plant Subsequent License Renewal Application2023-03-14014 March 2023 Environmental Scoping Meeting Related to the Monticello Nuclear Generating Plant Subsequent License Renewal Application PMNS20230188, Notice of Meeting with Northern States Power Company, Doing Business as Xcel Energy2023-02-24024 February 2023 Notice of Meeting with Northern States Power Company, Doing Business as Xcel Energy PMNS20220900, Pre-Submittal Meeting of License Renewal Application for Monticello Nuclear Generating Plant Environmental2022-09-12012 September 2022 Pre-Submittal Meeting of License Renewal Application for Monticello Nuclear Generating Plant Environmental PMNS20220695, Meeting with Xcel Energy to Discuss an Alternative Request Related to Excess Flow Check Valves at Monticello Nuclear Generating Plant2022-07-26026 July 2022 Meeting with Xcel Energy to Discuss an Alternative Request Related to Excess Flow Check Valves at Monticello Nuclear Generating Plant PMNS20220699, Meeting with Xcel Energy to Discuss the Amendment Request for Monticello Nuclear Generating Plant Related to Atrium 11 Fuel2022-07-0808 July 2022 Meeting with Xcel Energy to Discuss the Amendment Request for Monticello Nuclear Generating Plant Related to Atrium 11 Fuel PMNS20220141, Pre-Submittal Meeting for License Renewal Application for Monticello Nuclear Generating Plant (MNGP) Safety2022-03-0909 March 2022 Pre-Submittal Meeting for License Renewal Application for Monticello Nuclear Generating Plant (MNGP) Safety PMNS20220131, Pre-Submittal Meeting for License Renewal Application for Monticello Nuclear Generating Plant Environmental2022-03-0909 March 2022 Pre-Submittal Meeting for License Renewal Application for Monticello Nuclear Generating Plant Environmental PMNS20220019, Pre-Application Meeting with Xcel Energy to Discuss Excess Flow Check Valves Relief Request for Monticello Nuclear Generating Plant (Monticello)2022-01-13013 January 2022 Pre-Application Meeting with Xcel Energy to Discuss Excess Flow Check Valves Relief Request for Monticello Nuclear Generating Plant (Monticello) PMNS20211229, Pre-application Meeting Regarding Potential License Amendment Request to Modify Emergency Diesel Generator Fuel Oil Storage Tank Requirements for Monticello Nuclear Generating Plant2021-09-22022 September 2021 Pre-application Meeting Regarding Potential License Amendment Request to Modify Emergency Diesel Generator Fuel Oil Storage Tank Requirements for Monticello Nuclear Generating Plant PMNS20210203, Pre-Application Meeting with Xcel Energy to Discuss the Atrium 11 Fuel Transition License Amendment Request for Monticello Nuclear Generating Plant2021-03-0404 March 2021 Pre-Application Meeting with Xcel Energy to Discuss the Atrium 11 Fuel Transition License Amendment Request for Monticello Nuclear Generating Plant ML21022A0082021-01-22022 January 2021 Teleconference with Xcel Energy to Discuss a Planned License Amendment Request for Monticello Nuclear Generating Plant (Monticello) and Prairie Island Nuclear Generating Plant, Units 1 and 2 (Prairie Island) ML20055F8122020-02-27027 February 2020 Pre-Application Meeting - License Amendment Request - Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritsf Initiative 4b ML18067A0062018-03-12012 March 2018 Forthcoming Closed Meeting with Northern States Power Company Related to Security Plan Changes at Monticello Nuclear Generating Plant ML17293A4292017-10-23023 October 2017 Pre-Application Meeting October 23, 2017 ML15183A3862015-07-0101 July 2015 Ltr. 07/01/15 Prairie Island U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4782015-07-0101 July 2015 Ltr. 07/01/15 Duane Arnold U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4722015-07-0101 July 2015 Ltr. 07/01/2015 Fermi U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4632015-07-0101 July 2015 Ltr. 07/01/15 Monticello U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4792015-07-0101 July 2015 Ltr. 07/01/15 D.C. Cook U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting)(Drm) ML15183A4842015-07-0101 