ML17347A661
From kanterella
Revision as of 08:27, 22 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
ML17347A661 | |
Person / Time | |
---|---|
Site: | Turkey Point |
Issue date: | 12/10/1987 |
From: | Anderson E FLORIDA POWER & LIGHT CO. |
To: | |
Shared Package | |
ML17347A660 | List: |
References | |
MCI-PTN-300-2, NUDOCS 8712210026 | |
Download: ML17347A661 (2) | |
Similar Documents at Turkey Point | |
---|---|
Category:PRESERVICE & INSERVICE INSPECTION & TEST REPTS
MONTHYEARML17355A3611999-06-30030 June 1999
[Table view]Refueling Outage ISI Rept. ML17355A2201999-01-20020 January 1999 Refueling Outage ISI Rept. ML17354A7491997-10-13013 October 1997 SG Insp Rept. ML17354A5761997-07-10010 July 1997 Refueling Outage ISI Rept. ML17353A7771996-06-20020 June 1996 Refueling Outage,Form NIS-1 Owners Data Rept for Inservice Insps. ML17353A5201996-01-0303 January 1996 Refueling Outage ISI Rept. ML17353A4311995-10-17017 October 1995 Third 10-Yr ISI Interval IST Program for Pumps & Valves. ML17352B0291994-12-31031 December 1994 Refueling Outage ISI Rept. ML17353A3941994-11-23023 November 1994 SG Insp Rept. ML17352A7761994-08-15015 August 1994 ISI Rept. ML17352A7771994-05-10010 May 1994 FP&L Turkey Point Nuclear Plant Unit 3 Refueling Outage 1994 Siemens Power Corp Final Rept. ML17352A2301993-09-0101 September 1993 Third Ten-Year Inservice Insp Program for Turkey Point Nuclear Power Plant Units 3 & 4. ML17352A2001993-08-20020 August 1993 Inservice Insp Rept. ML17349A7541993-03-0909 March 1993 Refueling Outage Inservice Insp Rept. ML17349A2181992-04-14014 April 1992 Rev 4 to Second 10-Yr Inservice Insp Interval - Inservice Testing Program for Pumps & Valves. ML17348B3561992-01-10010 January 1992 ISI Summary Rept,Second Interval,Third Period,First Outage (1991). ML17348B3201991-12-0505 December 1991 ISI Summary Rept Second Interval, Third Period,First Outage (1991) Class 1,All Status Components. ML17348A3201990-05-22022 May 1990 Rev 0 to Final Rept of Inservice Insp NDE of Unisolable Piping Sys & Components for Potential Thermal Stress Effects for Turkey Point Nuclear Power Plant Unit 3. ML17348A5481990-04-0404 April 1990 1990 Inservice Insp Refueling Outage Summary Rept of NDE Activities,900206-0404 First Refueling Outage Second Period Second Insp Interval. ML17347B3441989-09-15015 September 1989 Form NIS-1 Owner Data Rept for Inservice Insps,1987 Unscheduled Outage. ML17347A6621987-12-10010 December 1987 Rev 1 to Inservice Insp Summary Results for Outage 2 (1987) First Period,Second Interval. ML17347A6611987-12-10010 December 1987 1987 Inservice Insp Summary Rept. ML17347A1881986-12-0101 December 1986 Inservice Insp Rept for 860111-0901,describing Results of Eddy Current Exam of Steam Generator Tubes & Data Rept for Repairs or Replacements ML17342A2361985-12-31031 December 1985 1985 Inservice Insp Summary Rept for Turkey Point Nuclear Power Plant Unit 3. ML17346A5111984-09-0404 September 1984 Inservice Insp Rept for 840306-0631.Describes Exams Performed on Reactor Pressure Vessel,Rcs Piping,Auxiliary Spray,Safety Injection Sys Piping,Rhr Piping Boron Injection,Steam Generator & Pressurizer ML17346A2661984-03-30030 March 1984 Inservice Insp Rept on 831001 to 840107,describing Insp of Various Components or Appurtenances ML17345B2111983-08-10010 August 1983 Owners Data Rept for Inservice Insps ML17341B3761982-09-0909 September 1982 Inservice Insp Rept Consisting of Class 1 & 2 Summary Exam Tables for Third Period of Program ML17340A5101980-12-18018 December 1980 Inservice Insp in Nov 1980.Describes Gauging of Steam Generator Hot & Cold Legs,Measurement of Visible Flow Slots,Eddy Current Insp of Small Radius U-bends & Preventive Plugging 1999-06-30 Category:TEXT-SAFETY REPORT MONTHYEARML20217L9371999-10-20020 October 1999
[Table view]Safety Evaluation Supporting Licensee Proposed Alternative from Certain Requirements of ASME Code,Section XI for First 10-Yr Interval Request for Relief for Containment Inservice Insp Program ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3891999-07-20020 July 1999 LER 99-001-00:on 990623,manual Rt from 100% Power Following Multiple Control Rod Drops Was Noted.Caused by Manual Action Taken by Reactor Control Operator.Inspected & Repaired Stationary Gripper Regulating Cards.With 990720 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17355A3611999-06-30030 June 1999 Refueling Outage ISI Rept. ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML20217B9871999-04-0808 April 1999 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408 ML17355A2881999-04-0505 April 1999 COLR for Turkey Point Unit 4 Cycle 18. ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17355A2201999-01-20020 January 1999 Refueling Outage ISI Rept. ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17354B1921998-11-18018 November 1998 LER 98-007-00:on 981020,containment Purge Supply,Valve Opened Wider than TS Limit.Caused by Improper Setting of Mechanical Stops.Incorporated Improved Standard Method of Measuring Angular Valve Position Into Sp.With 981118 Ltr ML17354B1891998-11-0909 November 1998 Simulatory Certification Update 2. ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17354B1591998-10-23023 October 1998 COLR for Turkey Point Unit 3 Cycle 17. ML17354B1361998-10-16016 October 1998 LER 98-004-00:on 980921,automatic Reactor Trip Occurred. Caused by Inadequate re-correlation of Intermediate Range Neutron Flux Instrumentation Reactor Trip Bistable. Enhanced Applicable Plant Procedures.With 981016 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17354B0971998-09-0909 September 1998 Part 21 Rept Re Possible Machining Defect in Certain One Inch Stainless Steel Swagelok Front Ferrules,Part Number SS-1613-1.Caused by Tubing Slipping Out of Fitting at Three Times Working Pressure of Tubing.Notified Affected Utils ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17354B0341998-07-15015 July 1998 LER 98-003-00:on 980619,discovered That Auxiliary Feedwater Sys Was Inoperable Due to Inadequate Inservice Testing of Valves.Caused by Misunderstanding of Testing Criteria.Util Revised Procedures & Verified Operability of Valves ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17354B0171998-06-29029 June 1998 Rev 1 to PTN-FPER-97-013, Evaluation of Turbine Lube Oil Fire. ML17354A9841998-06-18018 June 1998 LER 97-007-01:on 970730,automatic Reactor Trip Occurred Due to Closure of B Msiv.Caused by Failed BFD22S Relay.Six Relays on 3A,3B & 3C MSIVs Were Replaced & Implemented Plant Change to Disable Electronic Trip Function on 3 AFW Pumps ML17354A9741998-06-0909 June 1998 LER 98-002-00:on 980513,discovered Potential LOCA-initiated Electrical Fault Which Places ECCS Outside Design Basis. Caused by Inadequate Review of Effect on non-safety Circuit failures.Re-powered PC-*-600A Relays ML20248F7441998-05-31031 May 1998 Reactor Vessel Working Group,Response to RAI Regarding Reactor Pressure Vessel Integrity ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17354A8511998-03-24024 March 1998 LER 97-009-01:on 971114,discovered That CR Console Switch for 3B Sgfp Was Not in Start Position.Caused by Inadequate Procedural Guidance.Revised Procedures 3/4-OP-074,informed Personnel of Event & Performed Walkdown of CR ML17354B0001998-03-18018 March 1998 Florida Power & Light Topical Quality Asurance Rept, Dtd June 1998 ML17354A8441998-03-18018 March 1998 LER 98-001-00:on 980216,manual Reactor Trip Occurred Due to Loss of Turbine Control Oil Pressure W/Steam Leak in Auxiliary Feedwater Steam Supply Piping.Auxiliary Governor Maint Instructions Will Be revised.W/980318 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17354A7361997-12-12012 December 1997 LER 97-009-01:on 971114,identified That CR Console Switch for 3B SG Feedwater Pump Was Not in Start Position.Caused by Inadequate Procedural Guidance.Procedures 3/4-OP-074,SGFP Were revised.W/971212 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17354A7491997-10-13013 October 1997 SG Insp Rept. ML17354A8851997-10-13013 October 1997 FPL Units 3 & 4 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 960408-971013. ML17354A6801997-10-0808 October 1997 LER 97-008-00:on 970909,containment Sump Debris Screens Outside Design Basis Due to Stress Damage Was Discovered. Caused by Inadequate Procedural Guidance & Personnel Error. Discrepancies Found on Screens corrected.W/971008 Ltr ML17354A6791997-10-0606 October 1997 COLR Unit 4 Cycle 17, for Turkey Point ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr 1999-09-30 |
Text
TURKEY POINT NUCLEAR PLANT UNIT NO. 3 1987 I NSERV I CE I NSPECT I ON
SUMMARY
REPORT COMMERCIAL SERVICE DATE: l4 DECEMBER lgvg DOCKET NO.: 50 250 DOCUMENT NO.: MC I PTN 300 8 FLORIDA POVER AND LIGHI'OMPANY NUCLEAR ENERGY 0 0 CODES AND PROGKQ88 GROUP P. O. BOX i4000 JUNO BEACH, FLORIDA 33408 87i22i0026 05000250 87i2i5'DR ADDCK PDR
"A I
Retrieved from "https://kanterella.com/w/index.php?title=ML17347A661&oldid=1963828"