Advises That Program Plan for Detailed Control Room Design Review Will Be Submitted by 840220.Summary Status of Human Engineering Deficiencies to Be Corrected Prior to Exceeding 5% Rated Thermal Power Submitted
ML17277B278
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/24/1984
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Schwencer A
Office of Nuclear Reactor Regulation
References
GO2-84-036, GO2-84-36, NUDOCS 8401310021
Download: ML17277B278 (6)


Text

R EGUlATORY QORNATION OISTRIBUTION SYS+(RIOSI ACCESSION NBRs8401310021 DOC~DATE: 84/01/24 NOTARIZED!

NO DOCKET FACIL:50-397 WPPSS Nuclear Projects Unit 2i Washington Public Powe 05000397 AUTH BYNAME AUTHOR AFFILIATION SORENSENgG<C

~Washington Public Power Supply System RECIP~NAME RECIPIENT AFFILIATION SCHWENCERgAG Licensing Bnanch 2

SUBJECT:

Advises that program plan for detailed control room design review will be, submitted by 840220.Summary status of human engineer ing deficiencies to be corrected prior to exceeding 5X rated thermal power submitted, DlsTRIBUTION cooE: 8001s G0PIEs RKGEIYED:LTR 3, ENcL slzEe TITLE: Licensing Submittal:

PSAR/FSAR Amdts 8, Related Correspondence NOTES: RECIPIENT IO CODE/NAME.

NRR/DL/AOL NRR LB2 LA COPIES LTTR ENCL 1 1 RECIPIENT ID CODE/NAME NRR L02 BG AULUCKgR 01 COPIES LTTR EN 1 1 GL INTERNAL;ELD/HDS2 IE/OEPER/EPB 36 IE/DQAS IP/QAB21" NRR/OE/CEB 11 NRR/DE/EQB 13 NRR/OE/MEB 18 NRR/DE/SAB

'24 NRH/OHFS/HFE840 NRR/DHFS/PSRB NRR/OS I/AEB 26 NRA/OSI/CPB 10 NRR/DSI/ICSB 16 NRR/OS I/PSB 19 NRR/DSI/RSB 23 RGN5 EXTERNAL: ACRS 41.DMB/DSS (AMDTS)LPOR 03-NSIC 05 1 1 1 1 1 1 1 1 1 1 3 IE FILE IE/DEPER/IRB 35 NRR/DE/AEAB NRR/DE/EHEB NRR/DE/GB 28 NRR/DE/MTEB 17 NRR/OK/SGEB 25 NRR/DHFS/LQB 32 NRR/DL/SSPB NRR/DS I/ASB NRR/DS I/CSB 09 NRR/DSI/METB 12 N I/RAB 22 R G FI 04/MIB BNL(AMDTS ONLY)FEMA REP OI V 39 NRC PDR 02 NTIS.1 1 1 1 2 1 1 1 1 1 1 1 1 1 1 1 2 1=-1 1 0 1 1 1 1 0 TOTAL NUMBER OF COPIES REQUIRED: LTTR 53 ENCL 4 w 4 f/i"i H 4 I I 4 1<<IY<<I I IW A I Jl'4lj j II$l'44", I jr ill ,1 f Ijl 4'llIC,<<j Hii, f<<Ij,ll 4, III gijilj."4I 4 i Ij'4 f 4'g<<I),)f 4~$I H 4'<<fli I I'4 4 I>)lj I SI'III,I'Il I'0 II1I (I II ll, wwrlw iilgyi<<I<<HI I y'I'I g 4<<ir1 Ni I 44I I"4<<<<<<'$44 I S f f I>>i If"<'<<jig'g I i'3 4rrjl$<<$)i (I Ij 4 ryg ygllll f rjjg"Ij<<IWI j...rj f rqw I"Iggf,irl IW I IQ ll fl a<<till,)II<<II HI jj6 ii i krll j,j w RQI'1i ea w ee w w 9<<a 4c awa N-I~'jl4 jl~wj jwjjjj il I I<<i jjj<<4 NW IIJl,llIII I I i, IW<<"I lj nfl I~'I1<<I)ii iwifiiif