July 2015 Ltr. 07/01/15 Davis-Besse U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A3992015-07-0101 July 2015 Ltr. 07/01/15 Point Beach U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15182A4412015-07-0101 July 2015 Notice and Agenda - 2015 Operator Licensing Workshop ML15183A4452015-07-0101 July 2015 Ltr. 07/01/15 Perry U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML14258A0652014-09-15015 September 2014 Forthcoming Meeting with Northern States Power Company - Minnesota (NSPM) to Discuss License Amendment Requests Associated with Areva Fuel Transition and Future Extended Flow Window for the Monticello Nuclear Generating Plant ML14169A5522014-06-13013 June 2014 Operator License Workshop Invitation ML13322A0092013-11-18018 November 2013 Notice of Forthcoming Meeting with Xcel Energy to Discuss the Proposed License Amendment for Transitioning to Areva Atrium 10XM Fuel in the Extended Flow Window ML12311A3342012-11-0707 November 2012 Notice of Forthcoming Meeting with Northern States Power Company of Minnesota to Discuss the Monticello Nuclear Generating Plant Extended Power Uprate Review ML12138A3312012-05-17017 May 2012 05/31/2012, Notice of Significant Licensee Meeting (non-public) Regarding Operator Licensing Workshop and Meeting ML11250A1712011-09-14014 September 2011 Notice of Forthcoming Meeting with Petitioner Requesting Action Under 10 CFR 2.206 Regarding Immediate Suspension of the Operating Licenses of General Electric (GE) Mark 1 Boiling Water Reactors (Bwrs) ML11126A0962011-05-12012 May 2011 Notice of Meeting with Petitioner Requesting Action Under 10CFR2.206 Regarding Immediate Suspension of Operating Licenses of General Electric Mark 1 Boiling Water Reactors ML0932302042009-11-20020 November 2009 Notice of Meeting with Northern States Power Company to Discuss Issues Related to a Future Application for Amendment to Use the Maximum Extended Load Line Limit Analysis Plus (Mella+) Methodology ML0827304372008-09-30030 September 2008 Notice of Meeting with Northern States Power Co. Regarding a Future Amendment on Extended Power Uprate ML0810604592008-04-14014 April 2008 Summary of Meeting with Nuclear Management Company, Regarding the Nrc'S 2007 End-of Cycle Assessment of the Monticello Nuclear Generating Plant Safety Performance ML0800402012008-01-0707 January 2008 Notice of Meeting with Nuclear Management Company to Discuss Issues for a Future Extended Power Uprate Amendment at Monticello Nuclear Generating Plant ML0735318272007-12-21021 December 2007 Notice of Meeting with Nuclear Management Company Re Issues Related to the Proposed Combined Emergency Plan for Monticello and Prairie Island ML0725602242007-09-14014 September 2007 Notice of Forthcoming Meeting with Monticello Nuclear Generating Plant Regarding Steam Dryers in Extended Power Uprate Conditions ML0715806062007-06-0505 June 2007 Handout for Pre-application Meeting for Monticello Extended Power Uprate ML0634003252006-12-0707 December 2006 Notice of Presubmittal Conference for Proposed Emergency Plan Changes ML0609606082006-03-22022 March 2006 Meeting Agenda for Draft Suplement EIS Public Meeting - Monticello Nuclear Generating Plant ML0606700372006-03-21021 March 2006 Summary of Meeting to Discuss Full-Scope Application of Alternative Source Term (AST) Methodology for Monticello Nuclear Generating Plant ML0605906122006-02-28028 February 2006 03/22/2006 - Notice of Forthcoming Meeting to Discuss the Draft Supplemental Environmental Impact Statement (Dseis) for License Renewal at Monticello Nuclear Generating Plant (Monticello) ML0604502112006-02-17017 February 2006 Notice of Meeting with Nuclear Management Company, LLC, Monticello Nuclear Generating Plant, Regarding Full-Scope Application of Alternative Source Term Methodology ML0602502942006-01-25025 January 2006 Canceled Notice of Meeting with Nuclear Management Company Regarding Fleet Transition to NFPA Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants ML0522001692005-08-10010 August 2005 Notice of Meeting with Nuclear Management Company (NMC) Regarding Conversion to Improved Technical Specifications (ITS) at Monticello Nuclear Generating Plant 2024-01-19
