Requests Extension to Required Response Time to 880205 for Responding to Violations Noted in Insp Rept 50-397/87-19,per 871216 Telcon
ML17279A744
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/17/1987
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
GO2-87-288, NUDOCS 8712300003
Download: ML17279A744 (5)


Text

REGULATORY INFORNATION DISTRIBUTION SYSTEN (RIDS)

ACCESSION NBR: 8712300003 DOC. DATE: 87/12/17 NOTARIZED: NO DOCKET FACIL: 50-397 WPPSS Nuclear Pro Ject> Unit 2> Washington Public Powe 05000397 AUTH. NANE, AUTHOR AFFILIATION SORENSEN> G. C. Washington Public Power Supply System RECIP. MANE RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Requests extension to required response time to 880205 foT responding to violations noted in Insp rept 50-397/87-19> per 871216 telcon.

DISTRIBUTION CODE:

TITLE: General IEOID COPIES RECEIVED: LTR j ENCL J SIZE:

(50 Dkt)-Insp Rept/Notice of Violation Response NOTES:

REC IP IENT COP IES RECIPIENT COPIES ID CODE/NANE LTTR .ENCL ID CODE/NANE LTTR ENCL PDS PD 1 1 SANWORTH> R 2 2 INTERNAL: ACRS 2 2 AEOD 1 1 DEDRO 1 NRR NORISSEAU> D 1 1 NRR/DLPG/PEB 1 1 NRR/DOEA DIR 1 NRR/DREP/EPB 1 1 NRR/DREP/RPB 2 2 NRR/DRIS DIR 1 1 NRR/PNAS/ILRB 1 - 1 RNAN> J 1 1 OGC/HDS2 1 1 1 1 RES DEPY GI 1 1 RGN5 FILE 01 1 1 TERNAL: LPDR 1 1' NRC PDR NSIC 1 go.

gg fog TOTAL NUNBER OF COPIES REGUlRED: LTTR 23 ENCL 23

Washington Public Power Supply System 3000 George Washington Way. P.O. Box 968 Richland, Washington 99352-0968 (509)372-5000 December 17, 1987 G02-87-288

'ocket'No. 50-397 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Gentlemen:

Subject:

NUCLEAR PLANT NO. 2, LICENSE NPF-21 NRC INSPECTION REPORT 87-19, REQUEST FOR EXTENSION OF RESPONSE TIME

Reference:

Letter, JB Martin (NRC RV) to GC Sorensen (SS)

"NRC Inspection at WNP-2", dated 12/8/87 The reference forwarded the results of the NRC special team Safety System Functional Inspection (SSFI) conducted August 3 28, 1987 at WNP-2 and included a request that the Supply System provide a response to the enclosed violation within 30 days (January 7, 1988). It should be noted that the Supply System has continued to work to resolve those issues identified in the SSFI exit interview. However the Supply System has reviewed the Notice of Violation and considers that in order to provide a quality response an extension to the 30 days is needed; This request for extension is based on the following considerations: The number of violations, although level 4 and 5, will require a much larger effort to assemble, review, and approve than any Notice of Violation previously responded to. Key personnel necessary to ensure an accurate, quality response will be on Holiday throughout the next few weeks, and the plant has just completed a short but intense outage. This combined with the Holiday Season, results in requested and granted vacation time for personnel to both recover from the outage and enjoy the season.

87gpf 7 8 ~Zgpppp3 5ppp397 R P,gOCH PDR can.rid<I Wo . ~pl g pep ICE '/<3 I

Page Two NRC INSPECTION REPORT 87-19, RE(}VEST FOR EXTENSION OF RESPONSE TIME Accordingly, the Supply System hereby requests an extension to the required response time to February 5, 1988.

This request was informally discussed in a telephone conversation, December 16,'987, between Messrs R.-'J. Pate of your staff and P. L. Powell -of the

.Supply System. Should you have further questions, please contact Mr. P. L.

Powell, Manager, WNP-2 Licensing.

Very truly yours, G. C. Sorensen,,Manager Regulatory Programs PLP/bk cc: JB Martin - NRC RV RB Samworth - NRC NS Reynolds - BCPER DL Williams BPA 399 NRC Site Inspector - 901A

'