Forwards fitness-for-duty Semiannual Performance Rept for Period of Jan-June 1990,per 10CFR26.71(d)
ML17305B028
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 08/27/1990
From: Conway W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
161-03432-WFC-K, 161-3432-WFC-K, NUDOCS 9009060204
Download: ML17305B028 (18)


Text

ACCELERATED DISTRIBUTION DEMONS TION SYSTEM REGULATO INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9009060204 DOC.DATE: 90/08/27 NOTARIZED: NO DOCKET FACZL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH. NAME AUTHOR AFFILIATION CONWAYiW.F. Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards util fitness, for, duty semiannual performance rept for period of Jan 1990 June 1990,.---

DISTRIBUTION CODE: AOOZD COPIES RECEIVED:LTR  ! ENCL  ! SIZE:

TITLE: OR Submittal: General Distribution NOTES:STANDARDIZED PLANT 05000528 Standardized plant. 05000529 Standardized plant. 05000530 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA 1 1 PD5 PD 1 1

".PETERSONiS. 2 '2 TRAMMELLiC. 2 2 INTERNAL: ACRS 6 6 NRR'/DET/ECMB 9H 1 1 NRR/DOEA/OTSB11 1 1 'NRR/DST 8E2 1 1 NRR/DST/SELB 8D 1 1 NRR/DST/SICB 7E 1 1 NRR/DST/SRXB 8E 1 1 NUDOCS-ABSTRACT 1 1

- +>AM 1 0 OGC/HDS1 1 0 REG FILE 01 1 1 RES/DSIR/EIB 1 1 EXTERNAL: NRC PDR 1 1 NSIC 1 1 NQTEs: ~~~)~~re/k~6IQ 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 26 ENCL 24

I 'll

~ l 1 hler

~I P

h r t

Arizona Public Service Company P.O. BOX 53999 ~ PHOENIX, ARIZONA 85072<999 WILLIAMF. CONWAY EXECUTIVEVICE PRESIDENT 161-03432-WFC/KLNC NUCLEAR August 27, 1990 Docket Nos. STN 50-528/529/530 Document Control Desk U. S. Nuclear Regulatory Commission Mail Station Pl-37 Washington, D. C. 20555

Dear Sirs:

Sub] ect: Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2 and 3 Fitness-for-Duty Semiannual Performance Report File: 90-056-026 I

Pursuant to 10 CFR 26.71(d), the Attachment to this letter provides the Arizona Public Service (APS) Fitness-for-Duty semiannual performance report for the period of January 1990 through June 1990.

If you340-4041.

have any questions concerning this matter, contact Mr. A. C. Rogers at (602)

Sincerely, 9009060204 900827 i PDR R

ADOCK 05000528 PNU WFC/RAB/KLMC Attachment cc: J. B. Martin L. L. Bush D. H. Coe A. C. Gehr A. H. Gutterman gu/ g+ Jgg (I(g/g lpgplf ( (

il(

Ig La C

ARIZONA PUBLIC SERVICE FITNESS-FOR-DUTY PROGRAM PERFORMANCE REPORT January 1990 through June 1990 Introduction APS'ear-to-date statistics demonstrate that the implementation of the Fitness-for-Duty program has been successful in maintaining a drug-free work .place. The number of confirmed positive test results has dropped significantly since the Fitness-for-Duty Rule (10 CFR Part 26) became effective. APS credits,a major portion of this success,to good communication, enhanced awareness and education.

These efforts were made by APS and our contractor companies.

Anal sis of Pro ram Results We have performed a statistical breakdown of the confirmed positive drug test results by the reason for the test and the type of drug as follows.

Pre-badge Testing:

14 Marijuana 1 Amphetamine 1 Cocaine 2 Alcohol 18 Total Comments: A total of 1,695 individuals were pre-badge tested. All positive pre-badge drug test results involved contractor employees. Outages during this time period necessitated a large number of pre-badge tests. A conclusion that could'be reached by these statistics is that education plays .an important role in the Fitness-for-Duty Program implementation.

