Forwards Schedule Reiterating Util Plans for Implementation of USIs A-9 & A-44 & Provides Current Forecast Refuel Dates
ML17305A908
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 06/25/1990
From: Conway W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
REF-GTECI-A-09, REF-GTECI-A-44, REF-GTECI-EL, REF-GTECI-SY, TASK-A-09, TASK-A-44, TASK-A-9, TASK-OR 161-03303-WFC-G, 161-3303-WFC-G, NUDOCS 9007050188
Download: ML17305A908 (8)


Text

ACCELERATED ISTMBUTION DEMONSTPATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9007050188 DOC.DATE: 90/06/25 NOTARIZED: NO DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH. NAME 'UTHOR AFFILIATION CONWAY,W.F. Arizona Public Service Co. (formerly Arizona Nuclear Power R RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

I

SUBJECT:

Forwards schedule reiterating util plans for implementation of USIs A-9 6 A-44 6 provides current forecast, refuel dates. D DISTRIBUTION CODE A001D COPIES RECEIVED:LTR ENCL SIZE TITLE: OR Submittal: General Distribution NOTES 05000528

/

Standardized plant. 05000529 A Standardized plant. 05000530 D

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL .ID CODE/NAME, LTTR ENCL D PD5 LA 1 1 -'D5 PD 1 1 PETERSON,S. 5 5 CHAN,T 5 5 S INTERNAL: ACRS 6 NRR/DET/ECMB 9H 1 1 NRR/DOEA/OTSBl1 1 NRR/DST 8E2 1 1 NRR/DST/SELB 8D 1 NRR/DST/SICB 7E 1 1 NRR/DST/SRXB 8E 1 NUDOCS-ABSTRACT 1 1 OGC/HDS1 1 0 RES/DSIR/EIB 1 1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 1 NOTES 1 1 D

D D

NOTE TO ALL "RIDS" RECIPIENTS:

S.

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 33 ENCL 31

Oi iii O~'

Arizona Public Service Company P.O. BOX 53999 ~ PHOENIX, ARIZONA850724999 WILLIAMF. CONWAY 161-C8303-M!C/CAN EXECUTIVEVICEPRESIOENT June 25, 1990 NUCLEAR Docket Nos. STN 528/529/530 Document Control Desk U. S. Nuclear Regulatory Commission Mail Station Pl-37 Washington, D. C. 20555

References:

(1) Letter from W. F. Conway, APS, to Document Control Desk, NRC, "Information Concerning Status of Implementation of Unresolved Safety Issues,"

dated November 27, 1989 (2) Letter from Sheri R. Peterson, NRC, to William F. Conway, APS, "Unimplemented Unresolved Safety Issues at Palo Verde Nuclear Generating Station (TAC No. 75438),"

dated March 16, 1990 (3) Letter from Terence L. Chan, NRC, to W. F. Conway, APS, "Response to Generic Letter 89-19, 'Safety Implication of Control Systems in LWR Nuclear Power Plants,'VNGS (TAC Nos. 74975, 74976 and 74977)," dated May 9, 1990

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Unimplemented Unresolved Safety Issues File: 90-056-026 Arizona Public Service Company (APS) has reviewed Reference 2 concerning unimplemented unresolved safety issues (USIs) and concurs that USIs A-9 and A-44 have not been fully implemented at PVNGS. However, the implementation dates listed are inconsistent with the PVNGS forecast dates. This disparity may have occurred because the USI implementation dates provided to the staff by APS in Reference 1 were in terms of refueling outages without calendar dates.

The attachment to this letter reiterates our schedule for implementation of USIs A-9 and A-44 and provides the current forecast refueling dates.

9007050188 5'00625 PDR ADOCK 05000528 P PDC

~I ~ i C ~ ~ I

~

Document Control Desk 161-OX'Z/GAN U. S. Nuclear Regulatory Commission June 25, 1990 Page 2 In the Safety Evaluation Report transmitted by Reference 3, the staff has determined that USI A-47. is no longer an issue for PVNGS.

If you have any questions regarding this clarification, please contact R. A. Bernier of my staff at (602) 340-4295.

Sincerely, WFC/GAM/j le Attachment cc: J. B. Martin D. H. Coe T. L. Chan S. R. Peterson A. C. Gehr A. H. Gutterman

.i ~

ATTACHMENT Schedule for Im lementation of Incom lete USIs USI Title Estimated Im lementation Date A-9 Anticipated Transients Unit 1 - Third Refueling Without Scram (ATWS) Unit 2 - Third Refueling Unit 3' Second Refueling A-44 Stati:on Blackout Unit 1 - Fourth Refueling Unit 2 - Fourth Refueling Unit 3 - Third Refueling Forecast Refuelin Dates U-1 Third Refueling  : June, 1992 Fourth Refueling  : December, 1993 U-2 Third Refueling January, 1992 Fourth Refueling July, 1993 U-3',Second Refueling  : 'September, 1991 Third Refueling  : March, 1993'

4~ I

~ I dj ~ ~ . ~

I N