[Table view] Category:Meeting Briefing Package/Handouts
MONTHYEARML23192A7552023-07-14014 July 2023 July 14, 2023 Alternative Request to Defer Pvt of MO-2397 Pre-submittal Meeting Slides ML23157A0422023-06-0606 June 2023 2022 Monticello End-of-Cycle Meeting Presentation ML23086C0722023-03-27027 March 2023 Presentation Slide for Monticello Scoping Webinar, March 29, 2023 ML23081A0392023-03-22022 March 2023 Presentation Slide for Monticello Public Scoping Meeting, March 22, 2023 ML22255A2162022-09-13013 September 2022 Subsequent License Renewal Application- Public Meeting September 13, 2022, Applicant Slides ML22130A5852022-05-10010 May 2022 2021 Monticello and Prairie Island Nuclear Generating Plant End-of-Cycle Meeting Presentation ML22024A3722022-01-24024 January 2022 Pre-application Public Meeting Slides for Potential Relief Request Related to Excess Flow Check Valves at Monticello Nuclear Generating Plant ML21274A2762021-10-0505 October 2021 Public Preapplication Meeting Presentation for Fuel Oil Storage Tank Amendment ML21166A3792021-06-15015 June 2021 Units 1 and 2 2020 End-of-Cycle Meeting Presentation ML21032A2632021-02-0303 February 2021 Slides for Public Meeting with Xcel Energy to Discuss a Planned Amendment to Combine the Emergency Plans and Create a Common Emergency Offsite Facility for Monticello and Prairie Island ML20273A3102020-10-0202 October 2020 Xcel Energy Presentation for Forthcoming Public Meeting Related to Safety Limit Minimum Critical Power Ratio Amendment ML20055F8122020-02-27027 February 2020 Pre-Application Meeting - License Amendment Request - Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritsf Initiative 4b ML18039A0892018-02-0808 February 2018 Pre - Application Meeting Risk-Informed Exemption Request Regarding Exposed Structural Steel February 8, 2018 ML17293A4292017-10-23023 October 2017 Pre-Application Meeting October 23, 2017 ML17058A4842017-03-0202 March 2017 03/02/2017 Presentation Slides for the Exemption Request for Restoring Dry Shielded Canister (DSC) 11-15 Compliance to 10 CFR Part 72 Pre-Submittal Meeting ML17037D1172017-02-0707 February 2017 License Amendment Requests for Change in Emergency Plan Staff Augmentation Response Times Pre-Submittal Meeting for Prairie Island Nuclear Generating Plant Monticello Nuclear Generating Plant: February 7, 2017 ML17023A0652017-01-24024 January 2017 Pre-Submittal Call Regarding License Amendment Requests for Prairie Island Nuclear Generating Plant, Units 1 and 2 and Monticello Nuclear Generating Plant Emergency Action Level Scheme Changes ML16333A3112016-11-17017 November 2016 Excel Energy Meeting Presentation 11/17/2016 ML16312A5072016-11-0909 November 2016 Xcel Energy Presentation - Pre-Application Public Meeting on 11/09/2016 Re: Plan for Restoring DCS Nos. 11 - 16 (Monticello Nuclear Generating Plant, Independent Spent Fuel Storage Installation) (Docket No. 72-58, CAC No. L25156) ML15092A4802015-03-26026 March 2015 Annual Assessment Meeting - Slides ML14153A0242014-05-16016 May 2014 Xcel Energy'S Presentation Slides Supporting a May 16, 2014, Public Meeting to Discuss the Flood Hazard Reevaluation Schedule for the Monticello and Prairie Island Nuclear Generating Plants ML14108A4012014-03-31031 March 2014 Annual Assessment Meeting - Reactor Oversight Process 2013 Slides ML14108A4052014-03-31031 March 2014 EOC Meeting Licensee Slides ML13171A1522013-06-24024 June 2013 April 24, 2013, Summary of Public Meeting in City of Kewaunee to Make Post-Shutdown Decommissioning of Activities Report (PSDAR) Available for Public Comment ML13066A4462013-02-28028 February 2013 Xcel Energy Presentation Handout Supporting February 28, 2013, Pre-Application Meeting to Discuss Proposed Fuel Transition License Amendment Request ML12093A0982012-04-0202 April 2012 Slides Provided by Monticello Licensee for 4/3/12 Meeting