For Cause Testing:

1 Alcohol Comments: Based upon a combination of behavioral'bservation and allegation investigation, APS tested 17 individuals for cause during this reporting period. There was one positive alcohol test result from a contractor employee.

Random Testing:

1 Alcohol 1 Amphetamine 3 Cocaine 5 Total

4 FFD Program Performance Report January through June, 1990 Page Two Comments: 2,042 individuals were tested during this reporting period.

All positive random drug test results involved contractor personnel. Four out of the five tested positive on their first random test, one individual tested positive after the second random test (one month after the first test).

Post Accident Testing:

One 'test was,performed during this reporting period; the test result was negative.

Follow-Up Testing:

Prior to the implementat'ion of the Fitness-for-Duty Rule (10 CFR Part 26),

APS'ad implemented a one-year follow-up testing program for those APS employees who had a positive drug test. As of January 1990, there were six employees under the old'rogram. At the end of this reporting period, three employees remained in that program.

Effective January 1990, APS implemented a three year follow-up testing

,program for APS employees who 'test positive for alcohol (first occurrence only). The follow-up testing program was expanded to include those individuals for whom '"suitable inquiry" reveal'ed a single confirmed posi.tive drug or alcohol test three or more years prior to the date .access was requested. Under this program, a total of 65 tests were administered during this reporting period. At the end of the reporting period, nine individuals were .under .the follow-up testing program based on the results of the "suitable inquiry". Of those nine individuals, two are APS employees and, seven, are contractors. No one under the follow-up testing program tested positive during this reporting period.

Other Testing:

2 Refusal to take test (contractor)

APS management action in each case of a'confirmed positive test result or refusal was to remove the contractor from the site by revoking site access. Any individual who has had only one positive test is, eligible to reapply after, three years.

IIl 4

FFD Program Performance Report January through June, 1990 Page Three Challen es to the Fitness-for-Dut Pro ram A QA audit during early implementation of the program identified deficiencies in connection with the off-site laboratory. In order to correct these deficiencies, actions were taken to select a new off-site laboratory. However, problems with the reporting methods of this laboratory occurred, so additional action was,taken to select another laboratory. Therefore, since June, Nichols Institute was selected as the primary laboratory with Smith Kline contracted as the backup laboratory.

APS had originally specified 300 ng/ml as the screening cut-off level for methamphetamines. Nichols advised us that it could not adopt that level because it uses a new monoclonal reagent specifically designed to detect methamphetamines and manufactured to calibrate to the DHHS screening cut-off of 1000 ng/ml. Both the manufacturer of the reagent (SYVA) and Nichols studied the problem and suggested that we could revise our cut-off level to 1000 ng/ml without compromising the program's effectiveness. Since the reagent contains two anti-bodies, one to detect methamphetamines at 1000 ng/ml and one to detect amphetamines at 300 ng/ml, we now specify those two screening cut-off levels.

APS learned that an off-site laboratory had erroneously reported that two specimens were positive for marijuana. This discovery was made when the Medical Review Officer (MRO) requested quantitative results from the lab in the course of preparing the semiannual report for the NRC. That information showed that the GC/MS (gas chromatography/mass spectrometry) results for two specimens had levels less than 15 ng/ml (the specified cut-o'ff level for confirmatory tests) but had been reported to us as a positive. The individuals in question did not pursue the appeal process when notified that their tests were positive. APS has advised these individuals that their test results were negative and that our records had been corrected.

During the reporting period, no performance problems have been identified in connection with the blind performance specimens sent to any of the off-site laboratories which have been used by PVNGS.

APS has learned which is large that it is imperative enough and flexible to contract with an experienced laboratory to handle our special needs. We are enough also convinced that reliance on a laboratory's certification by DHHS must be supplemented by close monitoring of laboratory performance.

Summar of Pro ram Chan es Changes to the existing Fitness-for-Duty program have been made and are planned which, we believe, will improve the overall effectiveness. of the program.

Completed Actions:

1. New procedures were developed to implement Part 26 and these procedures have been revised to further enhance the program.

