Forwards Crdr & Emergency Procedure Functional Task Analysis Summary Rept & Emergency Operating Procedures, Including Rev 1 to Procedure 5.0.0, Emergency Procedure General Precautions.
ML17278A470
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 11/01/1985
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Butler W
Office of Nuclear Reactor Regulation
Shared Package
ML17278A471 List:
References
GO2-85-758, NUDOCS 8511110262
Download: ML17278A470 (4)


Text

I REGULATO~INFO'TION DISTR I BUT ION STEM (R IDS)ACCESSION NBR: B511110262 DOC.DATE: 85/11/01 NOTARI ED: NO DOCKET 8 FAC IL: 50-397 WPPSS Nuclear Pro Jecti Unit 2>Washington Public Pore 05000397 AUTH.NAME AUTHOR AFFILIATION SORENSENI G.C.Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION BUTLERI W.R.Licensing Branch 2

SUBJECT:

Forwards"CRDR'5 Emergency Procedure Functional Task Analgsis Summary Rept" 9~emergency operating proceduresi including Rev 1 to,Procedure 5.0.OI"Emergencu Procedure General Precautions.

" DISTRIBUTION CODE: AOOBD COPIEB RECEIVED: LTR+ENCL~BIIE: TITLE: OR/Licensing Submittal:

Supp I 1 to NUREQ-0737(Generic Ltr 82-33)NOTES QL: 12/20/83 05000397 REC IP IENT ID CODE/NAME NRR LB2 BC COPIES LTTR ENCL 7 7 RECIPIENT ID CODE/NAME COPIES LTTR ENCL , INTERNAL: ADM/LFMB NRR PAULSONI N NRR/DHFS/PSRB NRR/DL/QRB5 NRR/DSI/ICSB

~l NRaj B ES EXTERNAL: 24X NRC PDR 1 0 1 1 2 2 5 5 1 1 1 1 1 1 IE/DEPER/EPB NRR/DHFS/HFEB NRR/DL/ORAB NRR/DS I/CPB NRR/DSI/METH NRR/DS I/RSB RGN5 LPDR NSI C 3 3 5 5 1 1 1 1 1 1 1 1 1 1 1 1 1 TOTAL NUMBER OF CQP IES REQUIRED: LTTR 36 ENCL 35 I/0 V(h I'J"$I 6 Ih,'IhQ t,'Q I'F I 1 t~j.~V W II<I" t V h J-"L II",'~I'"W, Y;Qy;::l.I>>.'l g,ll hw~~ltll'I),)II , II V h Washington Public Power Supply System P.O.Box 968 3000 George Washington Way Richland, Washington 99352 (509)372-5000 ss~s~x02m ss>ioi PDR ADOCK 05000397 F PDR November 1, 1985 G02-85-758 Docket No.50-397 Director of Nuclear Reactor Regulation Attention:

Mr.W.R.Butler, Chief Licensing Branch No.2 Division of Licensing U.S.Nuclear Regulatory Commission Washington, D.C.20555

Dear Mr.Butler:

Subject:

NUCLEAR PLANT NO.2 DETAILED CONTROL ROOM DESIGN REVIEW (DCRDR)

SUMMARY

REPORT, SUBMITTAL OF Licensing Condition (16)Attachment 2, Requirement 1, to the WNP-2 Operating License, requires submittal of a Detailed Control Room Design Review (DCRDR)Summary Report,"not later than six months prior to the first refueling outage".Accordingly, the attached report is submitted.

Copies of the WNP-2 Emergency Operating Procedures (EOPs)that were utilized in the preparation of this report have been included as an additional attach-ment (No.2).With this submittal, the Supply System considers Licensing Condition (16}Attachment 2, Requirement 1, to be satisfied.

Should you have any further questions, please contact Mr.P.L.Powell, Manager, WNP-2 Licensing.

Very truly yours, G.C.S ensen, Manager Regulatory Programs PLP kit Attachments (2}cc: RC Barr-BPA JO Bradfute-NRC JB Martin-NRC RV E.Revell-BPA AD Toth-NRC Site NS Reynolds-BLCP8R y0@~t b J~I'