Regarding Containment Accident Pressure Credit for EPU Operation ML12017A0482012-01-17017 January 2012 Handout for 1-17-12 Meeting Re. a Future Application for Amendment Concerning Fuel Storage Criticality Analysis ML0934908762009-12-15015 December 2009 Meeting Slides from December 15, 2009 - Mellla+ LAR ML0912505822009-05-0505 May 2009 Meeting Slides, Monticello, Preparation & Assessment for Hostile Action-based Drill. ML0835703272008-12-17017 December 2008 Meeting Slides, Independent Human Performance Focused Self-Assessment Results, Presented by (Northern States Power Company, Minnesota at Public Meeting ML0810604592008-04-14014 April 2008 Summary of Meeting with Nuclear Management Company, Regarding the Nrc'S 2007 End-of Cycle Assessment of the Monticello Nuclear Generating Plant Safety Performance ML0804504802008-02-13013 February 2008 2/13/08 Meeting Handout ML0800905242008-01-0909 January 2008 Meeting Handout, Nuclear Emergency Plan Submittal for Monticello & Prairie Island, Units 1 and 2 ML0727705082007-10-0303 October 2007 10/3/07 Meeting Handout, Steam Dryer Evaluation Approach for Monticello Extended Power Uprate (Epu). ML0715806062007-06-0505 June 2007 Handout for Pre-application Meeting for Monticello Extended Power Uprate ML0710204892007-04-0404 April 2007 Meeting Slides, Monticello Annual Assessment Meeting Reactor Oversight Process - Cy 2006. ML0705106742007-02-21021 February 2007 NMC Slides for Public Meeting, Conduct of Operations Action Plan Update. ML0609606112006-03-22022 March 2006 Open House Handout for Monticello Draft Supplemental EIS Public Meeting - Monticello Nuclear Genearting Plant ML0606703372006-03-0606 March 2006 NMC Presentation on Alternative Source Term - Full Scope ML0514404942005-05-19019 May 2005 Public Meeting Slides Monticello End-of-Cycle Plant Performance Assessment ML0513802172005-05-11011 May 2005 Presentation Slides Used at Meeting on May 11, 2005, Between the NRC and NMC to Discuss Monticello LRA ML0434900602004-11-30030 November 2004 NMC Slides for 11/30/04 Public Meeting ML0413803782004-05-0707 May 2004 NMC New Fuel Supplier Development Initiative ML17252A1571977-09-14014 September 1977 Summary of Meeting Held with Representatives of the Mark I Owner'S Group to Discuss the Structural Acceptance Criteria for the Mark I Containment Long Term Program 2023-07-14
[Table view] |
Text
Committed to NuclearExcellence Pre-application Meeting for Monticello Extended Power Uprate (EPU)
June 5, 2007 Committed oNularES R
Agenda Ilntroductions Objectives
Background
Project Overview License Amendment Request Power Range Neutron Monitoring System Future Plans Project Time Line Summary and Conclusions Commifted to "S=r~c~),~
2-
Objectives Discuss:
- -Unit operational strategy
- EPU project strategy
- Submittal format
- One concurrent submittal
, Obtain NRC feedback
" Submittal format
° Concurrent submittal Ni~i~'h Committed to NudearErceil~~'
3
Background
Initial License (1970)
- 1670 MWt Original Licensed Thermal Power (OLTP)
Extended Power Uprate (1998)
- 1775 MWt (106.3% of OLTP)
- First EPU in the industry Extended Power Uprate (2009)
- Constant Pressure Power Uprate (CPPU)
- 2004 MWt (120% of OLTP)
Committed to Nuc10ar xcee 4
Unit Operational Strategy Renewed Operating License Dry Fuel Storage
.ife Cycle Management (LCM)
Extended Power Uprate-(EPU)
COMMMIOte t uerESKOr~
5
EPU Project Goals
.oals
- Maintain or improve safety and risk profile
-Improve equipment reliability NMC""%
Commitedto~dweelrFxeZeý 6
EPU Project Principles
- 01low existing regulatory processes Use industry operating experience C.oordinate with License Renewal and Life Cycle Management projects VMinimize the impact on day-to-day operation Extract the value from standardization, iconomies of scale, with minimal dupl COmmittdf No c--rEXS:
7
Project Organization EPU Project
-- Licensing ----------------- Manager Analyses and Engineering Operations ARaProject Liaison Liaison LANProject Manager Ccmmjfled *0 NucderEwWcer~m:.,O 8
