ML17305A887

From kanterella
Jump to navigation Jump to search
Advises That Fuel Pool Cooling & Cleanup Procedures Being Restructured,Per Response to Violations in Insp Repts 50-528/89-36 & 50-530/89-36
ML17305A887
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 06/14/1990
From: Conway W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9006200341
Download: ML17305A887 (6)


Text

ACCELERATED DISTRIBUTION DEMONSTFWTION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

CESSION NBR:9006200341 DOC.DATE: 90/06/14 NOTARIZED: NO DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit, 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH. NAME AUTHOR AFFILIATION CONWAY,W.F. Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Discusses "Fuel Pool Cooling 6 Cleanup" procedures in repsonse to violation noted in IR 50-528/89-36. D DISTRIBUTION CODE: AOOID TITLE: OR COPIES RECEIVED:LTR Submittal: General Distribution g ENCL IP SIZE:

NOTES: 05000528

/

Standardized plant. 05000529 A Standardized plant. 05000530 D

RECIPIENT COPIES RECIPIENT COPIES D ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA PD5 PD PETERSON,S. CHAN,T INTERNAL: ACRS NRR/DET/ECMB 9H NRR/DOEA/OTSB11 NRR/DST 8E2 NRR/DST/SELB 8D NRR/DST/SICB 7E NRR/DST/SRXB 8E NUDOCS-ABSTRACT RGFEOl OGC/HDS 1 RES/DSIR/EIB EXTERNAL: LPDR NRC PDR NSIC NOTES:

D D

NOTE TO ALL "RIDS" RECIPIENTS PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISI'RIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TAL NUMBER OF COPIES REQUIRED: LTTR 33 ENCL

I Arizona Public Service Company P.O. BOX 53999 ~ PHOENIX, ARIZONA 85072-3999 WILLIAMF. CONWAY 102-01731-WRF-TRB/JJN EXECUTIVEVICEPRESIDENT June 14, 1990 NUCLEAR U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Reference:

Letter from W. F. Conway, Executive Vice President Nuclear, Arizona Public Service, to U. S. Nuclear Regulatory Commission, dated November 21, 1989

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 1, 2, and 3 Docket No. STN 50-528 (License No. NPF-41)

Docket No. STN 50-529 (License No. NPF-51)

Docket No. STN 50-530 (License No. NPF-74)

Reply to Notice of Violation 50-528/89-36-01 and 50-530/89-36-'03 File: 90-070-026 As discussed in the referenced letter, the "Fuel Pool Cooling and Cleanup" procedures are being restructured to provide separate instructions for each mode of system operation. The procedure development expanded in scope to include all of the system's designed modes of operation. These procedures are being developed to enhance the administrative control for valve alignment rather than relying on special valve alignment sheets.

The procedures which have been identified and drafted are:

1) 4xOP-xPC01, "Spent Fuel Pool Cooling"
2) 4xOP-xPC02, "Filling 6 Draining of the Refueling Pool Using CS 6 LPSI Pumps"
3) 4xOP-xPC06, "Spent Fuel Pool Cleanup and Transfer"
4) 4xOP-xPC07, "Refueling Pool Cleanup and Transfer"
5) 4xOP-xPC08, "PC System Filter and Ton Exchanger Operations" (x- 1, 2, and 3 for Units 1, 2, and 3)

These procedure revisions are expected to be completed by August 20, 1990.

00

',90062 pp~ijj 900614 PDR ADDoc@ 05000528 PDC 0

V I

P t

i

Document, Control Desk 102-01731-WFC-TRB/JJN Page 2 June 14, 1990 Should you have any questions regarding this response, please contact me.

Very truly yours, WFC/TRB/JJN/tlg cc: J. B. Martin D. H. Coe T. L. Chan A. C. Gehr A. H. Gutterman

a '\