Informs That Evaluation of Work Control Program & Trend Analysis Program & Changes to Root Cause Failure Procedure Complete,Per Insp Repts 50-528/86-33,50-529/86-32 & 50-530/86-26.Root Cause Failure Policy Expected on 870901
ML17300A752
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 04/04/1987
From: VAN BRUNT E E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: MARTIN J B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
102-00318-EEVB, 102-318-EEVB, NUDOCS 8704200501
Download: ML17300A752 (6)


Text

REGULATOR Y I NFORHAT I ON D I STR I BUT I ON SYSTEN (R I DS),>ACCESSION NBR: 8704200501 DOC.DATE: 87/04/04 NOTARIZED:

NO FACIL: STN-50-528 Palo Verde Nuclear Station>Unit 1>Arizona Pub li STN-50-529 Palo Ver de Nuclear Station.-Uni t 2>Ari zona Pub li STN-50-530 Palo Verde Nuclear Station>Unit 3>Ari zona Publi TH.N*NE AUTHOR AFFIL I AT ION N BRUNT>E.E.Ari zona Nuclear Pouer Prospect (formerly Ari zona Public Serv REC IP.Nhl'!E RECIPIENT AFF IL I AT I ON-NARTIN>J.B.Regi on 5>Of f ice of Director

SUBJECT: Informs that corrective actions re Insp Repts 50-528/86-33>

50-529/86-32 8<50-530/86-26>

scheduled for completion on 870401>complete.PolicM on root cause of failure exp ected bg 870901.Changes to root cause of failure policy comp lete.DISTRIBUTION CODE: IE01D COPIES RECEIVED: LTR ENCL SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES: Standardized plant.N.Davis h!RR: 1Cg.Standardi zed plant.Y>.Davis>NHR: 1Cg.Standardized plant.N.Davis>NRR: iCg.05000528 0500052'5000530 RECIPIENT ID CODE/NAI'!E PD5 LA LICITRA, E INTERNAL: ACRS DEDRQ NRR ROE i'!.L NRR/DOEA DIR NRR/DREP/RPB PilAS/ILRB RE(: F I F)L E 01 EXTERNAL: LPDR NSI C NOTES: COPIES LTTR ENCL RECIPIENT ID CODE/NA>~!8 PD5 PD DAVIS>N AEOD..EN"-LIEBERNAN NRR/ADT NRR/DREP/EPB t'!RR/DRIS DIR OQC/HDS1 RES SPEIS>T NRC PDR COPIES LTTR ENCL TOTAL NU>1BER OF COPIES REQUIRED: LTTR 25,ENCL

Arizona Nuclear Power Project P.o.BOX 52034~PHOENIX, ARIZONA 85072-2034 102-00318-EEVB/TDS April 4, 1987 U.S.Nuclear Regulatory Commission Region V 1450 Maria Lane, Suite 210 Walnut Creek, California 94596-5368 Attention:

Subject: Mr.John B.Martin Regional Administrator Palo Verde Nuclear Generating Station (PVNGS)Unit 2 Docket No.STN 50-529 (License NPF-51)Response to Notice of Violation 50/529/86-32-04 File: 87-070-026 D.4.33.2 87-056-026 Reference: (a)ANPP-39745-EEVB/TDS, dated January 19, 1987;Response to Notice of Violation 50-529/86-32-04 (b)'etter from J.B.Martin, NRC to E.E.Van Brunt, Jr., ANPP, dated December 19, 1986.Subject: NRC Inspection Report Nos.50-528/86-33; 50-529/86-32; 50-530/86-26.

Dear Sir:

Attachment No.3 of Reference (a')in response to Reference (b), stated that an evaluation would be conducted of the work control program and the trend analysis program.Based on the results of the evaluations, necessary procedural controls would be established or revised as necessary to ensure thorough corrective action is initiated for conditions adverse to quality.Reference (a)stated these actions were expected to be completed by April 1, 1987.The evaluations have been completed along with changes to the Root Cause of Failure procedure.

However, the ANPP Policy on Root Cause of Failure is now expected to be completed by September 1, 1987.8704200501 870404 PDR ADOCK 05000528 8 PDR i

Mr.John B.Martin Palo Verde Nuclear Generating Station Page 2 of 2 The Quality Assurance Department is continuing to track the resolutions to the identified concerns via their Corrective Action Report.Very'truly yours, E.E.Van Brunt, Jr.Executive Vice President Project Director EEVB/TDS/cld Attachments cc: J.G.Haynes A.C.Gehr R.P.Zimmerman E.A.Licitra S.Richards