Project Implementation 1hased power increase over two
)perating cycles:
Phase I (2009): Operate to electrical generator limits Phase 11 (2011): Upgrade the electric generator Committed to Nuclar" Os 9
Planned Phase I Modifications
'team d ryers (if required)
Power Range Neutron Monitoring System nstrumentation and setpoints Various BOP modifications to be dentified in License Amendment Request Committed to NuclearFxcte 10
Planned Phase 11 Modifications Various BOP Modifications to be identified in the License Amendment Request mMCt -
Comm~lwto/*uc/ear xc~reffeI
'-g 11
Steam Dryer Evaluations April 2007 visual inspection results satisfactory Strain gauges installed during 2007 refueling outage Steam dryer vibration monitoring using the guidance of the BWR Vessel and Internals Project (BWRVIP)
Guidance from Regulatory Guid**e*"*6 NMCim 12
Containment Overpressure Credit Durrently licensed for containment verpressure credit
.PU analysis will be consistent with "ecent BWR EPUs Comm/fled toNjerýc~te, 13
License Amendment Request 3ased on GE licensing topical report
- NEDC-33004P-A, "Constant Pressure Power Uprate Licensing Topical Report," July 2003 (CPPU or CLTR)
- No increase in maximum steam dome pressure
- Not pursuing concurrent changes specifically excluded in topical Alternate Source Term already approved
~NM C~mMI~ed to Nudear~xceIfoW 14
License Amendment Request GE plant specific Power Uprate Safety Ana lysis Report (PUSAR)
- Technical report summarizing generic or plant specific analyses for EPU
- PUSAR follows licensing topical report format Commlftdtdo NucoaEvei 15
License Amendment Request BWR EPU License Amendment Request format after RS-001
- PUSAR in licensing topical report format
- RS-001 matrices mark-up with plant licensing basis
-RS-001 safety evaluation template mark-up
- Matrix cross-referencing RS-001 to.icst PUSAR Commiftd4 oýNu"rES:ier~
16
License Amendment Request Planned NMC EPU LAR format
- PUSAR reformatted to RS-001
- Regulatory evaluation and conclusion sections of the RS-001 safety evaluation templates will be within the PUSAR
- Specific Monticello licensing bases section provided (Monticello is not a GDC plant)
- NMC intends to request exception to the I rge transient test requirements Commi-ted"toN rES 17
License Amendment Request Potential benefits of planned format
- Eliminates safety evaluation template mark-up
- Eliminates RS-O01 to PUSAR topic-cross reference
- Provides complete information for reviewer Committed te NudeSc:lr 18
Power Range Neutron Monitoring GE Standard Nuclear Measurement Analysis and Control (NUMAC) Power Range Neutron Monitoring (PRNM)
System Digital replacement for original Average Power Range Monitor (APRM) equipment Includes the stability Option III Oscillation Power Range Monitor (OPRM) (
Co,ýMmffed to Nuda"srer-19
Power Range Neutron Monitoring Stability Option III OPRM trip capabilities
-SER for NEDC-3241 OP-A:
- OPRM function monitored for one cycle with trips deactivated
- Based on lack of industry experience
- -NMC plans to activate OPRM trip capabilities at start up from March 2009 outage Precedent exists for activating OPRM trip functions at first startup Co*
- .... . .. . . . .. ... .. .. . .. . . . "*2 0
Future Plans Submittals following EPU approval:
- Maximum Extended Load Line Limit Analysis Plus (MELLLA+)
- Detect and Suppress Solution - Confirmation Density (DSS-CD)
° GE Topical approved November 2006 commite t "udeR-x~~
I 21
Project Time Line M007 2008 2009 2010 2011 I Monitoring FIV FIV ods for EPU Monitoring Monitoring V Submittal NRC Approval 4RC Review of PRNMS
& Stability Option III V Submittal VNRC
. Approval V Submittal 14NRC DSS-CD Stability NRC Review Approval Solution LAR Prep V Submittal 14¥NRC Approval MELLLA+ LAR NRC Review A EPU Phase I & PRNMS Installation A EPU Phase 11
~mentation
Summary and Conclusions EPU Strategy
- PRNMS submittal last quarter 2007 EPU submittal first quarter 2008 RS-O01 Format
- Implementation in two phases (2009, 2011)
Duestions/Discussion Committed to Nuderr sm 23