IR 05000528/1986026

From kanterella
Jump to navigation Jump to search
Forwards marked-up Draft NRC Info Notice Entitled Control of Hot Particle Contamination at Nuclear Power Plants, Per 870626 Request.Issuance of Notice Suggested.W/O Encl. Portion of NRC Insp Rept 50-528/86-26 Also Encl
ML20235T710
Person / Time
Site: Palo Verde
Issue date: 07/16/1987
From: Dan Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Liza Cunningham
Office of Nuclear Reactor Regulation
Shared Package
ML20235T620 List:
References
FOIA-87-377 NUDOCS 8710130187
Download: ML20235T710 (2)


Text

-,

/

JUL 161987

-

.

I MEMORANDUM FOR:. LeMoine J. Cunningham, Acting Chief Radiation Protection Branch Division of Radiation Protection and Emergency Preparedness-Office of Nuclear Reactor Regulation FROM:

Douglas M. Collins, Chief

'

Emergency Preparedness and Radiological Protection Branch Division of Radiation Safety and Safeguards

.

SUBJECT:

COMMENTS ON NRC INFORMATION NOTICE " CONTROL OF HOT PARTICLE CONTAMINATION AT NUCLEAR POWER PLANTS"

[

This is in response to your memorandum dated June 26, 1987, requesting comments'

on the subject draft information notice.

We suggest the issuance of this information notice to provide additional information and guidance to the y

nuclear power industry. Our specific comments'are enclosed on a marked-up copy

'

of the draft information notice.

If you have any questions please give me or Charles M. Hosey a call.

l Douglas M. Collins Enclosure:

Marked-up Draft of NRC Information Notice bcc w/ enc 1:

l

-'

R. Bellamy, RI W. Shafer, RIII L. Yandell, RIV F. Wenslawski, RV J. Wigginton, NRR RII i

,

x

- '

K.

k' f87

\\ - ~

,

8710130187 BMW DON 377 PDR l

PD

$1 L_______m_-_______

_ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ - _.

.

,

,

Ig l

)

,

,,

v-

.

s.

.

,

,

(Closed) Follow-up Iterr. (05-14-86). Suspected sabotage of off-site equipment.

The licensee reported that on May 14, 1986, between 8:58 p.m.

and 9:23 p.m., May 14, 1986, three of the four licensee offsite high voltage trans;nission lines tripped of f-line.

The licensee did not identify any problems in their switchyard, nor at their towers within the owner controlled area.

Throughout the evening of May 14/15, 1986 all attempts to try and locate the cause of the power outage met with negative results.

On May 15, 1986, cable slings were discovered tied to towers of the high voltage transmission lines, each located between 25-35 miles from the site.

On May 15, 1986, the FBI arrived at the site of the first transmission line and assumed charge of the investigation.

The FBI is continuing their investigative efforts with assistance from NRC Office of Investigation (0I).

All relevant information, as it becomes available, is being forwarded to the FBI.

Due to 01's direct involvement in this case, this event is administratively closed in this inspection report.

No inspection efforts are required in support of this event.