I

~ (

4 1

FFD Program Performance Report January through June, 1990 Page Four

2. Additional measures were taken to improve the security at the collection/testing facility located at the Palo Verde site.
3. Personnel changes have been made in the program administration to achieve closer supervision of the collection and testing area and to increase the level of regulatory/compliance experience within the group.

The annual requalification training for supervisors in behavioral observation has been placed on the Palo Verde computer based training system. This will help ensure consistent application of the training requirements.

A collection facility has been established in Phoenix to accommodate those individuals who are located at our corporate offices. This will facilitate testing of those individuals who have infrequent access to the protected area.

Planned Actions:

Chain of custody forms with bar coding will be added to the program within the next eight to ten weeks. This will help reduce the potential for human error in data entry at the lab.

APS is planning to provide a new brochure which will again inform our personnel about our Employee Assistance and Fitness-for-Duty Programs.

Conclusions The first six months of our program show progress towards achieving a drug-free work place. The results of the drug testing program are showing evidence of this. Of the 2,'042 individuals randomly tested, five individuals, all contractor personnel, had positive test results. A good communication effort was made prior to the implementation of the program, and efforts continue to educate employees about the Fitness-for-Duty policy.

Re ortable Events Events reported by phone to NRC: 1 Total Summary of Event: On June 12, 1990, at 1832 hours0.0212 days <br />0.509 hours <br />0.00303 weeks <br />6.97076e-4 months <br />, 5.51 grams of marijuana were found by a security investigator in a locker located in a trailer within the protected area of Unit II. The search of the locker was prompted by an anonymous call to security. The caller indicated he had seen the substance placed in the locker by a mechanic (contractor employee). As a result of the investigation the individual's site access to Palo Verde was terminated.

ll Fitness for Duty Program Performance Data Personnel Subject to 10CFR 26 Arizona Public Service Conlpa ny 6 Hontha, Ending Palo Verde Nuclear Generatin Station PVNGS Location Jeanne Robertson, FFD Administrator (602) 393-7465 Contact nano Phono (inclndo azoa- codo)

Cutoffs: Screen/Con6rmation (ng/ml) C] Appendix A to 10CFR 26 Marijuana 20 /'5 Amphetamine 300 / 300 Benzodiazepines 3QQ ./ 3QQ

'Cocaine 300 / 150 Methamphetamineq ppp/ 3pp Barbiturates 3pp / 3pp Opiates 3pQ / 3pQ Phencyclidine 25 / 25 Alcohol (% of BAC) 04'esting Long Term Short Term Results Licensee Employees Contractor Contractor Personnel Personnel Average Number with Unescorted Access 2 234 ¹ N/A 1 546

¹ Referred Access

¹'ositive Categories Tested Positive to EAP Restored Tested Tested Positive Pre-badging 175 0 N A N A For cause 3 0 N/A N/A 14 Post accident 0 0 N A N A Random 1,202 0 N/A N/A 840 Follow-up 57 0 N/A N/A 0 Other (Ref usal ) 0 0 N/A N/A Total 1,437 0 N/A N/A 2,385 26

I ~ ~

Random Testing Program Results Individuals Tested 1989 1990 1991 1992 1993

¹ Positive

¹ Tested 2,042

% Positive 0.2X Graph of

% Positive Confirmed Positive Tests for Specific Substances Marijuana 14*

Cocaine Opiates Amphetamines Phencyclidine Alcohol Barbiturates Benzodiazepines

I, c

'r A

Note: The results reported with the / indicate, on the left, the number of tests which would have been reported's positive using. the NRC cut-off level, while, the number on, the right indicates the positive results using the APS cut-off level.

  • APS uses different cut-off levels than the NRC for several drugs. If the NRC screening cut-off level (100 ng/ml) for marijuana had'been used in the testing program instead of the APS cut-off level (20 ng/ml), five individuals would not have tested positive for marij'uana.
    • One pre-badge individual tested positive for two substances,. marijuana and cocaine.