'jl Ij,,l<<I 4'j<<fllii$<<fj gjgi<<Ili<<wl il Ilail I i<>l<<Ij'I nfl I r Il I w, 44 I Ji,(44 g tt g Jt'I jli l ill l IjjI'I>>HI II"I>>'NI I P, I I vjr I,<<I'irl lip IIII j 4'j>><<i NI tw j<<I,I IWI<<Q I'ji,ii IW<<'iij'I'gi,<<,I wg'rjjj l hf h'(4 If'I<<5'll ,N,l'4<<)I 4 I jj'I ,(X II jl iiij ww 4"1 I, f Hit 4I w 4 I wwk i I<<j,r>>i 4 I iiwjl Q I I I Iil I h,g I,'li>I II I Iij 4'Iii ll 4>>NN I'I$, f>>I<<r 4-, IN i'.ll,l>>lj 4'l g 4'I Wli ij I)H..>><<Ii Washington Public Power Supply System P.O.Box 968 3000 George Washington Way Richland, Washington 99352 (509)372-5000 January 24, 1984 G02-84-036 Docket No.50-397 Director of Nuclear Reactor Regulation Attention:

Mr.A.Schwencer, Chief Licensing Branch No.2 Division of Licensing U.S.Nuclear Regulatory Commission Washington, D.C.20555

Dear Mr.Schwencer:

84013i002i 840i24 PDR ADOCK 05000397 P PDR

Subject:

NUCLEAR PROJECT NO.2 CONTROL ROOM DESIGN

Reference:

WNP-2 Operating License NPF-21 The Reference Attachment 2, Item 1, requires that WNP-2 submit a program plan for a Detailed Control Room Design Review (DCRDR)within 2 months after issuance of the operating license.Submittal of the DCRDR is scheduled for February 20, 1984.In addition, human engineering deficiencies (HED)in the control room are required to be corrected and implemented as listed in Reference Attachment 2, Item 2.The following is a summary status of the deficiencies to be corrected prior to exceedin'g five percent (5A)of rated thermal power: Completion Schedule of HED'Corrections HED Descri tion 3/1/84 3/1/84 3/1/84 Complete Complete Complete Compl ete A 5.17 A 7.15 D 3.59 D 4.23 D 5.40 D 5.44 D.5.46 Inoperative System Status Panels Inoperative TDAS and GDS computer systems Mul tiple-meaning abbreviations, lack of abbrevi ation control Hard-to-operate pushbuttons on controllers Non-standard fuel-zone monitor meter scale, P-601 Identical push button/non-push button status lights, P-820 Identical push button/push button indicator lights, Rod Worth Minimizer, Rod Monitor control subpanels, P-603 1'fi l!IIJ'i'V,".RAGA~"."\'f.'!."~9": 9"5 TG/0'(.!10.".<l.)0 li""U(l 9g,"r'A;>;

gq:-.-g nAi p 03~-0" p,.k)f t'p A.Schwencer Page Two January 24, 1984 CONTROL ROOM DESIGN Completion Schedule of HED Correction HED Descri tion 3/1/84 Complete Complete Complete 3/1/84 3/1/84 D 6.101 D 8.38 D 9.5 E 5.61 E 5.69 F 4.37 Inadequate labeling, Isolation Control, P-601 Non-identical RFW meter groupings for Systems A 5 B, P-840 Inconsistent scales, CW Inlet Plenum Lever Indicator and Controller, P-840 Recorder pointers obscure scale numerals/graduation marks RPY depressurization procedures call for greater reading accuracy than is provided by pressure indicators Switch handles obscure pointers/labels, P-800 Requirement for the correction of the following deficiencies is to be within four (4)months after issuance of the reference operating license.These items are scheduled to be corrected by April 1, 1984.Description summary of these deficiencies are as follows: A 3.4 D 4.22 D 5.49 E 3.71, E 4.27 F 6.115 F 6.116 Audio alarm signal detection and intensity levels Extension handles for throttlable valve controls, P-820 Proper chart paper for Generator Monitor Temperature Recorder, P-820 Inconsistent pushbutton color coding Extension handle for RPS reset switch, P-603 Inconsistent fonts, switch escutcheon legends Inconsistent pushbutton color coding If there are any questions, please contact Mr.P.L.Powell.Manager, WNP-2 Licensing.

Yery truly yours, G.C.Sorensen, Manager Regulatory Programs BDP/tmh cc: R Auluck-NRC WS Chin-BPA AD Toth-NRC Site

~, v f'I E 1~A~4 4~~1