ML17285A318

From kanterella
Revision as of 13:16, 17 August 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Provides Revised Schedule Dates for Commitments Made in Response to Violations Noted in Insp Repts 50-397/87-19 & 50-397/88-41.Plant Procedures 10.25.19 & 11.2.1.2 Will Be Issued by 890417
ML17285A318
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/06/1989
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-89-035, GO2-89-35, TAC-63528, NUDOCS 8903140431
Download: ML17285A318 (4)


Text

A.CCELEPXrED Dl<HKBt-'z os DE)do>STR~Tlos SY~Hzx REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)CCESSION NBR:8903140431 DOC.DATE: 89/03/06 NOTARIZED:

NO DOCKET g FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington.Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION SORENSEN,G.C.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Responds to NRC 880727&890203 ltrs re violations noted in Insp Repts 50-397/87-19 S 50-397/88-41.

DISTRIBUTION CODE: IEOID COPIES RECEIVED:LTR 1 ENCL~SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES RECIPIENT ID CODE/NAME PD5 PD INTERNAL: ACRS AEOD/DEIIB NRR SHANKMAN,S NRR/DLPQ/PEB 11 NRR/DOEA DIR 11 NRR/DREP/RPB 10 NRR/PMAS/ILRB12 EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 1 1 2 2 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME SAMWORTH,R AEOD DEDRO NRR/DEST DIR NRR/DLPQ/QAB 10 NRR/DREP/EPB 10 NRR/DRIS DIR 9A NUDOCS-ABSTRACT OGC/HDS2 RGN5 FILE 01 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 R I D S NOrE'IO ALL"RIDS RZCIPIENIS

~PLEASE HELP US TO REDUCE WASTE CONIACI%HE DOCUMENT CONGEAL DESK~ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR KkK FBQM DZPHKBVTIGN LISTS FOR DOCUMENIS YOU DON'T NEEDt TOTAL NUMBER OF COPIES REQUIRED: LTTR 25 ENCL 25 WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George 11'ashington 1Vay~Richland, 11'ashington 99352 March 6, 1989 G02-89-035 Docket No.50-397 U.S.Nuclear Regulatory Commission Attn;Document Control Desk Mail Station Pl-137 Washington, D.C.20555 Gentlemen:

Subject:

NUCLEAR PLANT NO.2 ADDITIONAL RESPONSE TO NOTICE OF VIOLATIONS 87-19-29 AND 88-41-03 i

Reference:

1)Letter, G02-88-168, GC Sorensen (SS)to NRC,"NRC Inspection Report 87-19 Item 29 Instrument Rack Terminations", dated July 29, 1988 2)Letter, G02-89-014, GC Sorensen (SS)to NRC,"NRC Inspection Report 88-41 Response to Notice of Violation", dated February 3, 1989 The purpose of this letter is to provide revised scheduled completion dates associated with commitments made in response to Notice of Violations (NOVs)87-19-29 and 88-41-03.The reason for the following revised schedule is that completing the commitments has taken longer than anticipated when the original responses were submitted.

1)NOV 87-19-29 (Violation C.3)it In the referenced letter (1), the Supply System committed to revise Plant Procedure (PPM)10.25.19,"Termination and Splicing Instruction", to include examples of acceptable crimp configurations.

This action was to be completed by March 15, 1989.The revised procedure is currently in the procedure review process and will now be issued by April 17, 1989.

Page Two ADDITIONAL RESPONSE TO NOTICE OF VIOLATIONS 87-19-29 AND 88-41-03 i 2)NOV 88-41-03 (Violation B)In the referenced letter (2), the Supply System committed to make a pro-grammatic change to the ALARA process to reduce the threshold of those Radiation Work Permits (RWPs)which require a pre-job briefing.This action was also to be completed by March 15, 1989.Plant Procedure 11.2.1.2,"Al ARA Program Implementation", is currently in the process of being revised and now will be issued by April 17, 1989.Very truly yours,~(G.C.Sorensen, Manager Regulatory Programs JDA/bk cc: JB Martin-NRC RY NS Reynolds-BCP8R RB Samwor.h-NRC=DL Williams-BPA/399 HRC Site Inspector-901A