ML19256G092

From kanterella
Revision as of 12:09, 18 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 79-116/03L-0
ML19256G092
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/20/1979
From: Murray T
TOLEDO EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19256G093 List:
References
L79-1180, NUDOCS 7912270413
Download: ML19256G092 (1)


Text

,

.

.

O CZ. _ . .) TgE00m a k:d2C O N Dec ember 20, 1979 L79-ll80 FILE: RR 2 (NP-33-79-141)

Docket No. 50-346 License No. NPF-3 Mr. James G. Keppler Regional Director, Region III Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

Reportable Occurrence 79-116 Davis-Besse Nuclear Power Station Unit 1 Date of Occurrence: November 23, 1979 Enclosed are three copies of Licensee Event Report 79-116 with a supplemental in-formation sheet which is being submitted in ec cordance with Technical Specification 6.9 to provide 30 day written notification of the subject occurrence.

Yours truly,

'I O'W, G

Terry D. Murray Station Superintendent Davis-Besse Nuclear Power Station TDM/lj k Enclosure cc: Dr. Ernst Volgenau, Director Office of Inspection and Enforcement Encl: 30 copies LER 79-116 Mr. William G. Mcdonald, Director Office of Management Information and Program Control Encl: 3 copies LER 79-116 1643 283

, 7912270 f/3 _S THE TOLEDO ED: SON COMPANY ED'SCN PLAZA 300 MADISON AVENUE TOLEDO. OH 0 43352