ML17278A470

From kanterella
Revision as of 14:25, 29 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Forwards Crdr & Emergency Procedure Functional Task Analysis Summary Rept & Emergency Operating Procedures, Including Rev 1 to Procedure 5.0.0, Emergency Procedure General Precautions.
ML17278A470
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 11/01/1985
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Butler W
Office of Nuclear Reactor Regulation
Shared Package
ML17278A471 List:
References
GO2-85-758, NUDOCS 8511110262
Download: ML17278A470 (4)


Text

REGULATO~ INFO'TION I DISTR I BUT ION STEM ( R IDS )

ACCESSION NBR: B511110262 DOC. DATE: 85/11/01 NOTARI ED: NO DOCKET 8 FAC IL: 50-397 WPPSS Nuclear Pro Jecti Unit 2> Washington Public Pore 05000397 AUTH. NAME AUTHOR AFFILIATION SORENSENI G. C. Washington Public Power Supply System RECIP. NAME RECIPIENT AFFILIATION BUTLERI W. R. Licensing Branch 2

SUBJECT:

Forwards "CRDR '5 Emergency Procedure Functional Task Analgsis Summary Rept" 9~ emergency operating proceduresi including Rev 1 to,Procedure 5. 0. OI "Emergencu Procedure General Precautions. "

DISTRIBUTION CODE: AOOBD COPIEB RECEIVED: LTR +ENCL ~BIIE:

TITLE: OR/Licensing Submittal: Supp I 1 to NUREQ-0737(Generic Ltr 82-33)

NOTES 05000397 QL: 12/20/83 REC IP IENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL NRR LB2 BC 7 7

,

INTERNAL: ADM/LFMB 1 0 IE/DEPER/EPB 3 3 NRR PAULSONI N 1 1 NRR/DHFS/HFEB 5 5 NRR/DHFS/PSRB 2 2 NRR/DL/ORAB 1 1 NRR/DL/QRB5 5 5 NRR /DS I /CPB 1 NRR/DSI/ICSB 1 1 NRR /DSI/METH 1 1

~l NRaj B 1 1 NRR /DS I /RSB 1 1 ES 1 1 RGN5 1 1 EXTERNAL: 24X LPDR 1 1 NRC PDR NSI C 1 1 TOTAL NUMBER OF CQP IES REQUIRED: LTTR 36 ENCL 35

I

/

0 V(

h I'J

" $ I 6 Ih,'I hQ t,'Q I'F I 1 t

~ j. ~

V W II < I" t

g,ll hw

~~ltll h J-"L II

",'~ I'"W, Y;Qy V 'I), )

l .I >>. 'l II

, II V

h

Washington Public Power Supply System P.O. Box 968 3000 George Washington Way Richland, Washington 99352 (509) 372-5000 ss~s~x02m ss>ioi05000397 PDR ADOCK F PDR November 1, 1985 G02-85-758 Docket No. 50-397 Director of Nuclear Reactor Regulation Attention: Mr. W. R. Butler, Chief Licensing Branch No. 2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Butler:

Subject:

NUCLEAR PLANT NO. 2 DETAILED CONTROL ROOM DESIGN REVIEW (DCRDR)

SUMMARY

REPORT, SUBMITTAL OF Licensing Condition (16) Attachment 2, Requirement 1, to the WNP-2 Operating License, requires submittal of a Detailed Control Room Design Review (DCRDR)

Summary Report, "not later than six months prior to the first refueling outage".

Accordingly, the attached report is submitted.

Copies of the WNP-2 Emergency Operating Procedures (EOPs) that were utilized in the preparation of this report have been included as an additional attach-ment (No. 2). With this submittal, the Supply System considers Licensing Condition (16} Attachment 2, Requirement 1, to be satisfied.

Should you have any further questions, please contact Mr. P. L. Powell, Manager, WNP-2 Licensing.

Very truly yours, G. C. S ensen, Manager Regulatory Programs PLP kit Attachments (2}

cc: RC Barr - BPA JO Bradfute - NRC JB Martin - NRC RV E. Revell - BPA AD Toth - NRC Site y0@~

BLCP8R t b NS Reynolds

J~

I'