Responds to NRC 890821 & 0728 Ltrs Re Violations Noted in Insp Repts 50-397/89-06 & 50-397/89-13.Completion Dates Revised.Review of Work Practices Will Be Done by 900201 & single-train Sys Lesson Plans to Be Complete by 891130
ML17285A842
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/31/1989
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-89-202, NUDOCS 8911130295
Download: ML17285A842 (2)


Text

ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8911130295 DOC.DATE: 89/10/31 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION SORENSEN,G.C. Washington Public Power'Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Responds to NRC 890821 6 0728 ltrs re violations noted in Insp Repts 50-397/89-06 & 50-397/89-13.

SIZE:

l DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR ENCL TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 PD SAMWORTH,R INTERNAL: ACRS AEOD 1 AEOD/DEIIB AEOD/TPAD 1 DEDRO NRR SHANKMAN,S 1

. NRR/DEST DIR NRR/DLPQ/PEB 1 NRR/DOEA DIR 11 NRR/DREP/EPB 10 1 NRR/DREP/RPB 10 NRR/DRIS/DIR 1 NRR/PMAS/ILRB12 NUDOCS-ABSTRACT 1 OE L N,J OGC/HDS2 1 G FILE 02 RES MORISSEAU 1 D 1 RGN5 LE 01 EXTERNAL: LPDR NRC PDR NSIC NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM PI-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 26 ENCL Zb

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George ll'ashington N'ay ~ Richland, ll'ashington 99352 October 31, 1989 G02-89-202 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station Pl-137 Washington, D.C. 20555 Gentlemen:

Subject:

NUCLEAR PLANT NO. 2 LICENSE NO. NPF-21 NRC INSPECTION REPORTS 89-06 AND 89-13

Reference:

Letter, G02-89-143, GD Bouchey (SS) to NRC "NRC Inspection Report 89-06", dated August 21, 1989

2) Letter, G02-89-129, GD Bouchey (SS) to NRC "NRC Inspection Report 89-13", dated July 28, 1989 The purpose of this let'ter is to provide revised scheduled completion dates for commitments made in response to Notices of Violation (NOVs) 89-06-09 and 89-13-05. The reason for the revised schedule is that completing the commitments has taken longer than was originally anticipated.

In Reference 1), the Supply System committed to a complete review, of its work practices, including any necessary tr aining required. The action was to be completed in two parts. The review was to be done by November 1, 1989 and the formal programmatic changes were to be accomplished by January 1, 1990. These two dates have been changed to December 1, 1989 and February 1, 1990, respec-tively.

In Reference 2), the Supply System committed to discuss the application of 10CFR 50.73(a)(2)(v), as it applies to single-train systems, during Licensed Operator Requalification Training (Requalification Cycle 89-06, September 4 - October 6, 1989). Although this was presented as part of reportabi lity/compliance issue training briefings during Requalification Cycle 89-05 (July 31 - September 2, 1989)', lesson plans have since been prepared and it is now anticipated that the training will be completed by November 30, 1989.

Very truly yours, G. C. Sorensen, Manager Regulatory Programs JDA/bk cc: JB Martin , NRC RV RB Samworth, NRC NS Reynolds, BCP8R DL Williams, BPA/399 NRC Site Inspector - 901A